Randall Roost Angie Goodman
Principle Planner, Water Operations Water Quality Administrator
Lansing Board of Water and Light Lansing Board of Water and Light
Scott Hamelink
Director, Water Operations
Lansing Board of Water & Light
Municipally owned utility
Governed by a Board of
Commissioners who set policy,
approve budgets and rates
Groundwater supplies two water
conditioning plants that use lime-
soda softening on water from
124 wells
22 MGD average daily demand
providing water to 59,000 retail
accounts
Took ownership of all water service lines in 1927
Stopped installing LSLs in 1956
As a result of our ownership we developed a fairly accurate record
of service line materials. Our service card files were kept up to
date throughout.
Inventoried all service line materials in 1980s, identifying as lead,
copper, plastic or galvanized steel. Lead and galvanized were
labeled “non-standard”.
In 2004 we asked customers to self-identify LSLs. Vast majority
confirmed our records. Card files were transferred to GIS.
All sampling rounds have shown 90th % ile below 15ppb
BWL conditioned water is high pH (9.4), moderate alkalinity (35)
and hardness (98)
Optimal Corrosion Control installed in 1997
Monitoring reduced to 50 locations every three years
Some sampling rounds higher than others
Began accelerated LSLR, public education in 2004
Inventory showed about 17,000 LSLs as of the early 1990s
Estimates were based on Customer Information System and GIS
project
Before 2004 lead service lines were replaced as needed.
Developed accelerated LSLR Program, 2004
Proposed 14 year program, but the Board of Commissioners
required that we target 10 years.
Due to slowdown in combined sewer separation project, the
anticipated completion date is now June of 2017.
Current active LSLs remaining estimated at <500,
170 services with unknown materials that will be
investigated to be determined if lead.
Any lead service that is physically disturbed by such
things as dig-ins, excavations, or leak repair.
Services supplying schools, day care centers, or other
identified sensitive populations as defined by the
USEPA.
Services where there are sample results in excess of 15
ppb.
Services in the work zone of CSO replacement or
street restorations.
Multiple services within a compact area.
Length of lead pipe present in the service line.
7
46 71 106
172
94
138
631
1632
1573
1669
1984 1974
902
596
388
329
198 210
0
500
1000
1500
2000
2500
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
Number of LSLs Replaced
Number of LSLs Replaced
Coordination with street projects
More difficult and expensive without City Combined
Sewer Overflow (CSO) Separation Project or road
resurfacing
Cost per service goes from $3,500 when coordinating
with CSO to $6,500 without CSO.
Current removal method further reduces costs.
Material Costs
Copper price fluctuations and the Lead Free Act have
some impact but are small relative to street cut
impact
Meter location and ownership
House on slab, service line under house, porch, or
driveway
Meter pit conundrum, re: ownership
Crew Mobilization
No partial LSL replacement mandates same-day
completion, leaving us the choice of idle crew or
overtime
Working in the same or adjacent blocks reduces
mobilization costs
• Bill stuffers
• Special brochures to schools, day cares, health offices
• Lead information on the BWL web site
• Special meetings and community events
• Neighborhood meetings
• Preparations for customer response FAQs
• Lead Hotline
• Meetings with local media
The BWL hosted several community open houses at various locations around the city.
8 Stations were manned at each location:
Station 1 – Information about lead service lines
Station 2 – Identifying lead service lines
Station 3 – Sources of lead
Station 4 – What the BWL is doing
Station 5 – How to protect yourself from lead
Station 6 – Where your water comes from
Additionally there were two other stations. One
manned by staff from the county health
department , and one staffed by the MDEQ.
BWL does not repair LSLs…replacements only!
General Customer Outreach
Beginning in 2004 we developed and distributed brochures and articles in bill
stuffers
Conducted Open Houses at local schools and community centers
Added further recommended customer precautions to our Water Quality Report
As LSLR continues there is less concern from the general public
LSLR Notification
Letter is sent to LSL address requesting customer to contact us for an
appointment. The letter explains the process
Letter includes an explanation of the replacement tasks, the need for home
access, BWL and customer responsibilities
Meet with customer prior to or day of LSLR to explain the process, including
follow-up. This helps the customer understand the details.
Emergency Replacements
Used only in special conditions such as service breaks. We speak with the
