ASSIGNMENT
DRIVE WINETR SPRING 2014
PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4)
PGDPMN (SEM 2)
SUBJECT CODE & NAME PM0015 – QUANTITATIVE METHODS IN PROJECT
MANAGEMENT
SEMESTER 4
BK ID B1344
CREDITS 4
MARKS 60
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
1 Write short notes on:
 Q sort method of project selection
Answer : A method for analyzing the opinions of a group based on a series of rankings (sorts)
produced by the individual group members. The Q sort was originally developed within the field of
psychology as a means for measuring correlations among the views expressed by different people.
The letter Q was assigned to differentiate the method from another approach used in psychology,
known as the R method, for analyzing correlations among various factors (e.g., height versus age).
The Q sort, in contrast, is based on
 Basic components of a network
Answer : A computer network is a data communications system that interconnects computer
systems at various different sites.
In this learning module we are going to learn about the pieces that make a network , some of which
you are familar with:
 Project cost
Answer : Project cost management (PCM) is a method that uses technology to measure cost and
productivity through the full life cycle of enterprise level projects.
PCM encompasses several specific functions of project management including estimating, job
controls, field data collection, scheduling, accounting and design.
Beginning with estimating, a vital tool in PCM, actual historical data is used to accurately plan all
aspects of the project. As the project
 Resource smoothing
Answer : A scheduling calculation that involves utilising float or increasing or decreasing the
resources required for specific activities, such that any peaks and troughs of resource usage are
smoothed out. This does not affect the overall duration. It is also known as time limited resource
scheduling.
What is the difference between 'resource smoothing' and 'resource scheduling'?
Resource smoothing is used when the
2 What are the three methods for determining the forecasted cost at completion? Explain.
Answer : Three methods for determining the forecasted cost at completion :
1) General time forecasting formula
2) General cost forecasting formula
3) Performance factor
1) Cost forecasting EAC
Forecasting the final cost of the project is key to the success or failure of a project since it allows to
take corrective actions when the predicted EAC exceeds a certain threshold. This forecast is based
on the actual costs already spent and a prediction of the future spendings for the remaining portion
of work to be done. The general forecasting formula is equal to:
EAC = AC + PCWR
3 Describe the different stages in Project management.
Answer : Whether a project is large or small, the stages of a project are ultimately the same. Initiate
the project, and then move into planning, followed by execution. Once the project is in the
execution stage, you'll monitor and control it, which will continually influence changes that loop
back to the planning stage as necessary. Once all project tasks are complete and approved, you will
finally be ready to close the project.
4 Write short notes on:
 Linking of tasks in MS Project
Answer : Link tasks in a project
You can link any two tasks in a project to show their relationship (also called a task dependency).
Dependencies drive the project schedule — once you link the tasks, every change you make to the
predecessor affects the successor, which
 Setting resource calendar in MS Project
Answer : You can apply different, customized calendars to individual tasks and individual resources.
In most cases the base calendar is the calendar that describes the standard working times for most
resources in your organization. As you know, the base calendar contains standard working times that
designate the beginning of the work day at 8:00 A.M., ending at 5 P.M., and allowing employees a
one-hour break for lunch. If you want to
 Network diagram chart
Answer : The Network Diagram view was called the PERT Chart in earlier versions of Project. This
view shows the dependencies between tasks in a graphical manner. A box (also called a node)
represents each task, and a line connecting two boxes represents the dependency between those
tasks.
The Network Diagram view is just one of
 Updating the project in MS Project
Answer : You can quickly update your project's tasks to 100% complete or the scheduled percent
complete.
For example, your project is going well and most of your tasks are on track. Rather than updating
each task in your project daily, you update the tasks to their scheduled percent complete weekly,
and then modify the percent complete for those tasks that are either behind or ahead of schedule.
5 Discuss consolidating several projects in MS project.
Answer : Projects can get of hand quickly. Before you know it, a simple building project becomes a
collage of smaller projects, such as design, excavation, foundation work, and marketing. You can
have more control over your project by creating smaller projects in Microsoft Office Project 2007
and then linking them into a single file to show where they fit in your master project.
6 Describe how you can choose an appropriate forecasting model.
Answer : In virtually every decision they make, executives today consider some kind of forecast.
Sound predictions of demands and trends are no longer luxury items, but a necessity, if managers
are to cope with seasonality, sudden changes in demand levels, price-cutting maneuvers of the
competition, strikes, and large swings of the economy. Forecasting can help them deal with these
troubles; but it can help them more, the more they know about the general principles of forecasting,
what it can and cannot do for them currently, and
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )

