SlideShare a Scribd company logo
› Presentation of anti-noise walls
› Good Neighbourly Relations Committee:
City of Brossard
›New Champlain Bridge Corridor Project
›May 4, 2016
New Champlain Bridge Corridor Project 2
› Noise study
• Acoustic data
• Data analysis
• Location of walls
› Visual and urban integration of anti-noise walls
• Where we are today
• Where we want to be
• Architectural components
• Sunlight study
Presentation outline
New Champlain Bridge Corridor Project
Noise study
New Champlain Bridge Corridor Project
Noise criteria
The LAeq24h sound level must not exceed:
• 55 dBA if the initial ambient noise level was less than 55 dBA
• An increase in 1 dBA if the initial ambient noise level was
between 55 and 59 dBA
• 60 dBA if the initial ambient noise level was greater than or equal
to 60 dBA
4
New Champlain Bridge Corridor Project
Noise-sensitive zones
5
Noise -sensitive zones
New Champlain Bridge Corridor Project
Existing ambient noise level (June 2015)
6
Noise sensitive zone
New Champlain Bridge Corridor Project
Project’s noise impact in 2050
without off-site roads (including R132)
7
Noise sensitive zone
anti-noise wall
New Champlain Bridge Corridor Project
Visual and urban integration
New Champlain Bridge Corridor Project
Visual and urban integration
Where we are today
9
New Champlain Bridge Corridor Project
Visual and urban integration
10
Where we are today
New Champlain Bridge Corridor Project
Visual and urban integration
11
Where we are today
New Champlain Bridge Corridor Project
Visual and urban integration
12
Where we are today
New Champlain Bridge Corridor Project
Visual and urban integration
Projected situation of anti-noise walls
13
New Champlain Bridge Corridor Project
Types of anti-noise walls
TYPE A TYPE B TYPE C
OPAQUE SEMI-OPAQUE TRANSPARENT
14
New Champlain Bridge Corridor Project
Visual and urban integration
Chromatic transition
15
NB-600
W: 535 m
H: 2.5 m
Existing walls
Colour reference
NB-700
W: 125 m
H: 2.0 m
NB-800
W: 80 m
H: 3.5 m
New Champlain Bridge Corridor Project
Visual and urban integration
16
September21
2.Sunlight study, Villon street, Brossard/NB 700/800
9:00 am
New Champlain Bridge Corridor Project
Visual and urban integration
17
September21
2.Sunlight study, Villon street, Brossard/NB 700/800
11:00 am
New Champlain Bridge Corridor Project
Visual and urban integration
18
September21
2.Sunlight study, Villon street, Brossard/NB 700/800
2:00 pm
New Champlain Bridge Corridor Project
Visual and urban integration
19
September21
2.Sunlight study, Villon street, Brossard/NB 700/800
5:00 pm
New Champlain Bridge Corridor Project
Visual and urban integration
20
September211.Sunlight study, Voltaire street, Brossard/NB 600
9:00 am
New Champlain Bridge Corridor Project
Visual and urban integration
21
September211.Sunlight study, Voltaire street, Brossard/NB 600
11:00 am
New Champlain Bridge Corridor Project
Visual and urban integration
22
September211.Sunlight study, Voltaire street, Brossard/NB 600
2:00 pm
New Champlain Bridge Corridor Project
Visual and urban integration
23
September211.Sunlight study, Voltaire street, Brossard/NB 600
5:00 pm
Thank you!

More Related Content

What's hot

LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
Pont Samuel-De Champlain Bridge
 
Meeting minutes brossard good neighbourly relations commitee - may 17 2017
Meeting minutes   brossard good neighbourly relations commitee - may 17 2017Meeting minutes   brossard good neighbourly relations commitee - may 17 2017
Meeting minutes brossard good neighbourly relations commitee - may 17 2017
Pont Samuel-De Champlain Bridge
 
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Pont Samuel-De Champlain Bridge
 
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Pont Samuel-De Champlain Bridge
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Crosstown TO
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Pont Samuel-De Champlain Bridge
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Crosstown TO
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Crosstown TO
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
Crosstown TO
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
Crosstown TO
 
Allen Road - Eglinton West Station: Preliminary Design Consultation
Allen Road - Eglinton West Station: Preliminary Design ConsultationAllen Road - Eglinton West Station: Preliminary Design Consultation
Allen Road - Eglinton West Station: Preliminary Design Consultation
Crosstown TO
 