customer on site.
Access
Normally just coordination but ultimately comes down
to a condition of service
Easements
We have not sought easements and therefore must
count on good customer interaction and follow-
through
Through Wall Bore
Potential liability. Occasional disputes can be
expensive
Yard Restoration, non-standard installations
Trees, shrubs, plantings, crawl spaces, slab
foundations, porches, driveways, sheds, drywall
interiors, meter access require decisions case-by-case
Budget!
Approximately $42 million has been spent since 2004
LSLs are replaced as a capital project (an investment
into infrastructure)
Rate payers share in the cost and the community has
been generally supportive
We are currently spending on average $3 million per
year on LSLR.
No Response
to First
Letter:
Phone Call
Site Visit
Second
Letter Sent
10 Days after
Water
Service is
Turned Off
#1 #2
Prior to beginning the actual
replacement of the lead
service there is a substantial
amount of work that must be
done in advance. Scheduling
of the replacement with the
customer can take many
iterations before an
acceptable timetable can be
reached. Then the utility must
coordinate with local Miss-Dig
to locate other utilities in the
excavation areas.
The process begins by shutting
off the curb stop to prevent any
water in the system from
entering the customers
premises. This is especially
important to minimize the
transfer of any lead particulate
into the service or the
customer’s household piping
during the excavation of the
corporation at the main.
Once the curb stop has been closed
the work can then be divided into two
different work groups. The first work
group can then enter the premises and
disconnect the service from the meter
assembly.
The second work group can then begin
the excavation process at the main to
expose the corporation fitting.
Excavation can be accomplished with either
a backhoe or by using a vacuum excavator.
The advantage of the excavator is that it can
minimize the potential risk to other utilities
that can be difficult to locate or may have
been miss-marked.
Of course there is always a lot of
hand digging that must be done as
well. Once the corporation is
exposed the water is shut off at
that location as well. It is
important that the excavation of
the main and the corporation be
controlled to prevent any water or
soils from entering the corporation
or the new service once it is
installed.
Meanwhile inside…….
While the excavation continues outside
the employee inside the residence
begins the disconnection of the lead
service and preparing the new copper
for installation. We are also replacing
the water meter at the same time since
we already have access to the property.
One of the most important steps
in preparing the new copper line
to ready for installation is the
sealing of the new service before
it is pulled. The end of the
copper pipe is covered with
electrical tape. The pulling sock is
then placed over the end of the
copper pipe. Within the pulling
sock is a small rubber ball that is
pressed against the taped end of
the pipe to further prevent any
potential particulate from
entering the new copper service
during installation.
Once the corporation is exposed,
the excavation then moves to the
curb stop. The curb stop is removed
by cutting the lead line on both
sides of the curb stop. Then a line is
fished through the lead line from
the curb stop to the inside and a
3/8” steel cable is pulled back
through the service.
The copper pipe is then connected to the pulling harness and the harness is connected to
the steel cable. Using the backhoe, the lead service is pulled out of the ground from the
basement to the curb stop.
Once the copper pipe is visible in the curb stop excavation, the process stops to allow
the cable to be removed from the backhoe and it is then rethreaded through the
portion of the lead service line between the curb stop and the corporation. The
backhoe then pulls the copper line through to the corporation excavation. From there
the new copper service is attached to the corporation.
Once the copper is attached to the corporation then the copper line is cut in
the curb stop excavation and a new curb stop is installed. Water is then turned
back on for flushing of the new service line before new water meter is
connected.
We then provide a set of flushing
instructions to the property owner
for continued flushing of the
premise plumbing, with each tap
flushed for 5 minutes before
moving to the next tap
downstream from the meter.
If the customer requests it a filter
will be provided to them for use for
the next 3 months as an added
precaution.
0
100
200
300
400
500
600
700
NumberofLeadServices
Lead Service Replacement Schedule to Completion
Actual Projected
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Lines in 12 Years