More Related Content

What's hot

Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
mairemic
 
Project Planning
Project PlanningProject Planning
Project Planning
lew
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
341741357
 
Project Cost.pdf
Project Cost.pdfProject Cost.pdf
Project Cost.pdf
341741357
 
NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4
Future Managers
 
NCV 3 Project Management Hands-On Support Slide Show - Module 3
NCV 3 Project Management Hands-On Support Slide Show - Module 3NCV 3 Project Management Hands-On Support Slide Show - Module 3
NCV 3 Project Management Hands-On Support Slide Show - Module 3
Future Managers
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-schedule
Raaz Karkee
 
Event based scheduling brown bag
Event based scheduling brown bagEvent based scheduling brown bag
Event based scheduling brown bag
Glen Alleman
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
Ian Sommerville
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure
umair khan
 
Project Estimating
Project EstimatingProject Estimating
Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Training
guest2739cfb
 
7 managment and planning tools - Mohamed Omara
7 managment and planning tools - Mohamed Omara7 managment and planning tools - Mohamed Omara
7 managment and planning tools - Mohamed Omara
Mohamed Lotfy
 
Work plan and Scope creep
Work plan and Scope creepWork plan and Scope creep
Work plan and Scope creep
Onkar Tendulkar
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
Hoa PN Thaycacac
 
Project control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaProject control tools by Samuel obino mokaya
Project control tools by Samuel obino mokaya
Discover JKUAT
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and scheduling
Sulman Ahmed
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
Marius Miron
 
MS Project 2007 Tips and Tricks
MS Project 2007 Tips and TricksMS Project 2007 Tips and Tricks
MS Project 2007 Tips and Tricks
Joanne Greene-Blose
 
Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides
SlideTeam
 

What's hot (20)

Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
 
Project Cost.pdf
Project Cost.pdfProject Cost.pdf
Project Cost.pdf
 
NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4NCV 3 Project Management Hands-On Support Slide Show - Module 4
NCV 3 Project Management Hands-On Support Slide Show - Module 4
 
NCV 3 Project Management Hands-On Support Slide Show - Module 3
NCV 3 Project Management Hands-On Support Slide Show - Module 3NCV 3 Project Management Hands-On Support Slide Show - Module 3
NCV 3 Project Management Hands-On Support Slide Show - Module 3
 
Building a-project-schedule
Building a-project-scheduleBuilding a-project-schedule
Building a-project-schedule
 
Event based scheduling brown bag
Event based scheduling brown bagEvent based scheduling brown bag
Event based scheduling brown bag
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure
 
Project Estimating
Project EstimatingProject Estimating
Project Estimating
 
Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Training
 
7 managment and planning tools - Mohamed Omara
7 managment and planning tools - Mohamed Omara7 managment and planning tools - Mohamed Omara
7 managment and planning tools - Mohamed Omara
 
Work plan and Scope creep
Work plan and Scope creepWork plan and Scope creep
Work plan and Scope creep
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
 
Project control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaProject control tools by Samuel obino mokaya
Project control tools by Samuel obino mokaya
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and scheduling
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
MS Project 2007 Tips and Tricks
MS Project 2007 Tips and TricksMS Project 2007 Tips and Tricks
MS Project 2007 Tips and Tricks
 
Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides
 

Similar to Pm0015 – quantitative methods in project management

Pm0015 – quantitative methods in project
Pm0015 – quantitative methods in projectPm0015 – quantitative methods in project
Pm0015 – quantitative methods in project
smumbahelp
 
Project Management
Project ManagementProject Management
Project Management
David Edgerton, Jr.
 
