STRUKTUR
BETON I
V.A
V.B
V.C/
V.D
V.E
DIK : SUATU PLAT LANTAI TERLETAK DIATAS TIGA TUMPUAN A,B dan CPLAT
DIBEBANI BEBAN MATI (DL)/FINISHING = 0,5 kN/m² dan BEBAN HIDUP (LL) = 4 kN/m²
(Gbr) DATA PERHITUNGN : f’c = 25 Mpa (250 Kg/Cm²)
f’y = 400 Mpa (4.000 Kg/Cm²).
DIMINTA HITUNG : a. Pembesian Plat
PENYELESAIAN
:
= L/24 = 4800/24 = 200 mm diambil = 20 Cm
L = 4.560 + 2 x ½ 240 = 4.800 mm
1. Tentukan Lebar bentang
2. Tentukan tebal plat
24
0
24
0
4.560
h
GAMBAR PLAT
B
A
24
0
4.560
Wu= 1,2 x WD + 1,6 WL
WD = Berat sendiri Plat = 0,20 x 24 kN/m³ = 4,8 kN/m²
WD = Berat Finishing lantai = 0,5 kN/m²
JUMLAH WD = 5,3 kN/m²
Wu= 1,2 x 5,3 + 1,6 x 4 = 12,8 kN/m² ( 1.280 kg/m²)
3. HITUNG BEBAN
MA = MC = 1/24 x Wu x L²
MA = MC = 1/24 x 12,8 x (4,8)² = 12,3 kNm (1.230 kgm)
4. HITUNG MOMEN TUMPUAN
5. HITUNG M0MEN LAPANGAN
M lap AB = 1/11 x Wu x L²
Mlap AB= 1/11 x 12,8 x (4,8)² = 26,8 kNm (2.680 kgm)
MB = 1/9 x Wu x L²
MB = 1/9 x 12,8 x (4,8)² = 32,8 kNm (3.280 kgm)
Penutup beton Tabel = 20 mm = 2 Cm
diameter tulangan Ǿ = 12 mm = 1,2 Cm
6. Hitung Tulangan
d = h - a - 1/2 Ǿ = 200 - 20 - 1/2 x12 = 174 mm
Mu
bx d²
12,3
1,0 x (0,174 )²
= 406 kN/m² LIHAT TABEL SNI
7. MOMEN JEPIT TAK TERDUGA (MA = MC)
MA = MC = 12,3 kNm
Menurur Tabel di Interpolasi
400 = 0,0013
406 = ρ
500 = 0,0016
6
100 0,0003 6/100 x 0,0003 + 0,0013 = 0,0013
As = 0,0013 x1,0 x 0,174 x = 226 mm² ( 2,26Cm²)
PAKAI BESI Ǿ 8 – 200 mm = 251 mm² > 226 mm²
8. MOMEN LAPANGAN BENTANG (MLapAB = Mlap BC)= 26,8 kNm
Mu
bx d²
26,8
1,0 x (0,174 )²
= 885 kN/m²
Menurur Tabel di Interpolasi
800 = 0,0026
885 = ρ
900 = 0,0029
85
100 0,0003 85/100 x 0,0003 + 0,0026 = 0,0029
ρ = 0,0029
ρ = 0,0029
ρmin = 0,0018
ρmak = 0,0203
Lihat Tabel 7
Lihat Tabel 8
ρmin < ρ< ρmak
As = ρ x b xd
As = 0,0029 x1,0 x 0,174 x = 505 mm² ( 5,05 Cm²)
PAKAI BESI Ǿ 10 – 250 mm = 515 mm² > 505 mm²
Tulangan Pembagi menurut SKSNI T15 – 1991-03 Pasal 3.16.12
= 400 Mpa : As =
As = = 360 mm (3,6 Cm²)
0,18 𝑥1000 𝑥 200
100
9. MOMEN TUMPUAN (MB = 32,8 kNm)
Mu
bx d²
32,8
1,0 x (0,174 )²
= 1.083 kN/m²
1.000 = 0,0032
1.083 = ρ
1.100 = 0,0036
83
100 0,0004 83/100 x 0,0004 + 0,0032 = 0,0035
ρ = 0,0035
As = 0,0035 x1,0 x 0,174 x = 609 mm² ( 6,1 Cm²)
PAKAI BESI Ǿ 10 – 125 mm = 628 mm² > 609 mm²
24
0
24
0
4.560
h
B
A
24
0
4.560
TABEL 8
PROSENTASE TULANGAN MAKSIMUM ρ max
fy MPa
f'c Mpa(Kg/Cm²)
( Kg/Cm²
)
15 (150) 20 (200) 25 (250) 30 (300) 35 (350)
240
(2.400)
0.0242 0.0323 0.0404 0.0484 0.0538
400
(4.000)
0.0122 0.0163 0.0203 0.0244 0.0271
TABEL 6
TABEL NILAI -NILAI ρ min TIORITIS
fy MPa
( Kg/Cm² ) f'c Mpa(Kg/Cm²)
15 (150) 20 (200) 25 (250) 30 (300) 35 (350)
240
(2.400)
0.0025 0.0029 0.0032
0.0035 0.0038
400
(4.000)
0.0015 0.0017 0.0019
0.0021 0.0023
TABEL 7
TULANGAN MINIMUM YANG DISYARATAKAN ρ min
SELURUH fy = 250 MPa fy = 400 MPa
MUTU BETON =. 2.500 Kg/Cm² . = 4.000 Kg/Cm²
Balok dan Plat
Umumnya
0.0058 0.0035
Alternatif 4/3 ρ an 4/3 ρ an
Plat 0.0025 0.0018
TABEL PEMBESIAN BALOK DAN KOLOM
TABEL PEMBESIAN PLAT PER
METER PLAT
04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt

More Related Content

Similar to 04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt

Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
Luan Truong Van
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
luantvconst
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
Magdel Kotze
 

Similar to 04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt (20)

DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
 
Isolated Footing
Isolated FootingIsolated Footing
Isolated Footing
 
Muro contension raul1
Muro contension raul1Muro contension raul1
Muro contension raul1
 
perhitungan waffle slab
perhitungan waffle slab  perhitungan waffle slab
perhitungan waffle slab
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Harshal
HarshalHarshal
Harshal
 
Puentes
PuentesPuentes
Puentes
 
Doubly reinforced beam design
Doubly reinforced beam   designDoubly reinforced beam   design
Doubly reinforced beam design
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Design of stairs
Design of stairsDesign of stairs
Design of stairs
 
Column analysis
Column analysisColumn analysis
Column analysis
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Term project "Design of Slab Formwork"
Term project "Design of Slab Formwork"Term project "Design of Slab Formwork"
Term project "Design of Slab Formwork"
 
Ref F2F Week 4 - Solution_unlocked.pdf
Ref F2F Week 4 - Solution_unlocked.pdfRef F2F Week 4 - Solution_unlocked.pdf
Ref F2F Week 4 - Solution_unlocked.pdf
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school building
 
Calculo de losa aligerada
Calculo de losa aligeradaCalculo de losa aligerada
Calculo de losa aligerada
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan struktur
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 