More Related Content

Viewers also liked

Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Environmental Initiative
 
Business and Environment Series: Lick - Target-Ecoset
Business and Environment Series: Lick - Target-EcosetBusiness and Environment Series: Lick - Target-Ecoset
Business and Environment Series: Lick - Target-Ecoset
Environmental Initiative
 
Policy Forum Series: Hirl - Renewable Natural Gas, Sources and Markets
Policy Forum Series: Hirl - Renewable Natural Gas, Sources and MarketsPolicy Forum Series: Hirl - Renewable Natural Gas, Sources and Markets
Policy Forum Series: Hirl - Renewable Natural Gas, Sources and Markets
Environmental Initiative
 
MRPA Presentation - September 2012
MRPA Presentation - September 2012MRPA Presentation - September 2012
MRPA Presentation - September 2012
Environmental Initiative
 
Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...
Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...
Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...
Environmental Initiative
 
Ozone in Minnesota
Ozone in MinnesotaOzone in Minnesota
Ozone in Minnesota
Environmental Initiative
 
Business and Environment Series: Kroening - Big Picture of Downstream Waste M...
Business and Environment Series: Kroening - Big Picture of Downstream Waste M...Business and Environment Series: Kroening - Big Picture of Downstream Waste M...
Business and Environment Series: Kroening - Big Picture of Downstream Waste M...
Environmental Initiative
 
Ei overview24 apr12
Ei overview24 apr12Ei overview24 apr12
Ei overview24 apr12
Environmental Initiative
 
Charge&initial recs21june12
Charge&initial recs21june12Charge&initial recs21june12
Charge&initial recs21june12
Environmental Initiative
 
Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...
Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...
Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...
Environmental Initiative
 
Charge&initial recs21june12
Charge&initial recs21june12Charge&initial recs21june12
Charge&initial recs21june12
Environmental Initiative
 
Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...
Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...
Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...
Environmental Initiative
 
Policy Forum Series: Frank - TOD Policy Forum Central Corridor Presentation
Policy Forum Series: Frank - TOD Policy Forum Central Corridor PresentationPolicy Forum Series: Frank - TOD Policy Forum Central Corridor Presentation
Policy Forum Series: Frank - TOD Policy Forum Central Corridor Presentation
Environmental Initiative
 
Cashin - A Northern MN Perspective: Progress & Challenges
Cashin - A Northern MN Perspective: Progress & ChallengesCashin - A Northern MN Perspective: Progress & Challenges
Cashin - A Northern MN Perspective: Progress & Challenges
Environmental Initiative
 

Viewers also liked (14)

Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
 
Business and Environment Series: Lick - Target-Ecoset
Business and Environment Series: Lick - Target-EcosetBusiness and Environment Series: Lick - Target-Ecoset
Business and Environment Series: Lick - Target-Ecoset
 
Policy Forum Series: Hirl - Renewable Natural Gas, Sources and Markets
Policy Forum Series: Hirl - Renewable Natural Gas, Sources and MarketsPolicy Forum Series: Hirl - Renewable Natural Gas, Sources and Markets
Policy Forum Series: Hirl - Renewable Natural Gas, Sources and Markets
 
MRPA Presentation - September 2012
MRPA Presentation - September 2012MRPA Presentation - September 2012
MRPA Presentation - September 2012
 
Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...
Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...
Policy Forum Series: Smith - Natural Gas as Fuel for Electric Generation in t...
 
Ozone in Minnesota
Ozone in MinnesotaOzone in Minnesota
Ozone in Minnesota
 
Business and Environment Series: Kroening - Big Picture of Downstream Waste M...
Business and Environment Series: Kroening - Big Picture of Downstream Waste M...Business and Environment Series: Kroening - Big Picture of Downstream Waste M...
Business and Environment Series: Kroening - Big Picture of Downstream Waste M...
 
Ei overview24 apr12
Ei overview24 apr12Ei overview24 apr12
Ei overview24 apr12
 
Charge&initial recs21june12
Charge&initial recs21june12Charge&initial recs21june12
Charge&initial recs21june12
 
Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...
Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...
Policy Forum Series: Haigh - Transit-Oriented Development-an Investment in Ou...
 
Charge&initial recs21june12
Charge&initial recs21june12Charge&initial recs21june12
Charge&initial recs21june12
 
Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...
Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...
Hensel, Corrigan, Helmers & Hoefs - Emissions Reductions in Southeastern MN: ...
 
