Project Post Mortem Template
Introduction:
The purpose of the Project Post Mortem Report Template is to record, in detail, the specific
project activities that were most effective and those that require adjustments for future projects.
The objective of this report is to inform future project teams of important lessons learned during
the project (i.e. obstacles, challenges, successes, what could be done differently next time, etc.).
How to Use This Tool:
Fill in the report template provided below. Use the sample instructions provided in grey text as a
guide. Be sure to delete grey text once finished. In filling out the spaces provided be sure to think
about the project as a whole.
Consider the following areas in your comments and analysis:
 Planning
 Resources
 Scope
 Scheduling
 Project management
 Development
 Communication
 Quality assurance
 Testing
 Budget
 Team
 Tools and practice
 Product/deliverable(s)/outcome(s)
For each of the aforementioned areas be sure to think about:
 What worked well?
 What did not work well and caused the project to struggle?
 What would you do differently next time?
Page 2
Info-Tech Research Group
[Project Name]
Project Post Mortem Report
[Version 1.0]
[Date]
Page 3
Info-Tech Research Group
Report Owners and Contact Information
Name E-mail Phone Role
John Doe johndoe@sample.com 416-555-2651 Project Manager
[Insert more rows as needed]
Report Revision History
Date Reason for Change(s) Author(s)
12/28/2008 First draft John Doe
[Insert more rows as needed]
Page 4
Info-Tech Research Group
1. Introduction to Report
The Project Post Mortem Report is one of the final documents for the project and is used by the
project manager and senior level management to assess the success of the project, identify best
project practices, problem areas, and provide detailed suggestions for improvement on future
projects.
[Edit above as necessary]
2. Report Goals
The Project Post Mortem Report aims to:
 Review and validate the deliverables and success of the project.
 Identify project highlights and accomplishments for future projects.
 Identify problem areas and how problems were mitigated/dealt with.
 Outline key lessons learned/key takeaways from the project to apply to future projects.
[Edit above as necessary]
Page 5
Info-Tech Research Group
3. Project Parameters
Project Name:
Department:
Project Sponsor:
Project Manager:
Post Mortem Facilitator:
Target Completion Date:
Actual Completion Date:
Project Overview
[Provide a summary/describe the project in detail in the box provided below.]
For Example:
 Discuss the original project goals and objectives
 What was the original project success criterion?
Page 6
Info-Tech Research Group
4. Project Performance
Key Accomplishments
[List and describe key project accomplishments in the space provided below. Explain elements
that worked well and why. Consider listing them in order of importance. Be specific.]
For Example:
 What went right?
 What worked well?
 What was found to be particularly useful?
 Project highlights
Key Problem Areas
[List problem areas experienced throughout the project. Be specific.]
For Example:
 What went wrong?
 What project processes didn’t work well?
 What specific processes caused problems?
 What were the effects of key problems areas (i.e. on budget, schedule, etc.)?
 Technical challenges
Risk Management
[List project risks that have been mitigated and those that are still outstanding and need to be
managed.]
Project risks that have been mitigated:
Outstanding project risks that need to be managed:
Page 7
Info-Tech Research Group
Overall Project Assessment
[Score/rank the overall project assessment according to the measures provided. A 10 indicates
excellent, whereas a 1 indicates very poor.]
Criteria Score
Performance against project goals/objectives 1 2 3 4 5 6 7 8 9 10
Performance against planned schedule
1 2 3 4 5 6 7 8 9 10
Performance against quality goals
1 2 3 4 5 6 7 8 9 10
Performance against planned budget
1 2 3 4 5 6 7 8 9 10
Adherence to scope
1 2 3 4 5 6 7 8 9 10
Project planning
1 2 3 4 5 6 7 8 9 10
Resource management
1 2 3 4 5 6 7 8 9 10
Project management
1 2 3 4 5 6 7 8 9 10
Development
1 2 3 4 5 6 7 8 9 10
Communication
1 2 3 4 5 6 7 8 9 10
Team cooperation
1 2 3 4 5 6 7 8 9 10
Project deliverable(s)
1 2 3 4 5 6 7 8 9 10
Additional Comments:
Other general comments about the project, project progress, etc.
Page 8
Info-Tech Research Group
5. Key Lessons Learned
Lessons Learned
[Summarize and describe the key lessons and takeaways from the project. Be sure to include
new processes or best practices that may have been developed as a result of this project and to
discuss areas that could have been improved, as well as how (i.e. describe the problem and
suggested solution for improvement).]
For Example:
1. Problem: The limited availability of key project resources resulted in the potential to
significantly delay the project.
Solution: The impact of limited resource availability was identified early in the project and
as a result steps were taken to mitigate the potentially negative impact of schedule and
timeline.
Post Project Tasks/Future Considerations
[List and describe, in detail, all future considerations and work that needs to be done with respect
to the project.]
For Example:
 Ongoing development and maintenance considerations
 What actions have yet to be completed and who is responsible for them?
 Is there anything still outstanding or that will take time to realize? (i.e. in some instances
the full project deliverables will not be realized immediately)
Page 9
Info-Tech Research Group
6. Approval
__________________________ __________________________ _________________
Project Sponsor (PRINT NAME) Project Sponsor (SIGNATURE) Date
__________________________ __________________________ _________________
Project Manager (PRINT NAME) Project Manager (SIGNATURE) Date
------------------------------------------------------------------------------
Info-Tech Research Group tools and template documents are provided for the free and
unrestricted use of subscribers to Info-Tech Research Group services. These documents are
intended to supply general information only, not specific professional or personal advice, and are
not intended to be used as a substitute for any kind of professional advice. Use this document
either in whole or in part as a basis and guide for document creation. To customize this document
with corporate marks and titles, simply replace the Info-Tech Information in the Header and
Footer fields of this document.
Page 10
Info-Tech Research Group

