The document outlines a project to develop an earthquake sensor for an Indian children's hospital within 6 months with a budget of 20 lakhs and a team of 8 engineers. Key details include recruiting the engineering team, designing a vertical or horizontal sensor, selecting an installation location, procuring materials, testing the sensor for vibration, obtaining stakeholder approval, and installing the sensor by the deadline of March 31st, 2013. The project objectives, scope, resources, schedule and milestones are defined.
2. Develop a earthquake sensor for Indian children hospital.
You have six months to come out With a product. Recruit 8
engineering professionals who are experienced in sensor
products.
Create your own total budget and detailed sub tasks, and
come out with final product.
OBJECTIVES
6. Project Charter
Scope
Description of the project:
Need to develop the seismometer for Indian children
hospital for the safety purpose of patients and doctors on
31st march 2013
7. Is and Is Not
Must Want
Predict earthquake Smaller in size
Continuous monitor of vibration of earth Portable
should not stop at any case Auto alarm
Should give accurate details
Raw materials should be quality one
Is
Is Not
Not to measure any other nature disaster
8. FURPS
Functionality, the primary function of seismometer is to measure and predict
the attack of earthquakes
Usability, Indian children hospital uses the seismometer
Reliability, seismometer will work for long time
9. Schedule
Milestone Schedule:
Recruiting 8 Engineering Professional (01/10/2012)
Design the seismometer (vertical or horizontal) (05/10/2012)
Select the place to where to install (22/10/2012)
Procurement of raw materials (01/11/2012)
Fix the raw materials in correct alignment (15/11/2012)
Test for vibration (06/02/2013)
Get the approval from Stakeholders (13/02/2013)
Install it (10/03/2013)
Completion Criteria
Get the approval from Government (concern department) (25/02/2013)
10. Others
Target customer:
Indian children hospital is our target customer
Dependencies:
We need to depend on concern department (government) for the approval
Risk of doing:
Machine may hurt the employees
Meanwhile if the project fails means whole money will waste
Risk of Not doing:
if the machine is not installed means we cant measure the earthquakes
11. Resources
Staffing:
I am going to recruit 8 professional engineers who having experience in sensor
products
Cost:
Amount which I need to complete this project is Rs 20 lakhs
14. Status Report
What happened?
Tasks: fixing the raw materials. We are in the heart of our project. Until now
no issues are found. Everything is going on according to our plan
Issues: one think which we found to be solved was due to absent of Siva for 8
days there is a chance to late completion of project but It can be adjustable
Resources: for this issue Arun is replaced in the place of Siva
Why happened?
Due to some personal issue