Moving toward Portal Prosperity and Remote Building will increase your personal prosperity as well as industrial engineering competence and intellectual property ownership... an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems, A Major Shift in Management by the Morning Star is highlighted in Part III
Branch Sound and Image Construction Summary version v1,v2,v3Brij Consulting, LLC
ย
Branching from The Glass Warehouse we have gained insight into how to extend the process remotely through the use of sound and wave techniques, imaging and mobile encrypting of the advancing footprint. In V1 we begin the metric derivation, in V2 we look into the case building of product media in remote conditions and in V3 we look to the Appliance relationships necessary for these constructs. See also https://www.slideshare.net/Marshallja/the-glass-warehouse-v3-remote-extended
The Crossover Conveyance is a continuation of the Branch Sound and Motion study and begins with justification of Assets and Intellectual Properties in order to derive Convergence Metrics and an Intelligent Pathway to Remote design and delivery. See Also Portal Prosperity, an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems. In V2 we learn to thread the system and in v3 the relationship to Site Management in the portal delivery mechanic. We also explain what Religion is for as well as the Citadel of Zion.
Using a complete Wheel Method in Ark Mode to Simulate and to Operate a complex production of Bridged Instances is defined by its Marks and Encryptions that keep the project coordinated on its Bridge Pathways; In V1 we begin the difficult task of assembling the various process depictions of the Bridge. In V2 we will assemble trees and leaves more conjunctively and in V3 consider the Parametric Simulations that need to be used.
Using a complete Wheel Method in Ark Mode to Simulate and to Operate a complex production of Bridged Instances is defined by its Marks and Encryptions that keep the project coordinated on its Bridge Pathways; In V1 we begin the difficult task of assembling the various process depictions of the Bridge. In V2 we will assemble trees and leaves more conjunctively and in V3 consider the Parametric Simulations that need to be used.
Simulating Performance in the "Beam Moment" has become the means of generation of the Mix to form the Column or Beam and to control the project through to its completion. In V1 we explore the various Walk Pathways, in V2 we will begin to define Number Theory concepts to the Formation of Performance Design of the Product and in V3 Look at Land Systems and Anchoring
Using a complete Wheel Method in Ark Mode to Simulate and to Operate a complex production of Bridged Instances is defined by its Marks and Encryptions that keep the project coordinated on its Bridge Pathways; In V1 we begin the difficult task of assembling the various process depictions of the Bridge. In V2 we will assemble trees and leaves more conjunctively and in V3 consider the Parametric Simulations that need to be used.
Pipes and Plaits in Ark Mode Design V4 Pipe Stream MechanicsBrij Consulting, LLC
ย
Justification of the Build of Land Products is produced from a template that demonstrates its result later in a serialized string containing its build rate. In V1 we are primarily interested in identifying the load for land products. In V2 we are concerned with the Glass Product Warehouse and reassembly of customer delivered loads with a frequency traceable to load. And in V3 we are concerned with the Title, Deed, Records that need to be maintained. In V4 we will study pipe mechanics more in depth
The Crossover Conveyance is a continuation of the Branch Sound and Motion study and begins with justification of Assets and Intellectual Properties in order to derive Convergence Metrics and an Intelligent Pathway to Remote design and delivery. See Also Portal Prosperity, an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems. In V2 we learn to thread the system and in v3 the relationship to Site Management in the portal delivery mechanic. We also explain what Religion is for as well as the Citadel of Zion.
Branch Sound and Image Construction Summary version v1,v2,v3Brij Consulting, LLC
ย
Branching from The Glass Warehouse we have gained insight into how to extend the process remotely through the use of sound and wave techniques, imaging and mobile encrypting of the advancing footprint. In V1 we begin the metric derivation, in V2 we look into the case building of product media in remote conditions and in V3 we look to the Appliance relationships necessary for these constructs. See also https://www.slideshare.net/Marshallja/the-glass-warehouse-v3-remote-extended
The Crossover Conveyance is a continuation of the Branch Sound and Motion study and begins with justification of Assets and Intellectual Properties in order to derive Convergence Metrics and an Intelligent Pathway to Remote design and delivery. See Also Portal Prosperity, an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems. In V2 we learn to thread the system and in v3 the relationship to Site Management in the portal delivery mechanic. We also explain what Religion is for as well as the Citadel of Zion.
Using a complete Wheel Method in Ark Mode to Simulate and to Operate a complex production of Bridged Instances is defined by its Marks and Encryptions that keep the project coordinated on its Bridge Pathways; In V1 we begin the difficult task of assembling the various process depictions of the Bridge. In V2 we will assemble trees and leaves more conjunctively and in V3 consider the Parametric Simulations that need to be used.
Using a complete Wheel Method in Ark Mode to Simulate and to Operate a complex production of Bridged Instances is defined by its Marks and Encryptions that keep the project coordinated on its Bridge Pathways; In V1 we begin the difficult task of assembling the various process depictions of the Bridge. In V2 we will assemble trees and leaves more conjunctively and in V3 consider the Parametric Simulations that need to be used.
Simulating Performance in the "Beam Moment" has become the means of generation of the Mix to form the Column or Beam and to control the project through to its completion. In V1 we explore the various Walk Pathways, in V2 we will begin to define Number Theory concepts to the Formation of Performance Design of the Product and in V3 Look at Land Systems and Anchoring
Using a complete Wheel Method in Ark Mode to Simulate and to Operate a complex production of Bridged Instances is defined by its Marks and Encryptions that keep the project coordinated on its Bridge Pathways; In V1 we begin the difficult task of assembling the various process depictions of the Bridge. In V2 we will assemble trees and leaves more conjunctively and in V3 consider the Parametric Simulations that need to be used.
Pipes and Plaits in Ark Mode Design V4 Pipe Stream MechanicsBrij Consulting, LLC
ย
Justification of the Build of Land Products is produced from a template that demonstrates its result later in a serialized string containing its build rate. In V1 we are primarily interested in identifying the load for land products. In V2 we are concerned with the Glass Product Warehouse and reassembly of customer delivered loads with a frequency traceable to load. And in V3 we are concerned with the Title, Deed, Records that need to be maintained. In V4 we will study pipe mechanics more in depth
The Crossover Conveyance is a continuation of the Branch Sound and Motion study and begins with justification of Assets and Intellectual Properties in order to derive Convergence Metrics and an Intelligent Pathway to Remote design and delivery. See Also Portal Prosperity, an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems. In V2 we learn to thread the system and in v3 the relationship to Site Management in the portal delivery mechanic. We also explain what Religion is for as well as the Citadel of Zion.
