SlideShare a Scribd company logo
1 of 52
•UNIT I INTRODUCTION TO PROCESS PLANNING
•UNIT II PROCESS PLANNING ACTIVITIES
•UNIT III INTRODUCTION TO COST ESTIMATION
•UNIT IV PRODUCTION COST ESTIMATION
•UNIT V MACHINING TIME CALCULATION
UNIT V
MACHINING TIME CALCULATION
• Estimation of machining time
• Importance of machine time calculation
• Calculation of machining time for different lathe operations,
Drilling and Boring
• Machining time calculation for Milling, Shaping and Planning
• Machining time calculation for grinding
Introduction
• To estimate the total cost of any product involving machining
operations, the machining cost is to be estimated primarily.
• In order to estimate the machining cost, one has to calculate
the machining time required for these machining operations.
• After knowing the machining time and rate of machining, the
total machining cost can be calculated.
• Therefore the estimation of machining time for various
operations such as lathe, drilling. boring, shaping, planning,
milling and grinding operations are very essential in the cost
estimation activity.
What is meant by Machining Time?
• It is time for which the machine works on the component
• From the time when the tool touches the work to when the
tool leaves the component after completion of operation
• The machining time depends on die type and extent of
machining required, material being machined, speed, feed,
depth of cut and number of cuts required
• In addition to the actual machining time, an estimator has to
consider other time elements such as set-up time, handling
time, tear down time, down time and allowances to the
workers.
FACTORS TO BE CONSIDERED FOR
MACHINE TIME CALCULATION
•Set up time
•Operation time
•Tear down time
•Personal allowance
•Fatigue allowance
•Checking allowance
•Miscellaneous allowance
SETUPTIME
• This takes into account the time required to prepare the
machine for doing the job with the time taken to study the
blue print.
• The time to prepare the machine, in turn
• The time to install and adjust the tools in the machine, as well
as to make the machine ready to start the work.
OPERATION TIME
• The sum of handling time and machining time for a job is
called operation time.
• It is the duration of time that elapses between output of two
consecutive units of production.
TEAR DOWN TIME
• Tear down time takes into account the time necessary to
remove from the machine all tools and accessories, such as
jigs and fixtures, gauges and instruments etc.
• The time required for clearing operational chips from the
machine table and clearing of the machine itself are included
on this.
• Tear down time is generally 10 minute per shift of 8 hrs.
PERSONALALLOWANCE
• The time allowed for workers to meet their personal needs,
such as going to the urinal, drinking water, smoking, washing
their hands, etc is known as personal allowance.
• It is generally 5 to 10 minutes
FATIGUE ALLOWANCE
• The long working hours and poor working conditions such as
poor lighting, poor ventilation etc., cause fatigue
• Fatigue effect the efficiency of worker
• Fatigue decreases the worker capacity to work.
• The allowance for fatigue is taken depending upon the type
of work.
IMPORTANCE OF MACHINING TIME
CALCULATION
•To find the manufacturing cost of a particular job the
calculation of machining time is important, this
requires one or more machining operations.
•After determining the total time for machining, and
knowing the machining cost per unit time, the total
cost of machining can be worked out.
•Machining time is calculated by applying certain
basic formulae, tables of variables and constants.
• The basic formula used is
TRAVEL OF THE TOOL
• This is determined from the dimensions in the actual drawing of the part to be
manufactured.
• The necessary allowances for the tool approach and over-run for clearing the
tool off the job are taken into account with the actual length of the work, to
find the travel of the tool.
FEED
• Feed is the distance, through which the tool advances into the job in
one revolution
• If the work or the distance that the table holding the work travels is
one stroke of the tool. In metric units, feed is usually expressed in
mm/revolution or mm/stroke.
• Feed depends on the depth of cut, fitness of the work desired, rpm of
the job, etc.
DEPTH OF CUT
• It is the penetration of the cutting tool into the job in a single cut.
• In metric units, the depth of cut is expressed in mm.
• The depth of cut depends upon the fitness of the job required, such as
higher depth of cut for rough cut and smaller depth of cut for finish
cut.
RPM
• It represents the number of revolutions of the m/c spindle in one
minute.
• Thus it is the number of revolutions per minute of the job or of tool.
CUTTING SPEED
• The cutting speed can be defined as the relative surface speed
between the tool and the job.
• It is expressed in meters per minute (mpm)
• For example if a job of diameter D mm is revolving at a speed of N
rpm
CALCULATION OF MACHINING TIME FOR
DIFFERENT LATHE
OPERATIONS
Where D = Diameter of given blank,
d = diameter of blank after turning.
• In turning operation, the depth of cut should not exceed 3 mm for
rough cuts and 0.7 5 mm for finishing cuts.
FACING OPERATION
KNURLING
Continued…
REAMING
EXTERNAL RELIEF TURNING
TAPPING
THREADING
DRILLING
BORING
CHAMFERING
MACHINING TIME FOR SHAPING AND PLANING
• Shaping, planning and slotting operations are carried out on
reciprocating machines with a single point cutting tool.
Formula used
Estimation of time for milling operation
The approach is the distance the cutter must be engaged
before the full depth of cut is reached.
When cutter diameter is less than the width of the work.
(b) When cutter diameter is greater than the width of the
work.
Slab milling operation:
Estimation of time for Grinding operation
Formula used
PPCE Unit   5
PPCE Unit   5
PPCE Unit   5
PPCE Unit   5

