Types of manufacturing/production
             system



           Types of Production system




   Manufacturing System                 Service System




Continuous Production         Intermittent Production



                     Batch Production     Job Production


  Mass production( Flow)    Processing Production
Basic Types of Production Processes

  (1) Intermittent Production System
Production is performed on a start-and-stop basis, such as for the
manufacture of made-to-order products.

Batch Production System

•Highly specialized Human resource is required
•Highly specialized multi tasking machines
•Machines are shared.
•Production in batches
•Production lots are based on customer demand or order.
•No single sequence of operation
Finished goods are heterogeneous

Job production system

   In this system, the goods are produced according to definite
customers order and all manufacturing set ups depend on the
receipt of specific item in printing of example many different jobs go
on at any one time.


(2) Continuous Production Processes

–A production process, such as those used by chemical plants or
refineries, that runs for very long periods without the start-and-stop
behavior associated with intermittent production.

–Enormous capital investments are required for highly automated
facilities that use special-purpose equipment designed for high
volumes of production and little or no variation in the type of
outputs.
Mass Production

A special type of intermittent production process using
standardized methods and single-use machines to produce long
runs of standardized items.



Mass Production System (Flow)

Continuous Production

•Anticipation of demand
•May not have uniform production
•Standardized Raw material
•Big volume of limited product line
•Standard facility- high standardization.
•Fixed sequence of operation
•Material handling is easier
•High skilled operator not required
•More Human problem is foreseen
•Huge investment.
•High raw material inventory.

Processing Production System

  In this process are inter linked production is carried on
continuously through a uniform and standardized sequence of
operation. This type of production is used in bulk processing of
crude oil into petroleum, kerosene and diesel etc.
Operation scheduling

Master Production scheduling, detailed scheduling, facility loading
sequencing operations, priority sequencing techniques, line
balancing and line of balance (LOB),
(Problems in Priority sequencing, Johnson’s rule and Line
Balancing)

Scheduling

  • Scheduling: Establishing the timing of the use of equipment,
    facilities and human activities in an organization
  • Effective scheduling can yield
       – Cost savings
       – Increases in productivity

Objectives

  •   customer satisfaction
  •   optimization of cost
  •   increase in efficiency
  •   reduced variances in the transformation process
  •   employee focus in scheduling

Types of scheduling

  1. master scheduling
  2. parts scheduling
  3. machine loading scheduling

Principles of scheduling

Principle of optimum task size
Principle of the optimum production plan
Principle of the optimum operation sequence
Gantt chart

      Gantt chart - used as a visual aid for loading and scheduling



 Work         Mon.      Tues.     Wed.     Thurs.     Fri.
 Center
   1          Job 3                        Job 4
   2                    Job 3    Job 7
   3          Job 1                      Job 6       Job 7
   4         Job 10


Job Sequencing Rules

  • Sequencing: Determine the order in which jobs at a work
    center will be processed.

  • Workstation: An area where one person works, usually with
    special equipment, on a specialized job.

  • Priority rules: Simple heuristics used to select the order in
    which jobs will be processed.

  • Job time: Time needed for setup and processing of a job.


Priority Rules

  •   FCFS - first come, first served
  •   SPT - shortest processing time
  •   EDD - earliest due date
  •   CR - critical ratio
  •   S/O - slack per operation
  •   Rush - emergency
Average
            Average         Average         Number of
            Flow Time       Tardiness       Jobs at the
Rule        (days)          (days)          Work Center

FCFS            20.00            9.00               2.93
SPT             18.00            6.67               2.63
EDD             18.33            6.33               2.68
CR              22.17            9.67               3.24

Two Work Center Sequencing

  • Johnson’s Rule: technique for minimizing completion time for
    a group of jobs to be processed on two machines or at two
    work centers.
  • Minimizes total idle time
  • Several conditions must be satisfied

Johnson’s Rule Conditions

  • Job time must be known and constant
  • Job times must be independent of sequence
  • Jobs must follow same two-step sequence
  • Job priorities cannot be used
  • All units must be completed at the first
    work center before moving to second

Rule Optimum Sequence

  1.   List the jobs and their times at each work center
  2.   Select the job with the shortest time
  3.   Eliminate the job from further consideration
  4.   Repeat steps 2 and 3 until all jobs have been scheduled

More Related Content

What's hot

Scheduling
SchedulingScheduling
Scheduling
jaya_22
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
senthil.G
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Chap017 Scheduling Edit
Chap017 Scheduling EditChap017 Scheduling Edit
Chap017 Scheduling Edit
Ricky Muchtar
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
Jorge Fuentes
 

What's hot (20)

scheduling
schedulingscheduling
scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Scheduling Definition, objectives and types
Scheduling Definition, objectives and types Scheduling Definition, objectives and types
Scheduling Definition, objectives and types
 
Chap017 Scheduling Edit
Chap017 Scheduling EditChap017 Scheduling Edit
Chap017 Scheduling Edit
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
SCHEDULING
SCHEDULING  SCHEDULING
SCHEDULING
 
Cellular manufacturing and group technology
Cellular manufacturing and group technologyCellular manufacturing and group technology
Cellular manufacturing and group technology
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 

Similar to Pom

Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
SandipanMaji3
 
schedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptschedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.ppt
VELMURUGANM19
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 

Similar to Pom (20)

Process Selection and Facility layout.ppt
Process Selection and Facility layout.pptProcess Selection and Facility layout.ppt
Process Selection and Facility layout.ppt
 
