SlideShare a Scribd company logo
1 of 99
INTRODUCTION OF

           CENTRAL
TECHNICAL SERVICE DEPARTMENT
CSTD CONSISTS OF
            Technical head
                              Specification Manager – HO (Supporting All India Basis)

                              Training Manager- HO (Supporting All India Basis)

                                    Technical Executives Supporting In Respective Regions




                                                                                             2
Wednesday, December 14, 2011
CTSD RESPONISBILITIES


1.   New Product Development
2.   Deriving advanced application methods
3.   Designing CAD and 3 D drawings
4.   Designing technical bulletin, manual and write ups
5.   Competitor comparisons during tenders
6.   Evaluating building standards for our products
7.   Designing training presentations
8.   Supporting technical executives
9.   Value engineered speciation development
10. Case studies
11. Complaint handling
SPECIFICATION MANAGER


 1.   After taking all the details of the identified project which may be
      conceptual design stage or ongoing:
        a. Understanding the requirements of the project
        b. Providing a proper recommendation to the sales team after
             discussions with architects/consultants etc
2.    Initiation of project ground work
        a. Studying the site drawings
        b. Designing specification on the project specifically for various
           areas depending on the client’s requirements
3.    Presenting Technical document
        a. Proposal of ARDEX Endura technical services including features
           and benefits, system specification, treatment methodology and
           Auto CAD drawings, 3D illustration if required.
        b. Preparing detailed estimate of the proposed areas
        c. Preparing Bill of Quantities
TRAINING MANAGER



1. Designing training calendar.
2. Providing training to all in house team including
   technical executives, Applicator’s, client’s including
   hands on
3. Training on basics of building technologies (civil
   engineering)
4. Creating modules to make site mock ups, site trials,
   on site training to workmen.
5. Responsible for centralized training centre/academy
6. Designing samples of system recommendations
TECHNICAL EXECUTIVES


1.   Product presentation/Comparison/Mock up
       a. Highlighting the product features and characteristics in
           comparison with the other proposed competitor products and
           systems
       b. Executing live mock up on site to show product
           performance
       c. Mock up management.
2.   Quality assurance and Quality check
       a. Regular site visits to ensure the applicator ‘s adherence to
          the specifications
       b. Imparting site training and instructions to the applicators
3.   Certification of executions
       a. Making the final site visit after completion of job and
            certifying the job (Based on the requirements in consultation
            with sales team)
WATERPROOFING


   Waterproofing portfolio
   Surface preparations
   Critical areas of waterproofing
   System recommendations
Waterproofing portfolio
    We have various waterproofing systems to suite different
    areas of building

   Wet areas
       Under tile – Liquid applied membranes
       Under tile – Sheet applied waterproofing membranes

   Roof areas
     Roof protected
     Roof exposed
     Roof landscaped
   Basement
     Liquid applied membranes
            Positive side
     Sheet applied membranes
            Positive side
Waterproofing portfolio
  We have various waterproofing systems to suite different
  areas of building

 Swimming pool areas
    Critical pools
        Sheet applied membranes
        Liquid applied membranes

 Water containment structures
    Under tile liquid applied membranes
    Epoxy potable systems

 Expansion joint areas
Surface Preparation
Surface Preparation for Waterproofing

   Surface must be structurally sound
    Cracking or movement of the substrate after a membrane has been installed is
    likely to cause the membrane to fracture.
   Treat cracks and movement joints
    Cracks, construction joints, expansion joints and other mobile joints should be
    treated in accordance with the membrane manufacturers recommendations.
   Clean and free from any contaminant materials
    A membranes bond will fail at its weakest point so if applied over dust, loose
    materials or poorly bonded contaminants it will fail prematurely.
   Repair any holes/voids in the substrate
    A uniform thickness membrane is very difficult to achieve over holes/voids.
   Remove any protrusions and sharp edges
    A uniform thickness membrane is very difficult to achieve over protrusions or
    sharp edges.
Surface Preparation

Surface Preparation for Waterproofing
   Concrete should be aged for 28 days and screeds should be aged
    for 7 days
    Cementitious surfaces can develop plastic shrinkage cracks during initial
    curing which must be totally formed before the membrane is applied.
    Time must also be allowed for the development of efflorescence which
    must be removed before the membrane application.
   Ensure substrate is dry (5% moisture or less)
    High substrate moisture content will form blisters in the membrane during
    curing.
   Seal wet or freshly laid concrete with ARDEX WPM 300
    Allow to cure overnight. Provides a concrete curing membrane and barrier
    coat.
Surface Preparation

Priming for Waterproofing
Porous surfaces are primed to consolidate residual dust and reduce the
    porosity of the substrate to avoid excessively fast interface drying
                      and blistering of the membrane
    Wet or fresh concrete, PVC and metal are primed to provide a barrier
                   between the substrate and the membrane

    All cementitious substrates should be primed with ARDEX WPM 265
     Water Based Primer at a rate of 6m2/L
    Highly porous substrates may require 2 coats
    PVC should be primed with pink plumbers primer
    Metal surfaces should be primed with a two pack epoxy zinc phosphate
     primer
    If moisture content is too high or concrete is freshly laid, use ARDEX
     WPM 300 water based epoxy as a barrier coating
                  Allow primer to dry prior to waterproofing
CRITICAL AREAS OF WATERPROOFING
Other than the main treatments of waterproofing the following are the most critical
areas which needs to be addressed before the main waterproofing treatment

                           •     Cracks & Construction Joints

                           •     Rain Outlets / Bore Packing

                           •     Dissimilar Construction Joints / Corner treatment

                           •     Surface Moisture

                           •     Corners

                           •     Protection of Waterproofing Treatment
  Wednesday, December 14, 2011                                                        13
CRITICAL AREAS OF WATERPROOFING
                                  Cracks & Construction Joints


Surface cracks

•Surface Crack




   Wednesday, December 14, 2011                                  14
CRITICAL AREAS OF WATERPROOFING
                                  Cracks & Construction Joints


              Crack Chasing

• Surface crack
• Crack Chasing




   Wednesday, December 14, 2011                                  15
CRITICAL AREAS OF WATERPROOFING
                                  Cracks & Construction Joints


     Crack filling with sealant

• Surface crack
• Crack chasing
• Crack filling with sealant




   Wednesday, December 14, 2011                                  16
CRITICAL AREAS OF WATERPROOFING
                                    Cracks & Construction Joints


        Priming with WPM 300

•   Surface crack
•   Crack chasing
•   Crack filling with sealant
•   Priming with WPM 300




     Wednesday, December 14, 2011                                  17
CRITICAL AREAS OF WATERPROOFING
                                    Cracks & Construction Joints


          1st Coat of WPM 002

•   Surface cracks
•   Crack chasing
•   Crack filling with sealant
•   Priming with WPM 300
•   1st Coat of WPM 002




     Wednesday, December 14, 2011                                  18
CRITICAL AREAS OF WATERPROOFING
                                    Cracks & Construction Joints


          Reinforcement cloth

•   Surface cracks
•   Crack chasing
•   Crack filling with sealant
•   Priming with WPM 300
•   1st Coat of WPM 002
•   Reinforcement cloth




     Wednesday, December 14, 2011                                  19
CRITICAL AREAS OF WATERPROOFING
                                    Cracks & Construction Joints


          2nd coat of WPM 002

•   Surface crack
•   Crack chasing
•   Crack filling with sealant
•   Priming with WPM 300
•   1st Coat of WPM 002
•   Reinforcement cloth
•   2nd coat of WPM 002



     Wednesday, December 14, 2011                                  20
CRITICAL AREAS OF WATERPROOFING
                                  Rain Outlets/ Bore Packing


Core cutting

• Core cutting




   Wednesday, December 14, 2011                                21
CRITICAL AREAS OF WATERPROOFING
                                  Rain Outlets/ Bore Packing


                  Cleaning

• Core Cutting
• Cleaning




   Wednesday, December 14, 2011                                22
CRITICAL AREAS OF WATERPROOFING
                                  Rain Outlets/ Bore Packing