Policy Forum Series: Frank - TOD Policy Forum Central Corridor Presentation
Policy Forum Series: Frank - TOD Policy Forum Central Corridor PresentationPolicy Forum Series: Frank - TOD Policy Forum Central Corridor Presentation
Policy Forum Series: Frank - TOD Policy Forum Central Corridor Presentation
 
Cashin - A Northern MN Perspective: Progress & Challenges
Cashin - A Northern MN Perspective: Progress & ChallengesCashin - A Northern MN Perspective: Progress & Challenges
Cashin - A Northern MN Perspective: Progress & Challenges
 

Similar to Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Lines in 12 Years

Common Issues With Sewer Line Repair Columbia.pdf
Common Issues With Sewer Line Repair Columbia.pdfCommon Issues With Sewer Line Repair Columbia.pdf
Common Issues With Sewer Line Repair Columbia.pdf
Plumb Time Plumbing & Drain Services
 
Columbia Plumbers: Keeping the City Flowing
Columbia Plumbers: Keeping the City FlowingColumbia Plumbers: Keeping the City Flowing
Columbia Plumbers: Keeping the City Flowing
Plumb Time Plumbing & Drain Services
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
Loay Ghazaleh MBA, BSc Civil Eng.
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
Mark Oberschmidt
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
Crosstown TO
 
Water supply .pptx building services year
Water supply .pptx building services yearWater supply .pptx building services year
Water supply .pptx building services year
Nthabiseng47
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Toronto Public Consultation Unit
 
Water Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In BuildotechWater Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In Buildotech
biomeshubha
 
Plumbing handbook
Plumbing handbookPlumbing handbook
Plumbing handbook
Raees Nk
 
Raymond Pears.cv June 2015
Raymond Pears.cv June 2015Raymond Pears.cv June 2015
Raymond Pears.cv June 2015
raymond pears
 
2013 07
2013 072013 07
Taking a Closer Look at Sewer Contractors.pdf
Taking a Closer Look at Sewer Contractors.pdfTaking a Closer Look at Sewer Contractors.pdf
Taking a Closer Look at Sewer Contractors.pdf
Ips Wich City Civil
 
216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx
SbusisoNtuli1
 
Sewer lining Pomona.pdf
Sewer lining Pomona.pdfSewer lining Pomona.pdf
Sewer lining Pomona.pdf
Vograce
 
Fort indraprastha-egm v1.0
Fort  indraprastha-egm v1.0Fort  indraprastha-egm v1.0
Fort indraprastha-egm v1.0
Dwarak Ethiraj
 
Sayan CESC LT Report.pdf
Sayan  CESC LT Report.pdfSayan  CESC LT Report.pdf
Sayan CESC LT Report.pdf
SayanBasak15
 
Rubinstein, Water Rates Panel
Rubinstein, Water Rates PanelRubinstein, Water Rates Panel
Rubinstein, Water Rates Panel
TWCA
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
AsnelTiffa
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray
 
Plumbing
PlumbingPlumbing
Plumbing
Pundlik Rathod
 

Similar to Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Lines in 12 Years (20)

Common Issues With Sewer Line Repair Columbia.pdf
Common Issues With Sewer Line Repair Columbia.pdfCommon Issues With Sewer Line Repair Columbia.pdf
Common Issues With Sewer Line Repair Columbia.pdf
 
Columbia Plumbers: Keeping the City Flowing
Columbia Plumbers: Keeping the City FlowingColumbia Plumbers: Keeping the City Flowing
Columbia Plumbers: Keeping the City Flowing
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Water supply .pptx building services year
Water supply .pptx building services yearWater supply .pptx building services year
Water supply .pptx building services year
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Water Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In BuildotechWater Management at Rainbow Drive: In Buildotech
Water Management at Rainbow Drive: In Buildotech
 
Plumbing handbook
Plumbing handbookPlumbing handbook
Plumbing handbook
 
Raymond Pears.cv June 2015
Raymond Pears.cv June 2015Raymond Pears.cv June 2015
Raymond Pears.cv June 2015
 
2013 07
2013 072013 07
2013 07
 
Taking a Closer Look at Sewer Contractors.pdf
Taking a Closer Look at Sewer Contractors.pdfTaking a Closer Look at Sewer Contractors.pdf
Taking a Closer Look at Sewer Contractors.pdf
 
216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx216631544 Ntuli S.I EXP I.docx
216631544 Ntuli S.I EXP I.docx
 
