Acrylic Spray Waterproofing System Research and Application 2016/7/19
2
4
33
Technical Background31
Technical Content
Projects Application
Prospects and benefits
35
Technical Prospects
2
Acrylic Spray Waterproofing System Research and Application 2016/7/19
Technical Background[1]
3
1 TECHNICALBACKGROUND
1.1 Underground Projects Leakage Current Situation
2016/7/19Acrylic Spray Waterproofing System Research and Application
Highway Tunnels Underground Railway Parking Civil Air Defence
Common underground projects types
Underpass Tunnels Underground Street Underpass Underground Buildings
4
2016/7/19Acrylic Spray Waterproofing System Research and Application
High Leaking Rate of the
Underground Projects Up to 30%
1 TECHNICALBACKGROUND
5
1 TECHNICALBACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
Covered-excavation Tunneling
Waterproofing System
Cut and Covering Tunneling
Waterproofing System
1.2 Underground projects Leakage Reasons Analysis
Waterproofing
Layer
Waterproofing Layer
6
First Lining
Lining
Structural
Waterproofing
Waterproofing layer
Central
Sulcus
Confining Bed
Backfilling soil
Building
Envelope
Waterproofing
Building
Envelope
Waterproofing
Central
Sulcus
Surrounding Rock
for Seepage-proof
Secondary Lining
Lateral
Sulcus
Lateral
Sulcus
Surface Treatment
1 TECHNICALBACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
Covered-excavation
Waterproofing System
Cut and Covering
Tunnel Waterproofing
7
2016/7/19Acrylic Spray Waterproofing System Research and Application
Cut and Covering Metro Station
Waterproofing System
Waterproofing
Layer
1 TECHNICALBACKGROUND
8
2016/7/19Acrylic Spray Waterproofing System Research and Application
1TECHNICAL
BACKGROUND
9
1 TECHNICALBACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
The development of water migration during
the both concrete membrane interfaces
makes: the leaking area expands, wide
influence,
difficulties to find the leaking area, difficulties
to repair, high cost to repair. 10
1 TECHNICAL
BACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
 Disadvantages of Coiled Waterproofing
Membranes:
 Certainly not seamless
 Easy to be damaged in the subsequent
handling by welding spark, nails, rebar
 Easy to be influenced by the surface
evenness
 Easy to develop water migration
during the both concrete membranes
interfaces
11
1 TECHNICAL BACKGROUND
1.3 Acrylic Spray Waterproofing
2016/7/19Acrylic Spray Waterproofing System Research and Application 12
1 TECHNICAL
BACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
 Advantages of Acrylic Spray Film
 Seamless
 Strong Resistance to the
Subsequent Handling Damages
 A1 Grade Fireproof
 Fully Bonded System
 Prevent the Development of
Water Migration During the Both
Concrete Membrane Interfaces
 Play a Role In Lining Pressure
Resistance
13
1 TECHNICALBACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
1999
Dazhulin
Tunnel
2004~2007
Technology
System
Modified
2010
Munigou
Tunnel
14
1 TECHNICAL
BACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application
 Scope of Application
 Mountain
Tunnels
 Underpass
 Metro Stations
 Running Tunnel
 Shaft
 Immersed
Tunnels
 Cave
 Tunnel Repairing
15
Acrylic Spray Waterproofing System Research and Application 2016/7/19
Technical Content[2]
16
2 TECHNICALCONTENT
2.1 Polymerization Mechanism
2016/7/19Acrylic Spray Waterproofing System Research and Application 17
Produce
Radical
Chain
Initiation
Chain
Growth
Chain
Termination
2 TECHNICALCONTENT
2016/7/19Acrylic Spray Waterproofing System Research and Application 18
Main Liquid
A
Oxidant
Emulsion
A
Spray
Gun
Waterproofing Film
Surface
Emulsion
B
Main Liquid
B
Deoxidant
Mix Mix
2 TECHNICALCONTENT
2.2 Main Technology Consist
2016/7/19Acrylic Spray Waterproofing System Research and Application 19
Film Materials
• Polymerization Mechanism, Material Comparison
and Selection,Fomula,Manufacturing Technology
• Film Materials Modify Technology,Durability
Research
Spraying Machine
• Spraying Delivering Machine
• Spray Gun
Construction Technology
• Construction Progress
• Construction Technology Standards
2 TECHNICALBACKGROUND
2016/7/19Acrylic Spray Waterproofing System Research and Application 20
Waterproofing Materials
Research
Spraying Machines
Research
Construction Technology
2 TECHNICALCONTENT
2.3 Main Technical Data
2016/7/19Acrylic Spray Waterproofing System Research and Application 21
Inspection Item
Performance Requirement
Test MethodEmulsion A Emulsion B
Appearance
White or Grey
Suspension
Liquid
White or Grey
Suspension
Liquid Visual Inspection
Solid Content
≥45 ≥45
GB/T 16777
pH Value 7.0 ~ 8.0 6.0 ~ 7.0 pH test paper
Gel Time ≤5 seconds
According to
relevant
regulation
Inspection Item Performance Requirement Test Method
Breaking Tensile Strength
(Mpa)
≥1.1
GB/T 16777
Elongation at Break(%)
≥200
Tear Strength(kN/m) ≥5
Watertightness No Leakage
2 TECHNICALCONTENT
2.4 Waterproofing Performance Research
2016/7/19Acrylic Spray Waterproofing System Research and Application 22
Property Project Requirement
Basic Property Watertightness
The basic function requirement to
waterproofing material
Mechanical
Property
Strength External Stress Resistant
Tenacity External Abrasive Resistant
Drainage Function
Prevent the underground water
behind the lining accumulation
Chemical
Resistance
Resistance to
Corrosion
Resistance to the special ion in the
underground water corrosion
Acrylic Spray Waterproofing Film Main Functions Requirements
2 TECHNICALCONTENT
 Long-Term Impermeability Test(0.3Mpa,30 Days)
2016/7/19Acrylic Spray Waterproofing System Research and Application 23
2 TECHNICALCONTENT
 Impermeability Contrast Test Operated on Different Parts
2016/7/19Acrylic Spray Waterproofing System Research and Application 24
1.2 MPa 1.2 MPa 2.4 MPa
2 TECHNICAL
CONTENT
 Chemical Solution
Immersion Test
2016/7/19Acrylic Spray Waterproofing System Research and Application 25
2 TECHNICALCONTENT
Drying(Dehydration)Contrast Test
(100℃,Dry to Constant Weight)
2016/7/19Acrylic Spray Waterproofing System Research and Application 26
Tensile Splitting Strength
Test
2 TECHNICALCONTENT
Mixed-Mode Test-Pieces Mechanical Test