More Related Content

What's hot

Template kick off-meeting
Template kick off-meeting Template kick off-meeting
Template kick off-meeting
Hari Krishna
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
pankajsh10
 
Event project management
Event project managementEvent project management
Event project management
Raghu Raj Gopal
 
2. Softare QA roles and responsibilities
2. Softare QA roles and responsibilities2. Softare QA roles and responsibilities
2. Softare QA roles and responsibilities
Chandra Maddigapu
 
Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101
shailsood
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
Prasad Reddy
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
Anand Subramaniam
 
Goal setting for managers
Goal setting for managersGoal setting for managers
Goal setting for managers
Kevin Thomas
 
projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation template
dadiiskandar4
 
Introduction to Agile Project Management
Introduction to Agile Project ManagementIntroduction to Agile Project Management
Introduction to Agile Project Management
Semen Arslan
 
A Training Proposal
A Training ProposalA Training Proposal
A Training Proposal
David Lanre Messan
 
Risk Assessment PowerPoint Presentation Slides
Risk Assessment PowerPoint Presentation Slides Risk Assessment PowerPoint Presentation Slides
Risk Assessment PowerPoint Presentation Slides
SlideTeam
 
KPI
KPIKPI
Technical writing in an agile development environment
Technical writing in an agile development environmentTechnical writing in an agile development environment
Technical writing in an agile development environment
Alok Singh
 
Project management final report
Project management final reportProject management final report
Project management final report
SANKET SENAPATI
 
6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)
DavidMcLachlan1
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
Reetesh Gupta
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
Kamuran Koçak
 
Scanning of Business Analysis
Scanning of Business AnalysisScanning of Business Analysis
Scanning of Business Analysis
TechShiv
 

What's hot (20)

Template kick off-meeting
Template kick off-meeting Template kick off-meeting
Template kick off-meeting
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
 
Event project management
Event project managementEvent project management
Event project management
 
Agile risk management
Agile risk managementAgile risk management
Agile risk management
 
2. Softare QA roles and responsibilities
2. Softare QA roles and responsibilities2. Softare QA roles and responsibilities
2. Softare QA roles and responsibilities
 
Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
 
Goal setting for managers
Goal setting for managersGoal setting for managers
Goal setting for managers
 
projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation template
 
Introduction to Agile Project Management
Introduction to Agile Project ManagementIntroduction to Agile Project Management
Introduction to Agile Project Management
 