Imposition of Value Engineering in Plait Glass Composition V3 Packaging and D...Brij Consulting, LLC
ย
Arriving at Stream and Digital Write Capability there are two justification processes, one for material and the other for the finished product, both are written to the glass bin as a complex record and as attributes of an object. In V2 we are loading the instances and configuring for encryption. We learn many valued lessons about glass composition. In V3 we will make a product and see how packaging and conveyance are worked into the glass product. The glass material takes on the nature of the attributes which are assigned to it. Here, Value engineering helps to determine how much basis to add to the product cost. Also, how to utilize the Stream Approach to Prosper Instance Planning to Derive a Product in a Digital Portal Pipe with a competent engineering methodology. We are using an emulation of six layer glass to do this.
We have formed a new P(N) process and Theoretical Production to account for the cost of the Glass Mix. In doing so we see that there is a split in the process between the inhouse and remote requirement, and we need to devise Order Fulfillment in such a way that we can account for the completion of the Order. This we accomplish in V2 and V3. By running multiple instances of production we are able to test and to write a test for use at the site to finish the build. This leading to new encryption and remote building mechanics
The Glass Build, Mechanics and Assembly V3 Building of PropertiesBrij Consulting, LLC
ย
The Relationship of the 3D Glass Model to the Build is explored and the Cost of Assembly is added to the Matrix. In V2 we look into the financial aspects of the two businesses and compare them back to established metric arrangements. and developed standards. In V3 we will examine properties and modules in how they are developed.
We begin with evaluation of the Glass Build as an Engineering Process of Synthesis in Architectural Design in ARK Mode. Now we examine the Economic Change as we position the product in the market by determining what engineering requirements are first and develop a Theoretical Production to develop pricing and costing of the project. We begin to study the constraints of Remote Building with Media Modeling using Pipes and Conduits and to define the Parametric Test for bounds of the Model we constructed.
Pipes and Plaits in Ark Mode Design V2 and V3 Glass Warehouse and TitleBrij Consulting, LLC
ย
Justification of the Build of Land Products is produced from a template that demonstrates its result later in a serialized string containing its build rate. In V1 we are primarily interested in identifying the load for land products. In V2 we are concerned with the Glass Product Warehouse and reassembly of customer delivered loads with a frequency traceable to load. And in V3 we are concerned with the Title, Deed, Records that need to be maintained. In V4 we will study pipe mechanics more in depth
The Theory of Remote takes on more dimensional consideration starting with processes we are more familiar with. The Sandbox approach in Phase I will lead into the full Glass Process in Phase II and then to the Land and Community Development in Phase III. Here we develop the Home Media and Build Case Process as well as financial ramifications.
Time and Motion Motion in Ark Glass V1 Abandoning Paraphernalia.pdfBrij Consulting, LLC
ย
Overview
V1 Abandoning Paraphernalia has at its root the following concepts:
Solid State Performance through Ark Cloud Star Formative Properties
Theoretical Consistency in all Applications
No Material Failure or Zero-Sum Condition
Discipline needed for Utility Cognizance and standard oasis
Lack of frequency availability for other than the official business requirement
Glass Fingerprint for assigned Protocols (Applied in V2.)
V2 Minding the Thread gets deeper into the Mu Sic notation of instancing properties holding instances in moments when the properties or the containment of them must persist in motion. Examples of this are green energy conveyance, bridging mechanics, IP convergence and Portal arrangements, all appliance machines that must open and operate while their introspective property assignments need to be upgraded or changed.
V3 Stability in Connected Services rely on pipes and streaming that are grounded in permanent but untraceable root addresses that are never relative but fully sustainable and operated by the Morning Star; Accessibility is a function of Participation and Assignment for Portal and Warehouses
A discussion of the requirement to formulate the Glass Warehouse Process using the IP terms that are contained in the model and determining its boundaries and its articulated parts. V1 Economy of Build: Our use of the term IP is related to Intellectual Property relationships to In Place Products and Processes with parts defined. In V2 we will work on formulating the functional equation to define the whole and in V3 consider the operative city of Ark cloud development.
Simulating Performance in the "Beam Moment" has become the means of generation of the Mix to form the Column or Beam and to control the project through to its completion. In V1 we explore the various Walk Pathways, in V2 we will begin to define Number Theory concepts to the Formation of Performance Design of the Product and in V3 Look at Land Systems and Anchoring
Moving toward Portal Prosperity and Remote Building will increase your personal prosperity as well as industrial engineering competence and intellectual property ownership... an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems,
The Outcome of our Square Pi Digital Investment is a What If? Metric Map, Key to Stakeholder Investments https://www.slideshare.net/slideshow/comments-on-square-pi-key-to-the-investmentpdf/267325383
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David PhilpComit Projects Ltd
ย
Keynote - Preparing for a Digital Built Britain
David Philp, Director BIM โ EMEA at AECOM, Head of BIM, UK BIM Task Group
The Digital Built Britain (DBB) programme will build a digital economy for the construction industry in support of dramatically improving delivery, operations and services provided to citizens building on the standards and savings delivered by the BIM level 2 initiative. This session will explore how the Digital Built Britain strategy will take the next steps in defining advanced standards, creating new commercial models and identifying technologies to transform our approach to social infrastructure development and construction. The session will look at the need for operational data sets and integration of telemetry and IoT within the Built Environment and a shift towards Level 3 BIM. Level 3 will enable the interconnected digital design of different elements in a built environment and will extend BIM into the operation of assets over their lifetimes supporting the accelerated delivery of smart cities, services and grids.
Vector relationships in partnering simulations help to deploy complex lens and window relationships. LIFT and LIFE certifications supply access to Cloud-Star portal arrangements in the Glass system.
Part I City Scale: Vector relationships in partnering simulations help to deploy complex lens and window relationships. LIFT and LIFE certifications supply access to Cloud-Star portal arrangements in the Glass system.