2016/7/19Acrylic Spray Waterproofing System Research and Application 27
Tensile Test
Earlier Pouring
Concrete
Later Pouring
Concrete
Waterproofing
Layer
2 TECHNICALCONTENT
 Compound Concrete Water Moving Behind the Lining
Prevention Test(0.6 MPa)
2016/7/19Acrylic Spray Waterproofing System Research and Application 28
2 TECHNICALCONTENT
 Compound Concrete Control Drainage Test
2016/7/19Acrylic Spray Waterproofing System Research and Application 29
Max Rated
Hydraulic
Pressure is 6.3
Mpa,Max
Stable Hydraulic
Pressure Can Be
Added is 0.25
Mpa
2 TECHNICAL
CONTENT
2.5 Part of Technological
Achievements
2016/7/19Acrylic Spray Waterproofing System Research and Application 30
 Academic Achievements
 14 Authorized Patents
 Over 40 Articles(SCI included one,
 EI included 5)
 One Monograph(Tunnel and
Underground Spraying Film
Waterproofing)
 Training over 20 doctors and
masters
 Write an Industry Standard Book
2 TECHNICALCONTENT
 Academic Communication Home and Abroad
2016/7/19Acrylic Spray Waterproofing System Research and Application 31
2 TECHNICALCONTENT
2016/7/19Acrylic Spray Waterproofing System Research and Application 32
 Awards
The Second Class Prize of National Science and Technology Progress Award certificated by State Council, the
highest honor in People's Republic of China in science and technology, in order to recognize citizens and
organizations who have made remarkable contributions to scientific and technological progress, and to
promote the development of science and technology.
Acrylic Spray Waterproofing System Research and Application 2016/7/19
Projects Application[3]
33
3 PROJECTSAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 34
Railways
Tunnels
Highways
Tunnels
Underpass
Other
• 1999 Dazhulin Tunnel
• 2002 Mogouling Tunnel
• 2012 Tianpingshan Tunnel
• 2014 Wujiawan Tunnel
• 2001 Lianhuang Tunnel
• 2010 Munigou Tunnel
• 2011 Balangshan Tunnel
• 2013 Xueliangshan Tunnel
• 2013 Nanjing Youth
Olympic Center J-2 Part
• 2015 Langzhong Railway
Station Underpass
• 2013 An Underground Oil
Depot Cave
• 2014 Pengzhou Petrochemical
Base Tanks Bottom Seepage
Prevention
• 2014 Shenzhen LNG Terminal
3 PROJECTAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 35
3.1 Scope of Application
 Airtight, Backfilled, Covered
Tunnels, Underground Projects,
Caves and Similar Projects
 High Grade Requirement of
Waterproof(Design Thickness is
3mm and thicker)
 Operation On Upstream Face Or
Behind Structure Supported Parts
3 PROJECTAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 36
3.2 Operation
Operation Procedures
 Surface Clear
 Install Drainage Materials
Spray the film
Inspection
3 PROJECTAPPLICATION
 Surface Clear Requirements
 Surface protrusion should be
cut or hit to be flat
 Water on surface is not allowed,
otherwise, water shutoff or
drainage is required
 It is better to ensure a certain
evenness of the surface to save
spraying materials, otherwise,
Leveling or Isolation is required
 Surface Leaking Water pH Value
should be less than 13
2016/7/19Acrylic Spray Waterproofing System Research and Application 37
3 PROJECTAPPLICATION
 Thickness of the
Film Management
 Spraying Machine
Parameter Control
 Spray Gun Movement
Locus
 Spray Worker
Training
 Thickness
Inspection Methods
 Defect Repairing
2016/7/19Acrylic Spray Waterproofing System Research and Application 38
3 PROJECTAPPLICATION
 Spraying Machine Parameter
 Use High Pressure Airless
Spraying Apparatus for Large
Area Operation
 Mix inside the gun and mix
outside the gun
 Spraying Speed Rate should be
more than 1 m2/min
 Compressed Air Output
Pressure should be more than
1.0 MPa,Gas Production Rate
should be more than1 m3/min
2016/7/19Acrylic Spray Waterproofing System Research and Application 39
(1)
(2)
(1)
(2)
3 PROJECTAPPLICATION
 Spraying Operation Requirement
 Do In Time Protection and
Coverage to the Film
 Do Safeguarding Measures to the
workers
 Quality Inspection and Repairing
to the Film :Thickness、
Appearance、Leaking(Dominant
Items)
2016/7/19Acrylic Spray Waterproofing System Research and Application 40
3 PROJECTSAPPLICATION
3.3 Munigou Tunnel
2016/7/19
Acrylic Spray Waterproofing System Research and Application
41
Munigou Tunnel Location
Munigou Tunnel
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 42
 Munigou Tunnel is 1835m long,
Two-Lane ,Max Driving Speed
60km/h
 This project was on the altitude
over 3000 meters, with the
feature of high altitude, low air
pressure, low temperature and
large temperature difference
between day and night,
minimum temperature reached -
6℃ in the spring construction,
The groundwater is developed
in the tunnel.
3 PROJECTAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 43
Open Cut Tunnel Lining, Waterproofing and Insulation Structure
 Waterproofing and Insulation Design
Waterproofing and
Insulation Layer
Secondary Lining
3 PROJECTAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 44
Undercutting Part Lining, Waterproofing and Insulation Structure
Shotcrete First Lining
Drainage System Waterproofing and
Insulation Layer
Concrete Secondary Lining
 Waterproofing and Insulation Design
3 PROJECTAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 45
 Waterproofing and Insulation Design
Undercutting Part Lining Conventional Waterproofing Structure
Shotcrete First Lining
Drainage System Waterproofing and
Insulation Layer
Concrete Secondary Lining
Concrete Secondary Lining
EVA Membrane
Non-Woven Buffer Layer
Shotcrete First Lining
3 PROJECTSAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 46
Acrylic Spray Waterproofing in Munigou Tunnel
3 工程应用
2016/7/19隧道及地下工程丙烯酸盐喷膜防水技术研究及应用 47
Waterproofing Comparison After Construction
Waterproofing Comparison During the Construction
3 PROJECT APPLICATION
3.4 Nanjing Youth Olympic Center Axis Underpass
2016/7/19Acrylic Spray Waterproofing System Research and Application 48
 Nanjing Meizizhou Under-River
Tunnel-Youth Olympic Axis
Underground Construction Project
is one of the auxiliary projects for
2014 Youth Olympic Game,
consisted of Meizizhou Under-
River Tunnel, Youth Olympic Axis
Underground Transportation
System and Youth Olympic Axis
Plaza Underground Space three
parts.
Project Planning Block Satellite Map