A Training Proposal
A Training ProposalA Training Proposal
A Training Proposal
 
Risk Assessment PowerPoint Presentation Slides
Risk Assessment PowerPoint Presentation Slides Risk Assessment PowerPoint Presentation Slides
Risk Assessment PowerPoint Presentation Slides
 
KPI
KPIKPI
KPI
 
Technical writing in an agile development environment
Technical writing in an agile development environmentTechnical writing in an agile development environment
Technical writing in an agile development environment
 
Project management final report
Project management final reportProject management final report
Project management final report
 
6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Scanning of Business Analysis
Scanning of Business AnalysisScanning of Business Analysis
Scanning of Business Analysis
 

Viewers also liked

Post Mortem Template
Post Mortem TemplatePost Mortem Template
Post Mortem Template
Dennis Stevenson
 
Post mortem Review
Post mortem ReviewPost mortem Review
Post mortem Review
Gemma Catolino
 
It's Not Your Fault - Blameless Post-mortems
It's Not Your Fault - Blameless Post-mortemsIt's Not Your Fault - Blameless Post-mortems
It's Not Your Fault - Blameless Post-mortems
Jason Hand
 
Post-mortem Fail
Post-mortem FailPost-mortem Fail
Post-mortem Fail
VictorOps
 
incident analysis - procedure and approach
incident analysis - procedure and approachincident analysis - procedure and approach
incident analysis - procedure and approachDerek Chang
 
Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015
Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015
Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015
Mohd Mustakim Kamarudin
 
LAPORAN POST MORTEM PROGRAM SAINS SUKAN
LAPORAN POST MORTEM PROGRAM SAINS SUKANLAPORAN POST MORTEM PROGRAM SAINS SUKAN
LAPORAN POST MORTEM PROGRAM SAINS SUKAN
nurulfarahzuaniehusaini
 
Blameless Post-mortems: Everything You Ever Wanted to Know
Blameless Post-mortems: Everything You Ever Wanted to KnowBlameless Post-mortems: Everything You Ever Wanted to Know
Blameless Post-mortems: Everything You Ever Wanted to Know
VictorOps
 
Laporan penuh postmortem love
Laporan penuh postmortem   loveLaporan penuh postmortem   love
Laporan penuh postmortem lovemasbajury
 
Contoh post mortem
Contoh post mortemContoh post mortem
Contoh post mortemeedaa
 
Events management team job roles
Events management team job rolesEvents management team job roles
Events management team job rolesAshleighG
 
Borang laporan aktiviti unit beruniform sekolah 2015
Borang laporan aktiviti unit beruniform sekolah 2015Borang laporan aktiviti unit beruniform sekolah 2015
Borang laporan aktiviti unit beruniform sekolah 2015
Mohd Mustakim Kamarudin
 
Committee's for Event planning
Committee's for Event planningCommittee's for Event planning
Committee's for Event planningkaren33mn
 
Learning Lessons from a Completed Communications Project
Learning Lessons from a Completed Communications ProjectLearning Lessons from a Completed Communications Project
Learning Lessons from a Completed Communications Project
stoverts
 
14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning
14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning
14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning
Bruce Givner
 
Post mortem on a dog
Post mortem on a dogPost mortem on a dog
Post mortem on a dogBrian Musalo
 
HSSE Management - JMT M99 Incident Analysis
HSSE Management - JMT M99 Incident AnalysisHSSE Management - JMT M99 Incident Analysis
HSSE Management - JMT M99 Incident Analysis
Yang Ming
 
Critical incident analysis of knm
Critical incident analysis of knmCritical incident analysis of knm
Critical incident analysis of knmSoe Lu Kyaw
 

Viewers also liked (20)

Post Mortem Template
Post Mortem TemplatePost Mortem Template
Post Mortem Template
 
Post mortem Review
Post mortem ReviewPost mortem Review
Post mortem Review
 
It's Not Your Fault - Blameless Post-mortems
It's Not Your Fault - Blameless Post-mortemsIt's Not Your Fault - Blameless Post-mortems
It's Not Your Fault - Blameless Post-mortems
 