04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt

  • 2. DIK : SUATU PLAT LANTAI TERLETAK DIATAS TIGA TUMPUAN A,B dan CPLAT DIBEBANI BEBAN MATI (DL)/FINISHING = 0,5 kN/m² dan BEBAN HIDUP (LL) = 4 kN/m² (Gbr) DATA PERHITUNGN : f’c = 25 Mpa (250 Kg/Cm²) f’y = 400 Mpa (4.000 Kg/Cm²). DIMINTA HITUNG : a. Pembesian Plat PENYELESAIAN : = L/24 = 4800/24 = 200 mm diambil = 20 Cm L = 4.560 + 2 x ½ 240 = 4.800 mm 1. Tentukan Lebar bentang 2. Tentukan tebal plat 24 0 24 0 4.560 h GAMBAR PLAT B A 24 0 4.560
  • 3. Wu= 1,2 x WD + 1,6 WL WD = Berat sendiri Plat = 0,20 x 24 kN/m³ = 4,8 kN/m² WD = Berat Finishing lantai = 0,5 kN/m² JUMLAH WD = 5,3 kN/m² Wu= 1,2 x 5,3 + 1,6 x 4 = 12,8 kN/m² ( 1.280 kg/m²) 3. HITUNG BEBAN MA = MC = 1/24 x Wu x L² MA = MC = 1/24 x 12,8 x (4,8)² = 12,3 kNm (1.230 kgm) 4. HITUNG MOMEN TUMPUAN 5. HITUNG M0MEN LAPANGAN M lap AB = 1/11 x Wu x L² Mlap AB= 1/11 x 12,8 x (4,8)² = 26,8 kNm (2.680 kgm) MB = 1/9 x Wu x L² MB = 1/9 x 12,8 x (4,8)² = 32,8 kNm (3.280 kgm)
  • 4. Penutup beton Tabel = 20 mm = 2 Cm diameter tulangan Ǿ = 12 mm = 1,2 Cm 6. Hitung Tulangan d = h - a - 1/2 Ǿ = 200 - 20 - 1/2 x12 = 174 mm Mu bx d² 12,3 1,0 x (0,174 )² = 406 kN/m² LIHAT TABEL SNI 7. MOMEN JEPIT TAK TERDUGA (MA = MC) MA = MC = 12,3 kNm Menurur Tabel di Interpolasi 400 = 0,0013 406 = ρ 500 = 0,0016 6 100 0,0003 6/100 x 0,0003 + 0,0013 = 0,0013 As = 0,0013 x1,0 x 0,174 x = 226 mm² ( 2,26Cm²) PAKAI BESI Ǿ 8 – 200 mm = 251 mm² > 226 mm²
  • 5. 8. MOMEN LAPANGAN BENTANG (MLapAB = Mlap BC)= 26,8 kNm Mu bx d² 26,8 1,0 x (0,174 )² = 885 kN/m² Menurur Tabel di Interpolasi 800 = 0,0026 885 = ρ 900 = 0,0029 85 100 0,0003 85/100 x 0,0003 + 0,0026 = 0,0029 ρ = 0,0029 ρ = 0,0029 ρmin = 0,0018 ρmak = 0,0203 Lihat Tabel 7 Lihat Tabel 8 ρmin < ρ< ρmak As = ρ x b xd As = 0,0029 x1,0 x 0,174 x = 505 mm² ( 5,05 Cm²) PAKAI BESI Ǿ 10 – 250 mm = 515 mm² > 505 mm²
  • 6. Tulangan Pembagi menurut SKSNI T15 – 1991-03 Pasal 3.16.12 = 400 Mpa : As = As = = 360 mm (3,6 Cm²) 0,18 𝑥1000 𝑥 200 100 9. MOMEN TUMPUAN (MB = 32,8 kNm) Mu bx d² 32,8 1,0 x (0,174 )² = 1.083 kN/m² 1.000 = 0,0032 1.083 = ρ 1.100 = 0,0036 83 100 0,0004 83/100 x 0,0004 + 0,0032 = 0,0035 ρ = 0,0035 As = 0,0035 x1,0 x 0,174 x = 609 mm² ( 6,1 Cm²) PAKAI BESI Ǿ 10 – 125 mm = 628 mm² > 609 mm²
  • 8.
  • 9. TABEL 8 PROSENTASE TULANGAN MAKSIMUM ρ max fy MPa f'c Mpa(Kg/Cm²) ( Kg/Cm² ) 15 (150) 20 (200) 25 (250) 30 (300) 35 (350) 240 (2.400) 0.0242 0.0323 0.0404 0.0484 0.0538 400 (4.000) 0.0122 0.0163 0.0203 0.0244 0.0271
  • 10. TABEL 6 TABEL NILAI -NILAI ρ min TIORITIS fy MPa ( Kg/Cm² ) f'c Mpa(Kg/Cm²) 15 (150) 20 (200) 25 (250) 30 (300) 35 (350) 240 (2.400) 0.0025 0.0029 0.0032 0.0035 0.0038 400 (4.000) 0.0015 0.0017 0.0019 0.0021 0.0023
  • 11. TABEL 7 TULANGAN MINIMUM YANG DISYARATAKAN ρ min SELURUH fy = 250 MPa fy = 400 MPa MUTU BETON =. 2.500 Kg/Cm² . = 4.000 Kg/Cm² Balok dan Plat Umumnya 0.0058 0.0035 Alternatif 4/3 ρ an 4/3 ρ an Plat 0.0025 0.0018
  • 13. TABEL PEMBESIAN PLAT PER METER PLAT

Editor's Notes

  1. Masri ariva’i