OS.pptx
OS.pptxOS.pptx
OS.pptx
 
Mba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection aMba ii pmom_unit-1.4 process design, analysis & selection a
Mba ii pmom_unit-1.4 process design, analysis & selection a
 
Just in time
Just in timeJust in time
Just in time
 
scheduling.ppt course not for industrial engineering students
scheduling.ppt course not for industrial engineering studentsscheduling.ppt course not for industrial engineering students
scheduling.ppt course not for industrial engineering students
 
scheduling.ppt course not for industrial engineering students
scheduling.ppt course not for industrial engineering studentsscheduling.ppt course not for industrial engineering students
scheduling.ppt course not for industrial engineering students
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
Facility Layout,PPT.pptx
Facility Layout,PPT.pptxFacility Layout,PPT.pptx
Facility Layout,PPT.pptx
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 
OPERATIONS SCHEDULING.pptx
OPERATIONS SCHEDULING.pptxOPERATIONS SCHEDULING.pptx
OPERATIONS SCHEDULING.pptx
 
ch_scheduling (1).ppt
ch_scheduling (1).pptch_scheduling (1).ppt
ch_scheduling (1).ppt
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
schedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptschedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.ppt
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptx
 
Round Robin Algorithm.pptx
Round Robin Algorithm.pptxRound Robin Algorithm.pptx
Round Robin Algorithm.pptx
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.ppt
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
LINE PACING ETC...ppt
LINE PACING  ETC...pptLINE PACING  ETC...ppt
LINE PACING ETC...ppt
 
LINE PACING ETC..-2.ppt
LINE PACING  ETC..-2.pptLINE PACING  ETC..-2.ppt
LINE PACING ETC..-2.ppt
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling
 

Recently uploaded

Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Pusat Herbal Resmi BPOM
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 

Recently uploaded (20)

Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 

Pom

  • 1. Types of manufacturing/production system Types of Production system Manufacturing System Service System Continuous Production Intermittent Production Batch Production Job Production Mass production( Flow) Processing Production
  • 2. Basic Types of Production Processes (1) Intermittent Production System Production is performed on a start-and-stop basis, such as for the manufacture of made-to-order products. Batch Production System •Highly specialized Human resource is required •Highly specialized multi tasking machines •Machines are shared. •Production in batches •Production lots are based on customer demand or order. •No single sequence of operation Finished goods are heterogeneous Job production system In this system, the goods are produced according to definite customers order and all manufacturing set ups depend on the receipt of specific item in printing of example many different jobs go on at any one time. (2) Continuous Production Processes –A production process, such as those used by chemical plants or refineries, that runs for very long periods without the start-and-stop behavior associated with intermittent production. –Enormous capital investments are required for highly automated facilities that use special-purpose equipment designed for high volumes of production and little or no variation in the type of outputs.
  • 3. Mass Production A special type of intermittent production process using standardized methods and single-use machines to produce long runs of standardized items. Mass Production System (Flow) Continuous Production •Anticipation of demand •May not have uniform production •Standardized Raw material •Big volume of limited product line •Standard facility- high standardization. •Fixed sequence of operation •Material handling is easier •High skilled operator not required •More Human problem is foreseen •Huge investment. •High raw material inventory. Processing Production System In this process are inter linked production is carried on continuously through a uniform and standardized sequence of operation. This type of production is used in bulk processing of crude oil into petroleum, kerosene and diesel etc.
  • 4. Operation scheduling Master Production scheduling, detailed scheduling, facility loading sequencing operations, priority sequencing techniques, line balancing and line of balance (LOB), (Problems in Priority sequencing, Johnson’s rule and Line Balancing) Scheduling • Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization • Effective scheduling can yield – Cost savings – Increases in productivity Objectives • customer satisfaction • optimization of cost • increase in efficiency • reduced variances in the transformation process • employee focus in scheduling Types of scheduling 1. master scheduling 2. parts scheduling 3. machine loading scheduling Principles of scheduling Principle of optimum task size Principle of the optimum production plan Principle of the optimum operation sequence
  • 5. Gantt chart Gantt chart - used as a visual aid for loading and scheduling Work Mon. Tues. Wed. Thurs. Fri. Center 1 Job 3 Job 4 2 Job 3 Job 7 3 Job 1 Job 6 Job 7 4 Job 10 Job Sequencing Rules • Sequencing: Determine the order in which jobs at a work center will be processed. • Workstation: An area where one person works, usually with special equipment, on a specialized job. • Priority rules: Simple heuristics used to select the order in which jobs will be processed. • Job time: Time needed for setup and processing of a job. Priority Rules • FCFS - first come, first served • SPT - shortest processing time • EDD - earliest due date • CR - critical ratio • S/O - slack per operation • Rush - emergency
  • 6. Average Average Average Number of Flow Time Tardiness Jobs at the Rule (days) (days) Work Center FCFS 20.00 9.00 2.93 SPT 18.00 6.67 2.63 EDD 18.33 6.33 2.68 CR 22.17 9.67 3.24 Two Work Center Sequencing • Johnson’s Rule: technique for minimizing completion time for a group of jobs to be processed on two machines or at two work centers. • Minimizes total idle time • Several conditions must be satisfied Johnson’s Rule Conditions • Job time must be known and constant • Job times must be independent of sequence • Jobs must follow same two-step sequence • Job priorities cannot be used • All units must be completed at the first work center before moving to second Rule Optimum Sequence 1. List the jobs and their times at each work center 2. Select the job with the shortest time 3. Eliminate the job from further consideration 4. Repeat steps 2 and 3 until all jobs have been scheduled