This is to clarify that Mr. Sayan Basak, engineering trainee
(distribution) have successfully completed her training in LT mains
under my guidance as a part of the training program for engineering
trainee.
Date: .
Dy. Manager Mains
(Southern District)
Introduction
Kolkata, being one of the major hubs as far as India’s Industrial and Business
scenario is concerned; there is a steady increase in electricity demand in the
city. The scorching and sultry weather is also one of the key factors in this
regard. Every summer we see a rush ofapplications for new ACs leading to
heavy increase in load demand and hence system capacity.
Now, CESC has this responsibility of distributing power to the entire
population of 3 million in the metropolitan area of Kolkata and Howrah,
some portions of North & South 24 Parganas for which it has to maintain a
large distribution network. The distribution system is healthy and reliable
investments are made on an ongoing basis to maintain the network.
In addition to maintenance, CESC is constantly making efforts, inviting new
ideas to improve the existing network, starting from Distribution
Transformer up to the service end to meet various challenges faced by it on
daily basis.
Mainly distribution systems are of 2 types, they are-
• Primary Distribution system (33KV/11KV or 6KV)
• Secondary Distribution system (11KV or 6KV/400V)
Mains (Distribution) have two wings - LT and HT. Each of them has many
subdivisions. LT department is concerned with the secondary distribution
network (11 or 6kV/ 400V) that supplies electricity to domestic, commercial
and some industrial consumers. It basically deals with the fault detection,
restoration, new meter connection, LT cable joining etc. in LT network.
Day Wise Report:
Day 1 Report:
On Tuesday 19/07/2022, I reported at around 9 am at Jadavpur office. Asst.
Engineer sir Samaresh Gantait referred me to Mr Z. Khan, with him I went the
site Survery Park Kolkata.
Job Details: Two new service done on the 1462, Survey Park building and also
removal of old service under the supervisor Mr Z.Khan.
According to the job we have to place a new pole in front of this building.
• Firstly, a new pole is installed in front of the building and after that we
take connection from the nearest pole. A overhead service is done with 4
core LT AB (Arial Bunch) type cable used for this purpose. One G.I pipes
are sunk into holes dug with the help of earth Auger.
Job Slip for 49 mtr cable Job Slip for 45 mtr cable
After the pole installation we placed a 1100v underground service for main line
of the building. One cable is 49mtr long and another is 45mtr long according to
plan.
Laying of Service cable:
• Applicant’s details from job slip must be
verified.
• The meter board position and the wall for
fixing board must be verified.
• Depth of laying cable is 75 cm.
• Cable should be laid inside pipes
wherever crossing any installation of
other agencies and to be adequately
protected.
• Pre-cut length of cable is laid in trench
prepared and within pipes laid for this
purpose.
New Building where the work is done Pole arrived for installation
• The service cable should be containing a loop in ground below meter
board. This cable must enter meter board through a 75mm dia PVC pipe
1.0-meter-long placed vertically below ground.
For Joining the Connection:
The line was off for 1 hours form the
nearby pillar box and the jumper was
opened from the other side. Pillar boxes
are units from where the distribution takes
place i.e. they act as nodes. There are of
two types namely Feeder Pillar Box and
Distribution Pillar Box. In case of Feeder
Pillar Box it is connected to (400 mm2 XLPE
1.1kV grade cable) coming from the L.T end
of the transformer. While in a distribution
pillar box it may be connected to some
other pillar box or an overhead pole via
underground cables.
As the main work finished, the line was to
be normalised but before that they had to
check if there is any fault in the line.
Meter Board Installation:
• The main switch or MCB must
be identified.
• The board must be at least 1.0
meter verticaly above the floor
level.
• Earthing Brackets must be
provided to all meter boards.
• Asbestos millboards are fixed
over the rear wall for fre
protection.
Service Disconnected from Feeder Box
New Meter Installed
Day 2 Report:
On Wednesday 20/07/2022, I reported at around 9 am at Jadavpur office. Asst.
Engineer sir Samaresh Gantait referred me to Mr Z. Khan, with him I went the
site Golf Garden Kolkata.
Job Details: To install a feeder pillar in Golf Garden 17/D Prince Golam Hossain
Shah Rd under the supervisor Mr Z.Khan.
Job Slip
According to their service plan feeder pillar was installed over there.
Installation of Feeder Pillar Box:
• Mainly 6-way pillar box is generally installed there.
• This type of Feeder Pillar installed in conjunction with the distribution
transformer.
New Service Plan
• Here six nos. of cable may be terminated.
• Here four nos. of cablese may be
terminated.
Where to Erect:
• Erection requirements for both 4 & 6 way
are come.
• They are preferably to be erected on
footpaths.
• Sufficient clearance from building line is
maintained for smooth Pedestrian
movement.
Feeder Pillar Box Earthing:
• All pillar boxes body are earthed.
• Two nos. 4.5 mtr long and 50m dia C.I pipes are sunk into holes dug with
the help of earth Auger.
• The holes are 600mm apart and dug 450 mm away from pillar box.
• The neutral conductor is earthed only at Feeder box.
• Neural earth and body earth must be done on opposite side of the box
and separated by one meter.
Day 3 Report:
On Friday 22/07/2022, I reported at around 9 am at Jadavpur office. Asst.
Engineer sir Samaresh Gantait referred me to Prasanta sir, with him I went the
site Nava Nagar Colony.
Job Details: Jadavpur O/T No.1 U5—240 sqmm PVC dist. feed sing ACPB 316 U3
found 9R)/ (Red Phase No current).
Fault Type: Distributer Fault.
Pillar Box: JADAVPURE O/T T.1.F-1&2.
Cable Size: 240 Sqmm.
• Service was cut off from two pillar box. The Fault is happened on a linked
cable. Another pillar box we see the R phase is missing that means the
voltage of a R phase is zero. In case of linked cable, we have to punch the
cable to locate the fault.
• To perform punch or pin the cable we digging at the middle of the cable
length. Lamp test was done to locate different feeders and incomers.
• Necessary steps were taken in the pillar box so that underground digging
can be done safely to locate the fault.
• Several pockets were made in the ground to locate the fault. It was done
in the pin test method.
Faulty Pillar Box Fault occur on fifth number unit
After cut off the faulty part then that cable was prepared for the join. Using 240-
240 straight joint kit for joining this cable.
Finally, after the completed the joint check all the line and then supply was
resumed.
Pin Test is running Main Faulty Part
Cable joining is running Pour the mixture compound in the joint
Conclusion:
I have completed my training in LT cell from Jadavpur site under Mr
Soumyabrata Mazumder from the period of 18/07/2022 to 23/07/2022.
Throughout the training period I learned about new supply lines, Underground
distribution cable fault, service fault about pillar box etc.
The training was very an important as it helps to gain practical knowledge about
the subject which will helped me to gain practical knowledge and experience.

