Works proposed
for
FY2022-23
Cable Laying for Motor in Chowtuppal
• In Choutuppal Observatory water is being supplied by a 5HP Motor
• At present, it is being operated from the local municipality supply
which is given long back for the people staying there.
• Now, the people are not staying there and all are farmlands.
• Now, this line gets frequent interruptions due to various reasons.
• When the crop gets over, the local farmers are burning the crop residues.
Being the line is overhead, due to heat, the line is getting damaged.
• The line was erected long back around 20 years back. So, the strength of the
overhead line deteriorated.
• As the population over there got shifted, we cannot rely on the present
free supply. So, there is a need to give a permanent connection from
the main building supply. But we will connect an automatic
changeover switch such that the switch will normally get connected to
the free supply. When it gets interruption, it gets changed to the Main
building supply. Later on, our technicians will reach there, check the
problem and solve it.
Present state of the supply for motor
Financial Details
S. No. Description Quantity Units Unit Cost Amount
1
Excavation of Direct in Ground Cable Trench, Cable laying
with all sides Clay burnt Bricks, and natural sand
cushioning for the cable and refilling of the trench
270 Meters ₹ 1,000.00 ₹ 270,000.00
2
Supply of 25 sq. mm 4 core FRLS Under ground Cable.
Finolex/Polycab make
300 No's ₹ 450.00 ₹ 135,000.00
3 63A 4 pole Automatic Phase change over Switch 1 No. ₹ 21,000.00 ₹ 21,000.00
Total ₹ 426,000.00
Cable Laying for the Street Light poles
(Phase -1) in front of Cyber Building
• The present cable for Street Lights was laid around 30 years back
• Now at various places, the cable is getting damaged due to weather
conditions
• As per the CPWD norms, the underground cable’s life is also 20 years
• In the Institute as well quarters total of 197 Poles are there
• This work will be taken in a phased manner. The first phase is taken up for
the street light poles in front of the cyber building
• As the present connections are at the ground level, while gardening, water
enters these connections and damages the terminals with rusting. So,
junction boxes need to be placed around 3 feet height from ground level so
that connections will be safe. It will convenient for the staff also to work at
that height.
• In the places where the cable is healthy, new boxes will be utilized and
work will be taken up departmentally.
Present pictures of the connections for poles
in Cyber Building
Financial Details
S. No. Description Quantity Units Unit Cost Amount
1
Excavation of Direct in Ground Cable Trench, Cable laying with
all sides Clay burnt Bricks, and natural sand cushioning for the
cable and refilling of the trench
600 Meters ₹ 1,000.00 ₹ 600,000.00
2
8"x8" Junction boxes along with U bends for fixing it for poles
and electrical connection accessories
50 No. ₹ 2,000.00 ₹ 100,000.00
Total ₹ 700,000.00
Works Proposed for FY 2023-24
Cable Laying for the Street Light poles (Phase -
2) from Main Gate to Cyber Building:
• The present cable for Street Lights was laid around 30 years back
• Now at various places, the cable is getting damaged due to weather conditions
• As per the CPWD norms, the underground cable’s life is also 20 years
• In the Institute as well quarters total of 197 Poles are there
• This work will be taken in a phased manner. The Second phase is taken up for the
street light poles between the cyber building and the main gate
• As the present connections are at the ground level, while gardening water enters
these connections and damages the terminals with rusting. So, junction boxes need
to be placed around 3 feet height of ground level so that connections will be safe.
It will convenient for the staff also to work at that height.
• In the places where the cable is healthy, new boxes will be utilized and work will
be taken up departmentally.
Present pictures of the connections for poles
between Cyber Building and Main Building
Financial Details
S. No. Description Quantity Units Unit Cost Amount
1
Excavation of Direct in Ground Cable Trench, Cable laying with
all sides Clay burnt Bricks, and natural sand cushioning for the
cable and refilling of the trench