Pm0015 quantitative methods in project management
Pm0015   quantitative methods in project managementPm0015   quantitative methods in project management
Pm0015 quantitative methods in project management
smumbahelp
 
Workshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxWorkshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptx
HelenCandy2
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptx
MohammedNouh7
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
Ch23
Ch23Ch23
Pm 0010 introduction to project management
Pm 0010   introduction to project managementPm 0010   introduction to project management
Pm 0010 introduction to project management
smumbahelp
 
Pm0011 – project planning
Pm0011 – project planningPm0011 – project planning
Pm0011 – project planning
smumbahelp
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
CruzIbarra161
 
Project Preparation and Management
Project Preparation and ManagementProject Preparation and Management
Project Preparation and Management
GBPUA&T, Pantnagar
 
Assignment 1 Identify elements of concern (e.g. resources.docx
Assignment 1 Identify elements of concern (e.g. resources.docxAssignment 1 Identify elements of concern (e.g. resources.docx
Assignment 1 Identify elements of concern (e.g. resources.docx
sherni1
 
Week-4 GDPPD-project planning ad design pattern.pptx
Week-4 GDPPD-project planning ad design pattern.pptxWeek-4 GDPPD-project planning ad design pattern.pptx
Week-4 GDPPD-project planning ad design pattern.pptx
st4132634
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
Kate Pynn
 
Pm0011 – project planning and scheduling
Pm0011 – project planning and schedulingPm0011 – project planning and scheduling
Pm0011 – project planning and scheduling
smumbahelp
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planning
mfarbstein
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
smumbahelp
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
MSharmilaDeviITDEPT
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
briancrawford30935
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
Carla Fair-Wright
 

Similar to Pm0015 – quantitative methods in project management (20)

Pm0015 – quantitative methods in project
Pm0015 – quantitative methods in projectPm0015 – quantitative methods in project
Pm0015 – quantitative methods in project
 
Project Management
Project ManagementProject Management
Project Management
 
Pm0015 quantitative methods in project management
Pm0015   quantitative methods in project managementPm0015   quantitative methods in project management
Pm0015 quantitative methods in project management
 
Workshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxWorkshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptx
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptx
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Ch23
Ch23Ch23
Ch23
 
Pm 0010 introduction to project management
Pm 0010   introduction to project managementPm 0010   introduction to project management
Pm 0010 introduction to project management
 
Pm0011 – project planning
Pm0011 – project planningPm0011 – project planning
Pm0011 – project planning
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
Project Preparation and Management
Project Preparation and ManagementProject Preparation and Management
Project Preparation and Management
 
Assignment 1 Identify elements of concern (e.g. resources.docx
Assignment 1 Identify elements of concern (e.g. resources.docxAssignment 1 Identify elements of concern (e.g. resources.docx
Assignment 1 Identify elements of concern (e.g. resources.docx
 
Week-4 GDPPD-project planning ad design pattern.pptx
Week-4 GDPPD-project planning ad design pattern.pptxWeek-4 GDPPD-project planning ad design pattern.pptx
Week-4 GDPPD-project planning ad design pattern.pptx
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Pm0011 – project planning and scheduling
Pm0011 – project planning and schedulingPm0011 – project planning and scheduling
Pm0011 – project planning and scheduling
 
Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planning
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Project TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docxProject TimeIST4055Chapter 6Now that you have the Sc.docx
Project TimeIST4055Chapter 6Now that you have the Sc.docx
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 

Recently uploaded

Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Neo4j
 
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their MainframeDigital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Precisely
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Tosin Akinosho
 
"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota
Fwdays
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
Ivo Velitchkov
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |
AstuteBusiness
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
Miro Wengner
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
BibashShahi
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
Tatiana Kojar
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Alpen-Adria-Universität
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
saastr
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
Neo4j
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
akankshawande
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
ScyllaDB
 
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
Fwdays
 

Recently uploaded (20)

Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
 
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their MainframeDigital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
 
"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |Astute Business Solutions | Oracle Cloud Partner |
Astute Business Solutions | Oracle Cloud Partner |
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
 