More Related Content

Similar to Sayan CESC LT Report.pdf

Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
TalhaAbdulRehman2
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
Harish Agarwal
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
Tejveer Choudhary
 
Vinay r epo rt
Vinay r epo rtVinay r epo rt
Vinay r epo rt
Vinay Vashisht
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
Vinayak Prabhutendolkar
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMB SARKAR
 
ppt on gss
ppt on gssppt on gss
ppt on gss
harendrasharma25
 
ppt on gss
ppt on gssppt on gss
ppt on gss
harendrasharma25
 
Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02
k,l polytechnic roorkee
 
Solar Power Plant At Dindigul
Solar Power Plant At DindigulSolar Power Plant At Dindigul
Solar Power Plant At Dindigul
wajidsharieff
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
PremanandDesai
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
MUKULKUMAR210
 
hiren pathak-CV
hiren pathak-CVhiren pathak-CV
hiren pathak-CV
Hiren Pathak
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
ankesh kumar
 
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Environmental Initiative
 
220 kv g.s.s, report
 220 kv g.s.s, report 220 kv g.s.s, report
220 kv g.s.s, reportpanna rayal
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
Harish Agarwal
 

Similar to Sayan CESC LT Report.pdf (20)

Final Presentation Talha (1).pptx
Final Presentation Talha (1).pptxFinal Presentation Talha (1).pptx
Final Presentation Talha (1).pptx
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
Vinay r epo rt
Vinay r epo rtVinay r epo rt
Vinay r epo rt
 
Resume- Plant Manager- Harish
Resume- Plant Manager- HarishResume- Plant Manager- Harish
Resume- Plant Manager- Harish
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
ppt on gss
ppt on gssppt on gss
ppt on gss
 
ppt on gss
ppt on gssppt on gss
ppt on gss
 
Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02
 
Solar Power Plant At Dindigul
Solar Power Plant At DindigulSolar Power Plant At Dindigul
Solar Power Plant At Dindigul
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
Resume
ResumeResume
Resume
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
 
hiren pathak-CV
hiren pathak-CVhiren pathak-CV
hiren pathak-CV
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...
 
220 kv g.s.s, report
 220 kv g.s.s, report 220 kv g.s.s, report
220 kv g.s.s, report
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 