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfBrij Consulting, LLC
ย
Comments on โGlass Cars and New Ark Product Road Mapโ
Emulation is more than an art and closer to the science of building as it supplies a model for further study. Whether it is a residential, industrial or commercial architecture, the extensive product involvement from other industries furthers growth, and this includes Glass Cars and Road Systems.
Data necessary for our Model needs to be more than assembled, it has to be integrated to production and from that load-bearing statement, a forward-looking plan assembled for the whole glass industry partnership.
Emulation is more than an art and closer to the science of building as it supplies a model for further study. Whether it is a residential, industrial or commercial architecture, the extensive product involvement from other industries furthers growth, and this includes Glass Cars and Road Systems.
Data necessary for our Model needs to be more than assembled, it has to be integrated to production and from that load-bearing statement, a forward-looking plan assembled for the whole glass industry partnership.
How many glass models and types must be assembled before we develop a complete understanding of this adroit architecture? These and other questions we begin to explore in โGlass Cars and New Ark Product Road Map.โ
Our Next Paper, โCalendar Cartography,โ will highlight production events for New Glass Products, based on compiled information presented here.
How Analytic Solutions Drive Real-world Change (Interesting Use Cases)TIBCO Jaspersoft
ย
The power of analytics cannot be denied, but the speed of response tells the tale of success. The faster you can change a business process to take advantage of your data-driven insights, the faster and greater the results. That's why operational intelligence can provide such bang for the buck: the benefits start accruing right away.
Learn why analytics is no longer just for the elite. Weโll cover:
- Why "BI for the masses" has finally arrived
- What that means for your organization
- Several cutting-edge analytics solutions & how they help companies navigate the increasingly choppy waters of modern business.
Imposition of Value Engineering in Plait Glass Composition V3 Packaging and D...Brij Consulting, LLC
ย
Arriving at Stream and Digital Write Capability there are two justification processes, one for material and the other for the finished product, both are written to the glass bin as a complex record and as attributes of an object. In V2 we are loading the instances and configuring for encryption. We learn many valued lessons about glass composition. In V3 we will make a product and see how packaging and conveyance are worked into the glass product. The glass material takes on the nature of the attributes which are assigned to it. Here, Value engineering helps to determine how much basis to add to the product cost. Also, how to utilize the Stream Approach to Prosper Instance Planning to Derive a Product in a Digital Portal Pipe with a competent engineering methodology. We are using an emulation of six layer glass to do this.
We have formed a new P(N) process and Theoretical Production to account for the cost of the Glass Mix. In doing so we see that there is a split in the process between the inhouse and remote requirement, and we need to devise Order Fulfillment in such a way that we can account for the completion of the Order. This we accomplish in V2 and V3. By running multiple instances of production we are able to test and to write a test for use at the site to finish the build. This leading to new encryption and remote building mechanics
The Glass Build, Mechanics and Assembly V3 Building of PropertiesBrij Consulting, LLC
ย
The Relationship of the 3D Glass Model to the Build is explored and the Cost of Assembly is added to the Matrix. In V2 we look into the financial aspects of the two businesses and compare them back to established metric arrangements. and developed standards. In V3 we will examine properties and modules in how they are developed.
We begin with evaluation of the Glass Build as an Engineering Process of Synthesis in Architectural Design in ARK Mode. Now we examine the Economic Change as we position the product in the market by determining what engineering requirements are first and develop a Theoretical Production to develop pricing and costing of the project. We begin to study the constraints of Remote Building with Media Modeling using Pipes and Conduits and to define the Parametric Test for bounds of the Model we constructed.
Pipes and Plaits in Ark Mode Design V2 and V3 Glass Warehouse and TitleBrij Consulting, LLC
ย
Justification of the Build of Land Products is produced from a template that demonstrates its result later in a serialized string containing its build rate. In V1 we are primarily interested in identifying the load for land products. In V2 we are concerned with the Glass Product Warehouse and reassembly of customer delivered loads with a frequency traceable to load. And in V3 we are concerned with the Title, Deed, Records that need to be maintained. In V4 we will study pipe mechanics more in depth
The Theory of Remote takes on more dimensional consideration starting with processes we are more familiar with. The Sandbox approach in Phase I will lead into the full Glass Process in Phase II and then to the Land and Community Development in Phase III. Here we develop the Home Media and Build Case Process as well as financial ramifications.
Time and Motion Motion in Ark Glass V1 Abandoning Paraphernalia.pdfBrij Consulting, LLC
ย
Overview
V1 Abandoning Paraphernalia has at its root the following concepts:
Solid State Performance through Ark Cloud Star Formative Properties
Theoretical Consistency in all Applications
No Material Failure or Zero-Sum Condition
Discipline needed for Utility Cognizance and standard oasis
Lack of frequency availability for other than the official business requirement
Glass Fingerprint for assigned Protocols (Applied in V2.)
V2 Minding the Thread gets deeper into the Mu Sic notation of instancing properties holding instances in moments when the properties or the containment of them must persist in motion. Examples of this are green energy conveyance, bridging mechanics, IP convergence and Portal arrangements, all appliance machines that must open and operate while their introspective property assignments need to be upgraded or changed.
V3 Stability in Connected Services rely on pipes and streaming that are grounded in permanent but untraceable root addresses that are never relative but fully sustainable and operated by the Morning Star; Accessibility is a function of Participation and Assignment for Portal and Warehouses
A discussion of the requirement to formulate the Glass Warehouse Process using the IP terms that are contained in the model and determining its boundaries and its articulated parts. V1 Economy of Build: Our use of the term IP is related to Intellectual Property relationships to In Place Products and Processes with parts defined. In V2 we will work on formulating the functional equation to define the whole and in V3 consider the operative city of Ark cloud development.
