DIK : SUATU PLAT LANTAI TERLETAK DIATAS TIGA TUMPUAN A,B dan CPLAT
DIBEBANI BEBAN MATI (DL)/FINISHING = 0,5 kN/m² dan BEBAN HIDUP (LL) = 4 kN/m²
(Gbr) DATA PERHITUNGN : f’c = 25 Mpa (250 Kg/Cm²)
f’y = 400 Mpa (4.000 Kg/Cm²).
DIMINTA HITUNG : a. Pembesian Plat
PENYELESAIAN
:
= L/24 = 4800/24 = 200 mm diambil = 20 Cm
L = 4.560 + 2 x ½ 240 = 4.800 mm
1. Tentukan Lebar bentang
2. Tentukan tebal plat
24
0
24
0
4.560
h
GAMBAR PLAT
B
A
24
0
4.560
Wu= 1,2 x WD + 1,6 WL
WD = Berat sendiri Plat = 0,20 x 24 kN/m³ = 4,8 kN/m²
WD = Berat Finishing lantai = 0,5 kN/m²
JUMLAH WD = 5,3 kN/m²
Wu= 1,2 x 5,3 + 1,6 x 4 = 12,8 kN/m² ( 1.280 kg/m²)
3. HITUNG BEBAN
MA = MC = 1/24 x Wu x L²
MA = MC = 1/24 x 12,8 x (4,8)² = 12,3 kNm (1.230 kgm)
4. HITUNG MOMEN TUMPUAN
5. HITUNG M0MEN LAPANGAN
M lap AB = 1/11 x Wu x L²
Mlap AB= 1/11 x 12,8 x (4,8)² = 26,8 kNm (2.680 kgm)
MB = 1/9 x Wu x L²
MB = 1/9 x 12,8 x (4,8)² = 32,8 kNm (3.280 kgm)
Penutup beton Tabel = 20 mm = 2 Cm
diameter tulangan Ǿ = 12 mm = 1,2 Cm
6. Hitung Tulangan
d = h - a - 1/2 Ǿ = 200 - 20 - 1/2 x12 = 174 mm
Mu
bx d²
12,3
1,0 x (0,174 )²
= 406 kN/m² LIHAT TABEL SNI
7. MOMEN JEPIT TAK TERDUGA (MA = MC)
MA = MC = 12,3 kNm
Menurur Tabel di Interpolasi
400 = 0,0013
406 = ρ
500 = 0,0016
6
100 0,0003 6/100 x 0,0003 + 0,0013 = 0,0013
As = 0,0013 x1,0 x 0,174 x = 226 mm² ( 2,26Cm²)
PAKAI BESI Ǿ 8 – 200 mm = 251 mm² > 226 mm²
8. MOMEN LAPANGAN BENTANG (MLapAB = Mlap BC)= 26,8 kNm
Mu
bx d²
26,8
1,0 x (0,174 )²
= 885 kN/m²
Menurur Tabel di Interpolasi
800 = 0,0026
885 = ρ
900 = 0,0029
85
100 0,0003 85/100 x 0,0003 + 0,0026 = 0,0029
ρ = 0,0029
ρ = 0,0029
ρmin = 0,0018
ρmak = 0,0203
Lihat Tabel 7
Lihat Tabel 8
ρmin < ρ< ρmak
As = ρ x b xd
As = 0,0029 x1,0 x 0,174 x = 505 mm² ( 5,05 Cm²)
PAKAI BESI Ǿ 10 – 250 mm = 515 mm² > 505 mm²
Tulangan Pembagi menurut SKSNI T15 – 1991-03 Pasal 3.16.12
= 400 Mpa : As =
As = = 360 mm (3,6 Cm²)
0,18 𝑥1000 𝑥 200
100
9. MOMEN TUMPUAN (MB = 32,8 kNm)
Mu
bx d²
32,8
1,0 x (0,174 )²
= 1.083 kN/m²
1.000 = 0,0032
1.083 = ρ
1.100 = 0,0036
83
100 0,0004 83/100 x 0,0004 + 0,0032 = 0,0035
ρ = 0,0035
As = 0,0035 x1,0 x 0,174 x = 609 mm² ( 6,1 Cm²)
PAKAI BESI Ǿ 10 – 125 mm = 628 mm² > 609 mm²
24
0
24
0
4.560
h
B
A
24
0
4.560
TABEL 8
PROSENTASE TULANGAN MAKSIMUM ρ max
fy MPa
f'c Mpa(Kg/Cm²)
( Kg/Cm²
)
15 (150) 20 (200) 25 (250) 30 (300) 35 (350)
240
(2.400)
0.0242 0.0323 0.0404 0.0484 0.0538
400
(4.000)
0.0122 0.0163 0.0203 0.0244 0.0271
TABEL 6
TABEL NILAI -NILAI ρ min TIORITIS
fy MPa
( Kg/Cm² ) f'c Mpa(Kg/Cm²)
15 (150) 20 (200) 25 (250) 30 (300) 35 (350)
240
(2.400)
0.0025 0.0029 0.0032
0.0035 0.0038
400
(4.000)
0.0015 0.0017 0.0019
0.0021 0.0023
TABEL 7
TULANGAN MINIMUM YANG DISYARATAKAN ρ min
SELURUH fy = 250 MPa fy = 400 MPa
MUTU BETON =. 2.500 Kg/Cm² . = 4.000 Kg/Cm²
Balok dan Plat
Umumnya
0.0058 0.0035
Alternatif 4/3 ρ an 4/3 ρ an
Plat 0.0025 0.0018
TABEL PEMBESIAN BALOK DAN KOLOM
TABEL PEMBESIAN PLAT PER
METER PLAT
04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt

More Related Content

Similar to 04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt

DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxsubhashini214160
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabsLuan Truong Van
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfEr. Suman Jyoti
 
Design of stairs
Design of stairsDesign of stairs
Design of stairsBahzad5
 
Column analysis
Column analysisColumn analysis
Column analysisPenny3688
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Hamza Waheed
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabsluantvconst
 
Term project "Design of Slab Formwork"
Term project "Design of Slab Formwork"Term project "Design of Slab Formwork"
Term project "Design of Slab Formwork"Esraa Hussein
 
Ref F2F Week 4 - Solution_unlocked.pdf
Ref F2F Week 4 - Solution_unlocked.pdfRef F2F Week 4 - Solution_unlocked.pdf
Ref F2F Week 4 - Solution_unlocked.pdfRobin Arthur Flores
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footingkamariya keyur
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsMagdel Kotze
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school buildingRaghav Sankar
 
Calculo de losa aligerada
Calculo de losa aligeradaCalculo de losa aligerada
Calculo de losa aligeradaAntonio Zr
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan strukturKomang Satriawan
 

Similar to 04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt (20)

DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
 
Isolated Footing
Isolated FootingIsolated Footing
Isolated Footing
 
Muro contension raul1
Muro contension raul1Muro contension raul1
Muro contension raul1
 
perhitungan waffle slab
perhitungan waffle slab  perhitungan waffle slab
perhitungan waffle slab
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Harshal
HarshalHarshal
Harshal
 
Puentes
PuentesPuentes
Puentes
 
Doubly reinforced beam design
Doubly reinforced beam   designDoubly reinforced beam   design
Doubly reinforced beam design
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Design of stairs
Design of stairsDesign of stairs
Design of stairs
 
Column analysis
Column analysisColumn analysis
Column analysis
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Worked example extract_flat_slabs
Worked example extract_flat_slabsWorked example extract_flat_slabs
Worked example extract_flat_slabs
 
Term project "Design of Slab Formwork"
Term project "Design of Slab Formwork"Term project "Design of Slab Formwork"
Term project "Design of Slab Formwork"
 
Ref F2F Week 4 - Solution_unlocked.pdf
Ref F2F Week 4 - Solution_unlocked.pdfRef F2F Week 4 - Solution_unlocked.pdf
Ref F2F Week 4 - Solution_unlocked.pdf
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school building
 
Calculo de losa aligerada
Calculo de losa aligeradaCalculo de losa aligerada
Calculo de losa aligerada
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan struktur
 

Recently uploaded

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 

Recently uploaded (20)