                 Pipe Fixing

• Core cutting
• Cleaning
• Pipe fixing




   Wednesday, December 14, 2011                                23
CRITICAL AREAS OF WATERPROOFING
                                    Rain Outlets/ Bore Packing


                   Pipe fixing

•   Core cutting
•   Cleaning
•   Pipe fixing
•   Pipe fixing




     Wednesday, December 14, 2011                                24
CRITICAL AREAS OF WATERPROOFING
                                    Rain Outlets/ Bore Packing


          Filling with WPM SG

•   Core cutting
•   Cleaning
•   Pipe fixing
•   Pipe fixing
•   Filling with WPM SG




     Wednesday, December 14, 2011                                25
CRITICAL AREAS OF WATERPROOFING
                                    Rain Outlets/ Bore Packing


        Priming with WPM 300

•   Core cutting
•   Cleaning
•   Pipe fixing
•   Pipe fixing
•   Filling with WPM SG
•   Priming with WPM 300




     Wednesday, December 14, 2011                                26
CRITICAL AREAS OF WATERPROOFING
                                    Rain Outlets/ Bore Packing


          1st Coat of WPM 002

•   Core cutting
•   Cleaning
•   Pipe fixing
•   Pipe fixing
•   Filling with WPM SG
•   Priming with WPM 300
•   1st Coat of WPM 002



     Wednesday, December 14, 2011                                27
CRITICAL AREAS OF WATERPROOFING
                                    Rain Outlets/ Bore Packing


          Reinforcement cloth

•   Core cutting
•   Cleaning
•   Pipe fixing
•   Pipe fixing
•   Filling with WPM SG
•   Priming with WPM 300
•   1st Coat of WPM 002
•   Reinforcement

     Wednesday, December 14, 2011                                28
CRITICAL AREAS OF WATERPROOFING
                                    Rain Outlets/ Bore Packing


         2nd Coat of WPM 002

•   Core cutting
•   Cleaning
•   Pipe fixing
•   Pipe fixing
•   Filling with WPM SG
•   Priming with WPM 300
•   1st Coat of WPM 002
•   Reinforcement
•   2nd Coat of WPM 002
     Wednesday, December 14, 2011                                29
CRITICAL AREAS OF WATERPROOFING
                                  Dissimilar Construction Joints / Corner treatment


           Dissimilar joints

• Dissimilar joints




   Wednesday, December 14, 2011                                                       30
CRITICAL AREAS OF WATERPROOFING
                                  Dissimilar Construction Joints / Corner treatment


       Surface consolidation

• Dissimilar joints
• Surface consolidation




   Wednesday, December 14, 2011                                                       31
CRITICAL AREAS OF WATERPROOFING
                                  Dissimilar Construction Joints / Corner treatment


     Moisture barrier coating

• Dissimilar joints
• Surface consolidation
• Moisture barrier coating




   Wednesday, December 14, 2011                                                       32
CRITICAL AREAS OF WATERPROOFING
                                    Dissimilar Construction Joints / Corner treatment


          1st Coat of WPM 002

•   Dissimilar joints
•   Surface consolidation
•   Moisture barrier coating
•   1st Coat of WPM 002




     Wednesday, December 14, 2011                                                       33
CRITICAL AREAS OF WATERPROOFING
                                    Dissimilar Construction Joints / Corner treatment


          Reinforcement cloth

•   Dissimilar joints
•   Surface consolidation
•   Moisture barrier coating
•   1st Coat of WPM 002
•   Reinforcement cloth




     Wednesday, December 14, 2011                                                       34
CRITICAL AREAS OF WATERPROOFING
                                    Dissimilar Construction Joints / Corner treatment


         2nd Coat of WPM 002

•   Dissimilar joints
•   Surface consolidation
•   Moisture barrier coating
•   1st Coat of WPM 002
•   Reinforcement cloth
•   2nd Coat of WPM 002



     Wednesday, December 14, 2011                                                       35
CRITICAL AREAS OF WATERPROOFING
                                    Surface Moisture


Moisture raising in the
surface

• Moisture raising in the surface




   Wednesday, December 14, 2011                        36
CRITICAL AREAS OF WATERPROOFING
                                    Surface Moisture


       Moisture barrier coat

• Moisture raising in the surface
• Moisture barrier coat




   Wednesday, December 14, 2011                        37
CRITICAL AREAS OF WATERPROOFING
                                  Protection of Waterproofing Treatment


Waterproofing Treated
surface

• Waterproofing treated surface




   Wednesday, December 14, 2011                                           38
CRITICAL AREAS OF WATERPROOFING
                                  Protection of Waterproofing Treatment


      Damages to membrane


• Waterproofing treated surface
• Damages to treated surface




   Wednesday, December 14, 2011                                           39
CRITICAL AREAS OF WATERPROOFING
                                  Protection of Waterproofing Treatment


        Protection plastering



• Waterproofing treated surface
• Damages to treated surface
• Protection plastering




   Wednesday, December 14, 2011                                           40
WATERPROOFING
                SYSTEM
            RECOMMENDATIONS


Wednesday, December 14, 2011   41
WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING
WT1 - WPM 002 – Two component Acrylic Co polymer modified waterproofing System


             ADHESIVE        WPM 002      WPM 002    WPM 300       Concrete, Timber or
             AND TILING                                            F/C Substrate
WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING
      WT1 - WPM 002 – Two component Acrylic Co polymer modified waterproofing System


•   Surface preparation
•   Crack treatment
•   Wall consolidation
•   Bond breakers/cove installation
•   Priming with WPM 300
•   1st coat of WPM 002
•   Reinforcement installation in the
    corners using WPM deck web over wet
    coat of WPM 002
•   2nd coat of WPM 002
•   Protection plaster
WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING
WT2 – WPM 750 Butynol – Synthetic Rubber Sheet 0.50mm – 1mm thick Waterproofing System

                               BUTYNOL #2     BUTYNOL #1
                  ADHESIVE                                 ARDEX WA 98 Concrete, Timber or
                  AND TILING           ARDEX               ADHESIVE    F/C Substrate
                                       SEAM TAPE
WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING
     WT2 – WPM 750 Butynol – Synthetic Rubber Sheet 0.50mm – 1mm thick Waterproofing System


•   Surface preparation
•   Bond breakers
•   Adhesive installation
•   Butynol installation
•   Joint welding
•   Tile installation with
    necessary adhesives
WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING
WT3 – Waterproofing and decoupling - Seal Sheet under tile waterproofing system
                Butt joint
                                            Seal Sheet
                Treatment with
                                            Waterproofing
                WPM Deck web sandwiched b/n
                                            Membrane
Necessary       2coats of WPM 002                      BAL Gold star Concrete Substrate
Tiling                                                   Adhesive
                       Necessary
                       BAL adhesive       `
WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING
         002 - Butynol – Synthetic Rubber Sheet 0.50mm – 1mm thick Waterproofing System


•   Surface preparation
•   Bond breakers
•   Adhesive installation
•   Seal sheet installation
•   Butt joint treatment
•   Tile installation with
    necessary adhesives
ROOFS & DECKS – EXPOSED GRADE WATERPROOFING
RE1 – WPM 350 UV Stable Acrylic Co Polymer Modified Waterproofing System


               WPM 350              WPM 350        WPM 300       Concrete, Timber or
                                                                 F/C Substrate
ROOFS & DECKS – EXPOSED GRADE WATERPROOFING
          RE1 – WPM 350 UV Stable Acrylic Co Polymer Modified Waterproofing System

• Surface preparation
• Crack treatment
• Wall consolidation
• Bond breakers/cove installation
• Priming with WPM 300
• 1st coat of WPM 350
• Reinforcement installation in
  the corners using WPM deck
  web over wet coat of WPM 350
• 2nd coat of WPM 350
ROOFS & DECKS – EXPOSED GRADE WATERPROOFING
RE2 - Butynol – Synthetic Rubber Sheet 1.2mm – 1.5mm Waterproofing System

                           ARDEX
             BUTYNOL #2                            ARDEX WA 98 Concrete, Timber or
                           SEAM TAPE
                                                   ADHESIVE    F/C Substrate
                                  BUTYNOL #1
ROOFS & DECKS – EXPOSED GRADE WATERPROOFING
         RE2 - Butynol – Synthetic Rubber Sheet 1.2mm – 1.5mm Waterproofing System