Simulating Performance in the "Beam Moment" has become the means of generation of the Mix to form the Column or Beam and to control the project through to its completion. In V1 we explore the various Walk Pathways, in V2 we will begin to define Number Theory concepts to the Formation of Performance Design of the Product and in V3 Look at Land Systems and Anchoring
Moving toward Portal Prosperity and Remote Building will increase your personal prosperity as well as industrial engineering competence and intellectual property ownership... an overview of Productivity and Maintenance of Intellectual Property and Asset Management Systems,
The Outcome of our Square Pi Digital Investment is a What If? Metric Map, Key to Stakeholder Investments https://www.slideshare.net/slideshow/comments-on-square-pi-key-to-the-investmentpdf/267325383
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David PhilpComit Projects Ltd
ย
Keynote - Preparing for a Digital Built Britain
David Philp, Director BIM โ EMEA at AECOM, Head of BIM, UK BIM Task Group
The Digital Built Britain (DBB) programme will build a digital economy for the construction industry in support of dramatically improving delivery, operations and services provided to citizens building on the standards and savings delivered by the BIM level 2 initiative. This session will explore how the Digital Built Britain strategy will take the next steps in defining advanced standards, creating new commercial models and identifying technologies to transform our approach to social infrastructure development and construction. The session will look at the need for operational data sets and integration of telemetry and IoT within the Built Environment and a shift towards Level 3 BIM. Level 3 will enable the interconnected digital design of different elements in a built environment and will extend BIM into the operation of assets over their lifetimes supporting the accelerated delivery of smart cities, services and grids.
Vector relationships in partnering simulations help to deploy complex lens and window relationships. LIFT and LIFE certifications supply access to Cloud-Star portal arrangements in the Glass system.
Part I City Scale: Vector relationships in partnering simulations help to deploy complex lens and window relationships. LIFT and LIFE certifications supply access to Cloud-Star portal arrangements in the Glass system.
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfBrij Consulting, LLC
ย
Comments on โGlass Cars and New Ark Product Road Mapโ
Emulation is more than an art and closer to the science of building as it supplies a model for further study. Whether it is a residential, industrial or commercial architecture, the extensive product involvement from other industries furthers growth, and this includes Glass Cars and Road Systems.
Data necessary for our Model needs to be more than assembled, it has to be integrated to production and from that load-bearing statement, a forward-looking plan assembled for the whole glass industry partnership.
Emulation is more than an art and closer to the science of building as it supplies a model for further study. Whether it is a residential, industrial or commercial architecture, the extensive product involvement from other industries furthers growth, and this includes Glass Cars and Road Systems.
Data necessary for our Model needs to be more than assembled, it has to be integrated to production and from that load-bearing statement, a forward-looking plan assembled for the whole glass industry partnership.
How many glass models and types must be assembled before we develop a complete understanding of this adroit architecture? These and other questions we begin to explore in โGlass Cars and New Ark Product Road Map.โ
Our Next Paper, โCalendar Cartography,โ will highlight production events for New Glass Products, based on compiled information presented here.
How Analytic Solutions Drive Real-world Change (Interesting Use Cases)TIBCO Jaspersoft
ย
The power of analytics cannot be denied, but the speed of response tells the tale of success. The faster you can change a business process to take advantage of your data-driven insights, the faster and greater the results. That's why operational intelligence can provide such bang for the buck: the benefits start accruing right away.
Learn why analytics is no longer just for the elite. Weโll cover:
- Why "BI for the masses" has finally arrived
- What that means for your organization
- Several cutting-edge analytics solutions & how they help companies navigate the increasingly choppy waters of modern business.
Our Paper on the Plait Gate Assimilation of Digital is our attempt to reconcile our metrics back to the Gate Method of our paper Gate Plait Green. We have included the entire Scorecard Scrum and KPI metric relationship (Reminder: Scorecard has multiple parts) ... V2 will reconcile Ark Plait and V3 Develop Instances at the Gate
About the IPD using BIM by Pisut Aunwong . It shows the description about the BIM with respect to Integrated Project Delivery IPD. IPD has been a hot topic and with respect to BIM has been the most research part of this decade.
Something to consider, when you want to have information flow from design -> construction -> FM.
This is what we do in Granlund.
Sorry, some slides in Finnish...
Full Phase I of Remote Converge Process is Outlined and Task Developed and Bridged. The Theory of Remote takes on more dimensional consideration starting with processes we are more familiar with. The Sandbox approach in Phase I will lead into the full Glass Process in Phase II
Managing User Experience During Cloud MigrationseG Innovations
ย
Competition in the digital services world is about managing the customer experience. The cloud is an operating model, and migrating workloads to the cloud involves much more than โlift & shiftโ. In fact, the heavy lifting of cloud migrations may be much more about people than technologies.
Managing customer expectations requires that the user experience be at least as goodโif not betterโafter a cloud migration than it was before the migration took place. Customers really donโt care about the โcloudโ per se, they care about the outcomes that cloud-based services can provide.
Learn how you can manage customer expectations and leverage services-oriented monitoring as a program of work within a cloud migration.
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptxbidyut13
ย
Digitize the logistic operations in Indonesia with the use of Advance Analytics
Reduce the wait time of freight at different touch points (entry gate, exit gate and docks) in a warehouse, in turn will help reduce load/unload throughput time
Enhanced visibility of logistic operations for management to identify opportunities for improvement and take actions accordingly
Glass Systems Branching and Partner Acclimations in Three Portal Arrangements. CONTENTSOVERVIEW...Defining Portals, Splitting Demand as a VRD Technique, Reconciling Portals and Market Position, Scorecard Gearbox (to be discussed), Componentization and Early Phase Projects, Full Scope Delivery of Agile Projects, Associating Tasks and Task Analytics, Later PLAN Market Impact, Matching and Stacking in the Domains, Signature Delivery and Confluent Design
Similar to Portal Prosperity: An Overview Part I, Part II and Part III (20)
The document discusses scrum performance, portal build requirements, and streaming media in the context of a project. It covers problem definition, metrics, and the use of simulations. It also explores the concept of remote cloud assembly and the impact of glass technology.
https://www.slideshare.net/slideshow/comments-on-portal-compositions-all-parts-pdf/269367034
The document discusses scrum performance, portal build requirements, and streaming media in the context of a project. It covers problem definition, metrics, and the use of simulations. It also explores the concept of remote cloud assembly and the impact of glass technology.
