CURRICULUM VITAE
SATISHKUMAR. S. PATIL
B. E. (Electronics & Communication)
Contact No.09960310606
Email ID: enggsatish.patil1@gmail.com
I look forward to build a career in Engineering field, where I would leverage my abilities,
interest & knowledge into meaningful contribution towards meeting the organizational &
personal goal.
Graduation Degree : B.E. (Electronics & Communication)
University : Shivaji University, Kolhapur
Institute : Dr. J.J.Magdum College of Engineering, Jaysingpur 2012.
Aggregate : 57.4%
H.S.C : 66.63% (Army public school, Meerut cantt, U.P, 2007)
S.S.C : 67.40% (Army public school, Meerut cantt, U.P, 2005)
 Now, currently working in DMSS Infra India Pvt Ltd, Pune as a Project Planning Engineer
from Aug 14 to till date.
Roles and Responsibilities:-
 Detailed study of scope of work, Specification, Equipment Schedule and
BOQ, Purchase order etc.
 Design Project & Development of DC side Solar PV systems using PVsyst,
Meteonorms software.
 Handling complete project management through the installation, testing
and commissioning of the system.
 Preparation of plans, coordinates and directs the engineering work for a
project & Maintains engineering records, lists and reports as required
 Preparation of Daily, Weekly and One Month progress report &
participation in Meeting’s.
 Manpower handling and job assignment
 Providing all supports for site in terms of drawings, material, and short
supply if any.
1. First project -11.83 MWp TATA POWER SOLAR SYSTEMS LTD in Hiriyur,
(chitradurga- Karnataka). From Aug-14 to Oct 2014 as a Project Site engineer.
2. Second project – 5.5 MWp Chemtrols’ Solar India Pvt Ltd. in Daulatabad
(Sangareddy - Telanagana). From Nov-14 to Jan-15 as a Project Planning
engineer.
3. Third project – 10 Mwp Mahindra EPC Ltd in Dhanwada village
(Mahbubnagar- Telangana) from Jan-15 to April -15 as a Project Incharge &
Quality Engineer.
OBJECTIVES
EDUCATIONAL QUALIFICATION
WORK EXPERIENCE
 Firstly worked in GLOBAL TELECOM LTD. Pune as a NOC Engineer for Maharashtra &
Mumbai circle from Dec 12 to Nov 13.
Designation : NOC Engineer (Network Operation Center)
Department : NOC
Project : GIL-AIRCEL & GIL Own, UNINOR
Project Type : O&M (Operation & Maintenance)
Environment : For Troubleshoot Ticketing – BMC Remedy 7.1
Customers : GTL, GIL, AIRCEL, UNINOR
For Live Alarm Monitoring OSS –:
1) HUAWEI- iManager M2000.
2) Nokia Siemens Network-Citrix.
3) ZTE- NetNumen.
4) Ericsson Citrix.
Roles and Responsibilities:-
 24x7 I-WAN network and element monitoring & management.
 Online portal for complaint management.
 Fault management through NMS, troubleshooting & Problem resolution.
 Root cause analysis & reporting Service, Performance monitoring and reporting.
 Database storage – Maintaining a centralized database of the entire network.
Report generation and maintenance.
 Service management-coordination with NOC team.
 Now, secondly working in APT SAMRIDDHI PVT. LTD. Pune as a Project Engineer from Nov
13 to July 14.
Roles and Responsibilities:-
 Detailed study of scope of work, Specification, Equipment Schedule etc.
 Preparation of Daily & Weekly program based on one month look ahead program.
 Preparation of Daily, Weekly and One Month progress report.
 Coordination with all other services like Architectural & Electrical, etc. towards
successful completion of project.
 Attending the weekly site meeting with consultant and sub-contractors.
 Site visit, inspection of all Electrical & mechanical Equipment such as (DG,
transformer, UPS, HT & LT panels, Pumps, motor, & HT cables.)