Recently uploaded

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Sayan CESC LT Report.pdf

  • 1. The Calcutta Electric Supply Corporation Limited (CESC) VOCTIONAL TRAINING REPORT ON LT MAINS (SOUTHERN DISTRICT) Submitted By, Name: SAYAN BASAK B. P. Poddar Institute of Management and Technology University Roll: 11501620025 Date: 18/07/2022 – 23/07/2022
  • 2. Certificate of Declaration: This is to clarify that Mr. Sayan Basak, engineering trainee (distribution) have successfully completed her training in LT mains under my guidance as a part of the training program for engineering trainee. Date: . Dy. Manager Mains (Southern District)
  • 3. Introduction Kolkata, being one of the major hubs as far as India’s Industrial and Business scenario is concerned; there is a steady increase in electricity demand in the city. The scorching and sultry weather is also one of the key factors in this regard. Every summer we see a rush ofapplications for new ACs leading to heavy increase in load demand and hence system capacity. Now, CESC has this responsibility of distributing power to the entire population of 3 million in the metropolitan area of Kolkata and Howrah, some portions of North & South 24 Parganas for which it has to maintain a large distribution network. The distribution system is healthy and reliable investments are made on an ongoing basis to maintain the network. In addition to maintenance, CESC is constantly making efforts, inviting new ideas to improve the existing network, starting from Distribution Transformer up to the service end to meet various challenges faced by it on daily basis. Mainly distribution systems are of 2 types, they are- • Primary Distribution system (33KV/11KV or 6KV) • Secondary Distribution system (11KV or 6KV/400V) Mains (Distribution) have two wings - LT and HT. Each of them has many subdivisions. LT department is concerned with the secondary distribution network (11 or 6kV/ 400V) that supplies electricity to domestic, commercial and some industrial consumers. It basically deals with the fault detection, restoration, new meter connection, LT cable joining etc. in LT network.
  • 4. Day Wise Report: Day 1 Report: On Tuesday 19/07/2022, I reported at around 9 am at Jadavpur office. Asst. Engineer sir Samaresh Gantait referred me to Mr Z. Khan, with him I went the site Survery Park Kolkata. Job Details: Two new service done on the 1462, Survey Park building and also removal of old service under the supervisor Mr Z.Khan. According to the job we have to place a new pole in front of this building. • Firstly, a new pole is installed in front of the building and after that we take connection from the nearest pole. A overhead service is done with 4 core LT AB (Arial Bunch) type cable used for this purpose. One G.I pipes are sunk into holes dug with the help of earth Auger. Job Slip for 49 mtr cable Job Slip for 45 mtr cable
  • 5. After the pole installation we placed a 1100v underground service for main line of the building. One cable is 49mtr long and another is 45mtr long according to plan. Laying of Service cable: • Applicant’s details from job slip must be verified. • The meter board position and the wall for fixing board must be verified. • Depth of laying cable is 75 cm. • Cable should be laid inside pipes wherever crossing any installation of other agencies and to be adequately protected. • Pre-cut length of cable is laid in trench prepared and within pipes laid for this purpose. New Building where the work is done Pole arrived for installation
