 Plant Maintenance End User Manual
 MTTR/MTBR Report
Author  Janaka Pathmendra
Date Last Updated  JUNE 2014
2
Plant Maintenance Report MTTR/MTBR
Transaction code –MCJB
Mean Time to Repair (MTTR) and Mean Time Between Repair (MTBR).
This is a useful Report, The key figure values are reading directly from the notification database. In this
way, it is possible to obtain detailed information on a breakdown for each period, for example, the
notification number or the start/end of the malfunction.
In addition, the key figures "number of breakdowns reported'" and "total downtime" are displayed in the
standard analyses, the "number of actual breakdowns" is displayed, which is for example not the same as
the "number of breakdowns reported"
Enter the MCJB T-code ,then you can see this interface.
If you know the Equipment, you can enter the Equipment number and execute.
For example if you want Banbury 01 MTTR/MTBR Data.
3
Enter the Equipment number and execute.
If not you can select the get variant button then there are display created list .you can select the line item.
As an example CKITL MIX has selected & you can see,
4
For each technical object entered in the selection screen per period in the breakdown, you obtain the
following data:
o Number of breakdowns
o Length of downtime
o Mean Time to Repair
o Mean Time between Repair
The average duration of a machine breakdown, MTTR (Mean Time To Repair), is calculated from the
individual history of a piece of equipment. This gives the following formula:
MTTR= Length of breakdown /Numbers of breakdown
MTTR=Total breakdown time 15Hours in month /two break downs in month
MTTR=15H/2
MTTR is 7.5
The key figure MTBR is calculated in hours.
The following example shows how the MTBR is calculated:
Acquisition date of Banbury 01- 01.01.2014
First breakdown 10.01.2014
Downtime 10 hours
Second breakdown 20.01.2014
5
Downtime 5 hours
Number of breakdowns 2
20.01.2014 - 01.01.2014 =19Day
Hours=19 x 24 =456 Hours
First Break down time is 10Hours
MTBR = (19 * 24 - 10) / 2
= (456 - 10) / 2
= 223 hours
6
In this link, have any more data, Function location, Equipment, Reported by, Malfunction start
date & time, Malfunction end date, time & Breakdown duration etc.
Note-When you create the notification you must set the breakdown tick for calculate the
MTTR/MTBR & Breakdown report.
7
We distinguish between the following:
 Number of machine breakdowns reported
 Number of actual machine breakdowns
The reported breakdowns are important from a business point of view, whereas the actual
breakdowns are of interest from a technical viewpoint.
For Example when Banbury 01 Dump mill already breakdown & at that time, Banbury 01 came
breakdown. There are two-machine breakdown reported. However, there is a one actual machine
breakdown.
By using the breakdown statistics you can analyze the causes of a particular breakdown more
closely. The focus in this case is on the distribution of duration of the various breakdowns or
repairs, and on how these were caused. The aim of these analyses is to find out the cause behind a
short or long breakdown period, or the period between two consecutive breakdowns. An indicator
in the first screen of the notification indicates that a malfunction report or a maintenance request
contains a machine breakdown.

More Related Content

What's hot

Plant maintance module1
Plant maintance module1Plant maintance module1
Plant maintance module1
soumyajitdaripa
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
sapdocs. info
 
Simplifying SAP Plant Maintenance
Simplifying SAP Plant MaintenanceSimplifying SAP Plant Maintenance
Simplifying SAP Plant Maintenance
DeeDee Kato
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
Janaka Pathmendra
 
SAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account AssignmentSAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account Assignment
Subhrajyoti (Subhra) Bhattacharjee
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
expertisesignin1
 
SAP PM
SAP PMSAP PM
Application of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAPApplication of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAP
Tony Ciliberti PE
 
Ps sap-pm maintenance-planning
Ps sap-pm maintenance-planningPs sap-pm maintenance-planning
Ps sap-pm maintenance-planning
Mansour Hineidi
 
Sap pm test scripts
Sap pm test scriptsSap pm test scripts
Sap pm test scripts
Ganesh Kumar Gopinatha Rao
 