 Erection & Commissioning of Distribution Transformers (200,315,400, 1000,
1250, 1500, 2000, KVA).
 Preparation of appropriate documents for handing over the Project.
 Manpower handling and job assignment.
 Providing all supports for site in terms of drawings, material, and short supply if
any.
1. First project done with Cummins India Ltd at kothrud, (Pune -Maharashtra). From Nov-
13 to June 2014 as a MEP Site engineer.
2. Second project done with Umicore India Pvt Ltd. at shirval (satara - Maharashtra). From
June-14 to July 14 as a QA engineer.
Title : IVRS (Interactive Voice Response System)
Description: The Project is to design a system for educational application of IVRS. We
included various fields/options in project which is beneficial for callers to get
information about their pupil.
Title : TEMPERATURE CONTROLLER USING PT100
Description: Main aim of project is to control the temperature using resistance PT100.
This system can be used in various applications.
 PVsyst software, Meteonorms, BMC Remedy 7.1, MS- OFFICE, MS- Project.
 Operating systems: Windows 7, Windows XP.
 Basic knowledge of computer.
1. Winner in “ASHWAMEDH 2k11” National Level Event for E-Design (Expert).
2. Event -Coordinator of “ROBOCOM” Workshop.
3. “Non-TECHNICAL” Secretary of Electronics & Communication Department.
4. Participated in “ENTREPRENEURSHIP AWARENESS CAMP”.
Name : Satishkumar S patil
Father Name : Mr. Sakharam M patil
Date of Birth : 09th May, 1988
Languages Known : English, Hindi and Marathi
Hobbies : Riding bike, Photography, listening music, travelling.
Permanent Address : Sambhajinagar, A/P- sainik takali, Tal-shirol, Dist-Kolhapur,
Maharashtra.Pin: 410108
I hereby declare that the information furnished above is true to the best of my
knowledge.
Date:
Place: (signature)
PROJECT UNDERTAKEN
TECHNICAL SKILLS
EXTRACURRICULAR ACTIVITIES
PERSONAL DETAILS
DECLARATION

SATISH_CV

  • 1.
    CURRICULUM VITAE SATISHKUMAR. S.PATIL B. E. (Electronics & Communication) Contact No.09960310606 Email ID: enggsatish.patil1@gmail.com I look forward to build a career in Engineering field, where I would leverage my abilities, interest & knowledge into meaningful contribution towards meeting the organizational & personal goal. Graduation Degree : B.E. (Electronics & Communication) University : Shivaji University, Kolhapur Institute : Dr. J.J.Magdum College of Engineering, Jaysingpur 2012. Aggregate : 57.4% H.S.C : 66.63% (Army public school, Meerut cantt, U.P, 2007) S.S.C : 67.40% (Army public school, Meerut cantt, U.P, 2005)  Now, currently working in DMSS Infra India Pvt Ltd, Pune as a Project Planning Engineer from Aug 14 to till date. Roles and Responsibilities:-  Detailed study of scope of work, Specification, Equipment Schedule and BOQ, Purchase order etc.  Design Project & Development of DC side Solar PV systems using PVsyst, Meteonorms software.  Handling complete project management through the installation, testing and commissioning of the system.  Preparation of plans, coordinates and directs the engineering work for a project & Maintains engineering records, lists and reports as required  Preparation of Daily, Weekly and One Month progress report & participation in Meeting’s.  Manpower handling and job assignment  Providing all supports for site in terms of drawings, material, and short supply if any. 1. First project -11.83 MWp TATA POWER SOLAR SYSTEMS LTD in Hiriyur, (chitradurga- Karnataka). From Aug-14 to Oct 2014 as a Project Site engineer. 2. Second project – 5.5 MWp Chemtrols’ Solar India Pvt Ltd. in Daulatabad (Sangareddy - Telanagana). From Nov-14 to Jan-15 as a Project Planning engineer. 3. Third project – 10 Mwp Mahindra EPC Ltd in Dhanwada village (Mahbubnagar- Telangana) from Jan-15 to April -15 as a Project Incharge & Quality Engineer. OBJECTIVES EDUCATIONAL QUALIFICATION WORK EXPERIENCE
  • 2.