•   Surface preparation
•   Bond breakers
•   Adhesive installation
•   Butynol installation
•   Seam tape installation
•   Termination using aluminum
    pressure bar
ROOFS & DECKS WATERPROOFING – PROTECTED
RP1 – WPM 750 Butynol Synthetic Rubber Sheet 0.5 mm thick Waterproofing System
                                          BUTYNOL #1
                         BUTYNOL #2
                                                       ARDEX WA 98 Concrete, Timber or
          TILING WITH             Heat weld            ADHESIVE    F/C Substrate
          NECESSARY ADHESIVE
ROOFS & DECKS WATERPROOFING – PROTECTED
      RP1 – Butynol Synthetic Rubber Sheet 1.0mm – 1.5mm thick Waterproofing System

• Surface preparation
• Bond breakers
• Adhesive installation
• Butynol installation
• Sheet joint welding
• Termination using aluminum
  pressure bar
• Tile installation using
  adhesive
ROOFS & DECKS WATERPROOFING – PROTECTED
RP2 - WPM 002 – Two Component Acrylic Co Polymer Modified Waterproofing System


                             WPM 002   WPM 002       WPM 300       Concrete, Timber or
           SCREED / TILING                                         F/C Substrate
ROOFS & DECKS WATERPROOFING – PROTECTED
      RP2 - WPM 002 – Two Component Acrylic Co Polymer Modified Waterproofing System
• Surface preparation
• Crack treatment
• Wall consolidation
• Bond breakers/cove installation
• Priming with WPM 300
• 1st coat of WPM 002
• Reinforcement installation in
  the corners using WPM deck
  web over wet coat of WPM 002
• 2nd coat of WPM 002
• Protection plaster
• Necessary screeding/tiling
ROOFS & DECKS – LANDSCAPE WATERPROOFING
RL1 - WPM 320 – Liquid Applied Root Inhibiting Latex Emulsion Waterproofing System
               LANDSCAPE

                              WPM 320 WPM 320           WPM 300        Concrete, Timber or
                                                                       F/C Substrate
ROOFS & DECKS – LANDSCAPE WATERPROOFING
       RL1 - WPM 320 – Liquid Applied Root Inhibiting Latex Emulsion Waterproofing System
•   Surface preparation
•   Crack treatment
•   Wall consolidation
•   Bond breakers/cove installation
•   Priming with WPM 300
•   1st coat of WPM 320
•   Reinforcement installation in the
    corners using WPM deck web over
    wet coat of WPM 320
•   2nd coat of WPM 320
•   Protection plaster
•   Necessary screeding/tilingdrainage
    cells
Typical Planter Box — Detail
                                                                   Finished height of
                                                                   Membrane min. 50mm
Capping or
                                                                   Above soil
Applied finish
Coating over                                                                    Apply two
Membrane                                                                        Coats of
                                                                                WPM 320
Podium/deck                                                                     Retaining
Waterproofed with                                                               Wall to
WPM 350                                                                         Wall and
Roof & Deck                                                                     Base of
Membrane                                                                        Planter box
                                                                                (Min. DFT
WPM 265                                                                         1.2mm)
Primer




                    Slab        PU Seal 100                 Note: Proper drainage should
                                                            Be incorporated into planter



  Planter Box — Drainage Detail
                    Optional:           Protection lining
                                                                      Take WPM 320
                    Pebbles/            (Punch hole
                                                                      Down into waste
                    Stones or           Over waste if
  Ensure 1:80       Drainage cell       Using board)
  Falls to waste                                                         Pipe




                                                                                           Slab
ROOFS & DECKS – LANDSCAPE WATERPROOFING
RL2 - Butynol Synthetic Rubber Sheet 1.0mm – 1.5mm thick Waterproofing System
                                          BUTYNOL #1
                         BUTYNOL #2
                                                       ARDEX WA 98 Concrete, Timber or
            LANDSCAPE
                                  ARDEX                ADHESIVE    F/C Substrate
                                  SEAM TAPE
ROOFS & DECKS – LANDSCAPE WATERPROOFING
         RL2 - Butynol Synthetic Rubber Sheet 1.0mm thick Waterproofing System

• Surface preparation
• Bond breakers
• Adhesive installation
• Butynol installation
• Sheet joint welding
• Termination using aluminum
  pressure bar
• Necessary drainage cells
ROOFS & DECKS – LANDSCAPE WATERPROOFING
RL3 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System

                          WPM 3000 X
                          SELF ADHESIVE              ARDEX          Concrete Substrate
            LANDSCAPE
                                    WPM 3000 X       WPM 240
                                    SELF ADHESIVE
ROOFS & DECKS – LANDSCAPE WATERPROOFING
        RL3 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System

• Surface preparation
• Priming with WPM 240
• Additional 300mm wide WPM
  3000X at all internal and external
  corners
• WPM 3000X installation
• Necessary drainage cells
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
BR1 - WPM 3000 X – 2 Layers of Self Adhesive SBS 3.00mm thick Waterproofing System

            PROTECTION WPM 3000 X        WPM 3000 X     ARDEX
            BOARD                                       WPM 249        Concrete Substrate
                       2nd LAYER         1st LAYER
                                                        PRIMER
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
            BR1 - WPM 3000 X – 2 Layers of Self Adhesive SBS 3.00mm thick Waterproofing System

System                                                             Benefits
Prime with ARDEX WPM 249                                           3mm thick system
Install 2 layers of WPM 3000 X                                     Double seal at laps
(1.5mm each), self adhesive SBS                                    Positive vapour barrier
membrane in lap staggered manner
                                                                   Uniform film thickness
Install a Protection Board or Drainage Cell
                                                                   Excellent elongation
                                                                   Life expectancy 20 yrs plus


Applications
Below Grade basement floor & wall
positive side
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
BR2 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System

                         WPM 3000 X
                         SELF ADHESIVE               ARDEX          Concrete Substrate
        PROTECTION
        BOARD                       WPM 3000 X       WPM 249
                                    SELF ADHESIVE
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
             BR2 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System

System                                                           Benefits
Prime with ARDEX WPM 249                                         1.5mm thick system
Install a layer of WPM 3000 X 1.5mm                              Double seal at laps
self adhesive SBS membrane                                       Positive vapour barrier
Install a Protection Board
                                                                 Uniform film thickness
                                                                 Excellent elongation
                                                                 Life expectancy 10 yrs plus


Applications
Below Grade basement floor & wall
positive side
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
BR3 - Butynol Synthetic Rubber Sheet 1.2mm – 1.5mm thick Waterproofing System
                                          BUTYNOL #1
                         BUTYNOL #2
                                                       ARDEX WA 98 Concrete, Timber or
        PROTECTION
                                  ARDEX                ADHESIVE    F/C Substrate
        BOARD
                                  SEAM TAPE
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
              BR3 - Butynol Synthetic Rubber Sheet 1.2mm – 1.5mm thick Waterproofing System

System                                                            Benefits
ARDEX WA 98 Adhesive                                              Uniform Film Thickness
Install Butynol Sheet #1                                          1.4 mtr wide sheets
                                                                  One layer installation
Apply Seam Primer in between sheet laps
                                                                  High flexibility >300%
Apply ARDEX Seam Tape in between sheet laps
                                                                  High tensile strength
Install Butynol Sheet #2
                                                                  Compatible with BAL ENDURA Adhesive
Install a Protection Board                                        Life expectancy 20 yrs plus


Applications
Below Grade basement floor & wall
positive side
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
BR 4- WPM 320 – Liquid Applied Below Grade Latex Emulsion Waterproofing System


                  WPM 320              WPM 320        WPM 300       Concrete Substrate
BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE
              BR4 - WPM 320 – Liquid Applied Below Grade Latex Emulsion Waterproofing System

System                                                            Benefits
Prime with WPM 300                                                1.0mm thick system
                                                                  Contains root inhibitors to prevent root
Apply 1st coat of WPM 320
                                                                  growth ingress to the membrane
Deck web reinforcing cloth in corner, cracks & joints
                                                                  Positive vapour barrier
Apply 2nd coat of WPM 320
                                                                  Excellent elongation
Protection Board
                                                                  Heavy duty, chemical resistant
                                                                  Life expectancy 10 yrs plus