Part I is a noteworthy description dedicated to the Problem Definition of Portal Building. Its content is related to various topics, including scrum performance, problem correlation, project value attribution, portal build requirements, glass construction, and simulations. https://www.slideshare.net/slideshow/comments-on-portal-compositions-part-i-pdf/268722476
Part I is a noteworthy description dedicated to the Problem Definition of Portal Building. Its content is related to various topics, including scrum performance, problem correlation, project value attribution, portal build requirements, glass construction, and simulations.
The document is divided into three parts: Bookmarks, Golden Bricks, and Casting Crowns. It discusses various aspects of glass projects, including remote cloud assembly, metric maps, scrum performance, golden bricks, casting crowns (collaboration), and portal arrangements. It also mentions the importance of branding, marketing, and simulations in these projects. Additionally, the document contains a series of papers and presentations related to glass concepts and algorithms, covering topics such as benchmarking, glass impact, green energy, solid-state engineering, cloud-star evolution, simulations, and more about Ark Science and Glass building and production.
The document is divided into three parts: Bookmarks, Golden Bricks, and Casting Crowns. It discusses various aspects of glass projects, including remote cloud assembly, metric maps, scrum performance, golden bricks, casting crowns (collaboration), and portal arrangements. It also mentions the importance of branding, marketing, and simulations in these projects. Additionally, the document contains a series of papers and presentations related to glass concepts and algorithms, covering topics such as benchmarking, glass impact, green energy, solid-state engineering, cloud-star evolution, simulations, and more about Ark Science , Glass building and production.
https://www.slideshare.net/slideshow/comments-on-maker-maps-the-next-glass-strategy-pdf/268262695
The document contains a series of papers and presentations related to glass concepts and algorithms. The contents include discussions on topics such as momentum in glass building, impact engineering, continuous modeling, synergies, instancing, remote cloud assembly, simulations, portal design theory, metric maps, and the future projections of the glass plan. The papers also cover various aspects of glass production, including the use of solid-state engineering, green energy, wave and lens assimilation, and the development of remote architectural processes. โ Additionally, there are papers on the integration of glass with other technologies, such as media and tech in glass, digital production systems, and the use of gates and instances. The document also mentions the importance of certifications, securitization, and equity in the glass projects.
The document contains a series of papers and presentations related to glass concepts and algorithms. The contents include discussions on topics such as momentum in glass building, impact engineering, continuous modeling, synergies, instancing, remote cloud assembly, simulations, portal design theory, metric maps, and the future projections of the glass plan. The papers also cover various aspects of glass production, including the use of solid-state engineering, green energy, wave and lens assimilation, and the development of remote architectural processes. โ Additionally, there are papers on the integration of glass with other technologies, such as media and tech in glass, digital production systems, and the use of gates and instances. The document also mentions the importance of certifications, securitization, and equity in the glass projects. https://www.slideshare.net/slideshow/comments-on-step-into-the-world-of-glass-all-partspdf/267668471
The Scope of the 50-year Glass Plan is examined at length in its Continuous Modeling Phase. Momentum is founded on the synergism of the glass strategy. See visibly the conversion of Labor to the Balance Sheet https://www.slideshare.net/slideshow/comments-on-step-into-the-world-of-glass-building-part-ipdf/267465404
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
ย
The Scope of the 50-year Glass Plan is examined at length in its Continuous Modeling Phase. Momentum is founded on the synergism of the glass strategy. See visibly the conversion of Labor to the Balance Sheet
This paper describes the means to redevelop Scorecard to an on-demand product and as a scalable and portable application. Since we are applying a mark to market position to our hyD Division and looking for the implications of burden lift to the project earnback requirement, we will likely do some more KPI and SCRUM METRIC what if testing in our next paper, related to the effects of portal transactions.
This paper describes the means to redevelop Scorecard to an on-demand product and as a scalable and portable application. Since we are applying a mark to market position to our hyD Division and looking for the implications of burden lift to the project earnback requirement, we will likely do some more KPI and SCRUM METRIC what if testing in our next paper, related to the effects of portal transactions.
Can Scorecard raise our glass process to new heights of System Capability? We look at many advantages related to portals, processes and scrum-based production: Valuation of Purchase Price, Business correspondence to Goodwill and Supply Chain application.
Can Scorecard raise our glass process to new heights of System Capability? We look at many advantages related to portals, processes and scrum-based production: Valuation of Purchase Price, Business correspondence to Goodwill and Supply Chain application.
Glass Systems Branching and Partner Acclimations in Three Portal Arrangements. CONTENTS OVERVIEW...Defining Portals, Splitting Demand as a VRD Technique, Reconciling Portals and Market Position, Scorecard Gearbox (to be discussed), Componentization and Early Phase Projects, Full Scope Delivery of Agile Projects, Associating Tasks and Task Analytics, Later PLAN Market Impact, Matching and Stacking in the Domains, Signature Delivery and Confluent Design. Addendum shows Manufactuing Production, Scrum and Performance Statements. See Comments at https://www.slideshare.net/slideshows/comments-on-simulations-partners-addendumpdf/265866438
Glass Systems Branching and Partner Acclimations in Three Portal Arrangements. CONTENTS OVERVIEW...Defining Portals, Splitting Demand as a VRD Technique, Reconciling Portals and Market Position, Scorecard Gearbox (to be discussed), Componentization and Early Phase Projects, Full Scope Delivery of Agile Projects, Associating Tasks and Task Analytics, Later PLAN Market Impact, Matching and Stacking in the Domains, Signature Delivery and Confluent Design. Addendum shows Manufactuing Production, Scrum and Performance Statements
Glass Systems Branching and Partner Acclimations in Three Portal Arrangements. CONTENTSOVERVIEW...Defining Portals, Splitting Demand as a VRD Technique, Reconciling Portals and Market Position, Scorecard Gearbox (to be discussed), Componentization and Early Phase Projects, Full Scope Delivery of Agile Projects, Associating Tasks and Task Analytics, Later PLAN Market Impact, Matching and Stacking in the Domains, Signature Delivery and Confluent Design. SEE COMMENTS: https://www.slideshare.net/slideshows/comments-on-simulations-partnerspdf/265805054
On the horizon of the Crossover, Making a Watch Case Window and marking pivots, lifts and Moments of instance assimilation. Interpolation of the Area assists in valuing the project and its essential market relationship.