600 Meters ₹ 1,000.00 ₹ 600,000.00
2
8"x8" Junction boxes along with U bends for fixing it for poles
and electrical connection accessories
50 No. ₹ 2,000.00 ₹ 100,000.00
Total ₹ 700,000.00
Cable laying and renovation of the main
panel for the cyber building
• The switchgear system installed in the cyber building is around 30 years old
• Now the life of the cable as well as switchgear is about to be over. If we
don’t replace the cable, it may get fail at any time in the future
• Distribution renovation work will be taken up departmentally with the help
of procurement of the required items as and when required
• The cable which is available with us will not be sufficient for laying the
cable to this area because the distance is so long from the electrical section
to the cyber building and technically joints are not preferred while laying
underground cable.
• If joints are there, there will be a high chance of failure of the cable, so there
is a need to purchase the cable.
Present picture of the connections and cable
in Cyber Building
Financial Details
S. No. Description Quantity Units Unit Cost Amount
1 Supply of Underground Cable (240 sq. mm Size) 1950 Meters ₹ 3,000.00 ₹ 5,850,000.00
2 Laying of Underground cable 650 Meters ₹ 1,000.00 ₹ 650,000.00
3 630A 4 Pole Automatic Phase Changeover Switch 3 No's ₹ 150,000.00 ₹ 450,000.00
4 630A 4 Pole MCCB 6 No's ₹ 57,340.00 ₹ 344,040.00
5 400A 4 Pole MCCB 6 No's ₹ 34,444.00 ₹ 206,664.00
6 200A 4 Pole MCCB 6 No's ₹ 18,658.00 ₹ 111,948.00
7 100A 4 Pole MCCB 30 No's ₹ 11,510.00 ₹ 345,300.00
8 Panel Boards 3 No's ₹ 200,000.00 ₹ 600,000.00
Total ₹ 8,557,952.00
Renovation of quarters wiring (Type-1 Quarters)
• The existing wiring system in the quarters is damaged a lot. So, the
insulation of the wires is deteriorating day by day exponentially
• Now there is a high chance that due to insulation failure of the wires,
they get earthed with walls and give the electric shock to the occupants
of the quarters
• As rewiring of the complete quarters will not be possible at a time, it
will be taken up in a phased manner.
• As a first phase, type -1 Quarters are taken up as these quarter’s wiring
got damaged a lot.
Present state of the wiring in quarters
Financial Details
S. No. Description Quantity Units Unit Cost Amount
1
Supplying and laying of 1.5 sq. mm FRLS PVC insulated single core
copper conductor in PVC pipes to be fixed on surface
600 Meters ₹ 150.00 ₹ 90,000.00
2
Supplying and laying of 2.5 sq. mm FRLS PVC insulated single core
copper conductor in PVC pipes to be fixed on surface
75 Meters ₹ 180.00 ₹ 13,500.00
3
Supplying and laying of 4 sq. mm FRLS PVC insulated single core
copper conductor in PVC pipes to be fixed on surface
150 Meters ₹ 230.00 ₹ 34,500.00
4
Supplying and fixing of Modular surface boxes along with the
required switches and sockets including all distributions, MCBs etc.
10 No's ₹ 1,500.00 ₹ 15,000.00
Total per quarter ₹ 153,000.00
for total 20 quarters as and when vacant ₹ 3,060,000.00
Mains renovation in Extension Building
• In Extension Building, the main panel and its switches got outdated,
and need to replace that old panel and switches with new ones.
• As per the CPWD norms, the life of an LT/HT Switchgear is 20 Years.
Previously this switchgear was fixed during the construction of the
Extension Bulding
• So, there is a need for replacement for these switches and the panel.
Only material needs to be procured and work will be done
departmentally.
Present state of the Panels in Extension Building
Distribution work done departmentally in
Second Floor
Before Renovation After Renovation
Distribution work done departmentally in
Second Floor
Before Renovation After Renovation
UPS Panel Renovated Departmentally
Before Renovation After Renovation
Financial Details
S. No. Description Quantity Units Unit Cost Amount
1 630A 4 Pole Automatic Phase Changeover Switch 3 No's ₹ 150,000.00 ₹ 450,000.00
2 630A 4 Pole MCCB 6 No's ₹ 57,340.00 ₹ 344,040.00
3 400A 4 Pole MCCB 6 No's ₹ 34,444.00 ₹ 206,664.00
4 200A 4 Pole MCCB 6 No's ₹ 18,658.00 ₹ 111,948.00
5 100A 4 Pole MCCB 30 No's ₹ 11,510.00 ₹ 345,300.00
6 Panel Boards 3 No's ₹ 200,000.00 ₹ 600,000.00
Total ₹ 2,057,952.00
PPT on Proposal for FY2022-23.pptx
PPT on Proposal for FY2022-23.pptx