Our project B2-J1 Part
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 49
 This project’s core
control area is B2-J1
part,consisted of
Meizizhou Tunnel,
Bingzhou Road,
Interchange Ramps
and underground
space, it is a partial
underground three
layers framing
structure, cut and
covering method
adopted, A grade
waterproofing
requirement.
The Acrylic
Spray Film
Waterproofing
Area
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 50
3 PROJECTS APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 51
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 52
August,2015(rainy season) Return Visit Result
3 PROJECTAPPLICATION
3.5 Shenzhen East-West
Dapeng and Diefu offshore LNG
Terminal connects the harbor
trestle and the receiving station
tank field, total length 584m, max
depth of the tunnel 43m
This is the first LNG terminal in
China and the third in the world,
related documents and
construction experiences for
reference are very limited.
2016/7/19Acrylic Spray Waterproofing System Research and Application 53
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 54
The Terminal
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 55
 There are total 10 pipes
crossing through the
tunnel portal endwall,1
LNG Receiving Pipe,1
BOG Recirculatory
Pipe,1 LNG Circulating
Pipe,1 VENT Pipe,1 Fire
Water Supply Pipe and
5 Utility Pipes, protected
by filling nitrogen, with
high level requirements
on waterproofing and
gas tightness.(Special
Grade of waterproofing) LNG Terminal Sectional View and Tubes Arrangement Diagram
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 56
The ground water under the tunnel is fissure bedrock water that
mainly lays in medium-grained granites and vein rocks, spreading
over the fissuring in the strong and medium weathered layer.
Atmospheric precipitation supplies the ground water. Depth of the
ground water is 1.20 to 18.30 meters during the geological exploration.
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 57
• Two Geotextile-Two Membranes
waterproofing method:
• Geotextile waterproofing layer(400g
Geotextile) + Composite Waterproofing
Sheet(1.5mm thick EVA waterproofing
sheet+100g geotextile) + Acrylic Spray
Membrane(4mm thick), the original
steel plate waterproofing design
cancelled because steel plate needs
welding(no fire is allowed in the
construction),rough handling on the
welding, heavy weight, high costs, long
operation period time. Adopting PMC-S
saved 303 million US dollars and one
year construction period time.
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 58
EVA Membrane Installation in LNG Terminal
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 59
Our Acrylic Spray Waterproofing
Operation in Shenzhen LNG Terminal
3 PROJECT APPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 60
Acrylic Waterproofing Film Was not Damaged By the Second Lining Reinforcement Assembling and Welding
3 PROJECTAPPLICATION
2016/7/19Acrylic Spray Waterproofing System Research and Application 61
Perfect waterproofing effects in our
return visit during the equipment
construction stage(June,2015)
3 PROJECTAPPLICATION
3.6 Other Projects
2016/7/19Acrylic Spray Waterproofing System Research and Application 62
Acrylic Spray Waterproofing System Research and Application 2016/7/19
Prospects and Benefits[4]
63
4 PROSPECTS AND BENEFITS
4.1 Technical Advantages:
 Spraying leads to efficient, fast construction, saving
labors, it is a new generation and the main direction of
waterproofing technology development in the future
 Strong Adaptability to the surface, safe seams handle,
avoid the important hidden danger to waterproofing
 Fireproof, strong puncture resistant, strong subsequent
handling damage resistant
 Could be applied with waterproofing sheets to achieve gas
tightness, meet high waterproofing grade
 Save a huge amount of subsequent repairing and
maintenance cost, overall economic benefit is excellent.
2016/7/19Acrylic Spray Waterproofing System Research and Application 64
4 PROSPECTS AND BENEFITS
4.2 Prospects
2016/7/19Acrylic Spray Waterproofing System Research and Application 65
4 PROSPECTS AND BENEFITS
4.3 Benefits Analysis
2016/7/19Acrylic Spray Waterproofing System Research and Application 66
Subsurface Structure Performance-Time Graph
Benefit
Quality
Cost
Total Cost
Construction cost
Maintenance Cost
Subsurface Structure Cost-Quality Graph
Performance
Good
Bad
Construction
Time
Now Time
C:Failure and
Accident
A:Initial
Condition
D:Repairing, reinforcement
Boundary
Condition
Current
Condition
Acrylic Spray Waterproofing System Research and Application 2016/7/19
Technical Prospects[5]
67
5 TECHNICAL PROSPECTS
 Spray waterproofing materials types is growing in the market,
including acrylic, polyurea, rapid-hardening spray applied liquid
rubber asphalt, methyl methacrylate and so on, project
application cases of these spray waterproofing materials are also
growing gradually
2016/7/19Acrylic Spray Waterproofing System Research and Application 68
5 TECHNICALPROSPECTS
 Application in tunnels and
underground projects cases are
growing one by one,including
mountain tunnels、underground
railway and tunnels、underground
Park、underpass、immersed pipes
tunnels、shaft、cave and tunnel
repairing, etc.
2016/7/19Acrylic Spray Waterproofing System Research and Application 69
5 TECHNICALPROSPECTS
 Spray waterproofing materials types for tunnels and
underground projects are growing, exclusive spraying
machines are updating, spray waterproofing systems are
improving
2016/7/19Acrylic Spray Waterproofing System Research and Application 70
5 TECHNICAL PROSPECTS
 Relevant industry and national standards are coming on
and being revised, which lays the foundation of applying
new spraying waterproofing technologies
2016/7/19Acrylic Spray Waterproofing System Research and Application 71
(Revising)
5 TECHNICAL PROSPECT
New Technical contents and researching
methods are updating
2016/7/19Acrylic Spray Waterproofing System Research and Application 72
2016/7/19Acrylic Spray Waterproofing System Research and Application 73
Thanks for Watching.
If any inquiries, please contact mailto:colin@scgbco.com