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

04.PER PLAT 1 ARAH 3 TUMPUAN 8-9.ppt

  • 2. DIK : SUATU PLAT LANTAI TERLETAK DIATAS TIGA TUMPUAN A,B dan CPLAT DIBEBANI BEBAN MATI (DL)/FINISHING = 0,5 kN/m² dan BEBAN HIDUP (LL) = 4 kN/m² (Gbr) DATA PERHITUNGN : f’c = 25 Mpa (250 Kg/Cm²) f’y = 400 Mpa (4.000 Kg/Cm²). DIMINTA HITUNG : a. Pembesian Plat PENYELESAIAN : = L/24 = 4800/24 = 200 mm diambil = 20 Cm L = 4.560 + 2 x ½ 240 = 4.800 mm 1. Tentukan Lebar bentang 2. Tentukan tebal plat 24 0 24 0 4.560 h GAMBAR PLAT B A 24 0 4.560
  • 3. Wu= 1,2 x WD + 1,6 WL WD = Berat sendiri Plat = 0,20 x 24 kN/m³ = 4,8 kN/m² WD = Berat Finishing lantai = 0,5 kN/m² JUMLAH WD = 5,3 kN/m² Wu= 1,2 x 5,3 + 1,6 x 4 = 12,8 kN/m² ( 1.280 kg/m²) 3. HITUNG BEBAN MA = MC = 1/24 x Wu x L² MA = MC = 1/24 x 12,8 x (4,8)² = 12,3 kNm (1.230 kgm) 4. HITUNG MOMEN TUMPUAN 5. HITUNG M0MEN LAPANGAN M lap AB = 1/11 x Wu x L² Mlap AB= 1/11 x 12,8 x (4,8)² = 26,8 kNm (2.680 kgm) MB = 1/9 x Wu x L² MB = 1/9 x 12,8 x (4,8)² = 32,8 kNm (3.280 kgm)
  • 4. Penutup beton Tabel = 20 mm = 2 Cm diameter tulangan Ǿ = 12 mm = 1,2 Cm 6. Hitung Tulangan d = h - a - 1/2 Ǿ = 200 - 20 - 1/2 x12 = 174 mm Mu bx d² 12,3 1,0 x (0,174 )² = 406 kN/m² LIHAT TABEL SNI 7. MOMEN JEPIT TAK TERDUGA (MA = MC) MA = MC = 12,3 kNm Menurur Tabel di Interpolasi 400 = 0,0013 406 = ρ 500 = 0,0016 6 100 0,0003 6/100 x 0,0003 + 0,0013 = 0,0013 As = 0,0013 x1,0 x 0,174 x = 226 mm² ( 2,26Cm²) PAKAI BESI Ǿ 8 – 200 mm = 251 mm² > 226 mm²
  • 5. 8. MOMEN LAPANGAN BENTANG (MLapAB = Mlap BC)= 26,8 kNm Mu bx d² 26,8 1,0 x (0,174 )² = 885 kN/m² Menurur Tabel di Interpolasi 800 = 0,0026 885 = ρ 900 = 0,0029 85 100 0,0003 85/100 x 0,0003 + 0,0026 = 0,0029 ρ = 0,0029 ρ = 0,0029 ρmin = 0,0018 ρmak = 0,0203 Lihat Tabel 7 Lihat Tabel 8 ρmin < ρ< ρmak As = ρ x b xd As = 0,0029 x1,0 x 0,174 x = 505 mm² ( 5,05 Cm²) PAKAI BESI Ǿ 10 – 250 mm = 515 mm² > 505 mm²
  • 6. Tulangan Pembagi menurut SKSNI T15 – 1991-03 Pasal 3.16.12 = 400 Mpa : As = As = = 360 mm (3,6 Cm²) 0,18 𝑥1000 𝑥 200 100 9. MOMEN TUMPUAN (MB = 32,8 kNm) Mu bx d² 32,8 1,0 x (0,174 )² = 1.083 kN/m² 1.000 = 0,0032 1.083 = ρ 1.100 = 0,0036 83 100 0,0004 83/100 x 0,0004 + 0,0032 = 0,0035 ρ = 0,0035 As = 0,0035 x1,0 x 0,174 x = 609 mm² ( 6,1 Cm²) PAKAI BESI Ǿ 10 – 125 mm = 628 mm² > 609 mm²
  • 8.
  • 9. TABEL 8 PROSENTASE TULANGAN MAKSIMUM ρ max fy MPa f'c Mpa(Kg/Cm²) ( Kg/Cm² ) 15 (150) 20 (200) 25 (250) 30 (300) 35 (350) 240 (2.400) 0.0242 0.0323 0.0404 0.0484 0.0538 400 (4.000) 0.0122 0.0163 0.0203 0.0244 0.0271
  • 10. TABEL 6 TABEL NILAI -NILAI ρ min TIORITIS fy MPa ( Kg/Cm² ) f'c Mpa(Kg/Cm²) 15 (150) 20 (200) 25 (250) 30 (300) 35 (350) 240 (2.400) 0.0025 0.0029 0.0032 0.0035 0.0038 400 (4.000) 0.0015 0.0017 0.0019 0.0021 0.0023
  • 11. TABEL 7 TULANGAN MINIMUM YANG DISYARATAKAN ρ min SELURUH fy = 250 MPa fy = 400 MPa MUTU BETON =. 2.500 Kg/Cm² . = 4.000 Kg/Cm² Balok dan Plat Umumnya 0.0058 0.0035 Alternatif 4/3 ρ an 4/3 ρ an Plat 0.0025 0.0018
  • 13. TABEL PEMBESIAN PLAT PER METER PLAT

Editor's Notes

  1. Masri ariva’i