Applications
Only on positive side retaining wall
EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS
EF1 - WPM 330 – Anti Carbonation Waterproofing Façade Membrane System


              WPM 330             WPM 330        WPM 300       Concrete, Timber or
                                  FACADE                       F/C Substrate
EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS
                 EF1 - WPM 330 – Anti Carbonation Waterproofing Façade Membrane System

System                                                           Benefits
Prime with WPM 300 water based moisture                          100% water based acrylic.
barrier coat                                                     Anti-carbonation semi permeable
                                                                 membrane preventing concrete
Apply 1 coat of WPM 330 Facade
                                                                 corrosion and allowing the substrate to
Apply 2nd coat of WPM 330 Facade                                 breathe.
                                                                 Excellent dirt retention properties.
                                                                 Excellent colour retention
                                                                 Variable texture finish
                                                                 High flexibility
Applications                                                     Life expectancy 10 yrs plus
External facades of buildings
CBD's building
Sea shore buildings
Chemical & Gas plants etc
EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS
EF2 - WPM 310 – Waterproofing Facade Membrane System


      WPM 310             WPM 310       WPM 300        Concrete, Timber or
      FACADE                                           F/C Substrate
EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS
                           EF2 - WPM 310 – Waterproofing Facade Membrane System

System                                                            Benefits
Prime with WPM 300 water based primer                             100% water based acrylic.
Apply 1st coat of WPM 310 Façade membrane                         Semi permeable membrane allowing the
                                                                  substrate to breathe.
Apply 2nd coat of WPM 310 Facade
                                                                  Excellent dirt retention properties.
                                                                  Excellent colour retention
                                                                  Variable texture finish
                                                                  High flexibility
                                                                  Life expectancy 10 yrs plus




Applications
External facades of buildings
WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS
OS1 – WPM 200/WPM 300/WPM 300 Potable Grade Waterproofing Systems


             WPM 300            WPM 300       WPM 200      Concrete Substrate/
                                                           Neatly plastered
                                                           substrate
WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS
                OS1 – WPM 200/WPM 300/WPM 300 Potable Grade Waterproofing Systems

System                                                       Benefits
Apply 1 coat of concrete sealer WPM 200                      Two Part Epoxy system
Apply 1st coat of WPM 300                                    Water Based – compatible with
                                                             damp or wet surfaces
Apply 2nd coat of WPM 300
                                                             0.3 mm thick
                                                             Bond strength to concrete >5Mpa
                                                             Life expectancy 10 yrs plus




Applications
Internal of water tanks, reservoirs,
fish ponds and water features
Conforms to AS4020 and BS6920 for use in
contact with potable water
WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS
OS2 Butynol Synthetic Rubber Welded Bag of Butynol 1.5mm Potable Grade Waterproofing System


                 BUTYNOL #2                                               Concrete Substrate
                                    FACTORY
                                    WELD




 BUTYNOL #1
WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS
     OS2 Butynol Synthetic Rubber Welded Bag of Butynol 1.5mm Potable Grade Waterproofing System

System                                                          Benefits
Where the structural design fits a factory                      Uniform Film Thickness
welded bag of Butynol is laid into the                          Loose laid installation
containment structure.                                          High flexibility >300%
Bag must be detailed in accordance with                         High tensile strength
Ardex recommendations                                           Life expectancy 20 yrs plus
Conforms to AS4020 for use in contact with
potable water



Applications
Potable Water Tanks
WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS
 OS3 WPM 300/WPM 002/WPM 002/Tile/Screed Tanking Waterproofing Systems


Tile           WPM 002     WPM 002 WPM 300                    Concrete Substrate
Protective
plaster
WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS
          OS 3 WPM 200/WPM 300/WPM 002/WPM 002/Tile/Screed Tanking Waterproofing Systems

System                                                       Benefits
                                                             Two Part Epoxy system
Apply 1st coat of WPM 300                                    Water Based – compatible with
                                                             damp or wet surfaces
Apply 2 coats of WPM 002 Acrylic
                                                             0.3 mm thick
Co polymer waterproofing membrane.
                                                             Bond strength to concrete >5Mpa
Install a protective plaster or tiling                       Life expectancy 10 yrs plus




Applications
Internal of water tanks, reservoirs,
fish ponds and water features
For use under tile/under screed
WATERPROOFING OF SWIMMING POOL & WATER BODY
SP1 WPM 200/WPM 300/WPM 002/WPM 002 Pool Waterproofing System In Hydrostatic Situations

                   ADHESIVE WPM 002                          WPM 200
                   AND TILING
                                  WPM 002         WPM 300              Concrete Substrate
WATERPROOFING OF SWIMMING POOL & WATER BODY
      SP1 WPM 200/WPM 300/WPM 002/WPM 002 Pool Waterproofing System In Hydrostatic Situations

System                                                        Benefits
Prime with WPM 200 concrete sealer                            Water based
Apply 1 coat of WPM 300                                       Internally reinforced
                                                              High flexibility >300%
Apply 1st coats WPM 002 2 component
waterproofing membrane                                        Cementitious Acrylic
                                                              Compatible with BAL ENDURA Adhesive
Deck web polyester cloth (for corners)
Apply 2nd coat WPM 002                                        40Kg covers 20 Sqm
                                                              Surfaces must be tiled
Protective layer of plaster
                                                              Life expectancy 10 yrs plus
Necessary tile installation

Applications
Swimming Pools & Water Features
Must be tiled
SP2 Seal Sheet – Waterproofing and decoupling membrane
- Elevated Pool Waterproofing System In Hydrostatic Situations
                                    Seal sheet
   TILING                           Waterproofing membrane
                        Necessary              Gold star     Concrete Substrate
                        Adhesive               Adhesive
SP2 Seal Sheet – Waterproofing and decoupling membrane
                - Elevated Pool Waterproofing System In Hydrostatic Situations

•   Surface preparation
•   Bond breakers
•   Adhesive installation
•   Seal sheet installation
•   Butt joint treatment
•   Tile installation with necessary
    adhesives
1001 Expansion Joint Treatment




Typical C/S of Expansion Joint Treatment
1001 Expansion Joint Treatment


                                         THERMO PLASTIC COATED   1ST COAT WPM
                                         ELASTOMETER SEALING
                          2ND COAT WPM
                                         TAPE 29200

             WPM PRIMER                                               RCC SLAB
                                                                      WITH EXPANSION JOINT

PUSEAL 100
SEALANT




                                                                        BACKER ROD
1001 Expansion Joint Treatment


System                                                            Benefits
Prepare the joint with WPM 256 in                                 Total protection of expansion joints
conjunction with cement / sand                                    in all aspects of requirements
Install a PU Seal 100 after installation of                       including provision for proper
polystyrene backer rod                                            movements and waterproofing
                                                                  properties
Prime both side of joints with WPM 256
                                                                  High elongation
Install Coving Bandage sandwiched between
2 coats of liquid applied membranes                               Durable & heavy duty



Applications
Expansion joints
THANK YOU
FOR YOUR ATTENTION

More Related Content

What's hot

Understanding waterproofing
Understanding waterproofingUnderstanding waterproofing
Understanding waterproofingGraceAPAC
 
Waterproofing in structure
Waterproofing in structureWaterproofing in structure
Waterproofing in structureJyoti Ahlawat
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionsandeepasandaruwan1
 
Effective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIAEffective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIAW. R. Meadows
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicalsAvinash Kumar Gupta
 
Leakage in external walls of the buildings.
Leakage in external walls of the buildings.Leakage in external walls of the buildings.
Leakage in external walls of the buildings.NITINSAHETIYA1
 
Sealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by DesignSealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by DesignLawrence Le Roux
 
Pervious concrete
Pervious concretePervious concrete
Pervious concreteLatha Reddy
 
Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...
Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...
Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...W. R. Meadows
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET) Omar Hamim
 
Waterproofing in buildings
Waterproofing in buildingsWaterproofing in buildings
Waterproofing in buildingsLamaJassim1
 
Construction Materials
Construction Materials Construction Materials
Construction Materials Vijay RAWAT
 

What's hot (20)

Understanding waterproofing
Understanding waterproofingUnderstanding waterproofing
Understanding waterproofing
 
Waterproofing in structure
Waterproofing in structureWaterproofing in structure
Waterproofing in structure
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Water proofing-membrane
Water proofing-membraneWater proofing-membrane
Water proofing-membrane
 
Building components
Building componentsBuilding components
Building components
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
 
Paints and Finishes
Paints and FinishesPaints and Finishes
Paints and Finishes
 
Effective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIAEffective Concrete Waterproofing - AIA
Effective Concrete Waterproofing - AIA
 
waterproofing
waterproofingwaterproofing
waterproofing
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicals
 
Leakage in external walls of the buildings.
Leakage in external walls of the buildings.Leakage in external walls of the buildings.
Leakage in external walls of the buildings.
 