  • 6. • The service cable should be containing a loop in ground below meter board. This cable must enter meter board through a 75mm dia PVC pipe 1.0-meter-long placed vertically below ground. For Joining the Connection: The line was off for 1 hours form the nearby pillar box and the jumper was opened from the other side. Pillar boxes are units from where the distribution takes place i.e. they act as nodes. There are of two types namely Feeder Pillar Box and Distribution Pillar Box. In case of Feeder Pillar Box it is connected to (400 mm2 XLPE 1.1kV grade cable) coming from the L.T end of the transformer. While in a distribution pillar box it may be connected to some other pillar box or an overhead pole via underground cables. As the main work finished, the line was to be normalised but before that they had to check if there is any fault in the line. Meter Board Installation: • The main switch or MCB must be identified. • The board must be at least 1.0 meter verticaly above the floor level. • Earthing Brackets must be provided to all meter boards. • Asbestos millboards are fixed over the rear wall for fre protection. Service Disconnected from Feeder Box New Meter Installed
  • 7. Day 2 Report: On Wednesday 20/07/2022, I reported at around 9 am at Jadavpur office. Asst. Engineer sir Samaresh Gantait referred me to Mr Z. Khan, with him I went the site Golf Garden Kolkata. Job Details: To install a feeder pillar in Golf Garden 17/D Prince Golam Hossain Shah Rd under the supervisor Mr Z.Khan. Job Slip
  • 8. According to their service plan feeder pillar was installed over there. Installation of Feeder Pillar Box: • Mainly 6-way pillar box is generally installed there. • This type of Feeder Pillar installed in conjunction with the distribution transformer. New Service Plan
  • 9. • Here six nos. of cable may be terminated. • Here four nos. of cablese may be terminated. Where to Erect: • Erection requirements for both 4 & 6 way are come. • They are preferably to be erected on footpaths. • Sufficient clearance from building line is maintained for smooth Pedestrian movement. Feeder Pillar Box Earthing: • All pillar boxes body are earthed. • Two nos. 4.5 mtr long and 50m dia C.I pipes are sunk into holes dug with the help of earth Auger. • The holes are 600mm apart and dug 450 mm away from pillar box. • The neutral conductor is earthed only at Feeder box. • Neural earth and body earth must be done on opposite side of the box and separated by one meter.
  • 10. Day 3 Report: On Friday 22/07/2022, I reported at around 9 am at Jadavpur office. Asst. Engineer sir Samaresh Gantait referred me to Prasanta sir, with him I went the site Nava Nagar Colony. Job Details: Jadavpur O/T No.1 U5—240 sqmm PVC dist. feed sing ACPB 316 U3 found 9R)/ (Red Phase No current).
  • 11. Fault Type: Distributer Fault. Pillar Box: JADAVPURE O/T T.1.F-1&2. Cable Size: 240 Sqmm. • Service was cut off from two pillar box. The Fault is happened on a linked cable. Another pillar box we see the R phase is missing that means the voltage of a R phase is zero. In case of linked cable, we have to punch the cable to locate the fault. • To perform punch or pin the cable we digging at the middle of the cable length. Lamp test was done to locate different feeders and incomers. • Necessary steps were taken in the pillar box so that underground digging can be done safely to locate the fault. • Several pockets were made in the ground to locate the fault. It was done in the pin test method. Faulty Pillar Box Fault occur on fifth number unit
  • 12. After cut off the faulty part then that cable was prepared for the join. Using 240- 240 straight joint kit for joining this cable. Finally, after the completed the joint check all the line and then supply was resumed. Pin Test is running Main Faulty Part Cable joining is running Pour the mixture compound in the joint
  • 13. Conclusion: I have completed my training in LT cell from Jadavpur site under Mr Soumyabrata Mazumder from the period of 18/07/2022 to 23/07/2022. Throughout the training period I learned about new supply lines, Underground distribution cable fault, service fault about pillar box etc. The training was very an important as it helps to gain practical knowledge about the subject which will helped me to gain practical knowledge and experience.