More Related Content

Similar to PPT on Proposal for FY2022-23.pptx

132 k v-substation-training-for-students
132 k v-substation-training-for-students132 k v-substation-training-for-students
132 k v-substation-training-for-students
Sanjay Kumar Sharma
 
Fort indraprastha-egm v1.0
Fort  indraprastha-egm v1.0Fort  indraprastha-egm v1.0
Fort indraprastha-egm v1.0
Dwarak Ethiraj
 
building services in a building
building services in a buildingbuilding services in a building
building services in a building
Barsha
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
MUKULKUMAR210
 
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
IndiaMART InterMESH Limited
 
Project-Induction.pptx
Project-Induction.pptxProject-Induction.pptx
Project-Induction.pptx
jaegar .
 
Domestic wiring _ praveen
Domestic wiring _ praveenDomestic wiring _ praveen
Domestic wiring _ praveen
praveenurd
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
Harish Agarwal
 
Proposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western AustraliaProposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western Australia
Toe Myint Naing
 
Welding of Joints.pdf
Welding of Joints.pdfWelding of Joints.pdf
Welding of Joints.pdf
TVijayaGowri
 
Dc Motor Construction and Working
Dc Motor Construction and WorkingDc Motor Construction and Working
Dc Motor Construction and Working
Sourabh sharma
 
E&C-elearn.pdf
E&C-elearn.pdfE&C-elearn.pdf
E&C-elearn.pdf
RohitkrMahli239
 
Conductive concrete ppt (1)
Conductive concrete ppt (1)Conductive concrete ppt (1)
Conductive concrete ppt (1)
subbu lakshmi
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
Harish Agarwal
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
Harish Agarwal
 
Small residential stand alone roof top solar pv
Small residential stand alone roof top solar pvSmall residential stand alone roof top solar pv
Small residential stand alone roof top solar pv
encon2014
 
commutation failure
commutation failurecommutation failure
commutation failure
Shiva Kumar
 
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Environmental Initiative
 
Electrification
ElectrificationElectrification
Electrification
Sanish Bhochhibhoya
 
Resume- Plant Manager- Harish
Resume- Plant Manager- HarishResume- Plant Manager- Harish
Resume- Plant Manager- Harish
Harish Chandra Varshney
 

Similar to PPT on Proposal for FY2022-23.pptx (20)

132 k v-substation-training-for-students
132 k v-substation-training-for-students132 k v-substation-training-for-students
132 k v-substation-training-for-students
 
Fort indraprastha-egm v1.0
Fort  indraprastha-egm v1.0Fort  indraprastha-egm v1.0
Fort indraprastha-egm v1.0
 
building services in a building
building services in a buildingbuilding services in a building
building services in a building
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
 
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
 
Project-Induction.pptx
Project-Induction.pptxProject-Induction.pptx
Project-Induction.pptx
 
Domestic wiring _ praveen
Domestic wiring _ praveenDomestic wiring _ praveen
Domestic wiring _ praveen
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
Proposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western AustraliaProposed Bridge over the Preston River in East Bunbury, Western Australia
Proposed Bridge over the Preston River in East Bunbury, Western Australia
 
Welding of Joints.pdf
Welding of Joints.pdfWelding of Joints.pdf
Welding of Joints.pdf
 