Water proofing for expansion joints
Water proofing for expansion jointsWater proofing for expansion joints
Water proofing for expansion joints
 
Sealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by DesignSealants - Engineering Sealant Joints by Design
Sealants - Engineering Sealant Joints by Design
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...
Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...
Blindside Waterproofing: How to Select and Specify Pre-Applied Waterproofing ...
 
Lime classification
Lime   classificationLime   classification
Lime classification
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
 
Waterproofing in buildings
Waterproofing in buildingsWaterproofing in buildings
Waterproofing in buildings
 
Construction Materials
Construction Materials Construction Materials
Construction Materials
 
Ferrocement
FerrocementFerrocement
Ferrocement
 

Similar to CSTD Introduction - Central Technical Service Department Roles

How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...
How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...
How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...SamRivera19
 
Pre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 SolutionsPre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 SolutionsPeb 360 Solutions
 
Rainbow Transflex
Rainbow TransflexRainbow Transflex
Rainbow Transflexguest470ea8
 
Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495
 Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495  Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495
Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495 kodexcc
 
Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6Chris Bridges
 
presentation on retro fit and repair methods
presentation on retro fit and repair methodspresentation on retro fit and repair methods
presentation on retro fit and repair methodsKumarS250747
 
bro_sika-waterproofing-brochure.pdf
bro_sika-waterproofing-brochure.pdfbro_sika-waterproofing-brochure.pdf
bro_sika-waterproofing-brochure.pdfJonathanFeruelo1
 
WATERPROOFING.pptx
WATERPROOFING.pptxWATERPROOFING.pptx
WATERPROOFING.pptxErankajKumar
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiDr K M SONI
 
The Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing SolutionsThe Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing SolutionsNippon Paint Professional
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxDP NITHIN
 

Similar to CSTD Introduction - Central Technical Service Department Roles (20)

Wpm 002
Wpm 002Wpm 002
Wpm 002
 
Dual proof e 2016
Dual proof e 2016Dual proof e 2016
Dual proof e 2016
 
Our Services
Our ServicesOur Services
Our Services
 
SCC WITH KIM.PPTX
SCC WITH KIM.PPTXSCC WITH KIM.PPTX
SCC WITH KIM.PPTX
 
How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...
How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...
How to Apply Liquid Waterproofing Membranes for Internal and External Under-T...
 
Increase reliability of restoration sewer asset
Increase reliability of restoration sewer assetIncrease reliability of restoration sewer asset
Increase reliability of restoration sewer asset
 
Pre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 SolutionsPre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 Solutions
 
Rainbow Transflex
Rainbow TransflexRainbow Transflex
Rainbow Transflex
 
senthilkumar CV
senthilkumar CVsenthilkumar CV
senthilkumar CV
 
Waterproofing dublin09 1
Waterproofing dublin09 1Waterproofing dublin09 1
Waterproofing dublin09 1
 
Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495
 Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495  Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495
Waterproof Membranes at Best Price in Australia 📞+61 1800 418 495
 
Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6Design of earth-retaining structures - Lecture 6
Design of earth-retaining structures - Lecture 6
 
presentation on retro fit and repair methods
presentation on retro fit and repair methodspresentation on retro fit and repair methods
presentation on retro fit and repair methods
 
bro_sika-waterproofing-brochure.pdf
bro_sika-waterproofing-brochure.pdfbro_sika-waterproofing-brochure.pdf
bro_sika-waterproofing-brochure.pdf
 
WATERPROOFING.pptx
WATERPROOFING.pptxWATERPROOFING.pptx
WATERPROOFING.pptx
 
Site report 1
Site report 1Site report 1
Site report 1
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in Mumbai
 
The Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing SolutionsThe Ultimate Guide to Waterproofing Solutions
The Ultimate Guide to Waterproofing Solutions
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptx
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
 

Recently uploaded

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 

Recently uploaded (20)