More Related Content

What's hot

Waterproofing dublin09 1
Waterproofing dublin09 1Waterproofing dublin09 1
Waterproofing dublin09 1
BPA-GmbH, Waterproofing is our Passion!
 
Water Proofing techniques
Water Proofing techniquesWater Proofing techniques
Water Proofing techniques
abrahamgeorgesyd
 
Tunnel waterproofing – different components and types
Tunnel waterproofing – different components and typesTunnel waterproofing – different components and types
Tunnel waterproofing – different components and types
Constrofacilitator
 
Waterproofing. Concrete. Civil Engineering . Rebair & Rehab
Waterproofing. Concrete. Civil Engineering . Rebair & RehabWaterproofing. Concrete. Civil Engineering . Rebair & Rehab
Waterproofing. Concrete. Civil Engineering . Rebair & Rehab
Yash Shah
 
DualProof Brochure
DualProof BrochureDualProof Brochure
DualProof Brochure
SURFASOLOGY
 
Effective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIAEffective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIA
W. R. Meadows
 
Products & Services
Products & ServicesProducts & Services
Products & ServicesHRD Trading
 
CEMflex VB Plate Brochure
CEMflex VB Plate BrochureCEMflex VB Plate Brochure
CEMflex VB Plate Brochure
SURFASOLOGY
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
sandeepasandaruwan1
 
Osmosis - The Bane of Liquid Applied Waterproofing Membranes
Osmosis - The Bane of Liquid Applied Waterproofing MembranesOsmosis - The Bane of Liquid Applied Waterproofing Membranes
Osmosis - The Bane of Liquid Applied Waterproofing Membranes
Graham Finch
 
Waterproofing in building construction
Waterproofing in building constructionWaterproofing in building construction
Waterproofing in building construction
Riya Bagchi
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Omar Hamim
 
Permatech Brochure
Permatech BrochurePermatech Brochure
Permatech Brochure
Yogesh Parmar
 
waterproofing
waterproofingwaterproofing
waterproofing
modern metallurgicals
 
11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them
Michael Aldred
 
Basement Waterproofing for Homeowners
Basement Waterproofing for HomeownersBasement Waterproofing for Homeowners
Basement Waterproofing for Homeowners
Michael Razeghi
 
Maleki india2014
Maleki india2014Maleki india2014
Maleki india2014
Suneet Kotwal
 
WaterProofing Coatings
WaterProofing CoatingsWaterProofing Coatings
WaterProofing Coatings
IT Spidering Monarch
 
Basement tanking
Basement tankingBasement tanking
Basement tankingchazza1234
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
Suresh Kumar V K
 

What's hot (20)

Waterproofing dublin09 1
Waterproofing dublin09 1Waterproofing dublin09 1
Waterproofing dublin09 1
 
Water Proofing techniques
Water Proofing techniquesWater Proofing techniques
Water Proofing techniques
 
Tunnel waterproofing – different components and types
Tunnel waterproofing – different components and typesTunnel waterproofing – different components and types
Tunnel waterproofing – different components and types
 
Waterproofing. Concrete. Civil Engineering . Rebair & Rehab
Waterproofing. Concrete. Civil Engineering . Rebair & RehabWaterproofing. Concrete. Civil Engineering . Rebair & Rehab
Waterproofing. Concrete. Civil Engineering . Rebair & Rehab
 
DualProof Brochure
DualProof BrochureDualProof Brochure
DualProof Brochure
 
Effective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIAEffective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIA
 
Products & Services
Products & ServicesProducts & Services
Products & Services
 
CEMflex VB Plate Brochure
CEMflex VB Plate BrochureCEMflex VB Plate Brochure
CEMflex VB Plate Brochure
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
 
Osmosis - The Bane of Liquid Applied Waterproofing Membranes
Osmosis - The Bane of Liquid Applied Waterproofing MembranesOsmosis - The Bane of Liquid Applied Waterproofing Membranes
Osmosis - The Bane of Liquid Applied Waterproofing Membranes
 
Waterproofing in building construction
Waterproofing in building constructionWaterproofing in building construction
Waterproofing in building construction
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
 
Permatech Brochure
Permatech BrochurePermatech Brochure
Permatech Brochure
 
waterproofing
waterproofingwaterproofing
waterproofing
 
11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them
 
Basement Waterproofing for Homeowners
Basement Waterproofing for HomeownersBasement Waterproofing for Homeowners
Basement Waterproofing for Homeowners
 
Maleki india2014
Maleki india2014Maleki india2014
Maleki india2014
 
WaterProofing Coatings
WaterProofing CoatingsWaterProofing Coatings
WaterProofing Coatings
 
Basement tanking
Basement tankingBasement tanking
Basement tanking
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 

Viewers also liked

Integral Crystalline Waterproofing Technology
Integral Crystalline Waterproofing TechnologyIntegral Crystalline Waterproofing Technology
Integral Crystalline Waterproofing Technology
Kryton International Inc.
 
Waterproofing in structure
Waterproofing in structureWaterproofing in structure
Waterproofing in structure
Jyoti Ahlawat
 
Materials & procedures
Materials & proceduresMaterials & procedures
Materials & procedures
sekuhar
 
Admixtures in concrete
Admixtures in concreteAdmixtures in concrete
Admixtures in concrete
ashraygangully
 
Building Envelope Experts
 Building Envelope Experts Building Envelope Experts
Waterproofing copmound
Waterproofing copmoundWaterproofing copmound
Waterproofing copmound
BINDRESH KR. SAHANI (NOMAN)
 
Lecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessLecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition Assess
Teja Ande
 
Waterproofing of Terrace / Roof
Waterproofing of Terrace / RoofWaterproofing of Terrace / Roof
Waterproofing of Terrace / Roof
Dura Build Care Pvt. Ltd.
 
Tools and Equipment
Tools and Equipment Tools and Equipment
Tools and Equipment
Robbie Blake
 
Concrete and its types and properties and admixtures used in concrete
Concrete and its types and properties and admixtures used in concreteConcrete and its types and properties and admixtures used in concrete
Concrete and its types and properties and admixtures used in concrete
Zeeshan Afzal
 
Crystalline waterproofing technology
Crystalline waterproofing technologyCrystalline waterproofing technology
Crystalline waterproofing technology
VISHNU P
 
Wpm ppt presentation 7
Wpm ppt presentation  7Wpm ppt presentation  7
Wpm ppt presentation 7giri prasath.j
 
Quality Control for Masonry
Quality Control for MasonryQuality Control for Masonry
Quality Control for Masonry
Scott Conwell, FAIA, FCSI
 
Hardened concrete 1
Hardened concrete 1Hardened concrete 1
Hardened concrete 1Nagi Polu
 
Lecture bricks and blocks masonry
Lecture bricks and blocks masonryLecture bricks and blocks masonry
Lecture bricks and blocks masonry
Est
 
Lesson1
Lesson1Lesson1
Lesson1
Teja Ande
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
Suresh Kumar Vadakkath
 