Dc Motor Construction and Working
Dc Motor Construction and WorkingDc Motor Construction and Working
Dc Motor Construction and Working
 
E&C-elearn.pdf
E&C-elearn.pdfE&C-elearn.pdf
E&C-elearn.pdf
 
Conductive concrete ppt (1)
Conductive concrete ppt (1)Conductive concrete ppt (1)
Conductive concrete ppt (1)
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 
Small residential stand alone roof top solar pv
Small residential stand alone roof top solar pvSmall residential stand alone roof top solar pv
Small residential stand alone roof top solar pv
 
commutation failure
commutation failurecommutation failure
commutation failure
 
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
 
Electrification
ElectrificationElectrification
Electrification
 
Resume- Plant Manager- Harish
Resume- Plant Manager- HarishResume- Plant Manager- Harish
Resume- Plant Manager- Harish
 

Recently uploaded

Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
vikram sood
 
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Aggregage
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
ihavuls
 
writing report business partner b1+ .pdf
writing report business partner b1+ .pdfwriting report business partner b1+ .pdf
writing report business partner b1+ .pdf
VyNguyen709676
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
Lars Albertsson
 
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens""Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
sameer shah
 
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
taqyea
 
Learn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queriesLearn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queries
manishkhaire30
 
Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
Sachin Paul
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
hyfjgavov
 
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
mkkikqvo
 
Intelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicineIntelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicine
AndrzejJarynowski
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
Walaa Eldin Moustafa
 
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
bopyb
 
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
y3i0qsdzb
 
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docxDATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
SaffaIbrahim1
 
Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024
ElizabethGarrettChri
 
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
Timothy Spann
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
aqzctr7x
 
A presentation that explain the Power BI Licensing
A presentation that explain the Power BI LicensingA presentation that explain the Power BI Licensing
A presentation that explain the Power BI Licensing
AlessioFois2
 

Recently uploaded (20)

Global Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headedGlobal Situational Awareness of A.I. and where its headed
Global Situational Awareness of A.I. and where its headed
 
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
writing report business partner b1+ .pdf
writing report business partner b1+ .pdfwriting report business partner b1+ .pdf
writing report business partner b1+ .pdf
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
 
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens""Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
 
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
 
Learn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queriesLearn SQL from basic queries to Advance queries
Learn SQL from basic queries to Advance queries
 
Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......Palo Alto Cortex XDR presentation .......
Palo Alto Cortex XDR presentation .......
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
 
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
原版一比一多伦多大学毕业证(UofT毕业证书)如何办理
 
Intelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicineIntelligence supported media monitoring in veterinary medicine
Intelligence supported media monitoring in veterinary medicine
 
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data LakeViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
ViewShift: Hassle-free Dynamic Policy Enforcement for Every Data Lake
 
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
一比一原版(GWU,GW文凭证书)乔治·华盛顿大学毕业证如何办理
 
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
一比一原版巴斯大学毕业证(Bath毕业证书)学历如何办理
 
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docxDATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
DATA COMMS-NETWORKS YR2 lecture 08 NAT & CLOUD.docx
 
Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024
 
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
06-12-2024-BudapestDataForum-BuildingReal-timePipelineswithFLaNK AIM
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
A presentation that explain the Power BI Licensing
A presentation that explain the Power BI LicensingA presentation that explain the Power BI Licensing
A presentation that explain the Power BI Licensing
 