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
 

Pm0015 – quantitative methods in project management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 (Prefer mailing. Call in emergency ) ASSIGNMENT DRIVE WINETR SPRING 2014 PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4) PGDPMN (SEM 2) SUBJECT CODE & NAME PM0015 – QUANTITATIVE METHODS IN PROJECT MANAGEMENT SEMESTER 4 BK ID B1344 CREDITS 4 MARKS 60 Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. 1 Write short notes on:  Q sort method of project selection Answer : A method for analyzing the opinions of a group based on a series of rankings (sorts) produced by the individual group members. The Q sort was originally developed within the field of psychology as a means for measuring correlations among the views expressed by different people. The letter Q was assigned to differentiate the method from another approach used in psychology, known as the R method, for analyzing correlations among various factors (e.g., height versus age). The Q sort, in contrast, is based on  Basic components of a network Answer : A computer network is a data communications system that interconnects computer systems at various different sites. In this learning module we are going to learn about the pieces that make a network , some of which you are familar with:
  • 2.  Project cost Answer : Project cost management (PCM) is a method that uses technology to measure cost and productivity through the full life cycle of enterprise level projects. PCM encompasses several specific functions of project management including estimating, job controls, field data collection, scheduling, accounting and design. Beginning with estimating, a vital tool in PCM, actual historical data is used to accurately plan all aspects of the project. As the project  Resource smoothing Answer : A scheduling calculation that involves utilising float or increasing or decreasing the resources required for specific activities, such that any peaks and troughs of resource usage are smoothed out. This does not affect the overall duration. It is also known as time limited resource scheduling. What is the difference between 'resource smoothing' and 'resource scheduling'? Resource smoothing is used when the 2 What are the three methods for determining the forecasted cost at completion? Explain. Answer : Three methods for determining the forecasted cost at completion : 1) General time forecasting formula 2) General cost forecasting formula 3) Performance factor 1) Cost forecasting EAC Forecasting the final cost of the project is key to the success or failure of a project since it allows to take corrective actions when the predicted EAC exceeds a certain threshold. This forecast is based on the actual costs already spent and a prediction of the future spendings for the remaining portion of work to be done. The general forecasting formula is equal to: EAC = AC + PCWR 3 Describe the different stages in Project management. Answer : Whether a project is large or small, the stages of a project are ultimately the same. Initiate the project, and then move into planning, followed by execution. Once the project is in the execution stage, you'll monitor and control it, which will continually influence changes that loop back to the planning stage as necessary. Once all project tasks are complete and approved, you will finally be ready to close the project. 4 Write short notes on:
  • 3.  Linking of tasks in MS Project Answer : Link tasks in a project You can link any two tasks in a project to show their relationship (also called a task dependency). Dependencies drive the project schedule — once you link the tasks, every change you make to the predecessor affects the successor, which  Setting resource calendar in MS Project Answer : You can apply different, customized calendars to individual tasks and individual resources. In most cases the base calendar is the calendar that describes the standard working times for most resources in your organization. As you know, the base calendar contains standard working times that designate the beginning of the work day at 8:00 A.M., ending at 5 P.M., and allowing employees a one-hour break for lunch. If you want to  Network diagram chart Answer : The Network Diagram view was called the PERT Chart in earlier versions of Project. This view shows the dependencies between tasks in a graphical manner. A box (also called a node) represents each task, and a line connecting two boxes represents the dependency between those tasks. The Network Diagram view is just one of  Updating the project in MS Project Answer : You can quickly update your project's tasks to 100% complete or the scheduled percent complete. For example, your project is going well and most of your tasks are on track. Rather than updating each task in your project daily, you update the tasks to their scheduled percent complete weekly, and then modify the percent complete for those tasks that are either behind or ahead of schedule. 5 Discuss consolidating several projects in MS project. Answer : Projects can get of hand quickly. Before you know it, a simple building project becomes a collage of smaller projects, such as design, excavation, foundation work, and marketing. You can have more control over your project by creating smaller projects in Microsoft Office Project 2007 and then linking them into a single file to show where they fit in your master project. 6 Describe how you can choose an appropriate forecasting model.
  • 4. Answer : In virtually every decision they make, executives today consider some kind of forecast. Sound predictions of demands and trends are no longer luxury items, but a necessity, if managers are to cope with seasonality, sudden changes in demand levels, price-cutting maneuvers of the competition, strikes, and large swings of the economy. Forecasting can help them deal with these troubles; but it can help them more, the more they know about the general principles of forecasting, what it can and cannot do for them currently, and Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 (Prefer mailing. Call in emergency )