More Related Content

What's hot (20)

Merchant circle diagram
Merchant circle diagramMerchant circle diagram
Merchant circle diagram
 
Ppce unit 2- PROCESS PLANNING ACTIVITIES
Ppce unit 2- PROCESS PLANNING ACTIVITIESPpce unit 2- PROCESS PLANNING ACTIVITIES
Ppce unit 2- PROCESS PLANNING ACTIVITIES
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
Advanced Manufacturing Technology
Advanced Manufacturing TechnologyAdvanced Manufacturing Technology
Advanced Manufacturing Technology
 
Unit 1
Unit   1Unit   1
Unit 1
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process Planning
 
Vmc.pptx
Vmc.pptxVmc.pptx
Vmc.pptx
 
Process Planning & Cost Estimation
Process Planning & Cost EstimationProcess Planning & Cost Estimation
Process Planning & Cost Estimation
 
CNC Machines and its Components
CNC Machines and its ComponentsCNC Machines and its Components
CNC Machines and its Components
 
VMC Machine
VMC Machine VMC Machine
VMC Machine
 
Tool wear and tool Life
Tool wear and tool LifeTool wear and tool Life
Tool wear and tool Life
 
Types of cnc machines
Types of cnc machinesTypes of cnc machines
Types of cnc machines
 
FUNDAMENTALS OF CNC & PART PROGRAMMING - UNIT - 4 CAD&M
FUNDAMENTALS OF CNC & PART PROGRAMMING - UNIT - 4 CAD&MFUNDAMENTALS OF CNC & PART PROGRAMMING - UNIT - 4 CAD&M
FUNDAMENTALS OF CNC & PART PROGRAMMING - UNIT - 4 CAD&M
 
Nc part programming
Nc part programmingNc part programming
Nc part programming
 
Machine tools
Machine toolsMachine tools
Machine tools
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tool
 
Cnc cutting tools
Cnc cutting toolsCnc cutting tools
Cnc cutting tools
 
Process Planning
Process PlanningProcess Planning
Process Planning
 
CAD/CAM
CAD/CAMCAD/CAM
CAD/CAM
 
Introduction to manufacturing process
Introduction to manufacturing processIntroduction to manufacturing process
Introduction to manufacturing process
 

Similar to PPCE Unit 5

MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONDJAGADEESH1
 
UNIT- 5.pptx
UNIT- 5.pptxUNIT- 5.pptx
UNIT- 5.pptxAravind Ra
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptxDr.PERIASAMY K
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptxDJAGADEESH1
 
Process planning and cost estimation unit v
Process planning and cost estimation  unit   vProcess planning and cost estimation  unit   v
Process planning and cost estimation unit vs Kumaravel
 