BRICK MASONRY PPT BY SUBHENDU SAMUI
BRICK MASONRY PPT BY SUBHENDU SAMUIBRICK MASONRY PPT BY SUBHENDU SAMUI
BRICK MASONRY PPT BY SUBHENDU SAMUI
SUBHENDU SAMUI
 
CONCRETE ADMIXTURES
CONCRETE ADMIXTURESCONCRETE ADMIXTURES
CONCRETE ADMIXTURES
Bhrigu85
 

Viewers also liked (20)

Integral Crystalline Waterproofing Technology
Integral Crystalline Waterproofing TechnologyIntegral Crystalline Waterproofing Technology
Integral Crystalline Waterproofing Technology
 
Waterproofing in structure
Waterproofing in structureWaterproofing in structure
Waterproofing in structure
 
Materials & procedures
Materials & proceduresMaterials & procedures
Materials & procedures
 
Admixtures in concrete
Admixtures in concreteAdmixtures in concrete
Admixtures in concrete
 
Building Envelope Experts
 Building Envelope Experts Building Envelope Experts
Building Envelope Experts
 
Waterproofing copmound
Waterproofing copmoundWaterproofing copmound
Waterproofing copmound
 
Lecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessLecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition Assess
 
Waterproofing Solutions
Waterproofing SolutionsWaterproofing Solutions
Waterproofing Solutions
 
Waterproofing of Terrace / Roof
Waterproofing of Terrace / RoofWaterproofing of Terrace / Roof
Waterproofing of Terrace / Roof
 
Tools and Equipment
Tools and Equipment Tools and Equipment
Tools and Equipment
 
Concrete and its types and properties and admixtures used in concrete
Concrete and its types and properties and admixtures used in concreteConcrete and its types and properties and admixtures used in concrete
Concrete and its types and properties and admixtures used in concrete
 
Crystalline waterproofing technology
Crystalline waterproofing technologyCrystalline waterproofing technology
Crystalline waterproofing technology
 
Wpm ppt presentation 7
Wpm ppt presentation  7Wpm ppt presentation  7
Wpm ppt presentation 7
 
Quality Control for Masonry
Quality Control for MasonryQuality Control for Masonry
Quality Control for Masonry
 
Hardened concrete 1
Hardened concrete 1Hardened concrete 1
Hardened concrete 1
 
Lecture bricks and blocks masonry
Lecture bricks and blocks masonryLecture bricks and blocks masonry
Lecture bricks and blocks masonry
 
Lesson1
Lesson1Lesson1
Lesson1
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 
BRICK MASONRY PPT BY SUBHENDU SAMUI
BRICK MASONRY PPT BY SUBHENDU SAMUIBRICK MASONRY PPT BY SUBHENDU SAMUI
BRICK MASONRY PPT BY SUBHENDU SAMUI
 
CONCRETE ADMIXTURES
CONCRETE ADMIXTURESCONCRETE ADMIXTURES
CONCRETE ADMIXTURES
 

Similar to PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

Presentation on Railway Industry Application
Presentation on Railway Industry ApplicationPresentation on Railway Industry Application
Presentation on Railway Industry ApplicationRyan Li
 
An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...
An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...
An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...
IRJET Journal
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
Abhishek Paul
 
The Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing SolutionsThe Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing Solutions
Nippon Paint Professional
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
Raghavendra Raghu
 
Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...
Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...
Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...
Shakerqaidi
 
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET Journal
 
Autocan - Fewer constraints and superior performance
Autocan - Fewer constraints and superior performanceAutocan - Fewer constraints and superior performance
Autocan - Fewer constraints and superior performance
Eurovia_Group
 
Reviewing the Technology of Anti-ice in Cold High Altitude Road
Reviewing the Technology of Anti-ice in Cold High Altitude RoadReviewing the Technology of Anti-ice in Cold High Altitude Road
Reviewing the Technology of Anti-ice in Cold High Altitude Road
IJERA Editor
 
Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...
Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...
Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...
IRJET Journal
 
A Review paper on Ultra High Strength Concrete
A Review paper on Ultra High Strength ConcreteA Review paper on Ultra High Strength Concrete
A Review paper on Ultra High Strength Concrete
IRJET Journal
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete report
BudhramKamait1
 
Construction Forensic
Construction ForensicConstruction Forensic
Construction Forensic
Dr. ABEER KHALID MANSOUR
 
Tunnels - 150715 indeco ebook_en
Tunnels - 150715 indeco ebook_enTunnels - 150715 indeco ebook_en
Tunnels - 150715 indeco ebook_en
Ken Bigjonhson
 
Trenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportTrenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar Report
AkshathaBhandary
 
HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)Kiran Raj Veerappen
 

Similar to PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work (20)

Presentation on Railway Industry Application
Presentation on Railway Industry ApplicationPresentation on Railway Industry Application
Presentation on Railway Industry Application
 
An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...
An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...
An Analytical and Experimental Investigation of Ultimate Load Carrying capaci...
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
Sanipor
SaniporSanipor
Sanipor
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
 
The Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing SolutionsThe Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing Solutions
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Fastflow Siphonic Systems
Fastflow Siphonic SystemsFastflow Siphonic Systems
Fastflow Siphonic Systems
 
Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...
Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...
Ultra-high-performance fiber-reinforced concrete. Part IV Durability properti...
 
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
IRJET- An Expermental Study on Self Compacting Concrete by Replacing by Marbl...
 
Autocan - Fewer constraints and superior performance
Autocan - Fewer constraints and superior performanceAutocan - Fewer constraints and superior performance
Autocan - Fewer constraints and superior performance
 
Reviewing the Technology of Anti-ice in Cold High Altitude Road
Reviewing the Technology of Anti-ice in Cold High Altitude RoadReviewing the Technology of Anti-ice in Cold High Altitude Road
Reviewing the Technology of Anti-ice in Cold High Altitude Road
 
Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...
Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...
Experimental Evaluation of Durability Indices for Medium Strength Concrete Co...
 