KEY NOTE HILLSTA EXTERNAL v2
KEY NOTE HILLSTA EXTERNAL v2KEY NOTE HILLSTA EXTERNAL v2
KEY NOTE HILLSTA EXTERNAL v2Fan Hao
 
New Dorp Beach Sewer Project
New Dorp Beach Sewer ProjectNew Dorp Beach Sewer Project
New Dorp Beach Sewer ProjectJamesOddo
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Office of Contracting & Procurement (OCP)
 
Beach Access Plaza - Presentation at BHPOA on October 21, 2014
Beach Access Plaza - Presentation at BHPOA on October 21, 2014Beach Access Plaza - Presentation at BHPOA on October 21, 2014
Beach Access Plaza - Presentation at BHPOA on October 21, 2014
Rose Klein
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
Crosstown TO
 

What's hot (20)

LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
 
Meeting minutes brossard good neighbourly relations commitee - may 17 2017
Meeting minutes   brossard good neighbourly relations commitee - may 17 2017Meeting minutes   brossard good neighbourly relations commitee - may 17 2017
Meeting minutes brossard good neighbourly relations commitee - may 17 2017
 
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
 
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
Chaplin & Avenue Stations Construction Liaison Committe Meeting - September 2017
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
 
Allen Road - Eglinton West Station: Preliminary Design Consultation
Allen Road - Eglinton West Station: Preliminary Design ConsultationAllen Road - Eglinton West Station: Preliminary Design Consultation
Allen Road - Eglinton West Station: Preliminary Design Consultation
 
KEY NOTE HILLSTA EXTERNAL v2
KEY NOTE HILLSTA EXTERNAL v2KEY NOTE HILLSTA EXTERNAL v2
KEY NOTE HILLSTA EXTERNAL v2
 
New Dorp Beach Sewer Project
New Dorp Beach Sewer ProjectNew Dorp Beach Sewer Project
New Dorp Beach Sewer Project
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
Beach Access Plaza - Presentation at BHPOA on October 21, 2014
Beach Access Plaza - Presentation at BHPOA on October 21, 2014Beach Access Plaza - Presentation at BHPOA on October 21, 2014
Beach Access Plaza - Presentation at BHPOA on October 21, 2014
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 

Viewers also liked

Acc 2010
Acc 2010Acc 2010
Acc 2010
wall mauricio
 
تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب
تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب
تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب
Med Sugar Man
 
Cerificate of Appreciation 2
Cerificate of Appreciation 2Cerificate of Appreciation 2
Cerificate of Appreciation 2Dejan Stojnic
 
Profil The Beat_Printemps 2016
Profil The Beat_Printemps 2016Profil The Beat_Printemps 2016
Profil The Beat_Printemps 2016Gina B.Lesage
 
Brief media nouveau pont champlain - 25 aout 2016
Brief media nouveau pont champlain - 25 aout 2016Brief media nouveau pont champlain - 25 aout 2016
Brief media nouveau pont champlain - 25 aout 2016
Pont Samuel-De Champlain Bridge
 
'Brexit' –VAT & Customs implications for international supply chains
'Brexit' –VAT & Customs implications for international supply chains'Brexit' –VAT & Customs implications for international supply chains
'Brexit' –VAT & Customs implications for international supply chains
Alex Baulf
 
Travaux marins en securité (19 mai 2016) - Nouveau pont Champlain
Travaux marins en securité  (19 mai 2016) - Nouveau pont ChamplainTravaux marins en securité  (19 mai 2016) - Nouveau pont Champlain
Travaux marins en securité (19 mai 2016) - Nouveau pont Champlain
Pont Samuel-De Champlain Bridge
 
ITU 34/2016
ITU 34/2016ITU 34/2016
ITU 34/2016
Graham Brearley
 
Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...
Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...
Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...
Pont Samuel-De Champlain Bridge
 
Assemblée publique annuelle 2016
Assemblée publique annuelle 2016Assemblée publique annuelle 2016
Assemblée publique annuelle 2016
Ponts Jacques Cartier + Champlain Bridges
 
ITU 37/2016 final
ITU 37/2016 finalITU 37/2016 final
ITU 37/2016 final
Graham Brearley
 
Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017
Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017
Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017
Pont Samuel-De Champlain Bridge
 
Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016
Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016
Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016
Pont Samuel-De Champlain Bridge
 

Viewers also liked (13)

Acc 2010
Acc 2010Acc 2010
Acc 2010
 
تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب
تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب
تقرير ممارسة أنشطة الأعمال.. المغرب يتقدم بـ5 مراتب
 