Product Design & Development
Product Design & DevelopmentProduct Design & Development
Product Design & DevelopmentKashifChangez
 
unit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxVENKATESH676259
 
Process planning with an example
Process planning with an exampleProcess planning with an example
Process planning with an exampleHiran Gabriel
 
Introduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfIntroduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfPrabathDissanayake8
 
SNSCT
SNSCTSNSCT
SNSCTDharunCk
 
2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.pptMPIndhu
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTHamza Nasir
 
PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)Asim Aslam
 
lathe operations
lathe operationslathe operations
lathe operationsRaja P
 
internship presentation.pptx
internship presentation.pptxinternship presentation.pptx
internship presentation.pptxChinmaiKumar
 
Chapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centersChapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centersRAHUL THAKER
 
Drilling operation
Drilling operationDrilling operation
Drilling operationShehryarAwan3
 

Similar to PPCE Unit 5 (20)

MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
UNIT- 5.pptx
UNIT- 5.pptxUNIT- 5.pptx
UNIT- 5.pptx
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptx
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptx
 
Process planning and cost estimation unit v
Process planning and cost estimation  unit   vProcess planning and cost estimation  unit   v
Process planning and cost estimation unit v
 
Product Design & Development
Product Design & DevelopmentProduct Design & Development
Product Design & Development
 
unit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptx
 
Process planning with an example
Process planning with an exampleProcess planning with an example
Process planning with an example
 
Introduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfIntroduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdf
 
SNSCT
SNSCTSNSCT
SNSCT
 
2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
 
PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)PMTF INTERNSHIP (9 june tp 25 june-2015)
PMTF INTERNSHIP (9 june tp 25 june-2015)
 
lathe operations
lathe operationslathe operations
lathe operations
 
internship presentation.pptx
internship presentation.pptxinternship presentation.pptx
internship presentation.pptx
 
Drilling
DrillingDrilling
Drilling
 
Drilling (1)
Drilling (1)Drilling (1)
Drilling (1)
 
Chapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centersChapter 3 CNC turning and machining centers
Chapter 3 CNC turning and machining centers
 
Drilling operation
Drilling operationDrilling operation
Drilling operation
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 

More from Aravind Ra

PPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxPPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxAravind Ra
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxAravind Ra
 
PPCE UNIT- 2.pptx
PPCE UNIT- 2.pptxPPCE UNIT- 2.pptx
PPCE UNIT- 2.pptxAravind Ra
 
UNIT- 1.pptx
UNIT- 1.pptxUNIT- 1.pptx
UNIT- 1.pptxAravind Ra
 
clutch.ppt
clutch.pptclutch.ppt
clutch.pptAravind Ra
 
UNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.pptUNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.pptAravind Ra
 
unit_iii_bevel_gear.ppt
unit_iii_bevel_gear.pptunit_iii_bevel_gear.ppt
unit_iii_bevel_gear.pptAravind Ra
 
UNIT-2 DTS.pptx
UNIT-2 DTS.pptxUNIT-2 DTS.pptx
UNIT-2 DTS.pptxAravind Ra
 
UNIT-I DTS.pptx
UNIT-I DTS.pptxUNIT-I DTS.pptx
UNIT-I DTS.pptxAravind Ra
 
UNIT-V FMM
UNIT-V FMMUNIT-V FMM
UNIT-V FMMAravind Ra
 
UNIT-IV FMM
UNIT-IV FMMUNIT-IV FMM
UNIT-IV FMMAravind Ra
 
UNIT-III FMM
UNIT-III FMMUNIT-III FMM
UNIT-III FMMAravind Ra
 
UNIT-II FMM
UNIT-II FMMUNIT-II FMM
UNIT-II FMMAravind Ra
 
UNIT-I FMM
UNIT-I FMMUNIT-I FMM
UNIT-I FMMAravind Ra
 
Unit 2 planning
Unit 2 planningUnit 2 planning
Unit 2 planningAravind Ra
 
Unit 1 overview of management
Unit 1 overview of managementUnit 1 overview of management
Unit 1 overview of managementAravind Ra
 
