Sayan Basak completed a vocational training on LT mains distribution with CESC in Kolkata from July 18-23, 2022. Over three days, Sayan assisted with installing new service lines, installing a feeder pillar box, and locating an underground cable fault. Sayan gained hands-on experience with tasks like laying service cables, joining connections, installing meter boards, and using the pin test method to locate faults. The training provided valuable practical knowledge about maintaining and improving CESC's secondary distribution network.
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREPremanandDesai
Code of practice for Distribution Lines and Transformer centre, types of transformer centres -
Pole mounted, plinth mounted, indoor and outdoor types. Determining the rating of
Distribution Transformer. Write Specifications of the Distribution Transformer. Draw the
SLD of a Transformer centre indicating the size of protective devices, Prepare the schedule of
equipments /Materials with specifications for a 11KV/415V,100 KVA transformer centre and
their estimates, 415 V LT line materials and specifications , method of calculating various LT
line materials (only). Prepare the schedule of materials (only) for 3 phase 4 wire LT line,
11 KV HT Line-materials and their specifications, method of calculating various HT line
materials and tapping structure, TOPO sheet and its use, Concept of combined estimates.
Prepare the schedule of materials (only) for 11 KV single circuit HT line for Rural
Electrification.
(Note: HT lines over head type only)
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...Environmental Initiative
Lansing is one of only two cities in the United States to have completely replaced their lead service lines and is advising Flint, Michigan in the wake of their drinking water crisis. Scott Hamelink talked about how and why Lansing replaced their lead pipes, focusing on the methods that allowed them to cut the cost of replacement by more than half.
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREPremanandDesai
Code of practice for Distribution Lines and Transformer centre, types of transformer centres -
Pole mounted, plinth mounted, indoor and outdoor types. Determining the rating of
Distribution Transformer. Write Specifications of the Distribution Transformer. Draw the
SLD of a Transformer centre indicating the size of protective devices, Prepare the schedule of
equipments /Materials with specifications for a 11KV/415V,100 KVA transformer centre and
their estimates, 415 V LT line materials and specifications , method of calculating various LT
line materials (only). Prepare the schedule of materials (only) for 3 phase 4 wire LT line,
11 KV HT Line-materials and their specifications, method of calculating various HT line
materials and tapping structure, TOPO sheet and its use, Concept of combined estimates.
Prepare the schedule of materials (only) for 11 KV single circuit HT line for Rural
Electrification.
(Note: HT lines over head type only)
Getting the Lead Out: How Lansing, Michigan Replaced 13,500 Lead Service Line...Environmental Initiative
Lansing is one of only two cities in the United States to have completely replaced their lead service lines and is advising Flint, Michigan in the wake of their drinking water crisis. Scott Hamelink talked about how and why Lansing replaced their lead pipes, focusing on the methods that allowed them to cut the cost of replacement by more than half.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
1. The Calcutta Electric Supply Corporation Limited
(CESC)
VOCTIONAL TRAINING REPORT ON
LT MAINS
(SOUTHERN DISTRICT)
Submitted By,
Name: SAYAN BASAK
B. P. Poddar Institute of Management and
Technology
University Roll: 11501620025
Date: 18/07/2022 – 23/07/2022
2. Certificate of Declaration:
This is to clarify that Mr. Sayan Basak, engineering trainee
(distribution) have successfully completed her training in LT mains
under my guidance as a part of the training program for engineering
trainee.
Date: .
Dy. Manager Mains
(Southern District)
3. Introduction
Kolkata, being one of the major hubs as far as India’s Industrial and Business
scenario is concerned; there is a steady increase in electricity demand in the
city. The scorching and sultry weather is also one of the key factors in this
regard. Every summer we see a rush ofapplications for new ACs leading to
heavy increase in load demand and hence system capacity.
Now, CESC has this responsibility of distributing power to the entire
population of 3 million in the metropolitan area of Kolkata and Howrah,
some portions of North & South 24 Parganas for which it has to maintain a
large distribution network. The distribution system is healthy and reliable
investments are made on an ongoing basis to maintain the network.
In addition to maintenance, CESC is constantly making efforts, inviting new
ideas to improve the existing network, starting from Distribution
Transformer up to the service end to meet various challenges faced by it on
daily basis.
Mainly distribution systems are of 2 types, they are-
• Primary Distribution system (33KV/11KV or 6KV)
• Secondary Distribution system (11KV or 6KV/400V)
Mains (Distribution) have two wings - LT and HT. Each of them has many
subdivisions. LT department is concerned with the secondary distribution
network (11 or 6kV/ 400V) that supplies electricity to domestic, commercial
and some industrial consumers. It basically deals with the fault detection,
restoration, new meter connection, LT cable joining etc. in LT network.
4. Day Wise Report:
Day 1 Report:
On Tuesday 19/07/2022, I reported at around 9 am at Jadavpur office. Asst.
Engineer sir Samaresh Gantait referred me to Mr Z. Khan, with him I went the
site Survery Park Kolkata.
Job Details: Two new service done on the 1462, Survey Park building and also
removal of old service under the supervisor Mr Z.Khan.