Plant maint p pt-wisdom
Plant maint p pt-wisdomPlant maint p pt-wisdom
Plant maint p pt-wisdom
jskishore
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
sapdocs. info
 
Sap S4 HANA PM Online training +918660816919
Sap S4 HANA PM Online training +918660816919Sap S4 HANA PM Online training +918660816919
Sap S4 HANA PM Online training +918660816919
Senthil kumar
 
SapPreventive Maintenance
SapPreventive Maintenance SapPreventive Maintenance
SapPreventive Maintenance
Mohamed Saad Gelbana
 
SAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureSAP EAM/PM Organization Structure
SAP EAM/PM Organization Structure
IITian Academy
 
Etm equipment and_tools management
Etm equipment and_tools managementEtm equipment and_tools management
Etm equipment and_tools management
Piyush Bose
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
Subhrajyoti (Subhra) Bhattacharjee
 
Payroll configuration
Payroll configurationPayroll configuration
Payroll configuration
gayathri166
 
Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2
gabrielsyst
 
SAP HCM - Organization Management end user presentation
SAP HCM - Organization Management end user presentationSAP HCM - Organization Management end user presentation
SAP HCM - Organization Management end user presentation
steve4sap
 

What's hot (20)

Plant maintance module1
Plant maintance module1Plant maintance module1
Plant maintance module1
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
 
Simplifying SAP Plant Maintenance
Simplifying SAP Plant MaintenanceSimplifying SAP Plant Maintenance
Simplifying SAP Plant Maintenance
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
 
SAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account AssignmentSAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account Assignment
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
SAP PM
SAP PMSAP PM
SAP PM
 
Application of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAPApplication of ISO 14224 Methods in SAP
Application of ISO 14224 Methods in SAP
 
Ps sap-pm maintenance-planning
Ps sap-pm maintenance-planningPs sap-pm maintenance-planning
Ps sap-pm maintenance-planning
 
Sap pm test scripts
Sap pm test scriptsSap pm test scripts
Sap pm test scripts
 
Plant maint p pt-wisdom
Plant maint p pt-wisdomPlant maint p pt-wisdom
Plant maint p pt-wisdom
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
 
Sap S4 HANA PM Online training +918660816919
Sap S4 HANA PM Online training +918660816919Sap S4 HANA PM Online training +918660816919
Sap S4 HANA PM Online training +918660816919
 
SapPreventive Maintenance
SapPreventive Maintenance SapPreventive Maintenance
SapPreventive Maintenance
 
SAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureSAP EAM/PM Organization Structure
SAP EAM/PM Organization Structure
 
Etm equipment and_tools management
Etm equipment and_tools managementEtm equipment and_tools management
Etm equipment and_tools management
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
 
Payroll configuration
Payroll configurationPayroll configuration
Payroll configuration
 
Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2Sap plant-maintenance-pm-business-blueprint-bbp2
Sap plant-maintenance-pm-business-blueprint-bbp2
 
SAP HCM - Organization Management end user presentation
SAP HCM - Organization Management end user presentationSAP HCM - Organization Management end user presentation
SAP HCM - Organization Management end user presentation
 

Similar to Plant Maintenance user manual MTTR Report

MTBF vs MTTR.pptx
MTBF vs MTTR.pptxMTBF vs MTTR.pptx
MTBF vs MTTR.pptx
BalakumarV6
 
Sap mtbr
Sap mtbrSap mtbr
Maintenance Management - Project
Maintenance Management - ProjectMaintenance Management - Project
Maintenance Management - Project
Abhishek Raj
 
CMMS - From Theory to Execution
CMMS - From Theory to ExecutionCMMS - From Theory to Execution
CMMS - From Theory to Execution
Mohammed Hamed Ahmed Soliman
 
Job Ops 2014 R1 User Guide
Job Ops 2014 R1 User GuideJob Ops 2014 R1 User Guide
Job Ops 2014 R1 User Guide
90 Minds Consulting Group
 
What are the essential elements to have in BRDR plansWhen is a d.pdf
What are the essential elements to have in BRDR plansWhen is a d.pdfWhat are the essential elements to have in BRDR plansWhen is a d.pdf
What are the essential elements to have in BRDR plansWhen is a d.pdf
RAJATCHUGH12
 