Unit 5---bearings
Unit 5---bearingsUnit 5---bearings
Unit 5---bearingsAravind Ra
 
Unit 4---springs
Unit 4---springsUnit 4---springs
Unit 4---springsAravind Ra
 
Unit 3---knuckle joint--
Unit   3---knuckle joint--Unit   3---knuckle joint--
Unit 3---knuckle joint--Aravind Ra
 
Coupling -unit-2
Coupling -unit-2Coupling -unit-2
Coupling -unit-2Aravind Ra
 

More from Aravind Ra (20)

PPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxPPCE UNIT- 4.pptx
PPCE UNIT- 4.pptx
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptx
 
PPCE UNIT- 2.pptx
PPCE UNIT- 2.pptxPPCE UNIT- 2.pptx
PPCE UNIT- 2.pptx
 
UNIT- 1.pptx
UNIT- 1.pptxUNIT- 1.pptx
UNIT- 1.pptx
 
clutch.ppt
clutch.pptclutch.ppt
clutch.ppt
 
UNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.pptUNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.ppt
 
unit_iii_bevel_gear.ppt
unit_iii_bevel_gear.pptunit_iii_bevel_gear.ppt
unit_iii_bevel_gear.ppt
 
UNIT-2 DTS.pptx
UNIT-2 DTS.pptxUNIT-2 DTS.pptx
UNIT-2 DTS.pptx
 
UNIT-I DTS.pptx
UNIT-I DTS.pptxUNIT-I DTS.pptx
UNIT-I DTS.pptx
 
UNIT-V FMM
UNIT-V FMMUNIT-V FMM
UNIT-V FMM
 
UNIT-IV FMM
UNIT-IV FMMUNIT-IV FMM
UNIT-IV FMM
 
UNIT-III FMM
UNIT-III FMMUNIT-III FMM
UNIT-III FMM
 
UNIT-II FMM
UNIT-II FMMUNIT-II FMM
UNIT-II FMM
 
UNIT-I FMM
UNIT-I FMMUNIT-I FMM
UNIT-I FMM
 
Unit 2 planning
Unit 2 planningUnit 2 planning
Unit 2 planning
 
Unit 1 overview of management
Unit 1 overview of managementUnit 1 overview of management
Unit 1 overview of management
 
Unit 5---bearings
Unit 5---bearingsUnit 5---bearings
Unit 5---bearings
 
Unit 4---springs
Unit 4---springsUnit 4---springs
Unit 4---springs
 
Unit 3---knuckle joint--
Unit   3---knuckle joint--Unit   3---knuckle joint--
Unit 3---knuckle joint--
 
Coupling -unit-2
Coupling -unit-2Coupling -unit-2
Coupling -unit-2
 

Recently uploaded

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEslot gacor bisa pakai pulsa
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Top Rated Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĂŁo Esperancinha
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Top Rated Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth âźź 6297143586 âźź Call Me For Genuine Se...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