Post-mortem Fail
Post-mortem FailPost-mortem Fail
Post-mortem Fail
 
incident analysis - procedure and approach
incident analysis - procedure and approachincident analysis - procedure and approach
incident analysis - procedure and approach
 
Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015
Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015
Borang post mortem kokurikulum ketua jawatan kuasa program unit 2015
 
LAPORAN POST MORTEM PROGRAM SAINS SUKAN
LAPORAN POST MORTEM PROGRAM SAINS SUKANLAPORAN POST MORTEM PROGRAM SAINS SUKAN
LAPORAN POST MORTEM PROGRAM SAINS SUKAN
 
Blameless Post-mortems: Everything You Ever Wanted to Know
Blameless Post-mortems: Everything You Ever Wanted to KnowBlameless Post-mortems: Everything You Ever Wanted to Know
Blameless Post-mortems: Everything You Ever Wanted to Know
 
Laporan penuh postmortem love
Laporan penuh postmortem   loveLaporan penuh postmortem   love
Laporan penuh postmortem love
 
Contoh post mortem
Contoh post mortemContoh post mortem
Contoh post mortem
 
Events management team job roles
Events management team job rolesEvents management team job roles
Events management team job roles
 
Borang laporan aktiviti unit beruniform sekolah 2015
Borang laporan aktiviti unit beruniform sekolah 2015Borang laporan aktiviti unit beruniform sekolah 2015
Borang laporan aktiviti unit beruniform sekolah 2015
 
Committee's for Event planning
Committee's for Event planningCommittee's for Event planning
Committee's for Event planning
 
Event management
Event managementEvent management
Event management
 
Learning Lessons from a Completed Communications Project
Learning Lessons from a Completed Communications ProjectLearning Lessons from a Completed Communications Project
Learning Lessons from a Completed Communications Project
 
14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning
14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning
14 09-04 Everything You Always Wanted To Know About Post-Mortem Planning
 
Post mortem on a dog
Post mortem on a dogPost mortem on a dog
Post mortem on a dog
 
Sheldon Haleck autopsy report
Sheldon Haleck autopsy reportSheldon Haleck autopsy report
Sheldon Haleck autopsy report
 
HSSE Management - JMT M99 Incident Analysis
HSSE Management - JMT M99 Incident AnalysisHSSE Management - JMT M99 Incident Analysis
HSSE Management - JMT M99 Incident Analysis
 
Critical incident analysis of knm
Critical incident analysis of knmCritical incident analysis of knm
Critical incident analysis of knm
 

Similar to Post mortem report

Project management lecture 11 slide 11
Project management lecture 11 slide 11Project management lecture 11 slide 11
Project management lecture 11 slide 11beautyshine
 
Project charter sample
Project charter sampleProject charter sample
Project charter sample
Gregory Weiss
 
Project CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docxProject CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docx
briancrawford30935
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
AASTHA76
 
How to close a project
How to close a projectHow to close a project
How to close a project
Emmanuel Mwagomba
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).ppt
AynetuTerefe2
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
CruzIbarra161
 
EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter
Anastasia Walter
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
megat zainurul anuar
 
Assignment
Assignment Assignment
Assignment
BarryAllen147
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
Project Cubicle
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1Jonathan Joyce
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
guest90bddb
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
Bogdan Gorka
 
Project Plan template
Project Plan templateProject Plan template
Project Plan template
Demand Metric
 
closure_report_template_0_0.docx
closure_report_template_0_0.docxclosure_report_template_0_0.docx
closure_report_template_0_0.docx
Hanane Sweet
 

Similar to Post mortem report (20)

Project management lecture 11 slide 11
Project management lecture 11 slide 11Project management lecture 11 slide 11
Project management lecture 11 slide 11
 
Project charter sample
Project charter sampleProject charter sample
Project charter sample
 
Project CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docxProject CharterProject Charter DocumentProject Name.docx
Project CharterProject Charter DocumentProject Name.docx
 