Sewer lining Pomona.pdf
Sewer lining Pomona.pdfSewer lining Pomona.pdf
Sewer lining Pomona.pdf
 
Fort indraprastha-egm v1.0
Fort  indraprastha-egm v1.0Fort  indraprastha-egm v1.0
Fort indraprastha-egm v1.0
 
Sayan CESC LT Report.pdf
Sayan  CESC LT Report.pdfSayan  CESC LT Report.pdf
Sayan CESC LT Report.pdf
 
Rubinstein, Water Rates Panel
Rubinstein, Water Rates PanelRubinstein, Water Rates Panel
Rubinstein, Water Rates Panel
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Plumbing
PlumbingPlumbing
Plumbing
 

More from Environmental Initiative

City of Hugo - Stormwater Management Plan
City of Hugo - Stormwater Management PlanCity of Hugo - Stormwater Management Plan
City of Hugo - Stormwater Management Plan
Environmental Initiative
 
Paul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics SustainabilityPaul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics Sustainability
Environmental Initiative
 
2014 pf1 biddle_material_solutions
2014 pf1 biddle_material_solutions2014 pf1 biddle_material_solutions
2014 pf1 biddle_material_solutions
Environmental Initiative
 
SPR Slides - LCA - 5.14.2014
SPR Slides - LCA - 5.14.2014SPR Slides - LCA - 5.14.2014
SPR Slides - LCA - 5.14.2014
Environmental Initiative
 
2014 bes1 owen_herman_miller
2014 bes1 owen_herman_miller2014 bes1 owen_herman_miller
2014 bes1 owen_herman_miller
Environmental Initiative
 
Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...
Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...
Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...
Environmental Initiative
 
Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...
Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...
Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...
Environmental Initiative
 
Sustainability at Medtronic
Sustainability at MedtronicSustainability at Medtronic
Sustainability at Medtronic
Environmental Initiative
 
Change Management Overview: A Proven Strategy for Design and Implementation o...
Change Management Overview: A Proven Strategy for Design and Implementation o...Change Management Overview: A Proven Strategy for Design and Implementation o...
Change Management Overview: A Proven Strategy for Design and Implementation o...
Environmental Initiative
 
Policy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy Future
Policy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy FuturePolicy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy Future
Policy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy Future
Environmental Initiative
 
Policy Forum Series: Bull - Clean Energy That Works For Minnesota
Policy Forum Series: Bull - Clean Energy That Works For MinnesotaPolicy Forum Series: Bull - Clean Energy That Works For Minnesota
Policy Forum Series: Bull - Clean Energy That Works For Minnesota
Environmental Initiative
 
Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...
Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...
Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...
Environmental Initiative
 
Policy Forum Series: Grant - Role of Natural Gas in Electricity Generation
Policy Forum Series: Grant - Role of Natural Gas in Electricity GenerationPolicy Forum Series: Grant - Role of Natural Gas in Electricity Generation
Policy Forum Series: Grant - Role of Natural Gas in Electricity Generation
Environmental Initiative
 
Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...
Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...
Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...
Environmental Initiative
 
Policy Forum Series: Whelan - Natural Gas Market Impact on Minnesota Business
Policy Forum Series: Whelan - Natural Gas Market Impact on Minnesota BusinessPolicy Forum Series: Whelan - Natural Gas Market Impact on Minnesota Business
Policy Forum Series: Whelan - Natural Gas Market Impact on Minnesota Business
Environmental Initiative
 
Policy Forum Series: Nelson - Natural Gas & Energy Efficiency
Policy Forum Series: Nelson - Natural Gas & Energy EfficiencyPolicy Forum Series: Nelson - Natural Gas & Energy Efficiency
Policy Forum Series: Nelson - Natural Gas & Energy Efficiency
Environmental Initiative
 
Busines and Environment Series: Saric-Fairview-Packaging
Busines and Environment Series: Saric-Fairview-PackagingBusines and Environment Series: Saric-Fairview-Packaging
Busines and Environment Series: Saric-Fairview-PackagingEnvironmental Initiative
 
Business & Environment Series: Polin - Waste Reduction at Central Container Corp
Business & Environment Series: Polin - Waste Reduction at Central Container CorpBusiness & Environment Series: Polin - Waste Reduction at Central Container Corp
Business & Environment Series: Polin - Waste Reduction at Central Container Corp
Environmental Initiative
 