A Review paper on Ultra High Strength Concrete
A Review paper on Ultra High Strength ConcreteA Review paper on Ultra High Strength Concrete
A Review paper on Ultra High Strength Concrete
 
Self compacting concrete report
Self compacting concrete reportSelf compacting concrete report
Self compacting concrete report
 
ATS11-05415
ATS11-05415ATS11-05415
ATS11-05415
 
Construction Forensic
Construction ForensicConstruction Forensic
Construction Forensic
 
Tunnels - 150715 indeco ebook_en
Tunnels - 150715 indeco ebook_enTunnels - 150715 indeco ebook_en
Tunnels - 150715 indeco ebook_en
 
Trenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportTrenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar Report
 
HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)HYPRO Presentation (Last Update May_2016)
HYPRO Presentation (Last Update May_2016)
 

Recently uploaded

一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 

Recently uploaded (20)

一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 

PMC-S Acrylic Liquid Cold Spray Applied Waterproofing System-Specialized for Tunnel and Underground Work

  • 1. ACRYLIC SPRAY WATERPROOFING SYSTEM RESEARCH AND APPLICATION Reporting Date:July 7th,2016 Colin Leung +86 15928474171(whatsapp)
  • 2. CONTENT Acrylic Spray Waterproofing System Research and Application 2016/7/19 2 4 33 Technical Background31 Technical Content Projects Application Prospects and benefits 35 Technical Prospects 2
  • 3. Acrylic Spray Waterproofing System Research and Application 2016/7/19 Technical Background[1] 3
  • 4. 1 TECHNICALBACKGROUND 1.1 Underground Projects Leakage Current Situation 2016/7/19Acrylic Spray Waterproofing System Research and Application Highway Tunnels Underground Railway Parking Civil Air Defence Common underground projects types Underpass Tunnels Underground Street Underpass Underground Buildings 4
  • 5. 2016/7/19Acrylic Spray Waterproofing System Research and Application High Leaking Rate of the Underground Projects Up to 30% 1 TECHNICALBACKGROUND 5
  • 6. 1 TECHNICALBACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application Covered-excavation Tunneling Waterproofing System Cut and Covering Tunneling Waterproofing System 1.2 Underground projects Leakage Reasons Analysis Waterproofing Layer Waterproofing Layer 6 First Lining Lining Structural Waterproofing Waterproofing layer Central Sulcus Confining Bed Backfilling soil Building Envelope Waterproofing Building Envelope Waterproofing Central Sulcus Surrounding Rock for Seepage-proof Secondary Lining Lateral Sulcus Lateral Sulcus Surface Treatment
  • 7. 1 TECHNICALBACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application Covered-excavation Waterproofing System Cut and Covering Tunnel Waterproofing 7
  • 8. 2016/7/19Acrylic Spray Waterproofing System Research and Application Cut and Covering Metro Station Waterproofing System Waterproofing Layer 1 TECHNICALBACKGROUND 8
  • 9. 2016/7/19Acrylic Spray Waterproofing System Research and Application 1TECHNICAL BACKGROUND 9
  • 10. 1 TECHNICALBACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application The development of water migration during the both concrete membrane interfaces makes: the leaking area expands, wide influence, difficulties to find the leaking area, difficulties to repair, high cost to repair. 10
  • 11. 1 TECHNICAL BACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application  Disadvantages of Coiled Waterproofing Membranes:  Certainly not seamless  Easy to be damaged in the subsequent handling by welding spark, nails, rebar  Easy to be influenced by the surface evenness  Easy to develop water migration during the both concrete membranes interfaces 11
  • 12. 1 TECHNICAL BACKGROUND 1.3 Acrylic Spray Waterproofing 2016/7/19Acrylic Spray Waterproofing System Research and Application 12
  • 13. 1 TECHNICAL BACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application  Advantages of Acrylic Spray Film  Seamless  Strong Resistance to the Subsequent Handling Damages  A1 Grade Fireproof  Fully Bonded System  Prevent the Development of Water Migration During the Both Concrete Membrane Interfaces  Play a Role In Lining Pressure Resistance 13
  • 14. 1 TECHNICALBACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application 1999 Dazhulin Tunnel 2004~2007 Technology System Modified 2010 Munigou Tunnel 14
  • 15. 1 TECHNICAL BACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application  Scope of Application  Mountain Tunnels  Underpass  Metro Stations  Running Tunnel  Shaft  Immersed Tunnels  Cave  Tunnel Repairing 15
  • 16. Acrylic Spray Waterproofing System Research and Application 2016/7/19 Technical Content[2] 16
  • 17. 2 TECHNICALCONTENT 2.1 Polymerization Mechanism 2016/7/19Acrylic Spray Waterproofing System Research and Application 17 Produce Radical Chain Initiation Chain Growth Chain Termination
  • 18. 2 TECHNICALCONTENT 2016/7/19Acrylic Spray Waterproofing System Research and Application 18 Main Liquid A Oxidant Emulsion A Spray Gun Waterproofing Film Surface Emulsion B Main Liquid B Deoxidant Mix Mix
  • 19. 2 TECHNICALCONTENT 2.2 Main Technology Consist 2016/7/19Acrylic Spray Waterproofing System Research and Application 19 Film Materials • Polymerization Mechanism, Material Comparison and Selection,Fomula,Manufacturing Technology • Film Materials Modify Technology,Durability Research Spraying Machine • Spraying Delivering Machine • Spray Gun Construction Technology • Construction Progress • Construction Technology Standards
  • 20. 2 TECHNICALBACKGROUND 2016/7/19Acrylic Spray Waterproofing System Research and Application 20 Waterproofing Materials Research Spraying Machines Research Construction Technology
  • 21. 2 TECHNICALCONTENT 2.3 Main Technical Data 2016/7/19Acrylic Spray Waterproofing System Research and Application 21 Inspection Item Performance Requirement Test MethodEmulsion A Emulsion B Appearance White or Grey Suspension Liquid White or Grey Suspension Liquid Visual Inspection Solid Content ≥45 ≥45 GB/T 16777 pH Value 7.0 ~ 8.0 6.0 ~ 7.0 pH test paper Gel Time ≤5 seconds According to relevant regulation Inspection Item Performance Requirement Test Method Breaking Tensile Strength (Mpa) ≥1.1 GB/T 16777 Elongation at Break(%) ≥200 Tear Strength(kN/m) ≥5 Watertightness No Leakage
  • 22. 2 TECHNICALCONTENT 2.4 Waterproofing Performance Research 2016/7/19Acrylic Spray Waterproofing System Research and Application 22 Property Project Requirement Basic Property Watertightness The basic function requirement to waterproofing material Mechanical Property Strength External Stress Resistant Tenacity External Abrasive Resistant Drainage Function Prevent the underground water behind the lining accumulation Chemical Resistance Resistance to Corrosion Resistance to the special ion in the underground water corrosion Acrylic Spray Waterproofing Film Main Functions Requirements