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docxBSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
System Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).pptSystem Analysis & Design (CHAPTER TWO) (1).ppt
System Analysis & Design (CHAPTER TWO) (1).ppt
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter EU Horizon2020 proposal development by Anastasia Walter
EU Horizon2020 proposal development by Anastasia Walter
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Assignment
Assignment Assignment
Assignment
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
 
Session 2 gdas pmp study group presentation
Session 2   gdas pmp study group presentationSession 2   gdas pmp study group presentation
Session 2 gdas pmp study group presentation
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
Project Plan template
Project Plan templateProject Plan template
Project Plan template
 
closure_report_template_0_0.docx
closure_report_template_0_0.docxclosure_report_template_0_0.docx
closure_report_template_0_0.docx
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 

More from Kuaci Pedas

Technical report
Technical reportTechnical report
Technical reportKuaci Pedas
 
Proposal of training_project
Proposal of training_projectProposal of training_project
Proposal of training_projectKuaci Pedas
 
Part 3 write_it_right_latest
Part 3 write_it_right_latestPart 3 write_it_right_latest
Part 3 write_it_right_latestKuaci Pedas
 
Part 1 transferable_skills
Part 1 transferable_skillsPart 1 transferable_skills
Part 1 transferable_skillsKuaci Pedas
 
Learningstylesurvey maxsa ig
Learningstylesurvey maxsa igLearningstylesurvey maxsa ig
Learningstylesurvey maxsa igKuaci Pedas
 
Groupworkquestionnaire
GroupworkquestionnaireGroupworkquestionnaire
GroupworkquestionnaireKuaci Pedas
 

More from Kuaci Pedas (9)

Technical report
Technical reportTechnical report
Technical report
 
Proposal of training_project
Proposal of training_projectProposal of training_project
Proposal of training_project
 
Part 3 write_it_right_latest
Part 3 write_it_right_latestPart 3 write_it_right_latest
Part 3 write_it_right_latest
 
Part 1 transferable_skills
Part 1 transferable_skillsPart 1 transferable_skills
Part 1 transferable_skills
 
Learningstylesurvey maxsa ig
Learningstylesurvey maxsa igLearningstylesurvey maxsa ig
Learningstylesurvey maxsa ig
 
Groupworkquestionnaire
GroupworkquestionnaireGroupworkquestionnaire
Groupworkquestionnaire
 
Group dynamics
Group dynamicsGroup dynamics
Group dynamics
 
G53 qat09pdf6up
G53 qat09pdf6upG53 qat09pdf6up
G53 qat09pdf6up
 
Team
TeamTeam
Team
 

Recently uploaded

Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 

Recently uploaded (20)

Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 

Post mortem report

  • 1. Page 1 Info-Tech Research Group Project Post Mortem Template Introduction: The purpose of the Project Post Mortem Report Template is to record, in detail, the specific project activities that were most effective and those that require adjustments for future projects. The objective of this report is to inform future project teams of important lessons learned during the project (i.e. obstacles, challenges, successes, what could be done differently next time, etc.). How to Use This Tool: Fill in the report template provided below. Use the sample instructions provided in grey text as a guide. Be sure to delete grey text once finished. In filling out the spaces provided be sure to think about the project as a whole. Consider the following areas in your comments and analysis:  Planning  Resources  Scope  Scheduling  Project management  Development  Communication  Quality assurance  Testing  Budget  Team  Tools and practice  Product/deliverable(s)/outcome(s) For each of the aforementioned areas be sure to think about:  What worked well?  What did not work well and caused the project to struggle?  What would you do differently next time?
  • 2. Page 2 Info-Tech Research Group [Project Name] Project Post Mortem Report [Version 1.0] [Date]
  • 3. Page 3 Info-Tech Research Group Report Owners and Contact Information Name E-mail Phone Role John Doe johndoe@sample.com 416-555-2651 Project Manager [Insert more rows as needed] Report Revision History Date Reason for Change(s) Author(s) 12/28/2008 First draft John Doe [Insert more rows as needed]
  • 4. Page 4 Info-Tech Research Group 1. Introduction to Report The Project Post Mortem Report is one of the final documents for the project and is used by the project manager and senior level management to assess the success of the project, identify best project practices, problem areas, and provide detailed suggestions for improvement on future projects. [Edit above as necessary] 2. Report Goals The Project Post Mortem Report aims to:  Review and validate the deliverables and success of the project.  Identify project highlights and accomplishments for future projects.  Identify problem areas and how problems were mitigated/dealt with.  Outline key lessons learned/key takeaways from the project to apply to future projects. [Edit above as necessary]
  • 5. Page 5 Info-Tech Research Group 3. Project Parameters Project Name: Department: Project Sponsor: Project Manager: Post Mortem Facilitator: Target Completion Date: Actual Completion Date: Project Overview [Provide a summary/describe the project in detail in the box provided below.] For Example:  Discuss the original project goals and objectives  What was the original project success criterion?
  • 6. Page 6 Info-Tech Research Group 4. Project Performance Key Accomplishments [List and describe key project accomplishments in the space provided below. Explain elements that worked well and why. Consider listing them in order of importance. Be specific.] For Example:  What went right?  What worked well?  What was found to be particularly useful?  Project highlights Key Problem Areas [List problem areas experienced throughout the project. Be specific.] For Example:  What went wrong?  What project processes didn’t work well?  What specific processes caused problems?  What were the effects of key problems areas (i.e. on budget, schedule, etc.)?  Technical challenges Risk Management [List project risks that have been mitigated and those that are still outstanding and need to be managed.] Project risks that have been mitigated: Outstanding project risks that need to be managed:
  • 7. Page 7 Info-Tech Research Group Overall Project Assessment [Score/rank the overall project assessment according to the measures provided. A 10 indicates excellent, whereas a 1 indicates very poor.] Criteria Score Performance against project goals/objectives 1 2 3 4 5 6 7 8 9 10 Performance against planned schedule 1 2 3 4 5 6 7 8 9 10 Performance against quality goals 1 2 3 4 5 6 7 8 9 10 Performance against planned budget 1 2 3 4 5 6 7 8 9 10 Adherence to scope 1 2 3 4 5 6 7 8 9 10 Project planning 1 2 3 4 5 6 7 8 9 10 Resource management 1 2 3 4 5 6 7 8 9 10 Project management 1 2 3 4 5 6 7 8 9 10 Development 1 2 3 4 5 6 7 8 9 10 Communication 1 2 3 4 5 6 7 8 9 10 Team cooperation 1 2 3 4 5 6 7 8 9 10 Project deliverable(s) 1 2 3 4 5 6 7 8 9 10 Additional Comments: Other general comments about the project, project progress, etc.
  • 8. Page 8 Info-Tech Research Group 5. Key Lessons Learned Lessons Learned [Summarize and describe the key lessons and takeaways from the project. Be sure to include new processes or best practices that may have been developed as a result of this project and to discuss areas that could have been improved, as well as how (i.e. describe the problem and suggested solution for improvement).] For Example: 1. Problem: The limited availability of key project resources resulted in the potential to significantly delay the project. Solution: The impact of limited resource availability was identified early in the project and as a result steps were taken to mitigate the potentially negative impact of schedule and timeline. Post Project Tasks/Future Considerations [List and describe, in detail, all future considerations and work that needs to be done with respect to the project.] For Example:  Ongoing development and maintenance considerations  What actions have yet to be completed and who is responsible for them?  Is there anything still outstanding or that will take time to realize? (i.e. in some instances the full project deliverables will not be realized immediately)
  • 9. Page 9 Info-Tech Research Group 6. Approval __________________________ __________________________ _________________ Project Sponsor (PRINT NAME) Project Sponsor (SIGNATURE) Date __________________________ __________________________ _________________ Project Manager (PRINT NAME) Project Manager (SIGNATURE) Date ------------------------------------------------------------------------------ Info-Tech Research Group tools and template documents are provided for the free and unrestricted use of subscribers to Info-Tech Research Group services. These documents are intended to supply general information only, not specific professional or personal advice, and are not intended to be used as a substitute for any kind of professional advice. Use this document either in whole or in part as a basis and guide for document creation. To customize this document with corporate marks and titles, simply replace the Info-Tech Information in the Header and Footer fields of this document.