Business & Environment Series: Cioci-Lahd-Managing Upstream Waste
Business & Environment Series: Cioci-Lahd-Managing Upstream WasteBusiness & Environment Series: Cioci-Lahd-Managing Upstream Waste
Business & Environment Series: Cioci-Lahd-Managing Upstream Waste
Environmental Initiative
 

More from Environmental Initiative (19)

City of Hugo - Stormwater Management Plan
City of Hugo - Stormwater Management PlanCity of Hugo - Stormwater Management Plan
City of Hugo - Stormwater Management Plan
 
Paul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics SustainabilityPaul Lilienthal - Pictura Graphics Sustainability
Paul Lilienthal - Pictura Graphics Sustainability
 
2014 pf1 biddle_material_solutions
2014 pf1 biddle_material_solutions2014 pf1 biddle_material_solutions
2014 pf1 biddle_material_solutions
 
SPR Slides - LCA - 5.14.2014
SPR Slides - LCA - 5.14.2014SPR Slides - LCA - 5.14.2014
SPR Slides - LCA - 5.14.2014
 
2014 bes1 owen_herman_miller
2014 bes1 owen_herman_miller2014 bes1 owen_herman_miller
2014 bes1 owen_herman_miller
 
Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...
Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...
Business and Environment Series: Yoakum - Closing the Loop: Managing Dowsntre...
 
Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...
Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...
Business and Environment Series: Dickson - Waste Reduction Programs, UMN Dini...
 
Sustainability at Medtronic
Sustainability at MedtronicSustainability at Medtronic
Sustainability at Medtronic
 
Change Management Overview: A Proven Strategy for Design and Implementation o...
Change Management Overview: A Proven Strategy for Design and Implementation o...Change Management Overview: A Proven Strategy for Design and Implementation o...
Change Management Overview: A Proven Strategy for Design and Implementation o...
 
Policy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy Future
Policy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy FuturePolicy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy Future
Policy Forum Series: Reha - The Role of Natural Gas in Minnesota's Energy Future
 
Policy Forum Series: Bull - Clean Energy That Works For Minnesota
Policy Forum Series: Bull - Clean Energy That Works For MinnesotaPolicy Forum Series: Bull - Clean Energy That Works For Minnesota
Policy Forum Series: Bull - Clean Energy That Works For Minnesota
 
Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...
Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...
Policy Forum Series: Teller - The Changing Role of Natural Gas in the United ...
 
Policy Forum Series: Grant - Role of Natural Gas in Electricity Generation
Policy Forum Series: Grant - Role of Natural Gas in Electricity GenerationPolicy Forum Series: Grant - Role of Natural Gas in Electricity Generation
Policy Forum Series: Grant - Role of Natural Gas in Electricity Generation
 
Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...
Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...
Policy Forum Series: Daugherty - Natural Gas & Minnesota's Energy Future, the...
 
Policy Forum Series: Whelan - Natural Gas Market Impact on Minnesota Business
Policy Forum Series: Whelan - Natural Gas Market Impact on Minnesota BusinessPolicy Forum Series: Whelan - Natural Gas Market Impact on Minnesota Business
Policy Forum Series: Whelan - Natural Gas Market Impact on Minnesota Business
 
Policy Forum Series: Nelson - Natural Gas & Energy Efficiency
Policy Forum Series: Nelson - Natural Gas & Energy EfficiencyPolicy Forum Series: Nelson - Natural Gas & Energy Efficiency
Policy Forum Series: Nelson - Natural Gas & Energy Efficiency
 
Busines and Environment Series: Saric-Fairview-Packaging
Busines and Environment Series: Saric-Fairview-PackagingBusines and Environment Series: Saric-Fairview-Packaging
Busines and Environment Series: Saric-Fairview-Packaging
 
Business & Environment Series: Polin - Waste Reduction at Central Container Corp
Business & Environment Series: Polin - Waste Reduction at Central Container CorpBusiness & Environment Series: Polin - Waste Reduction at Central Container Corp
Business & Environment Series: Polin - Waste Reduction at Central Container Corp
 