On the horizon of the Crossover, Making a Watch Case Window and marking pivots, lifts and Moments of instance assimilation. Interpolation of the Area assists in valuing the project and its essential market relationship
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
ย
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.๐คฏ
We will dig deeper into:
1. How to capture video testimonials that convert from your audience ๐ฅ
2. How to leverage your testimonials to boost your sales ๐ฒ
3. How you can capture more CRM data to understand your audience better through video testimonials. ๐
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
ย
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Improving profitability for small businessBen Wann
ย
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Memorandum Of Association Constitution of Company.pptseri bangash
ย
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Putting the SPARK into Virtual Training.pptxCynthia Clay
ย
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
ย
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
๐ข Email Access
๐ข Bank Added
๐ข Card Verified
๐ข Full SSN Provided
๐ข Phone Number Access
๐ข Driving License Copy
๐ข Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1โช(218) 203-5951โฌ
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโs DholeraAvirahi City Dholera
ย
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isnโt just any project; itโs a potential game changer for Indiaโs chipmaking aspirations and a boon for investors seeking promisingย residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
ย
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
ย
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
"๐ฉ๐ฌ๐ฎ๐ผ๐ต ๐พ๐ฐ๐ป๐ฏ ๐ป๐ฑ ๐ฐ๐บ ๐ฏ๐จ๐ณ๐ญ ๐ซ๐ถ๐ต๐ฌ"
๐๐ ๐๐จ๐ฆ๐ฌ (๐๐ ๐๐จ๐ฆ๐ฆ๐ฎ๐ง๐ข๐๐๐ญ๐ข๐จ๐ง๐ฌ) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
๐๐ ๐๐จ๐ฆ๐ฌ provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
โญ ๐ ๐๐๐ญ๐ฎ๐ซ๐๐ ๐ฉ๐ซ๐จ๐ฃ๐๐๐ญ๐ฌ:
โข 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
โข SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
โขFreenBecky 1st Fan Meeting in Vietnam
โขCHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
โข WOW K-Music Festival 2023
โข Winner [CROSS] Tour in HCM
โข Super Show 9 in HCM with Super Junior
โข HCMC - Gyeongsangbuk-do Culture and Tourism Festival
โข Korean Vietnam Partnership - Fair with LG
โข Korean President visits Samsung Electronics R&D Center
โข Vietnam Food Expo with Lotte Wellfood
"๐๐ฏ๐๐ซ๐ฒ ๐๐ฏ๐๐ง๐ญ ๐ข๐ฌ ๐ ๐ฌ๐ญ๐จ๐ซ๐ฒ, ๐ ๐ฌ๐ฉ๐๐๐ข๐๐ฅ ๐ฃ๐จ๐ฎ๐ซ๐ง๐๐ฒ. ๐๐ ๐๐ฅ๐ฐ๐๐ฒ๐ฌ ๐๐๐ฅ๐ข๐๐ฏ๐ ๐ญ๐ก๐๐ญ ๐ฌ๐ก๐จ๐ซ๐ญ๐ฅ๐ฒ ๐ฒ๐จ๐ฎ ๐ฐ๐ข๐ฅ๐ฅ ๐๐ ๐ ๐ฉ๐๐ซ๐ญ ๐จ๐ ๐จ๐ฎ๐ซ ๐ฌ๐ญ๐จ๐ซ๐ข๐๐ฌ."
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
ย
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
ย
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Affordable Stationery Printing Services in Jaipur | Navpack n Print
ย
Portal Prosperity: An Overview Part I, Part II and Part III
1. PORTAL PROSPERITY
OVERVIEW | BRIJ CONSULTING, LLC| JEAN A. MARSHALL
^
MDIA
Part I: Advantages
Part II: Justifications
Part III: Process Summarization
2. Part I: Advantages of Portal Arrangements
Contents
I. Portal Goals
II. Take Ownership
III. Competitive Positioning
IV. Technology
V. Industry Buy-In
VI. Project Monitoring
VII. Resources
VIII. Oversight
IX. Related Documents
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 2
The Advantages of Portal Arrangements in
Ark Mode Plait Glass are the underlying
thread of documentation and support that
sponsors easier ownership and competitive
positioning, advancing technology through
oversight and monitoring at all levels of the
ONE SYSTEM of architecture and
composition across all industries and
economies.
Forward Planning is the most significant
sign of the advancing model
2
3. Portal Goals
1. Identifying Revenue-Streaming Portal Production
2. Assessing Upgrade and Leveraging Capability
3. Valuing the Portal Assets and Application Upgrade Strategy
4. Learning to Simulate Portability Requirements
5. Engineering the Supply Chain Interoperability and
Interpolation
Future Transparency
^Threads Remote Capability
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 3
4. Take Ownership
Portal Ownership is something high tech companies take for granted
, but they donโt exhibit their
ownership on their Balance Sheet. Standard and Poorโs Estimates $30 Trillion worth of portal
production assets are not carried on the books and an equal amount of Intellectual Property is
unrecorded. That is at least $60 Trillion in EQUITY and LEVERAGING capability missing from our
economy.
Who Benefits?
1. Manufacturers and Suppliers of High-Tech Products
2. Solution Providers of Applications
3. Customers who want ready-access to their own markets
4. Banks who want ready wealth-assessment tools
5. All Remote Building, Media Based Industries
-for more information see our other papers at the end of this presentation
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 4
Under this Glass method, Instances achieve funding and booking
through IP Process Certifications, Spending and Reporting easier.
5. Competitive Positioning
Competitors
โฆ Changing a Data Position to an Equity Position
Strengths
โฆ Developing a Foothold in Emerging Markets
Weaknesses
โฆ Gaining Platform Engineering Competence while Learning
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 5
Remote Building changes the
technical orientation of work
6. Technology
New technology (Hardware becomes Software)
โฆ Learning to Emulate Glass
Standards being adopted.