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 

CSTD Introduction - Central Technical Service Department Roles

  • 1. INTRODUCTION OF CENTRAL TECHNICAL SERVICE DEPARTMENT
  • 2. CSTD CONSISTS OF  Technical head  Specification Manager – HO (Supporting All India Basis)  Training Manager- HO (Supporting All India Basis)  Technical Executives Supporting In Respective Regions 2 Wednesday, December 14, 2011
  • 3. CTSD RESPONISBILITIES 1. New Product Development 2. Deriving advanced application methods 3. Designing CAD and 3 D drawings 4. Designing technical bulletin, manual and write ups 5. Competitor comparisons during tenders 6. Evaluating building standards for our products 7. Designing training presentations 8. Supporting technical executives 9. Value engineered speciation development 10. Case studies 11. Complaint handling
  • 4. SPECIFICATION MANAGER 1. After taking all the details of the identified project which may be conceptual design stage or ongoing: a. Understanding the requirements of the project b. Providing a proper recommendation to the sales team after discussions with architects/consultants etc 2. Initiation of project ground work a. Studying the site drawings b. Designing specification on the project specifically for various areas depending on the client’s requirements 3. Presenting Technical document a. Proposal of ARDEX Endura technical services including features and benefits, system specification, treatment methodology and Auto CAD drawings, 3D illustration if required. b. Preparing detailed estimate of the proposed areas c. Preparing Bill of Quantities
  • 5. TRAINING MANAGER 1. Designing training calendar. 2. Providing training to all in house team including technical executives, Applicator’s, client’s including hands on 3. Training on basics of building technologies (civil engineering) 4. Creating modules to make site mock ups, site trials, on site training to workmen. 5. Responsible for centralized training centre/academy 6. Designing samples of system recommendations
  • 6. TECHNICAL EXECUTIVES 1. Product presentation/Comparison/Mock up a. Highlighting the product features and characteristics in comparison with the other proposed competitor products and systems b. Executing live mock up on site to show product performance c. Mock up management. 2. Quality assurance and Quality check a. Regular site visits to ensure the applicator ‘s adherence to the specifications b. Imparting site training and instructions to the applicators 3. Certification of executions a. Making the final site visit after completion of job and certifying the job (Based on the requirements in consultation with sales team)
  • 7. WATERPROOFING  Waterproofing portfolio  Surface preparations  Critical areas of waterproofing  System recommendations
  • 8. Waterproofing portfolio We have various waterproofing systems to suite different areas of building  Wet areas  Under tile – Liquid applied membranes  Under tile – Sheet applied waterproofing membranes  Roof areas  Roof protected  Roof exposed  Roof landscaped  Basement  Liquid applied membranes  Positive side  Sheet applied membranes  Positive side
  • 9. Waterproofing portfolio We have various waterproofing systems to suite different areas of building  Swimming pool areas  Critical pools  Sheet applied membranes  Liquid applied membranes  Water containment structures  Under tile liquid applied membranes  Epoxy potable systems  Expansion joint areas
  • 10. Surface Preparation Surface Preparation for Waterproofing  Surface must be structurally sound Cracking or movement of the substrate after a membrane has been installed is likely to cause the membrane to fracture.  Treat cracks and movement joints Cracks, construction joints, expansion joints and other mobile joints should be treated in accordance with the membrane manufacturers recommendations.  Clean and free from any contaminant materials A membranes bond will fail at its weakest point so if applied over dust, loose materials or poorly bonded contaminants it will fail prematurely.  Repair any holes/voids in the substrate A uniform thickness membrane is very difficult to achieve over holes/voids.  Remove any protrusions and sharp edges A uniform thickness membrane is very difficult to achieve over protrusions or sharp edges.
  • 11. Surface Preparation Surface Preparation for Waterproofing  Concrete should be aged for 28 days and screeds should be aged for 7 days Cementitious surfaces can develop plastic shrinkage cracks during initial curing which must be totally formed before the membrane is applied. Time must also be allowed for the development of efflorescence which must be removed before the membrane application.  Ensure substrate is dry (5% moisture or less) High substrate moisture content will form blisters in the membrane during curing.  Seal wet or freshly laid concrete with ARDEX WPM 300 Allow to cure overnight. Provides a concrete curing membrane and barrier coat.
  • 12. Surface Preparation Priming for Waterproofing Porous surfaces are primed to consolidate residual dust and reduce the porosity of the substrate to avoid excessively fast interface drying and blistering of the membrane Wet or fresh concrete, PVC and metal are primed to provide a barrier between the substrate and the membrane  All cementitious substrates should be primed with ARDEX WPM 265 Water Based Primer at a rate of 6m2/L  Highly porous substrates may require 2 coats  PVC should be primed with pink plumbers primer  Metal surfaces should be primed with a two pack epoxy zinc phosphate primer  If moisture content is too high or concrete is freshly laid, use ARDEX WPM 300 water based epoxy as a barrier coating Allow primer to dry prior to waterproofing
  • 13. CRITICAL AREAS OF WATERPROOFING Other than the main treatments of waterproofing the following are the most critical areas which needs to be addressed before the main waterproofing treatment • Cracks & Construction Joints • Rain Outlets / Bore Packing • Dissimilar Construction Joints / Corner treatment • Surface Moisture • Corners • Protection of Waterproofing Treatment Wednesday, December 14, 2011 13
  • 14. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints Surface cracks •Surface Crack Wednesday, December 14, 2011 14
  • 15. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints Crack Chasing • Surface crack • Crack Chasing Wednesday, December 14, 2011 15
  • 16. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints Crack filling with sealant • Surface crack • Crack chasing • Crack filling with sealant Wednesday, December 14, 2011 16
  • 17. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints Priming with WPM 300 • Surface crack • Crack chasing • Crack filling with sealant • Priming with WPM 300 Wednesday, December 14, 2011 17
  • 18. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints 1st Coat of WPM 002 • Surface cracks • Crack chasing • Crack filling with sealant • Priming with WPM 300 • 1st Coat of WPM 002 Wednesday, December 14, 2011 18
  • 19. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints Reinforcement cloth • Surface cracks • Crack chasing • Crack filling with sealant • Priming with WPM 300 • 1st Coat of WPM 002 • Reinforcement cloth Wednesday, December 14, 2011 19
  • 20. CRITICAL AREAS OF WATERPROOFING Cracks & Construction Joints 2nd coat of WPM 002 • Surface crack • Crack chasing • Crack filling with sealant • Priming with WPM 300 • 1st Coat of WPM 002 • Reinforcement cloth • 2nd coat of WPM 002 Wednesday, December 14, 2011 20
  • 21. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Core cutting • Core cutting Wednesday, December 14, 2011 21
  • 22. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Cleaning • Core Cutting • Cleaning Wednesday, December 14, 2011 22
  • 23. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Pipe Fixing • Core cutting • Cleaning • Pipe fixing Wednesday, December 14, 2011 23
  • 24. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Pipe fixing • Core cutting • Cleaning • Pipe fixing • Pipe fixing Wednesday, December 14, 2011 24
  • 25. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Filling with WPM SG • Core cutting • Cleaning • Pipe fixing • Pipe fixing • Filling with WPM SG Wednesday, December 14, 2011 25
  • 26. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Priming with WPM 300 • Core cutting • Cleaning • Pipe fixing • Pipe fixing • Filling with WPM SG • Priming with WPM 300 Wednesday, December 14, 2011 26
  • 27. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing 1st Coat of WPM 002 • Core cutting • Cleaning • Pipe fixing • Pipe fixing • Filling with WPM SG • Priming with WPM 300 • 1st Coat of WPM 002 Wednesday, December 14, 2011 27
  • 28. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing Reinforcement cloth • Core cutting • Cleaning • Pipe fixing • Pipe fixing • Filling with WPM SG • Priming with WPM 300 • 1st Coat of WPM 002 • Reinforcement Wednesday, December 14, 2011 28