Business & Environment Series: Cioci-Lahd-Managing Upstream Waste
Business & Environment Series: Cioci-Lahd-Managing Upstream WasteBusiness & Environment Series: Cioci-Lahd-Managing Upstream Waste
Business & Environment Series: Cioci-Lahd-Managing Upstream Waste
 

Recently uploaded

Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Dr. P.B.Dharmasena
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理
yxfus
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
mvrpcz6
 
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
ehfyqtu
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
astuz
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
CIFOR-ICRAF
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
AmitKumar619042
 
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
pareeksulkash
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
neilsencassidy
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
xeexm
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
Addu25809
 

Recently uploaded (18)

Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
 
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
 
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
 

Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Lines in 12 Years

  • 1. Randall Roost Angie Goodman Principle Planner, Water Operations Water Quality Administrator Lansing Board of Water and Light Lansing Board of Water and Light Scott Hamelink Director, Water Operations Lansing Board of Water & Light
  • 2. Municipally owned utility Governed by a Board of Commissioners who set policy, approve budgets and rates Groundwater supplies two water conditioning plants that use lime- soda softening on water from 124 wells 22 MGD average daily demand providing water to 59,000 retail accounts
  • 3. Took ownership of all water service lines in 1927 Stopped installing LSLs in 1956 As a result of our ownership we developed a fairly accurate record of service line materials. Our service card files were kept up to date throughout. Inventoried all service line materials in 1980s, identifying as lead, copper, plastic or galvanized steel. Lead and galvanized were labeled “non-standard”. In 2004 we asked customers to self-identify LSLs. Vast majority confirmed our records. Card files were transferred to GIS.
  • 4. All sampling rounds have shown 90th % ile below 15ppb BWL conditioned water is high pH (9.4), moderate alkalinity (35) and hardness (98) Optimal Corrosion Control installed in 1997 Monitoring reduced to 50 locations every three years Some sampling rounds higher than others Began accelerated LSLR, public education in 2004
  • 5. Inventory showed about 17,000 LSLs as of the early 1990s Estimates were based on Customer Information System and GIS project Before 2004 lead service lines were replaced as needed. Developed accelerated LSLR Program, 2004 Proposed 14 year program, but the Board of Commissioners required that we target 10 years. Due to slowdown in combined sewer separation project, the anticipated completion date is now June of 2017. Current active LSLs remaining estimated at <500, 170 services with unknown materials that will be investigated to be determined if lead.
  • 6. Any lead service that is physically disturbed by such things as dig-ins, excavations, or leak repair. Services supplying schools, day care centers, or other identified sensitive populations as defined by the USEPA. Services where there are sample results in excess of 15 ppb. Services in the work zone of CSO replacement or street restorations. Multiple services within a compact area. Length of lead pipe present in the service line.
  • 7. 7 46 71 106 172 94 138 631 1632 1573 1669 1984 1974 902 596 388 329 198 210 0 500 1000 1500 2000 2500 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Number of LSLs Replaced Number of LSLs Replaced
  • 8. Coordination with street projects More difficult and expensive without City Combined Sewer Overflow (CSO) Separation Project or road resurfacing Cost per service goes from $3,500 when coordinating with CSO to $6,500 without CSO. Current removal method further reduces costs. Material Costs Copper price fluctuations and the Lead Free Act have some impact but are small relative to street cut impact
  • 9. Meter location and ownership House on slab, service line under house, porch, or driveway Meter pit conundrum, re: ownership Crew Mobilization No partial LSL replacement mandates same-day completion, leaving us the choice of idle crew or overtime Working in the same or adjacent blocks reduces mobilization costs
  • 10. • Bill stuffers • Special brochures to schools, day cares, health offices • Lead information on the BWL web site • Special meetings and community events • Neighborhood meetings • Preparations for customer response FAQs • Lead Hotline • Meetings with local media
  • 11. The BWL hosted several community open houses at various locations around the city. 8 Stations were manned at each location: Station 1 – Information about lead service lines Station 2 – Identifying lead service lines Station 3 – Sources of lead Station 4 – What the BWL is doing Station 5 – How to protect yourself from lead Station 6 – Where your water comes from Additionally there were two other stations. One manned by staff from the county health department , and one staffed by the MDEQ.