Cerificate of Appreciation 2
Cerificate of Appreciation 2Cerificate of Appreciation 2
Cerificate of Appreciation 2
 
Profil The Beat_Printemps 2016
Profil The Beat_Printemps 2016Profil The Beat_Printemps 2016
Profil The Beat_Printemps 2016
 
Brief media nouveau pont champlain - 25 aout 2016
Brief media nouveau pont champlain - 25 aout 2016Brief media nouveau pont champlain - 25 aout 2016
Brief media nouveau pont champlain - 25 aout 2016
 
'Brexit' –VAT & Customs implications for international supply chains
'Brexit' –VAT & Customs implications for international supply chains'Brexit' –VAT & Customs implications for international supply chains
'Brexit' –VAT & Customs implications for international supply chains
 
Travaux marins en securité (19 mai 2016) - Nouveau pont Champlain
Travaux marins en securité  (19 mai 2016) - Nouveau pont ChamplainTravaux marins en securité  (19 mai 2016) - Nouveau pont Champlain
Travaux marins en securité (19 mai 2016) - Nouveau pont Champlain
 
ITU 34/2016
ITU 34/2016ITU 34/2016
ITU 34/2016
 
Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...
Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...
Rencontre d’information publique de l'Île-des-Soeurs - Nouveau pont Champlain...
 
Assemblée publique annuelle 2016
Assemblée publique annuelle 2016Assemblée publique annuelle 2016
Assemblée publique annuelle 2016
 
ITU 37/2016 final
ITU 37/2016 finalITU 37/2016 final
ITU 37/2016 final
 
Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017
Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017
Nouveau pont champlain - Présentation École Polytechnique - 9 fevrier 2017
 
Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016
Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016
Présentation comité de bon voisinage Verdun - Le Sud-Ouest - 8 fevrier 2016
 

Similar to Presentation anti noise walls good neighbourly relations committee City of Brossard - May 4, 2016

Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
Pont Samuel-De Champlain Bridge
 
Meeting of the verdun sud ouest good neighbourly relations committee - febru...
Meeting of the verdun  sud ouest good neighbourly relations committee - febru...Meeting of the verdun  sud ouest good neighbourly relations committee - febru...
Meeting of the verdun sud ouest good neighbourly relations committee - febru...
Pont Samuel-De Champlain Bridge
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
Ponts Jacques Cartier + Champlain Bridges
 
Bryn davidson - Lanefab Design Build - wood_talks2019
Bryn davidson - Lanefab Design Build - wood_talks2019Bryn davidson - Lanefab Design Build - wood_talks2019
Bryn davidson - Lanefab Design Build - wood_talks2019
brynd2001
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
VDOT Northern Virginia
 
Blair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBlair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBLAIRBRIXTON
 
DOW Public Meeting Slides 12.19.19
DOW Public Meeting Slides 12.19.19DOW Public Meeting Slides 12.19.19
DOW Public Meeting Slides 12.19.19
Heritage Wind
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
Soumalya Bag
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre
 
Review of work in 2016
Review of work in 2016Review of work in 2016
16_Presentation - NVF Annual Bridge Confererence 2014
16_Presentation - NVF Annual Bridge Confererence 201416_Presentation - NVF Annual Bridge Confererence 2014
16_Presentation - NVF Annual Bridge Confererence 2014Mukilavan Pandiselvam
 

Similar to Presentation anti noise walls good neighbourly relations committee City of Brossard - May 4, 2016 (16)

Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
 
Meeting of the verdun sud ouest good neighbourly relations committee - febru...
Meeting of the verdun  sud ouest good neighbourly relations committee - febru...Meeting of the verdun  sud ouest good neighbourly relations committee - febru...
Meeting of the verdun sud ouest good neighbourly relations committee - febru...
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
PORTFOLIO_AntonioPeriago_2015
PORTFOLIO_AntonioPeriago_2015PORTFOLIO_AntonioPeriago_2015
PORTFOLIO_AntonioPeriago_2015
 
Bryn davidson - Lanefab Design Build - wood_talks2019
Bryn davidson - Lanefab Design Build - wood_talks2019Bryn davidson - Lanefab Design Build - wood_talks2019
Bryn davidson - Lanefab Design Build - wood_talks2019
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Blair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBlair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med Res
 
DOW Public Meeting Slides 12.19.19
DOW Public Meeting Slides 12.19.19DOW Public Meeting Slides 12.19.19
DOW Public Meeting Slides 12.19.19
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
 
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA Engineering
 
C.V.
C.V.C.V.
C.V.
 