  • 29. CRITICAL AREAS OF WATERPROOFING Rain Outlets/ Bore Packing 2nd Coat of WPM 002 • Core cutting • Cleaning • Pipe fixing • Pipe fixing • Filling with WPM SG • Priming with WPM 300 • 1st Coat of WPM 002 • Reinforcement • 2nd Coat of WPM 002 Wednesday, December 14, 2011 29
  • 30. CRITICAL AREAS OF WATERPROOFING Dissimilar Construction Joints / Corner treatment Dissimilar joints • Dissimilar joints Wednesday, December 14, 2011 30
  • 31. CRITICAL AREAS OF WATERPROOFING Dissimilar Construction Joints / Corner treatment Surface consolidation • Dissimilar joints • Surface consolidation Wednesday, December 14, 2011 31
  • 32. CRITICAL AREAS OF WATERPROOFING Dissimilar Construction Joints / Corner treatment Moisture barrier coating • Dissimilar joints • Surface consolidation • Moisture barrier coating Wednesday, December 14, 2011 32
  • 33. CRITICAL AREAS OF WATERPROOFING Dissimilar Construction Joints / Corner treatment 1st Coat of WPM 002 • Dissimilar joints • Surface consolidation • Moisture barrier coating • 1st Coat of WPM 002 Wednesday, December 14, 2011 33
  • 34. CRITICAL AREAS OF WATERPROOFING Dissimilar Construction Joints / Corner treatment Reinforcement cloth • Dissimilar joints • Surface consolidation • Moisture barrier coating • 1st Coat of WPM 002 • Reinforcement cloth Wednesday, December 14, 2011 34
  • 35. CRITICAL AREAS OF WATERPROOFING Dissimilar Construction Joints / Corner treatment 2nd Coat of WPM 002 • Dissimilar joints • Surface consolidation • Moisture barrier coating • 1st Coat of WPM 002 • Reinforcement cloth • 2nd Coat of WPM 002 Wednesday, December 14, 2011 35
  • 36. CRITICAL AREAS OF WATERPROOFING Surface Moisture Moisture raising in the surface • Moisture raising in the surface Wednesday, December 14, 2011 36
  • 37. CRITICAL AREAS OF WATERPROOFING Surface Moisture Moisture barrier coat • Moisture raising in the surface • Moisture barrier coat Wednesday, December 14, 2011 37
  • 38. CRITICAL AREAS OF WATERPROOFING Protection of Waterproofing Treatment Waterproofing Treated surface • Waterproofing treated surface Wednesday, December 14, 2011 38
  • 39. CRITICAL AREAS OF WATERPROOFING Protection of Waterproofing Treatment Damages to membrane • Waterproofing treated surface • Damages to treated surface Wednesday, December 14, 2011 39
  • 40. CRITICAL AREAS OF WATERPROOFING Protection of Waterproofing Treatment Protection plastering • Waterproofing treated surface • Damages to treated surface • Protection plastering Wednesday, December 14, 2011 40
  • 41. WATERPROOFING SYSTEM RECOMMENDATIONS Wednesday, December 14, 2011 41
  • 42. WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING WT1 - WPM 002 – Two component Acrylic Co polymer modified waterproofing System ADHESIVE WPM 002 WPM 002 WPM 300 Concrete, Timber or AND TILING F/C Substrate
  • 43. WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING WT1 - WPM 002 – Two component Acrylic Co polymer modified waterproofing System • Surface preparation • Crack treatment • Wall consolidation • Bond breakers/cove installation • Priming with WPM 300 • 1st coat of WPM 002 • Reinforcement installation in the corners using WPM deck web over wet coat of WPM 002 • 2nd coat of WPM 002 • Protection plaster
  • 44.
  • 45. WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING WT2 – WPM 750 Butynol – Synthetic Rubber Sheet 0.50mm – 1mm thick Waterproofing System BUTYNOL #2 BUTYNOL #1 ADHESIVE ARDEX WA 98 Concrete, Timber or AND TILING ARDEX ADHESIVE F/C Substrate SEAM TAPE
  • 46. WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING WT2 – WPM 750 Butynol – Synthetic Rubber Sheet 0.50mm – 1mm thick Waterproofing System • Surface preparation • Bond breakers • Adhesive installation • Butynol installation • Joint welding • Tile installation with necessary adhesives
  • 47.
  • 48. WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING WT3 – Waterproofing and decoupling - Seal Sheet under tile waterproofing system Butt joint Seal Sheet Treatment with Waterproofing WPM Deck web sandwiched b/n Membrane Necessary 2coats of WPM 002 BAL Gold star Concrete Substrate Tiling Adhesive Necessary BAL adhesive `
  • 49. WET AREA (BATHROOM, TOILET, BALCONY) WATERPROOFING 002 - Butynol – Synthetic Rubber Sheet 0.50mm – 1mm thick Waterproofing System • Surface preparation • Bond breakers • Adhesive installation • Seal sheet installation • Butt joint treatment • Tile installation with necessary adhesives
  • 50.
  • 51. ROOFS & DECKS – EXPOSED GRADE WATERPROOFING RE1 – WPM 350 UV Stable Acrylic Co Polymer Modified Waterproofing System WPM 350 WPM 350 WPM 300 Concrete, Timber or F/C Substrate
  • 52. ROOFS & DECKS – EXPOSED GRADE WATERPROOFING RE1 – WPM 350 UV Stable Acrylic Co Polymer Modified Waterproofing System • Surface preparation • Crack treatment • Wall consolidation • Bond breakers/cove installation • Priming with WPM 300 • 1st coat of WPM 350 • Reinforcement installation in the corners using WPM deck web over wet coat of WPM 350 • 2nd coat of WPM 350
  • 53.
  • 54. ROOFS & DECKS – EXPOSED GRADE WATERPROOFING RE2 - Butynol – Synthetic Rubber Sheet 1.2mm – 1.5mm Waterproofing System ARDEX BUTYNOL #2 ARDEX WA 98 Concrete, Timber or SEAM TAPE ADHESIVE F/C Substrate BUTYNOL #1
  • 55. ROOFS & DECKS – EXPOSED GRADE WATERPROOFING RE2 - Butynol – Synthetic Rubber Sheet 1.2mm – 1.5mm Waterproofing System • Surface preparation • Bond breakers • Adhesive installation • Butynol installation • Seam tape installation • Termination using aluminum pressure bar
  • 56. ROOFS & DECKS WATERPROOFING – PROTECTED RP1 – WPM 750 Butynol Synthetic Rubber Sheet 0.5 mm thick Waterproofing System BUTYNOL #1 BUTYNOL #2 ARDEX WA 98 Concrete, Timber or TILING WITH Heat weld ADHESIVE F/C Substrate NECESSARY ADHESIVE
  • 57. ROOFS & DECKS WATERPROOFING – PROTECTED RP1 – Butynol Synthetic Rubber Sheet 1.0mm – 1.5mm thick Waterproofing System • Surface preparation • Bond breakers • Adhesive installation • Butynol installation • Sheet joint welding • Termination using aluminum pressure bar • Tile installation using adhesive
  • 58.
  • 59. ROOFS & DECKS WATERPROOFING – PROTECTED RP2 - WPM 002 – Two Component Acrylic Co Polymer Modified Waterproofing System WPM 002 WPM 002 WPM 300 Concrete, Timber or SCREED / TILING F/C Substrate
  • 60. ROOFS & DECKS WATERPROOFING – PROTECTED RP2 - WPM 002 – Two Component Acrylic Co Polymer Modified Waterproofing System • Surface preparation • Crack treatment • Wall consolidation • Bond breakers/cove installation • Priming with WPM 300 • 1st coat of WPM 002 • Reinforcement installation in the corners using WPM deck web over wet coat of WPM 002 • 2nd coat of WPM 002 • Protection plaster • Necessary screeding/tiling
  • 61.
  • 62. ROOFS & DECKS – LANDSCAPE WATERPROOFING RL1 - WPM 320 – Liquid Applied Root Inhibiting Latex Emulsion Waterproofing System LANDSCAPE WPM 320 WPM 320 WPM 300 Concrete, Timber or F/C Substrate
  • 63. ROOFS & DECKS – LANDSCAPE WATERPROOFING RL1 - WPM 320 – Liquid Applied Root Inhibiting Latex Emulsion Waterproofing System • Surface preparation • Crack treatment • Wall consolidation • Bond breakers/cove installation • Priming with WPM 300 • 1st coat of WPM 320 • Reinforcement installation in the corners using WPM deck web over wet coat of WPM 320 • 2nd coat of WPM 320 • Protection plaster • Necessary screeding/tilingdrainage cells
  • 64. Typical Planter Box — Detail Finished height of Membrane min. 50mm Capping or Above soil Applied finish Coating over Apply two Membrane Coats of WPM 320 Podium/deck Retaining Waterproofed with Wall to WPM 350 Wall and Roof & Deck Base of Membrane Planter box (Min. DFT WPM 265 1.2mm) Primer Slab PU Seal 100 Note: Proper drainage should Be incorporated into planter Planter Box — Drainage Detail Optional: Protection lining Take WPM 320 Pebbles/ (Punch hole Down into waste Stones or Over waste if Ensure 1:80 Drainage cell Using board) Falls to waste Pipe Slab
  • 65. ROOFS & DECKS – LANDSCAPE WATERPROOFING RL2 - Butynol Synthetic Rubber Sheet 1.0mm – 1.5mm thick Waterproofing System BUTYNOL #1 BUTYNOL #2 ARDEX WA 98 Concrete, Timber or LANDSCAPE ARDEX ADHESIVE F/C Substrate SEAM TAPE
  • 66. ROOFS & DECKS – LANDSCAPE WATERPROOFING RL2 - Butynol Synthetic Rubber Sheet 1.0mm thick Waterproofing System • Surface preparation • Bond breakers • Adhesive installation • Butynol installation • Sheet joint welding • Termination using aluminum pressure bar • Necessary drainage cells
  • 67.
  • 68. ROOFS & DECKS – LANDSCAPE WATERPROOFING RL3 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System WPM 3000 X SELF ADHESIVE ARDEX Concrete Substrate LANDSCAPE WPM 3000 X WPM 240 SELF ADHESIVE
  • 69. ROOFS & DECKS – LANDSCAPE WATERPROOFING RL3 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System • Surface preparation • Priming with WPM 240 • Additional 300mm wide WPM 3000X at all internal and external corners • WPM 3000X installation • Necessary drainage cells