PPT on Proposal for FY2022-23.pptx

  • 2. Cable Laying for Motor in Chowtuppal • In Choutuppal Observatory water is being supplied by a 5HP Motor • At present, it is being operated from the local municipality supply which is given long back for the people staying there. • Now, the people are not staying there and all are farmlands. • Now, this line gets frequent interruptions due to various reasons. • When the crop gets over, the local farmers are burning the crop residues. Being the line is overhead, due to heat, the line is getting damaged. • The line was erected long back around 20 years back. So, the strength of the overhead line deteriorated.
  • 3. • As the population over there got shifted, we cannot rely on the present free supply. So, there is a need to give a permanent connection from the main building supply. But we will connect an automatic changeover switch such that the switch will normally get connected to the free supply. When it gets interruption, it gets changed to the Main building supply. Later on, our technicians will reach there, check the problem and solve it.
  • 4. Present state of the supply for motor
  • 5. Financial Details S. No. Description Quantity Units Unit Cost Amount 1 Excavation of Direct in Ground Cable Trench, Cable laying with all sides Clay burnt Bricks, and natural sand cushioning for the cable and refilling of the trench 270 Meters ₹ 1,000.00 ₹ 270,000.00 2 Supply of 25 sq. mm 4 core FRLS Under ground Cable. Finolex/Polycab make 300 No's ₹ 450.00 ₹ 135,000.00 3 63A 4 pole Automatic Phase change over Switch 1 No. ₹ 21,000.00 ₹ 21,000.00 Total ₹ 426,000.00
  • 6. Cable Laying for the Street Light poles (Phase -1) in front of Cyber Building • The present cable for Street Lights was laid around 30 years back • Now at various places, the cable is getting damaged due to weather conditions • As per the CPWD norms, the underground cable’s life is also 20 years • In the Institute as well quarters total of 197 Poles are there • This work will be taken in a phased manner. The first phase is taken up for the street light poles in front of the cyber building • As the present connections are at the ground level, while gardening, water enters these connections and damages the terminals with rusting. So, junction boxes need to be placed around 3 feet height from ground level so that connections will be safe. It will convenient for the staff also to work at that height. • In the places where the cable is healthy, new boxes will be utilized and work will be taken up departmentally.
  • 7. Present pictures of the connections for poles in Cyber Building
  • 8. Financial Details S. No. Description Quantity Units Unit Cost Amount 1 Excavation of Direct in Ground Cable Trench, Cable laying with all sides Clay burnt Bricks, and natural sand cushioning for the cable and refilling of the trench 600 Meters ₹ 1,000.00 ₹ 600,000.00 2 8"x8" Junction boxes along with U bends for fixing it for poles and electrical connection accessories 50 No. ₹ 2,000.00 ₹ 100,000.00 Total ₹ 700,000.00
  • 9. Works Proposed for FY 2023-24
  • 10. Cable Laying for the Street Light poles (Phase - 2) from Main Gate to Cyber Building: • The present cable for Street Lights was laid around 30 years back • Now at various places, the cable is getting damaged due to weather conditions • As per the CPWD norms, the underground cable’s life is also 20 years • In the Institute as well quarters total of 197 Poles are there • This work will be taken in a phased manner. The Second phase is taken up for the street light poles between the cyber building and the main gate • As the present connections are at the ground level, while gardening water enters these connections and damages the terminals with rusting. So, junction boxes need to be placed around 3 feet height of ground level so that connections will be safe. It will convenient for the staff also to work at that height. • In the places where the cable is healthy, new boxes will be utilized and work will be taken up departmentally.
  • 11. Present pictures of the connections for poles between Cyber Building and Main Building