โฆ Scrum Costing and Asset Production
Standards specifically create Intellectual Property
โฆ Scientific Method Deployed
โฆ Multiple Encryption Types
Hypothetical Glass Format
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 6
7. Industry Buy-In
Branching Techniques
โฆ Interpolations
โฆ Baseline and Benchmarked Instances
โฆ Mobile Replication of Products
โฆ Simulation Techniques
โฆ Fully Driven Glass Capability
โฆ Increasing Design Complexity
โฆ Streamline Warehouse
โฆ Candle Conveyance
In Process
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 7
8. Resources
Project Maps
Encryption
Critical Marks
Stage Definitions
Bridge Specified Outcomes
Sponsoring Deliverables and Financial Outcomes
Oversight
New Requirements:
1. Remote Branch
2. Instance Staging
3. Secant Tooling Design
4. Ark Media
Artifactual(s)
5. Integral Glass Mix
Concept
6. Ground Case
7. Build Case
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 8
9. Project Monitoring
High-level overview of progress against
schedule.
โฆ On-track in what areas
โฆ Behind in what areas
โฆ Ahead in what areas
Unexpected delays or issues.
Beginning of Architectural Design Mode
Tracking and Reporting Capability
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 9
10. Oversight
Guaranteed procedural outcomes based on reliable engineering, tested and prototyped glass
emulation of materials and competently devised processes.
Financial competency, tested quality, strenuous due diligence at multiple levels
MDIA
One System, One Education, One
Compliant Concept, One Signature
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 10
Consistent and
Continuous Modeling
and Simulation
Concepts
Advancing With an Eternal Plan
11. Related Documents
Complex Planning tied to Performance
Mechanics
Real Time Execution of Financial
Assemblies and Reporting, known
Market Value
From the Matrix to the Component, to
the Product, the Economy of the
Forward-Looking Statement reveals that
the Intellectual Property will produce a
remotely extensible solution to the
course of building at the Media Product
Level.
All Intellectual Properties are Recorded
and Title Documented
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 11
Econometrics are cubic and not cyclical figures, they are fair value portfolio measurements
12. Part II Justifications
I. Load Basis of Assets
II. Comments on the Load Basis of Assets
III. Intellectual Properties for Streamline
IV. Product Load Statements
V. How is it Encrypted?
VI. Extending the Branch
VII. Branch Mobility and Conveyance
VIII. Instances Supply for Variable Rate Demand
IX. How does it Benefit You?
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 12
The Justifications of Assets is a serious part
of doing business and is enabled by having
a relational conduit between the product,
the market, the economy both interior to
the production effort and exterior to the
supply chain. Building remotely is a great
advantage in glass, but one we must further
exonerate and explore.
On an Investment of $3.3 Billion we will produce
$30 Billion increase in Asset Production, but we do
not completely justify it until our next paper where
we make and produce the Streamline products.
y = -56.90221x + 14,557,227,025,214.90000
Rยฒ = 0.06092
1455+
13. Load Basis of Assets
1/31/2022
BRIJ CONSULTING, LLC, JEAN MARSHALL
13
Planning
1
2
3
3
2
1
4
4
5
5
A B
A
B
.27x2=.54
Incumbent Load Marker
per Arch. Builds
Architectural Builds
Value added
14. 1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 14
After Production, before Streamline
People need to
understand their
work and its result
This is the IP to Assimilate Pipe Builds and Land Pipe before Streamline
4
All Property is UPGRADED and
REPLACED in the assimilation of
NEW METHODS
15. Intellectual Property Replacements
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 15
A
Incumbent Load is related to tooling
Burden Replacement is for 1W Confection
using Rate Changes
The Intellectual Property is
carried at the level of 1000 unit
pricing for each product^, while
the product can be sold in the
market-place at volume level
pricing. Changes in the build
method have influenced the
carrying value. This is prior to
streamlining the warehouse
process. ^See slide 17 examples.
Lowered IP cost was
picked up in
streamlined burden
applied in asset
production and
replacing vendor cost
See our justification for
Streamlining in our Conveyance paper
16. Intellectual
Properties
for Streamline
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 16
IP ANALYSIS
The Streamline Process in the
Warehouse includes not only
the full simulation of the
Product but all new build cases
and additional appliance
utilities in the Forward-Looking
Plan. Notice the continuous
flow of the analysis, no
adjustments are required.
No Adjustments
See Load Stโs slide 15
Current
Price
Average
Price
Future Use
17. Product Load Statements
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 17
Non-Deciduous Streamline of Process Adjustment
141x2= 282 Load
IP
IP
IP
18. How is it Encrypted?
Encryption Keys and Step-thru of
calculations can be accomplished
through a fingerprint designed for the
specific process by changing the foot
and looking for a specific interior
metric along the curve that fits the
pattern. Keys must not be duplicated
in a process warehouse. There may be
certain exceptions to this, however.
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 18
y = 0.01001x2 - 579,513,237,010.81800x +
2,690,703,128,754.96000
Rยฒ = 0.37679
0.00E+00
5.00E+11
1.00E+12
1.50E+12
2.00E+12
2.50E+12
3.00E+12
0 1 2 3 4 5
7WW Walk
P(n)
P1
remote P(n)^
Pre production
Re-Model
Interim P(m)
Poly. (remote P(n)^)
This is the beginning of the task of writing Mu Sic
Note: We used the Read Method
to Manually Step-thru Process
And made keys for temporary use
Our Permanent keys were gathered from
process statements as is yellow arrow for 7WWrite (Slide 16)
If necessary, a random
key method can be used
to cover the key
relational process. In
glass because of the
layers and menu
arrangement, itโs not
normally necessary
19. BRIJ CONSULTING, LLC, JEAN MARSHALL 19
Extending the Branch
105.71-100= 5.7
-105.71+150=45.2
4
3
2
1
2
4
50.9 = Interior Margin
2 4
+1000 = Mega Margin
1/31/2022
+10509
The beginning of
live instances is
mobile
conveyance and
remote branching
As shown in Branch:
Sound and Image Construction
20. Branch Mobility and Conveyance
1/31/2022
BRIJ CONSULTING, LLC, JEAN MARSHALL
20
1455+
P
UV
Time and Motion is clock time
Generating beginning production
UV
P
G
As a brief look at conveyance
and branch mobility we
extend our production (P) to
the gate (G) and the wall
(W) by branching in other
appliances without
additional case builds by
subscribing. No products
have been produced yet.
W
Slide 14
Shown in Crossover Conveyance
UVremdr.