  • 12. BWL does not repair LSLs…replacements only! General Customer Outreach Beginning in 2004 we developed and distributed brochures and articles in bill stuffers Conducted Open Houses at local schools and community centers Added further recommended customer precautions to our Water Quality Report As LSLR continues there is less concern from the general public LSLR Notification Letter is sent to LSL address requesting customer to contact us for an appointment. The letter explains the process Letter includes an explanation of the replacement tasks, the need for home access, BWL and customer responsibilities Meet with customer prior to or day of LSLR to explain the process, including follow-up. This helps the customer understand the details. Emergency Replacements Used only in special conditions such as service breaks. We speak with the customer on site.
  • 13.
  • 14.
  • 15. Access Normally just coordination but ultimately comes down to a condition of service Easements We have not sought easements and therefore must count on good customer interaction and follow- through Through Wall Bore Potential liability. Occasional disputes can be expensive
  • 16. Yard Restoration, non-standard installations Trees, shrubs, plantings, crawl spaces, slab foundations, porches, driveways, sheds, drywall interiors, meter access require decisions case-by-case Budget! Approximately $42 million has been spent since 2004 LSLs are replaced as a capital project (an investment into infrastructure) Rate payers share in the cost and the community has been generally supportive We are currently spending on average $3 million per year on LSLR.
  • 17. No Response to First Letter: Phone Call Site Visit Second Letter Sent 10 Days after Water Service is Turned Off #1 #2
  • 18. Prior to beginning the actual replacement of the lead service there is a substantial amount of work that must be done in advance. Scheduling of the replacement with the customer can take many iterations before an acceptable timetable can be reached. Then the utility must coordinate with local Miss-Dig to locate other utilities in the excavation areas.
  • 19. The process begins by shutting off the curb stop to prevent any water in the system from entering the customers premises. This is especially important to minimize the transfer of any lead particulate into the service or the customer’s household piping during the excavation of the corporation at the main.
  • 20. Once the curb stop has been closed the work can then be divided into two different work groups. The first work group can then enter the premises and disconnect the service from the meter assembly. The second work group can then begin the excavation process at the main to expose the corporation fitting. Excavation can be accomplished with either a backhoe or by using a vacuum excavator. The advantage of the excavator is that it can minimize the potential risk to other utilities that can be difficult to locate or may have been miss-marked.
  • 21. Of course there is always a lot of hand digging that must be done as well. Once the corporation is exposed the water is shut off at that location as well. It is important that the excavation of the main and the corporation be controlled to prevent any water or soils from entering the corporation or the new service once it is installed.
  • 22. Meanwhile inside……. While the excavation continues outside the employee inside the residence begins the disconnection of the lead service and preparing the new copper for installation. We are also replacing the water meter at the same time since we already have access to the property.
  • 23. One of the most important steps in preparing the new copper line to ready for installation is the sealing of the new service before it is pulled. The end of the copper pipe is covered with electrical tape. The pulling sock is then placed over the end of the copper pipe. Within the pulling sock is a small rubber ball that is pressed against the taped end of the pipe to further prevent any potential particulate from entering the new copper service during installation.
  • 24. Once the corporation is exposed, the excavation then moves to the curb stop. The curb stop is removed by cutting the lead line on both sides of the curb stop. Then a line is fished through the lead line from the curb stop to the inside and a 3/8” steel cable is pulled back through the service.
  • 25. The copper pipe is then connected to the pulling harness and the harness is connected to the steel cable. Using the backhoe, the lead service is pulled out of the ground from the basement to the curb stop.
  • 26. Once the copper pipe is visible in the curb stop excavation, the process stops to allow the cable to be removed from the backhoe and it is then rethreaded through the portion of the lead service line between the curb stop and the corporation. The backhoe then pulls the copper line through to the corporation excavation. From there the new copper service is attached to the corporation.
  • 27. Once the copper is attached to the corporation then the copper line is cut in the curb stop excavation and a new curb stop is installed. Water is then turned back on for flushing of the new service line before new water meter is connected.
  • 28. We then provide a set of flushing instructions to the property owner for continued flushing of the premise plumbing, with each tap flushed for 5 minutes before moving to the next tap downstream from the meter. If the customer requests it a filter will be provided to them for use for the next 3 months as an added precaution.