According to the job we have to place a new pole in front of this building.
• Firstly, a new pole is installed in front of the building and after that we
take connection from the nearest pole. A overhead service is done with 4
core LT AB (Arial Bunch) type cable used for this purpose. One G.I pipes
are sunk into holes dug with the help of earth Auger.
Job Slip for 49 mtr cable Job Slip for 45 mtr cable
5. After the pole installation we placed a 1100v underground service for main line
of the building. One cable is 49mtr long and another is 45mtr long according to
plan.
Laying of Service cable:
• Applicant’s details from job slip must be
verified.
• The meter board position and the wall for
fixing board must be verified.
• Depth of laying cable is 75 cm.
• Cable should be laid inside pipes
wherever crossing any installation of
other agencies and to be adequately
protected.
• Pre-cut length of cable is laid in trench
prepared and within pipes laid for this
purpose.
New Building where the work is done Pole arrived for installation
6. • The service cable should be containing a loop in ground below meter
board. This cable must enter meter board through a 75mm dia PVC pipe
1.0-meter-long placed vertically below ground.
For Joining the Connection:
The line was off for 1 hours form the
nearby pillar box and the jumper was
opened from the other side. Pillar boxes
are units from where the distribution takes
place i.e. they act as nodes. There are of
two types namely Feeder Pillar Box and
Distribution Pillar Box. In case of Feeder
Pillar Box it is connected to (400 mm2 XLPE
1.1kV grade cable) coming from the L.T end
of the transformer. While in a distribution
pillar box it may be connected to some
other pillar box or an overhead pole via
underground cables.
As the main work finished, the line was to
be normalised but before that they had to
check if there is any fault in the line.
Meter Board Installation:
• The main switch or MCB must
be identified.
• The board must be at least 1.0
meter verticaly above the floor
level.
• Earthing Brackets must be
provided to all meter boards.
• Asbestos millboards are fixed
over the rear wall for fre
protection.
Service Disconnected from Feeder Box
New Meter Installed
7. Day 2 Report:
On Wednesday 20/07/2022, I reported at around 9 am at Jadavpur office. Asst.
Engineer sir Samaresh Gantait referred me to Mr Z. Khan, with him I went the
site Golf Garden Kolkata.
Job Details: To install a feeder pillar in Golf Garden 17/D Prince Golam Hossain
Shah Rd under the supervisor Mr Z.Khan.
Job Slip
8. According to their service plan feeder pillar was installed over there.
Installation of Feeder Pillar Box:
• Mainly 6-way pillar box is generally installed there.
• This type of Feeder Pillar installed in conjunction with the distribution
transformer.
New Service Plan
9. • Here six nos. of cable may be terminated.
• Here four nos. of cablese may be
terminated.
Where to Erect:
• Erection requirements for both 4 & 6 way
are come.
• They are preferably to be erected on
footpaths.
• Sufficient clearance from building line is
maintained for smooth Pedestrian
movement.
Feeder Pillar Box Earthing:
• All pillar boxes body are earthed.
• Two nos. 4.5 mtr long and 50m dia C.I pipes are sunk into holes dug with
the help of earth Auger.
• The holes are 600mm apart and dug 450 mm away from pillar box.
• The neutral conductor is earthed only at Feeder box.
• Neural earth and body earth must be done on opposite side of the box
and separated by one meter.
10. Day 3 Report:
On Friday 22/07/2022, I reported at around 9 am at Jadavpur office. Asst.
Engineer sir Samaresh Gantait referred me to Prasanta sir, with him I went the
site Nava Nagar Colony.
Job Details: Jadavpur O/T No.1 U5—240 sqmm PVC dist. feed sing ACPB 316 U3
found 9R)/ (Red Phase No current).
11. Fault Type: Distributer Fault.
Pillar Box: JADAVPURE O/T T.1.F-1&2.
Cable Size: 240 Sqmm.
• Service was cut off from two pillar box. The Fault is happened on a linked
cable. Another pillar box we see the R phase is missing that means the
voltage of a R phase is zero. In case of linked cable, we have to punch the
cable to locate the fault.
• To perform punch or pin the cable we digging at the middle of the cable
length. Lamp test was done to locate different feeders and incomers.
• Necessary steps were taken in the pillar box so that underground digging
can be done safely to locate the fault.
• Several pockets were made in the ground to locate the fault. It was done
in the pin test method.
Faulty Pillar Box Fault occur on fifth number unit
12. After cut off the faulty part then that cable was prepared for the join. Using 240-
240 straight joint kit for joining this cable.
Finally, after the completed the joint check all the line and then supply was
resumed.
Pin Test is running Main Faulty Part
Cable joining is running Pour the mixture compound in the joint
13. Conclusion:
I have completed my training in LT cell from Jadavpur site under Mr
Soumyabrata Mazumder from the period of 18/07/2022 to 23/07/2022.
Throughout the training period I learned about new supply lines, Underground
distribution cable fault, service fault about pillar box etc.
The training was very an important as it helps to gain practical knowledge about
the subject which will helped me to gain practical knowledge and experience.