Interview Questions about SAP MM.pptx
Interview Questions about SAP MM.pptxInterview Questions about SAP MM.pptx
Interview Questions about SAP MM.pptx
AkshayKamat11
 
JCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 Onwards
JCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 OnwardsJCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 Onwards
JCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 Onwards
jhennd iesofku
 
JCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 Onwards
JCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 OnwardsJCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 Onwards
JCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 Onwards
jhsejfmn ukkemf
 
eresource pms generic
eresource pms generic eresource pms generic
eresource pms generic
eresource infotech pvt ltd
 
MCHB03-27-12
MCHB03-27-12MCHB03-27-12
MCHB03-27-12
Michael Hopkins
 
Jcb 446 wheeled loader service repair manual
Jcb 446 wheeled loader service repair manualJcb 446 wheeled loader service repair manual
Jcb 446 wheeled loader service repair manual
fjskemdzaqmme
 
Jcb 456 wheeled loader service repair manual
Jcb 456 wheeled loader service repair manualJcb 456 wheeled loader service repair manual
Jcb 456 wheeled loader service repair manual
fjjsekwsxkdmmem
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
nfra erp
 
JCB 456 WHEELED LOADER Service Repair Manual
JCB 456 WHEELED LOADER Service Repair ManualJCB 456 WHEELED LOADER Service Repair Manual
JCB 456 WHEELED LOADER Service Repair Manual
fujsjefjkkekem
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
ijsrd.com
 
SAP Demand Management
SAP Demand ManagementSAP Demand Management
SAP Demand Management
Rahul Shukla
 
Ulhas pujari mtbf
Ulhas pujari mtbfUlhas pujari mtbf
Ulhas pujari mtbf
UlhasPujari
 
Ulhas Pujari MTBF
Ulhas Pujari MTBFUlhas Pujari MTBF
Ulhas Pujari MTBF
UlhasPujari
 
Ulhas pujari mtbf
Ulhas pujari mtbfUlhas pujari mtbf
Ulhas pujari mtbf
UlhasPujari
 

Similar to Plant Maintenance user manual MTTR Report (20)

MTBF vs MTTR.pptx
MTBF vs MTTR.pptxMTBF vs MTTR.pptx
MTBF vs MTTR.pptx
 
Sap mtbr
Sap mtbrSap mtbr
Sap mtbr
 
Maintenance Management - Project
Maintenance Management - ProjectMaintenance Management - Project
Maintenance Management - Project
 
CMMS - From Theory to Execution
CMMS - From Theory to ExecutionCMMS - From Theory to Execution
CMMS - From Theory to Execution
 
Job Ops 2014 R1 User Guide
Job Ops 2014 R1 User GuideJob Ops 2014 R1 User Guide
Job Ops 2014 R1 User Guide
 
What are the essential elements to have in BRDR plansWhen is a d.pdf
What are the essential elements to have in BRDR plansWhen is a d.pdfWhat are the essential elements to have in BRDR plansWhen is a d.pdf
What are the essential elements to have in BRDR plansWhen is a d.pdf
 
Interview Questions about SAP MM.pptx
Interview Questions about SAP MM.pptxInterview Questions about SAP MM.pptx
Interview Questions about SAP MM.pptx
 
JCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 Onwards
JCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 OnwardsJCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 Onwards
JCB 8016 MINI EXCAVATOR Service Repair Manual SN:1155000 Onwards
 
JCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 Onwards
JCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 OnwardsJCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 Onwards
JCB 8018 MINI EXCAVATOR Service Repair Manual SN:1046000 Onwards
 
eresource pms generic
eresource pms generic eresource pms generic
eresource pms generic
 
MCHB03-27-12
MCHB03-27-12MCHB03-27-12
MCHB03-27-12
 
Jcb 446 wheeled loader service repair manual
Jcb 446 wheeled loader service repair manualJcb 446 wheeled loader service repair manual
Jcb 446 wheeled loader service repair manual
 