     Firstly workedin GLOBAL TELECOM LTD. Pune as a NOC Engineer for Maharashtra & Mumbai circle from Dec 12 to Nov 13. Designation : NOC Engineer (Network Operation Center) Department : NOC Project : GIL-AIRCEL & GIL Own, UNINOR Project Type : O&M (Operation & Maintenance) Environment : For Troubleshoot Ticketing – BMC Remedy 7.1 Customers : GTL, GIL, AIRCEL, UNINOR For Live Alarm Monitoring OSS –: 1) HUAWEI- iManager M2000. 2) Nokia Siemens Network-Citrix. 3) ZTE- NetNumen. 4) Ericsson Citrix. Roles and Responsibilities:-  24x7 I-WAN network and element monitoring & management.  Online portal for complaint management.  Fault management through NMS, troubleshooting & Problem resolution.  Root cause analysis & reporting Service, Performance monitoring and reporting.  Database storage – Maintaining a centralized database of the entire network. Report generation and maintenance.  Service management-coordination with NOC team.  Now, secondly working in APT SAMRIDDHI PVT. LTD. Pune as a Project Engineer from Nov 13 to July 14. Roles and Responsibilities:-  Detailed study of scope of work, Specification, Equipment Schedule etc.  Preparation of Daily & Weekly program based on one month look ahead program.  Preparation of Daily, Weekly and One Month progress report.  Coordination with all other services like Architectural & Electrical, etc. towards successful completion of project.  Attending the weekly site meeting with consultant and sub-contractors.  Site visit, inspection of all Electrical & mechanical Equipment such as (DG, transformer, UPS, HT & LT panels, Pumps, motor, & HT cables.)  Erection & Commissioning of Distribution Transformers (200,315,400, 1000, 1250, 1500, 2000, KVA).  Preparation of appropriate documents for handing over the Project.  Manpower handling and job assignment.  Providing all supports for site in terms of drawings, material, and short supply if any. 1. First project done with Cummins India Ltd at kothrud, (Pune -Maharashtra). From Nov- 13 to June 2014 as a MEP Site engineer. 2. Second project done with Umicore India Pvt Ltd. at shirval (satara - Maharashtra). From June-14 to July 14 as a QA engineer.
  • 3.
    Title : IVRS(Interactive Voice Response System) Description: The Project is to design a system for educational application of IVRS. We included various fields/options in project which is beneficial for callers to get information about their pupil. Title : TEMPERATURE CONTROLLER USING PT100 Description: Main aim of project is to control the temperature using resistance PT100. This system can be used in various applications.  PVsyst software, Meteonorms, BMC Remedy 7.1, MS- OFFICE, MS- Project.  Operating systems: Windows 7, Windows XP.  Basic knowledge of computer. 1. Winner in “ASHWAMEDH 2k11” National Level Event for E-Design (Expert). 2. Event -Coordinator of “ROBOCOM” Workshop. 3. “Non-TECHNICAL” Secretary of Electronics & Communication Department. 4. Participated in “ENTREPRENEURSHIP AWARENESS CAMP”. Name : Satishkumar S patil Father Name : Mr. Sakharam M patil Date of Birth : 09th May, 1988 Languages Known : English, Hindi and Marathi Hobbies : Riding bike, Photography, listening music, travelling. Permanent Address : Sambhajinagar, A/P- sainik takali, Tal-shirol, Dist-Kolhapur, Maharashtra.Pin: 410108 I hereby declare that the information furnished above is true to the best of my knowledge. Date: Place: (signature) PROJECT UNDERTAKEN TECHNICAL SKILLS EXTRACURRICULAR ACTIVITIES PERSONAL DETAILS DECLARATION