  • 23. 2 TECHNICALCONTENT  Long-Term Impermeability Test(0.3Mpa,30 Days) 2016/7/19Acrylic Spray Waterproofing System Research and Application 23
  • 24. 2 TECHNICALCONTENT  Impermeability Contrast Test Operated on Different Parts 2016/7/19Acrylic Spray Waterproofing System Research and Application 24 1.2 MPa 1.2 MPa 2.4 MPa
  • 25. 2 TECHNICAL CONTENT  Chemical Solution Immersion Test 2016/7/19Acrylic Spray Waterproofing System Research and Application 25
  • 26. 2 TECHNICALCONTENT Drying(Dehydration)Contrast Test (100℃,Dry to Constant Weight) 2016/7/19Acrylic Spray Waterproofing System Research and Application 26
  • 27. Tensile Splitting Strength Test 2 TECHNICALCONTENT Mixed-Mode Test-Pieces Mechanical Test 2016/7/19Acrylic Spray Waterproofing System Research and Application 27 Tensile Test Earlier Pouring Concrete Later Pouring Concrete Waterproofing Layer
  • 28. 2 TECHNICALCONTENT  Compound Concrete Water Moving Behind the Lining Prevention Test(0.6 MPa) 2016/7/19Acrylic Spray Waterproofing System Research and Application 28
  • 29. 2 TECHNICALCONTENT  Compound Concrete Control Drainage Test 2016/7/19Acrylic Spray Waterproofing System Research and Application 29 Max Rated Hydraulic Pressure is 6.3 Mpa,Max Stable Hydraulic Pressure Can Be Added is 0.25 Mpa
  • 30. 2 TECHNICAL CONTENT 2.5 Part of Technological Achievements 2016/7/19Acrylic Spray Waterproofing System Research and Application 30  Academic Achievements  14 Authorized Patents  Over 40 Articles(SCI included one,  EI included 5)  One Monograph(Tunnel and Underground Spraying Film Waterproofing)  Training over 20 doctors and masters  Write an Industry Standard Book
  • 31. 2 TECHNICALCONTENT  Academic Communication Home and Abroad 2016/7/19Acrylic Spray Waterproofing System Research and Application 31
  • 32. 2 TECHNICALCONTENT 2016/7/19Acrylic Spray Waterproofing System Research and Application 32  Awards The Second Class Prize of National Science and Technology Progress Award certificated by State Council, the highest honor in People's Republic of China in science and technology, in order to recognize citizens and organizations who have made remarkable contributions to scientific and technological progress, and to promote the development of science and technology.
  • 33. Acrylic Spray Waterproofing System Research and Application 2016/7/19 Projects Application[3] 33
  • 34. 3 PROJECTSAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 34 Railways Tunnels Highways Tunnels Underpass Other • 1999 Dazhulin Tunnel • 2002 Mogouling Tunnel • 2012 Tianpingshan Tunnel • 2014 Wujiawan Tunnel • 2001 Lianhuang Tunnel • 2010 Munigou Tunnel • 2011 Balangshan Tunnel • 2013 Xueliangshan Tunnel • 2013 Nanjing Youth Olympic Center J-2 Part • 2015 Langzhong Railway Station Underpass • 2013 An Underground Oil Depot Cave • 2014 Pengzhou Petrochemical Base Tanks Bottom Seepage Prevention • 2014 Shenzhen LNG Terminal
  • 35. 3 PROJECTAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 35 3.1 Scope of Application  Airtight, Backfilled, Covered Tunnels, Underground Projects, Caves and Similar Projects  High Grade Requirement of Waterproof(Design Thickness is 3mm and thicker)  Operation On Upstream Face Or Behind Structure Supported Parts
  • 36. 3 PROJECTAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 36 3.2 Operation Operation Procedures  Surface Clear  Install Drainage Materials Spray the film Inspection
  • 37. 3 PROJECTAPPLICATION  Surface Clear Requirements  Surface protrusion should be cut or hit to be flat  Water on surface is not allowed, otherwise, water shutoff or drainage is required  It is better to ensure a certain evenness of the surface to save spraying materials, otherwise, Leveling or Isolation is required  Surface Leaking Water pH Value should be less than 13 2016/7/19Acrylic Spray Waterproofing System Research and Application 37
  • 38. 3 PROJECTAPPLICATION  Thickness of the Film Management  Spraying Machine Parameter Control  Spray Gun Movement Locus  Spray Worker Training  Thickness Inspection Methods  Defect Repairing 2016/7/19Acrylic Spray Waterproofing System Research and Application 38
  • 39. 3 PROJECTAPPLICATION  Spraying Machine Parameter  Use High Pressure Airless Spraying Apparatus for Large Area Operation  Mix inside the gun and mix outside the gun  Spraying Speed Rate should be more than 1 m2/min  Compressed Air Output Pressure should be more than 1.0 MPa,Gas Production Rate should be more than1 m3/min 2016/7/19Acrylic Spray Waterproofing System Research and Application 39 (1) (2) (1) (2)
  • 40. 3 PROJECTAPPLICATION  Spraying Operation Requirement  Do In Time Protection and Coverage to the Film  Do Safeguarding Measures to the workers  Quality Inspection and Repairing to the Film :Thickness、 Appearance、Leaking(Dominant Items) 2016/7/19Acrylic Spray Waterproofing System Research and Application 40
  • 41. 3 PROJECTSAPPLICATION 3.3 Munigou Tunnel 2016/7/19 Acrylic Spray Waterproofing System Research and Application 41 Munigou Tunnel Location Munigou Tunnel
  • 42. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 42  Munigou Tunnel is 1835m long, Two-Lane ,Max Driving Speed 60km/h  This project was on the altitude over 3000 meters, with the feature of high altitude, low air pressure, low temperature and large temperature difference between day and night, minimum temperature reached - 6℃ in the spring construction, The groundwater is developed in the tunnel.
  • 43. 3 PROJECTAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 43 Open Cut Tunnel Lining, Waterproofing and Insulation Structure  Waterproofing and Insulation Design Waterproofing and Insulation Layer Secondary Lining
  • 44. 3 PROJECTAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 44 Undercutting Part Lining, Waterproofing and Insulation Structure Shotcrete First Lining Drainage System Waterproofing and Insulation Layer Concrete Secondary Lining  Waterproofing and Insulation Design
  • 45. 3 PROJECTAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 45  Waterproofing and Insulation Design Undercutting Part Lining Conventional Waterproofing Structure Shotcrete First Lining Drainage System Waterproofing and Insulation Layer Concrete Secondary Lining Concrete Secondary Lining EVA Membrane Non-Woven Buffer Layer Shotcrete First Lining
  • 46. 3 PROJECTSAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 46 Acrylic Spray Waterproofing in Munigou Tunnel
  • 47. 3 工程应用 2016/7/19隧道及地下工程丙烯酸盐喷膜防水技术研究及应用 47 Waterproofing Comparison After Construction Waterproofing Comparison During the Construction