Jcb 456 wheeled loader service repair manual
Jcb 456 wheeled loader service repair manualJcb 456 wheeled loader service repair manual
Jcb 456 wheeled loader service repair manual
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
JCB 456 WHEELED LOADER Service Repair Manual
JCB 456 WHEELED LOADER Service Repair ManualJCB 456 WHEELED LOADER Service Repair Manual
JCB 456 WHEELED LOADER Service Repair Manual
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
SAP Demand Management
SAP Demand ManagementSAP Demand Management
SAP Demand Management
 
Ulhas pujari mtbf
Ulhas pujari mtbfUlhas pujari mtbf
Ulhas pujari mtbf
 
Ulhas Pujari MTBF
Ulhas Pujari MTBFUlhas Pujari MTBF
Ulhas Pujari MTBF
 
Ulhas pujari mtbf
Ulhas pujari mtbfUlhas pujari mtbf
Ulhas pujari mtbf
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
mahaffeycheryld
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 

Plant Maintenance user manual MTTR Report

  • 1. 1 End User Manual Plant Maintenance General Information  Plant Maintenance End User Manual  MTTR/MTBR Report Author  Janaka Pathmendra Date Last Updated  JUNE 2014
  • 2. 2 Plant Maintenance Report MTTR/MTBR Transaction code –MCJB Mean Time to Repair (MTTR) and Mean Time Between Repair (MTBR). This is a useful Report, The key figure values are reading directly from the notification database. In this way, it is possible to obtain detailed information on a breakdown for each period, for example, the notification number or the start/end of the malfunction. In addition, the key figures "number of breakdowns reported'" and "total downtime" are displayed in the standard analyses, the "number of actual breakdowns" is displayed, which is for example not the same as the "number of breakdowns reported" Enter the MCJB T-code ,then you can see this interface. If you know the Equipment, you can enter the Equipment number and execute. For example if you want Banbury 01 MTTR/MTBR Data.
  • 3. 3 Enter the Equipment number and execute. If not you can select the get variant button then there are display created list .you can select the line item. As an example CKITL MIX has selected & you can see,
  • 4. 4 For each technical object entered in the selection screen per period in the breakdown, you obtain the following data: o Number of breakdowns o Length of downtime o Mean Time to Repair o Mean Time between Repair The average duration of a machine breakdown, MTTR (Mean Time To Repair), is calculated from the individual history of a piece of equipment. This gives the following formula: MTTR= Length of breakdown /Numbers of breakdown MTTR=Total breakdown time 15Hours in month /two break downs in month MTTR=15H/2 MTTR is 7.5 The key figure MTBR is calculated in hours. The following example shows how the MTBR is calculated: Acquisition date of Banbury 01- 01.01.2014 First breakdown 10.01.2014 Downtime 10 hours Second breakdown 20.01.2014
  • 5. 5 Downtime 5 hours Number of breakdowns 2 20.01.2014 - 01.01.2014 =19Day Hours=19 x 24 =456 Hours First Break down time is 10Hours MTBR = (19 * 24 - 10) / 2 = (456 - 10) / 2 = 223 hours
  • 6. 6 In this link, have any more data, Function location, Equipment, Reported by, Malfunction start date & time, Malfunction end date, time & Breakdown duration etc. Note-When you create the notification you must set the breakdown tick for calculate the MTTR/MTBR & Breakdown report.
  • 7. 7 We distinguish between the following:  Number of machine breakdowns reported  Number of actual machine breakdowns The reported breakdowns are important from a business point of view, whereas the actual breakdowns are of interest from a technical viewpoint. For Example when Banbury 01 Dump mill already breakdown & at that time, Banbury 01 came breakdown. There are two-machine breakdown reported. However, there is a one actual machine breakdown. By using the breakdown statistics you can analyze the causes of a particular breakdown more closely. The focus in this case is on the distribution of duration of the various breakdowns or repairs, and on how these were caused. The aim of these analyses is to find out the cause behind a short or long breakdown period, or the period between two consecutive breakdowns. An indicator in the first screen of the notification indicates that a malfunction report or a maintenance request contains a machine breakdown.