  • 12. Financial Details S. No. Description Quantity Units Unit Cost Amount 1 Excavation of Direct in Ground Cable Trench, Cable laying with all sides Clay burnt Bricks, and natural sand cushioning for the cable and refilling of the trench 600 Meters ₹ 1,000.00 ₹ 600,000.00 2 8"x8" Junction boxes along with U bends for fixing it for poles and electrical connection accessories 50 No. ₹ 2,000.00 ₹ 100,000.00 Total ₹ 700,000.00
  • 13. Cable laying and renovation of the main panel for the cyber building • The switchgear system installed in the cyber building is around 30 years old • Now the life of the cable as well as switchgear is about to be over. If we don’t replace the cable, it may get fail at any time in the future • Distribution renovation work will be taken up departmentally with the help of procurement of the required items as and when required • The cable which is available with us will not be sufficient for laying the cable to this area because the distance is so long from the electrical section to the cyber building and technically joints are not preferred while laying underground cable. • If joints are there, there will be a high chance of failure of the cable, so there is a need to purchase the cable.
  • 14. Present picture of the connections and cable in Cyber Building
  • 15. Financial Details S. No. Description Quantity Units Unit Cost Amount 1 Supply of Underground Cable (240 sq. mm Size) 1950 Meters ₹ 3,000.00 ₹ 5,850,000.00 2 Laying of Underground cable 650 Meters ₹ 1,000.00 ₹ 650,000.00 3 630A 4 Pole Automatic Phase Changeover Switch 3 No's ₹ 150,000.00 ₹ 450,000.00 4 630A 4 Pole MCCB 6 No's ₹ 57,340.00 ₹ 344,040.00 5 400A 4 Pole MCCB 6 No's ₹ 34,444.00 ₹ 206,664.00 6 200A 4 Pole MCCB 6 No's ₹ 18,658.00 ₹ 111,948.00 7 100A 4 Pole MCCB 30 No's ₹ 11,510.00 ₹ 345,300.00 8 Panel Boards 3 No's ₹ 200,000.00 ₹ 600,000.00 Total ₹ 8,557,952.00
  • 16. Renovation of quarters wiring (Type-1 Quarters) • The existing wiring system in the quarters is damaged a lot. So, the insulation of the wires is deteriorating day by day exponentially • Now there is a high chance that due to insulation failure of the wires, they get earthed with walls and give the electric shock to the occupants of the quarters • As rewiring of the complete quarters will not be possible at a time, it will be taken up in a phased manner. • As a first phase, type -1 Quarters are taken up as these quarter’s wiring got damaged a lot.
  • 17. Present state of the wiring in quarters
  • 18. Financial Details S. No. Description Quantity Units Unit Cost Amount 1 Supplying and laying of 1.5 sq. mm FRLS PVC insulated single core copper conductor in PVC pipes to be fixed on surface 600 Meters ₹ 150.00 ₹ 90,000.00 2 Supplying and laying of 2.5 sq. mm FRLS PVC insulated single core copper conductor in PVC pipes to be fixed on surface 75 Meters ₹ 180.00 ₹ 13,500.00 3 Supplying and laying of 4 sq. mm FRLS PVC insulated single core copper conductor in PVC pipes to be fixed on surface 150 Meters ₹ 230.00 ₹ 34,500.00 4 Supplying and fixing of Modular surface boxes along with the required switches and sockets including all distributions, MCBs etc. 10 No's ₹ 1,500.00 ₹ 15,000.00 Total per quarter ₹ 153,000.00 for total 20 quarters as and when vacant ₹ 3,060,000.00
  • 19. Mains renovation in Extension Building • In Extension Building, the main panel and its switches got outdated, and need to replace that old panel and switches with new ones. • As per the CPWD norms, the life of an LT/HT Switchgear is 20 Years. Previously this switchgear was fixed during the construction of the Extension Bulding • So, there is a need for replacement for these switches and the panel. Only material needs to be procured and work will be done departmentally.
  • 20. Present state of the Panels in Extension Building
  • 21. Distribution work done departmentally in Second Floor Before Renovation After Renovation
  • 22. Distribution work done departmentally in Second Floor Before Renovation After Renovation
  • 23. UPS Panel Renovated Departmentally Before Renovation After Renovation
  • 24. Financial Details S. No. Description Quantity Units Unit Cost Amount 1 630A 4 Pole Automatic Phase Changeover Switch 3 No's ₹ 150,000.00 ₹ 450,000.00 2 630A 4 Pole MCCB 6 No's ₹ 57,340.00 ₹ 344,040.00 3 400A 4 Pole MCCB 6 No's ₹ 34,444.00 ₹ 206,664.00 4 200A 4 Pole MCCB 6 No's ₹ 18,658.00 ₹ 111,948.00 5 100A 4 Pole MCCB 30 No's ₹ 11,510.00 ₹ 345,300.00 6 Panel Boards 3 No's ₹ 200,000.00 ₹ 600,000.00 Total ₹ 2,057,952.00