  • 48. 3 PROJECT APPLICATION 3.4 Nanjing Youth Olympic Center Axis Underpass 2016/7/19Acrylic Spray Waterproofing System Research and Application 48  Nanjing Meizizhou Under-River Tunnel-Youth Olympic Axis Underground Construction Project is one of the auxiliary projects for 2014 Youth Olympic Game, consisted of Meizizhou Under- River Tunnel, Youth Olympic Axis Underground Transportation System and Youth Olympic Axis Plaza Underground Space three parts. Project Planning Block Satellite Map Our project B2-J1 Part
  • 49. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 49  This project’s core control area is B2-J1 part,consisted of Meizizhou Tunnel, Bingzhou Road, Interchange Ramps and underground space, it is a partial underground three layers framing structure, cut and covering method adopted, A grade waterproofing requirement. The Acrylic Spray Film Waterproofing Area
  • 50. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 50
  • 51. 3 PROJECTS APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 51
  • 52. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 52 August,2015(rainy season) Return Visit Result
  • 53. 3 PROJECTAPPLICATION 3.5 Shenzhen East-West Dapeng and Diefu offshore LNG Terminal connects the harbor trestle and the receiving station tank field, total length 584m, max depth of the tunnel 43m This is the first LNG terminal in China and the third in the world, related documents and construction experiences for reference are very limited. 2016/7/19Acrylic Spray Waterproofing System Research and Application 53
  • 54. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 54 The Terminal
  • 55. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 55  There are total 10 pipes crossing through the tunnel portal endwall,1 LNG Receiving Pipe,1 BOG Recirculatory Pipe,1 LNG Circulating Pipe,1 VENT Pipe,1 Fire Water Supply Pipe and 5 Utility Pipes, protected by filling nitrogen, with high level requirements on waterproofing and gas tightness.(Special Grade of waterproofing) LNG Terminal Sectional View and Tubes Arrangement Diagram
  • 56. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 56 The ground water under the tunnel is fissure bedrock water that mainly lays in medium-grained granites and vein rocks, spreading over the fissuring in the strong and medium weathered layer. Atmospheric precipitation supplies the ground water. Depth of the ground water is 1.20 to 18.30 meters during the geological exploration.
  • 57. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 57 • Two Geotextile-Two Membranes waterproofing method: • Geotextile waterproofing layer(400g Geotextile) + Composite Waterproofing Sheet(1.5mm thick EVA waterproofing sheet+100g geotextile) + Acrylic Spray Membrane(4mm thick), the original steel plate waterproofing design cancelled because steel plate needs welding(no fire is allowed in the construction),rough handling on the welding, heavy weight, high costs, long operation period time. Adopting PMC-S saved 303 million US dollars and one year construction period time.
  • 58. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 58 EVA Membrane Installation in LNG Terminal
  • 59. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 59 Our Acrylic Spray Waterproofing Operation in Shenzhen LNG Terminal
  • 60. 3 PROJECT APPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 60 Acrylic Waterproofing Film Was not Damaged By the Second Lining Reinforcement Assembling and Welding
  • 61. 3 PROJECTAPPLICATION 2016/7/19Acrylic Spray Waterproofing System Research and Application 61 Perfect waterproofing effects in our return visit during the equipment construction stage(June,2015)
  • 62. 3 PROJECTAPPLICATION 3.6 Other Projects 2016/7/19Acrylic Spray Waterproofing System Research and Application 62
  • 63. Acrylic Spray Waterproofing System Research and Application 2016/7/19 Prospects and Benefits[4] 63
  • 64. 4 PROSPECTS AND BENEFITS 4.1 Technical Advantages:  Spraying leads to efficient, fast construction, saving labors, it is a new generation and the main direction of waterproofing technology development in the future  Strong Adaptability to the surface, safe seams handle, avoid the important hidden danger to waterproofing  Fireproof, strong puncture resistant, strong subsequent handling damage resistant  Could be applied with waterproofing sheets to achieve gas tightness, meet high waterproofing grade  Save a huge amount of subsequent repairing and maintenance cost, overall economic benefit is excellent. 2016/7/19Acrylic Spray Waterproofing System Research and Application 64
  • 65. 4 PROSPECTS AND BENEFITS 4.2 Prospects 2016/7/19Acrylic Spray Waterproofing System Research and Application 65
  • 66. 4 PROSPECTS AND BENEFITS 4.3 Benefits Analysis 2016/7/19Acrylic Spray Waterproofing System Research and Application 66 Subsurface Structure Performance-Time Graph Benefit Quality Cost Total Cost Construction cost Maintenance Cost Subsurface Structure Cost-Quality Graph Performance Good Bad Construction Time Now Time C:Failure and Accident A:Initial Condition D:Repairing, reinforcement Boundary Condition Current Condition
  • 67. Acrylic Spray Waterproofing System Research and Application 2016/7/19 Technical Prospects[5] 67
  • 68. 5 TECHNICAL PROSPECTS  Spray waterproofing materials types is growing in the market, including acrylic, polyurea, rapid-hardening spray applied liquid rubber asphalt, methyl methacrylate and so on, project application cases of these spray waterproofing materials are also growing gradually 2016/7/19Acrylic Spray Waterproofing System Research and Application 68
  • 69. 5 TECHNICALPROSPECTS  Application in tunnels and underground projects cases are growing one by one,including mountain tunnels、underground railway and tunnels、underground Park、underpass、immersed pipes tunnels、shaft、cave and tunnel repairing, etc. 2016/7/19Acrylic Spray Waterproofing System Research and Application 69
  • 70. 5 TECHNICALPROSPECTS  Spray waterproofing materials types for tunnels and underground projects are growing, exclusive spraying machines are updating, spray waterproofing systems are improving 2016/7/19Acrylic Spray Waterproofing System Research and Application 70
  • 71. 5 TECHNICAL PROSPECTS  Relevant industry and national standards are coming on and being revised, which lays the foundation of applying new spraying waterproofing technologies 2016/7/19Acrylic Spray Waterproofing System Research and Application 71 (Revising)
  • 72. 5 TECHNICAL PROSPECT New Technical contents and researching methods are updating 2016/7/19Acrylic Spray Waterproofing System Research and Application 72