Pre-Production Setup
L
L Leveraged Outcomes =29.5
29.5-29.25= .25+.222 =.028 Pre-Production
337.47 โ 332.9 = 4.43 incremental ROI not achieved yet
See our Justification of Assets Produced in our Conveyance Paper
A
A
21. Instances
Supply for
Variable Rate
Demand
Multiple assemblies are managed
simultaneously (1)
Coinciding build requirements are
managed separately and married (4,5)
The Before and After scenarios are
studied in simulation and configured
together (2,3)
BRIJ CONSULTING, LLC, JEAN MARSHALL 1/31/2022 21
Flash Metric shows Stage level of Completion
22. How does it benefit you?
Some people prefer to have
personally owned Intellectual
Properties and the process allows for
this entrepreneurial talent to emerge.
While refreshed skillsets are enough
for most people to avoid
obsolescence in their field or craft,
continuous advanced planning keeps
everyone actively employed and โin
the loopโ of building, making and
servicing very functionally creative
glass markets.
Going Remote with glass builds is the
whole point of Ark development.
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 22
Remote Own
IP ?
y
n
23. Part III: Process Summarization
1. Covenant Based Process
2. Certified Membership
3. Morning Star Sovereignty
4. Officer and Director Security
5. Member Protective Service
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 23
MDIA
24. Covenant Based
Process
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 24
1. Worldwide One System with no political aspirations.
2. No plagiarism, interloping, design compromise.
3. Complete documentation and evidence in
circumstances of error, to correct system and reinstate a
better process composition.
4. No Personal Liability, no insurance necessary, only
responsible participation.
5. If a memberโs service is called into question, an
advocate is immediately supplied.
๏ Clear and Immediate Terms
๏ Uncompromised Unity and Standards
๏ Policies that are immediately
recognizable and fair
๏ Human Advocacy that is unqualified
membership (no repercussions for
requiring changes for fair and above-
board treatment)
๏ Promises are reviewed and kept on an
individual and group basis
25. BRIJ CONSULTING, LLC, JEAN MARSHALL 1/31/2022 25
1. Uncompromised Solutions.
2. Rewarded Service and Participation.
3 Certifications enumerate pay and equity.
4. All Participation is explained, and Trademarks,
Symbols of Authority and Signage described.
5. Immediate Restitution is made for learning
curve once accomplished.
Certified
Membership
๏ Fully Streamed and Accessible
๏ Uncompromised Authority
๏ Complete Educational Delivery
๏ System Oversight
๏ No Hidden or surprise decisions related to
the individual and his/her merit, always
fully disclosed.
26. Morning Star
Sovereignty
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 26
1. Ownership in all operational and manifested
design throughout all territorial compositions.
2. Known as God, Biblical and Otherwise.
3. Creational Capabilities governed by board of
Members at Level of God.
4. Ancient of Days rules.
5. Known Attributes of God are predefined; all
members must comply.
๏ No Member of God is without Oversight
๏ Uncompromised Authority
๏ No one can impersonate a Godhead or
their appointed Officers
๏ Equanimity exists throughout the system,
and all speak their mind, and if corrected
comprehend the greater testimony and
accede to it
๏ No one can abuse their membership at
any level and not be censured for it
27. BRIJ CONSULTING, LLC, JEAN MARSHALL 1/31/2022 27
Officer and
Director Security
1. Title retention regardless of position changes.
2. Appointed by Board of Recognition.
3. Governance Training and Education.
4. Appointed Management Capability fully
supported and explained.
5. Stewardship by Appointment is unquestionably
secured even if a decision is overturned by a ruling.
๏ Compliance is a necessity and is completely
mentored
๏ No person will ever manage in an untrained
capacity and be held accountable for it ever
again, no oneโs job can be taken from them
๏ People will always have an understudy so
they can be pulled from one job and
assigned temporary responsibility to
accommodate this training
๏ A clear and competent pathway to positions
of authority is supplied
28. Member Protected Services
1/31/2022 BRIJ CONSULTING, LLC, JEAN MARSHALL 28
1. All Members are Protected by equal Participation; NO discrimination is permitted.
2. All Members receive a full propensity of body and soul capability (living or dead.)
3. No harm should come to any member at any time.
4. An uncompromised Human Advocate is always appointed.
5. All governments cease, One System is deployed. All religions are disbanded.
^
29. Remote
V3 and V4
holds all
contents
https://www.slideshare.net/Marshallja/presentations
See next slides for list of the preceding Ark and Digital Plait content
BRIJ CONSULTING, LLC, JEAN MARSHALL
1.
โข Portal Prosperity: An overview of Glass Theory and Ark Design develops property
reconcilement for Conveyance and promotes the advancing theory
โข Crossover Conveyance: Beginning with Remote Signature, threading the advancing
fingerprint with a glass path and integral site management, moving into real-time
SIMULATIONS (not published yet.)
1/31/2022
New
Papers
30. Ark Model
V3 and V4
holds all
contents
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media
to write and produce in Ark Science and Dimensional Systems, Introduction of the
Story โEru finds a Golden Pen.โ
2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and
Remix specifications, beginning crosswalk and encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of
Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark
encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility
for building and research in remote Ark Science. Start of Tooling and Secant Design
for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write
Process
8. Bridging the Instance: Now operating multiple instances must bridge the operations,
learn about deciduous models and deliberate the outcome of operations for the 2022
Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products
themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land
Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of
seamless integration of methods and modes of operation. See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus
and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch capability of new
applications, appliances and mode[ls] of operations
https://www.slideshare.net/Marshallja/presentations
See next slide for list of the preceding Digital Plait content
Remote
Access
Streamlined
Rates
BRIJ CONSULTING, LLC, JEAN MARSHALL
1/31/2022 30
31. 31
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants
and Wheels for the โcube-ified glassโ engineering of Imaging, sound and motion
characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional
Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional
systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic product
ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a
Digital Portal Production System using appliances gained through Plait Object and Gate
driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of
product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict โฆMotivated
by sound it creates a means by sound to cascade light for safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck
(Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new
(Dialogue paper)
^
To Change
Digital Plait Papers with Content Description
(Reverse Order)
BRIJ CONSULTING, LLC, JEAN MARSHALL
1/31/2022