Review of work in 2016
Review of work in 2016Review of work in 2016
Review of work in 2016
 
16_Presentation - NVF Annual Bridge Confererence 2014
16_Presentation - NVF Annual Bridge Confererence 201416_Presentation - NVF Annual Bridge Confererence 2014
16_Presentation - NVF Annual Bridge Confererence 2014
 

More from Pont Samuel-De Champlain Bridge

Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...
Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...
Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...
Pont Samuel-De Champlain Bridge
 
Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...
Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...
Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...
Pont Samuel-De Champlain Bridge
 
Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...
Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...
Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...
Pont Samuel-De Champlain Bridge
 
Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...
Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...
Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...
Pont Samuel-De Champlain Bridge
 
Mobilité Montreal - Document technique chantiers majeurs automne 2019
Mobilité Montreal - Document technique chantiers majeurs automne 2019Mobilité Montreal - Document technique chantiers majeurs automne 2019
Mobilité Montreal - Document technique chantiers majeurs automne 2019
Pont Samuel-De Champlain Bridge
 
Mobilité Montréal - Présentation chantiers majeurs automne 2019
Mobilité Montréal - Présentation chantiers majeurs automne 2019Mobilité Montréal - Présentation chantiers majeurs automne 2019
Mobilité Montréal - Présentation chantiers majeurs automne 2019
Pont Samuel-De Champlain Bridge
 
Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018
Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018
Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018
Pont Samuel-De Champlain Bridge
 
Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...
Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...
Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...
Pont Samuel-De Champlain Bridge
 
Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019
Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019
Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019
Pont Samuel-De Champlain Bridge
 
En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...
En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...
En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...
Pont Samuel-De Champlain Bridge
 
Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...
Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...
Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...
Pont Samuel-De Champlain Bridge
 
Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...
Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...
Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...
Pont Samuel-De Champlain Bridge
 
Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019
Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019
Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019
Pont Samuel-De Champlain Bridge
 
Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...
Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...
Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...
Pont Samuel-De Champlain Bridge
 
Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018
Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018
Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018
Pont Samuel-De Champlain Bridge
 
Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...
Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...
Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...
Pont Samuel-De Champlain Bridge
 
Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...
Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...
Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...
Pont Samuel-De Champlain Bridge
 
Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...
Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...
Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...
Pont Samuel-De Champlain Bridge
 
Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...
Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...
Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...
Pont Samuel-De Champlain Bridge
 
Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...
Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...
Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...
Pont Samuel-De Champlain Bridge
 

More from Pont Samuel-De Champlain Bridge (20)

Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...
Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...
Virtual Public Information Meeting: Noise Barriers in Verdun / Le Sud-Ouest -...
 
Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...
Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...
Rencontre information publique virtuelle : murs anti-bruit dans les secteurs ...
 
Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...
Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...
Coulisses du pont Samuel-De Champlain - Chantier de l'emploi - Montreal - 12 ...
 
Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...
Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...
Boulevard René-Lévesque - Île-des-Soeurs - Mise a jour des travaux - 30 aout ...
 
Mobilité Montreal - Document technique chantiers majeurs automne 2019
Mobilité Montreal - Document technique chantiers majeurs automne 2019Mobilité Montreal - Document technique chantiers majeurs automne 2019
Mobilité Montreal - Document technique chantiers majeurs automne 2019
 
Mobilité Montréal - Présentation chantiers majeurs automne 2019
Mobilité Montréal - Présentation chantiers majeurs automne 2019Mobilité Montréal - Présentation chantiers majeurs automne 2019
Mobilité Montréal - Présentation chantiers majeurs automne 2019
 
Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018
Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018
Briefing media - Ouverture du pont samuel-de champlain - 17 juin 2018
 
Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...
Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...
Rencontre de comité de bon voisinage Brossard - 29 mai 2019 - Projet de corri...
 
Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019
Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019
Comité de bon voisinage Verdun / Île-des-Soeurs / Le Sud-Ouest - 16 mai 2019
 
En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...
En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...
En route vers l'ouverture du pont Samuel-De Champlain - 11 avril 2019 - aga b...
 
Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...
Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...
Scénarios de mobilité à L'Ile-des-soeurs - Rencontre avec les commerçants et ...
 
Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...
Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...
Scénarios de mobilité - Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fe...
 
Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019
Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019
Comité de bon voisinage Verdun / Le Sud-Ouest - 20 fevrier 2019
 
Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...
Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...
Compte rendu comite de bon voisinage brossard - nouveau pont champlain - 26 s...
 
Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018
Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018
Compte-rendu comité de bon voisinage Verdun - Le Sud-Ouest du 12 septembre 2018
 
Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...
Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...
Mobilité Montréal : chacun fait partie de la solution - Rencontre d'informati...
 
Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...
Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...
Mobilite verdun et ile des-soeurs - Mise à jour du 26 novembre 2018 - Nouveau...
 
Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...
Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...
Nouveau pont champlain : pas tres loin du but - Briefing technique et visite ...
 
Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...
Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...
Scénarios de mobilit. dans le secteur Île-des-Soeurs - Mise-à-jour du 8 octob...
 
Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...
Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...
Scénarios de mobilité dans le secteur de L'Île-des-Soeurs - Mise à jour du 27...
 

Recently uploaded

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
nikitacareer3
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 

Recently uploaded (20)

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 

Presentation anti noise walls good neighbourly relations committee City of Brossard - May 4, 2016

  • 1. › Presentation of anti-noise walls › Good Neighbourly Relations Committee: City of Brossard ›New Champlain Bridge Corridor Project ›May 4, 2016
  • 2. New Champlain Bridge Corridor Project 2 › Noise study • Acoustic data • Data analysis • Location of walls › Visual and urban integration of anti-noise walls • Where we are today • Where we want to be • Architectural components • Sunlight study Presentation outline
  • 3. New Champlain Bridge Corridor Project Noise study
  • 4. New Champlain Bridge Corridor Project Noise criteria The LAeq24h sound level must not exceed: • 55 dBA if the initial ambient noise level was less than 55 dBA • An increase in 1 dBA if the initial ambient noise level was between 55 and 59 dBA • 60 dBA if the initial ambient noise level was greater than or equal to 60 dBA 4
  • 5. New Champlain Bridge Corridor Project Noise-sensitive zones 5 Noise -sensitive zones
  • 6. New Champlain Bridge Corridor Project Existing ambient noise level (June 2015) 6 Noise sensitive zone
  • 7. New Champlain Bridge Corridor Project Project’s noise impact in 2050 without off-site roads (including R132) 7 Noise sensitive zone anti-noise wall
  • 8. New Champlain Bridge Corridor Project Visual and urban integration
  • 9. New Champlain Bridge Corridor Project Visual and urban integration Where we are today 9
  • 10. New Champlain Bridge Corridor Project Visual and urban integration 10 Where we are today
  • 11. New Champlain Bridge Corridor Project Visual and urban integration 11 Where we are today
  • 12. New Champlain Bridge Corridor Project Visual and urban integration 12 Where we are today
  • 13. New Champlain Bridge Corridor Project Visual and urban integration Projected situation of anti-noise walls 13
  • 14. New Champlain Bridge Corridor Project Types of anti-noise walls TYPE A TYPE B TYPE C OPAQUE SEMI-OPAQUE TRANSPARENT 14
  • 15. New Champlain Bridge Corridor Project Visual and urban integration Chromatic transition 15 NB-600 W: 535 m H: 2.5 m Existing walls Colour reference NB-700 W: 125 m H: 2.0 m NB-800 W: 80 m H: 3.5 m
  • 16. New Champlain Bridge Corridor Project Visual and urban integration 16 September21 2.Sunlight study, Villon street, Brossard/NB 700/800 9:00 am
  • 17. New Champlain Bridge Corridor Project Visual and urban integration 17 September21 2.Sunlight study, Villon street, Brossard/NB 700/800 11:00 am
  • 18. New Champlain Bridge Corridor Project Visual and urban integration 18 September21 2.Sunlight study, Villon street, Brossard/NB 700/800 2:00 pm
  • 19. New Champlain Bridge Corridor Project Visual and urban integration 19 September21 2.Sunlight study, Villon street, Brossard/NB 700/800 5:00 pm
  • 20. New Champlain Bridge Corridor Project Visual and urban integration 20 September211.Sunlight study, Voltaire street, Brossard/NB 600 9:00 am
  • 21. New Champlain Bridge Corridor Project Visual and urban integration 21 September211.Sunlight study, Voltaire street, Brossard/NB 600 11:00 am
  • 22. New Champlain Bridge Corridor Project Visual and urban integration 22 September211.Sunlight study, Voltaire street, Brossard/NB 600 2:00 pm
  • 23. New Champlain Bridge Corridor Project Visual and urban integration 23 September211.Sunlight study, Voltaire street, Brossard/NB 600 5:00 pm