  • 70. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR1 - WPM 3000 X – 2 Layers of Self Adhesive SBS 3.00mm thick Waterproofing System PROTECTION WPM 3000 X WPM 3000 X ARDEX BOARD WPM 249 Concrete Substrate 2nd LAYER 1st LAYER PRIMER
  • 71. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR1 - WPM 3000 X – 2 Layers of Self Adhesive SBS 3.00mm thick Waterproofing System System Benefits Prime with ARDEX WPM 249 3mm thick system Install 2 layers of WPM 3000 X Double seal at laps (1.5mm each), self adhesive SBS Positive vapour barrier membrane in lap staggered manner Uniform film thickness Install a Protection Board or Drainage Cell Excellent elongation Life expectancy 20 yrs plus Applications Below Grade basement floor & wall positive side
  • 72. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR2 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System WPM 3000 X SELF ADHESIVE ARDEX Concrete Substrate PROTECTION BOARD WPM 3000 X WPM 249 SELF ADHESIVE
  • 73. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR2 - WPM 3000 X – 1 Layer Self Adhesive SBS 1.5mm thick Waterproofing System System Benefits Prime with ARDEX WPM 249 1.5mm thick system Install a layer of WPM 3000 X 1.5mm Double seal at laps self adhesive SBS membrane Positive vapour barrier Install a Protection Board Uniform film thickness Excellent elongation Life expectancy 10 yrs plus Applications Below Grade basement floor & wall positive side
  • 74. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR3 - Butynol Synthetic Rubber Sheet 1.2mm – 1.5mm thick Waterproofing System BUTYNOL #1 BUTYNOL #2 ARDEX WA 98 Concrete, Timber or PROTECTION ARDEX ADHESIVE F/C Substrate BOARD SEAM TAPE
  • 75. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR3 - Butynol Synthetic Rubber Sheet 1.2mm – 1.5mm thick Waterproofing System System Benefits ARDEX WA 98 Adhesive Uniform Film Thickness Install Butynol Sheet #1 1.4 mtr wide sheets One layer installation Apply Seam Primer in between sheet laps High flexibility >300% Apply ARDEX Seam Tape in between sheet laps High tensile strength Install Butynol Sheet #2 Compatible with BAL ENDURA Adhesive Install a Protection Board Life expectancy 20 yrs plus Applications Below Grade basement floor & wall positive side
  • 76. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR 4- WPM 320 – Liquid Applied Below Grade Latex Emulsion Waterproofing System WPM 320 WPM 320 WPM 300 Concrete Substrate
  • 77. BASEMENT FLOOR & WALL BELOW GRADE – POSITIVE SIDE BR4 - WPM 320 – Liquid Applied Below Grade Latex Emulsion Waterproofing System System Benefits Prime with WPM 300 1.0mm thick system Contains root inhibitors to prevent root Apply 1st coat of WPM 320 growth ingress to the membrane Deck web reinforcing cloth in corner, cracks & joints Positive vapour barrier Apply 2nd coat of WPM 320 Excellent elongation Protection Board Heavy duty, chemical resistant Life expectancy 10 yrs plus Applications Only on positive side retaining wall
  • 78. EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS EF1 - WPM 330 – Anti Carbonation Waterproofing Façade Membrane System WPM 330 WPM 330 WPM 300 Concrete, Timber or FACADE F/C Substrate
  • 79. EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS EF1 - WPM 330 – Anti Carbonation Waterproofing Façade Membrane System System Benefits Prime with WPM 300 water based moisture 100% water based acrylic. barrier coat Anti-carbonation semi permeable membrane preventing concrete Apply 1 coat of WPM 330 Facade corrosion and allowing the substrate to Apply 2nd coat of WPM 330 Facade breathe. Excellent dirt retention properties. Excellent colour retention Variable texture finish High flexibility Applications Life expectancy 10 yrs plus External facades of buildings CBD's building Sea shore buildings Chemical & Gas plants etc
  • 80. EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS EF2 - WPM 310 – Waterproofing Facade Membrane System WPM 310 WPM 310 WPM 300 Concrete, Timber or FACADE F/C Substrate
  • 81. EXTERNAL FAÇADE & ANTICORBONATION SYSTEMS EF2 - WPM 310 – Waterproofing Facade Membrane System System Benefits Prime with WPM 300 water based primer 100% water based acrylic. Apply 1st coat of WPM 310 Façade membrane Semi permeable membrane allowing the substrate to breathe. Apply 2nd coat of WPM 310 Facade Excellent dirt retention properties. Excellent colour retention Variable texture finish High flexibility Life expectancy 10 yrs plus Applications External facades of buildings
  • 82. WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS OS1 – WPM 200/WPM 300/WPM 300 Potable Grade Waterproofing Systems WPM 300 WPM 300 WPM 200 Concrete Substrate/ Neatly plastered substrate
  • 83. WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS OS1 – WPM 200/WPM 300/WPM 300 Potable Grade Waterproofing Systems System Benefits Apply 1 coat of concrete sealer WPM 200 Two Part Epoxy system Apply 1st coat of WPM 300 Water Based – compatible with damp or wet surfaces Apply 2nd coat of WPM 300 0.3 mm thick Bond strength to concrete >5Mpa Life expectancy 10 yrs plus Applications Internal of water tanks, reservoirs, fish ponds and water features Conforms to AS4020 and BS6920 for use in contact with potable water
  • 84.
  • 85. WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS OS2 Butynol Synthetic Rubber Welded Bag of Butynol 1.5mm Potable Grade Waterproofing System BUTYNOL #2 Concrete Substrate FACTORY WELD BUTYNOL #1
  • 86. WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS OS2 Butynol Synthetic Rubber Welded Bag of Butynol 1.5mm Potable Grade Waterproofing System System Benefits Where the structural design fits a factory Uniform Film Thickness welded bag of Butynol is laid into the Loose laid installation containment structure. High flexibility >300% Bag must be detailed in accordance with High tensile strength Ardex recommendations Life expectancy 20 yrs plus Conforms to AS4020 for use in contact with potable water Applications Potable Water Tanks
  • 87. WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS OS3 WPM 300/WPM 002/WPM 002/Tile/Screed Tanking Waterproofing Systems Tile WPM 002 WPM 002 WPM 300 Concrete Substrate Protective plaster
  • 88. WATER IMMERSION – OHT/UG SUMP TANKING SYSTEMS OS 3 WPM 200/WPM 300/WPM 002/WPM 002/Tile/Screed Tanking Waterproofing Systems System Benefits Two Part Epoxy system Apply 1st coat of WPM 300 Water Based – compatible with damp or wet surfaces Apply 2 coats of WPM 002 Acrylic 0.3 mm thick Co polymer waterproofing membrane. Bond strength to concrete >5Mpa Install a protective plaster or tiling Life expectancy 10 yrs plus Applications Internal of water tanks, reservoirs, fish ponds and water features For use under tile/under screed
  • 89.
  • 90. WATERPROOFING OF SWIMMING POOL & WATER BODY SP1 WPM 200/WPM 300/WPM 002/WPM 002 Pool Waterproofing System In Hydrostatic Situations ADHESIVE WPM 002 WPM 200 AND TILING WPM 002 WPM 300 Concrete Substrate
  • 91. WATERPROOFING OF SWIMMING POOL & WATER BODY SP1 WPM 200/WPM 300/WPM 002/WPM 002 Pool Waterproofing System In Hydrostatic Situations System Benefits Prime with WPM 200 concrete sealer Water based Apply 1 coat of WPM 300 Internally reinforced High flexibility >300% Apply 1st coats WPM 002 2 component waterproofing membrane Cementitious Acrylic Compatible with BAL ENDURA Adhesive Deck web polyester cloth (for corners) Apply 2nd coat WPM 002 40Kg covers 20 Sqm Surfaces must be tiled Protective layer of plaster Life expectancy 10 yrs plus Necessary tile installation Applications Swimming Pools & Water Features Must be tiled
  • 92.
  • 93. SP2 Seal Sheet – Waterproofing and decoupling membrane - Elevated Pool Waterproofing System In Hydrostatic Situations Seal sheet TILING Waterproofing membrane Necessary Gold star Concrete Substrate Adhesive Adhesive
  • 94. SP2 Seal Sheet – Waterproofing and decoupling membrane - Elevated Pool Waterproofing System In Hydrostatic Situations • Surface preparation • Bond breakers • Adhesive installation • Seal sheet installation • Butt joint treatment • Tile installation with necessary adhesives
  • 95.
  • 96. 1001 Expansion Joint Treatment Typical C/S of Expansion Joint Treatment
  • 97. 1001 Expansion Joint Treatment THERMO PLASTIC COATED 1ST COAT WPM ELASTOMETER SEALING 2ND COAT WPM TAPE 29200 WPM PRIMER RCC SLAB WITH EXPANSION JOINT PUSEAL 100 SEALANT BACKER ROD
  • 98. 1001 Expansion Joint Treatment System Benefits Prepare the joint with WPM 256 in Total protection of expansion joints conjunction with cement / sand in all aspects of requirements Install a PU Seal 100 after installation of including provision for proper polystyrene backer rod movements and waterproofing properties Prime both side of joints with WPM 256 High elongation Install Coving Bandage sandwiched between 2 coats of liquid applied membranes Durable & heavy duty Applications Expansion joints
  • 99. THANK YOU FOR YOUR ATTENTION