PPCE Unit 5

  • 1. •UNIT I INTRODUCTION TO PROCESS PLANNING •UNIT II PROCESS PLANNING ACTIVITIES •UNIT III INTRODUCTION TO COST ESTIMATION •UNIT IV PRODUCTION COST ESTIMATION •UNIT V MACHINING TIME CALCULATION
  • 2. UNIT V MACHINING TIME CALCULATION • Estimation of machining time • Importance of machine time calculation • Calculation of machining time for different lathe operations, Drilling and Boring • Machining time calculation for Milling, Shaping and Planning • Machining time calculation for grinding
  • 3. Introduction • To estimate the total cost of any product involving machining operations, the machining cost is to be estimated primarily. • In order to estimate the machining cost, one has to calculate the machining time required for these machining operations. • After knowing the machining time and rate of machining, the total machining cost can be calculated. • Therefore the estimation of machining time for various operations such as lathe, drilling. boring, shaping, planning, milling and grinding operations are very essential in the cost estimation activity.
  • 4. What is meant by Machining Time? • It is time for which the machine works on the component • From the time when the tool touches the work to when the tool leaves the component after completion of operation • The machining time depends on die type and extent of machining required, material being machined, speed, feed, depth of cut and number of cuts required • In addition to the actual machining time, an estimator has to consider other time elements such as set-up time, handling time, tear down time, down time and allowances to the workers.
  • 5. FACTORS TO BE CONSIDERED FOR MACHINE TIME CALCULATION •Set up time •Operation time •Tear down time •Personal allowance •Fatigue allowance •Checking allowance •Miscellaneous allowance
  • 6. SETUPTIME • This takes into account the time required to prepare the machine for doing the job with the time taken to study the blue print. • The time to prepare the machine, in turn • The time to install and adjust the tools in the machine, as well as to make the machine ready to start the work.
  • 7. OPERATION TIME • The sum of handling time and machining time for a job is called operation time. • It is the duration of time that elapses between output of two consecutive units of production. TEAR DOWN TIME • Tear down time takes into account the time necessary to remove from the machine all tools and accessories, such as jigs and fixtures, gauges and instruments etc. • The time required for clearing operational chips from the machine table and clearing of the machine itself are included on this. • Tear down time is generally 10 minute per shift of 8 hrs.
  • 8. PERSONALALLOWANCE • The time allowed for workers to meet their personal needs, such as going to the urinal, drinking water, smoking, washing their hands, etc is known as personal allowance. • It is generally 5 to 10 minutes FATIGUE ALLOWANCE • The long working hours and poor working conditions such as poor lighting, poor ventilation etc., cause fatigue • Fatigue effect the efficiency of worker • Fatigue decreases the worker capacity to work. • The allowance for fatigue is taken depending upon the type of work.
  • 9. IMPORTANCE OF MACHINING TIME CALCULATION •To find the manufacturing cost of a particular job the calculation of machining time is important, this requires one or more machining operations. •After determining the total time for machining, and knowing the machining cost per unit time, the total cost of machining can be worked out. •Machining time is calculated by applying certain basic formulae, tables of variables and constants.
  • 10. • The basic formula used is TRAVEL OF THE TOOL • This is determined from the dimensions in the actual drawing of the part to be manufactured. • The necessary allowances for the tool approach and over-run for clearing the tool off the job are taken into account with the actual length of the work, to find the travel of the tool.
  • 11. FEED • Feed is the distance, through which the tool advances into the job in one revolution • If the work or the distance that the table holding the work travels is one stroke of the tool. In metric units, feed is usually expressed in mm/revolution or mm/stroke. • Feed depends on the depth of cut, fitness of the work desired, rpm of the job, etc. DEPTH OF CUT • It is the penetration of the cutting tool into the job in a single cut. • In metric units, the depth of cut is expressed in mm. • The depth of cut depends upon the fitness of the job required, such as higher depth of cut for rough cut and smaller depth of cut for finish cut.
  • 12. RPM • It represents the number of revolutions of the m/c spindle in one minute. • Thus it is the number of revolutions per minute of the job or of tool. CUTTING SPEED • The cutting speed can be defined as the relative surface speed between the tool and the job. • It is expressed in meters per minute (mpm) • For example if a job of diameter D mm is revolving at a speed of N rpm
  • 13. CALCULATION OF MACHINING TIME FOR DIFFERENT LATHE OPERATIONS
  • 14. Where D = Diameter of given blank, d = diameter of blank after turning. • In turning operation, the depth of cut should not exceed 3 mm for rough cuts and 0.7 5 mm for finishing cuts.
  • 15.
  • 16.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. MACHINING TIME FOR SHAPING AND PLANING • Shaping, planning and slotting operations are carried out on reciprocating machines with a single point cutting tool.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40. Estimation of time for milling operation
  • 41. The approach is the distance the cutter must be engaged before the full depth of cut is reached. When cutter diameter is less than the width of the work.
  • 42. (b) When cutter diameter is greater than the width of the work.
  • 44.
  • 45. Estimation of time for Grinding operation
  • 46.
  • 47.