Content
§  Automotive Needs and Requirements
§  Product Life Cycle Management (PLM)
§  PLM Gates Key Requirements
§  PLM Summary
Automotive Needs And Requirements
VDA 2
QA of deliveries
VDA 3 (Part 1 and 2)
Reliability assurance at
suppliers and OEM‘s
VDA 4 and VDA 4.3
QA before serial production
VDA 5
MSA
VDA 6.3
Process Audit 2010
VDA 13
Development of SW band
systems
VDA 19
Technical cleanness
VDA RGA
Maturity level assurance for
new parts incl. components
requirements
VDA RPP & FAA
Robust production process
AIAG
2nd edition APQP
LEGAL REQUIREMENTS
INTERNATIONAL REQ’TS
AUTOMOTIVE OEM REQ’T
AUTOMOTIVE SUPPLIER
DIN ISO 9000
VDA, AIAG
& ISO/TS-16949
QSK,
special terms,..
SUPPLIER
BUSINESS
PROCESS
Highly Regulated & Rigid Industry
INPUT
OUTPUT
Project Related Requirements
VDA 2
VDA 3 (1&2)
VDA 4 & 4.3
VDA 13
VDA 19
VDA RPP
Supplier selection, QA agreement, Production
process and product approval
Part 1 - Reliability management over PLM
Part 2 - Methods and tools to estimate reliability
Risk analyses (FMEA, FTA and SWOT, Poke
Yoke)
Development of software band systems –
requirements for processes and products
Technical cleanliness in assembly, environment,
Logistics, Personnel and Assembly Equip.
Robust Production Processes implemented,
Evaluated, influencing factors, and Improvement
Project Related Requirements
VDA 2
VDA 3 (1&2)
VDA 4 & 4.3
VDA 13
VDA 19
VDA RPP
Supplier selection, QA agreement, Production
process and product approval
Part 1 - Reliability management over PLM
Part 2 - Methods and tools to estimate reliability
Risk analyses (FMEA, FTA and SWOT, Poke
Yoke)
Development of software band systems –
requirements for processes and products
Technical cleanliness in assembly, environment,
Logistics, Personnel and Assembly Equip.
Robust Production Processes implemented,
Evaluated, influencing factors, and Improvement
Project Related Requirements
VDA 2
VDA 3 (1&2)
VDA 4 & 4.3
VDA 13
VDA 19
VDA RPP
Supplier selection, QA agreement, Production
process and product approval
Part 1 - Reliability management over PLM
Part 2 - Methods and tools to estimate reliability
Risk analysis (FMEA, FTA and SWOT, Poke
Yoke)
Development of software band systems –
requirements for processes and products
Technical cleanliness in assembly, environment,
Logistics, Personnel and Assembly Equip.
Robust Production Processes implemented,
Evaluated, influencing factors, and Improvement
Project Related Requirements
VDA 2
VDA 3 (1&2)
VDA 4 & 4.3
VDA 13
VDA 19
VDA RPP
Supplier selection, QA agreement, Production
process and product approval
Part 1 - Reliability management over PLM
Part 2 - Methods and tools to estimate reliability
Risk analyses (FMEA, FTA and SWOT, Poke
Yoke)
Development of software band systems –
requirements for processes and products
Technical cleanliness in assembly, environment,
Logistics, Personnel and Assembly Equip.
Robust Production Processes implemented,
Evaluated, influencing factors, and Improvement
Project Related Requirements
VDA 2
VDA 3 (1&2)
VDA 4 & 4.3
VDA 13
VDA 19
VDA RPP
Supplier selection, QA agreement, Production
process and product approval
Part 1 - Reliability management over PLM
Part 2 - Methods and tools to estimate reliability
Risk analyses (FMEA, FTA and SWOT, Poke
Yoke)
Development of software band systems –
requirements for processes and products
Technical cleanliness in assembly, environment,
Logistics, Personnel and Assembly Equip.
Robust Production Processes implemented,
Evaluated, influencing factors, and Improvement
Project Related Requirements
VDA 2
VDA 3 (1&2)
VDA 4 & 4.3
VDA 13
VDA 19
VDA RPP
Supplier selection, QA agreement, Production
process and product approval
Part 1 - Reliability management over PLM
Part 2 - Methods and tools to estimate reliability
Risk analyses (FMEA, FTA and SWOT, Poke
Yoke)
Development of software band systems –
requirements for processes and products
Technical cleanliness in assembly, environment,
Logistics, Personnel and Assembly Equip.
Robust Production Processes implemented,
Evaluated, influencing factors, and Improvement
Product Life Cycle management (PLM)
Development Delays Inevitably Lead to Poor
SOP Performance – Contribution Margin Drainer
[effort] [units]
[time]
SOP
Product Development Gates
Today’s
Performance
Needed
Performance
PLM Maturity Gates
effort
units
Important Fact:
PLM Gating Process
Off-Process
A B C D SOP MP ELV
Home Location
100
80
60
40
20
DesignReadiness
Mass Production
Prototype
Off-tool
End-of-Life
Vehicles
Start of
Production
Product Development Gates
Management Support is Paramount at Gate
Reviews – Removing Roadblocks
Important Fact:
Prototype Gate Key Requirements
A B C D SOP MP ELV
100
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
Planning and Resources Allocation is
Paramount at This Gate – Quality not Quantity
§  Customer Requirements
§  Feasibility Study
§  ESI
§  Design Goals
§  Quality Plan
§  Lessons Learned
§  Teams and Tools!
Important Fact:
Off Tool Gate Key Requirements
100
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
In Depth and on Time Design Reviews Will Save the
Organization Significant Embarrassment Down the Road
Off-tool
§  Design Verification
§  Critical Char Ctrl
§  Supplier Selection & Award
§  dFMEA
§  DFA, DFM
§  Industrialization Concept
A B C D SOP MP ELV
Important Fact:
Off Process Gate Key Requirements
10
0
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
Product Industrialization - Optimized Cell
Design and NO Significant Changes
Off-tool
§  pFMEA
§  Process Capability plan
§  MSA
§  Process Optimization
§  Supplier Readiness
Off-Process
A B C D SOP MP ELV
Important Fact:
Home Location Gate Key Requirements
100
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
Equipments Validation, Material Flow, Line
Readiness Leading to Successful PPAP
Off-tool
§ PFD
§ Process Verification
§ Process Control Plan
§ EE training
§ Capability study
§ PPAP
Off-Process
Home Location
A B C D SOP MP ELV
Important Fact:
SOP Gate Key Gate Requirements
100
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
Safe Launch and Quick Response is Key During
Production Ramp up
Off-tool
§  R@R Volume Ramp
§  EE Readiness
§  Safe Launch
§  Launch Voice of
Customer
Off-Process
Home Location
Start of
Production
A B C D SOP MP ELV
Important Fact:
Mass-Production Gate Key Req’ts
100
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
Variation Control and Continuous
Improvements
Off-tool §  Variations Control
§  Delivered Quality
§  Analysis TAT
Off-Process
Home Location
Start of
Production
Mass Production
A B C D SOP MP ELV
Important Fact:
ELV Gate Key Requirements
100
80
60
40
20
DesignReadiness
Prototype
Product Development Gates
Proper Materials Disposition – Good Corporate
Stewardship
Off-tool
§ Warranty Mgmt.
§ Service agreement
§ HAZMAT
Off-Process
Home Location
Start of
Production
Mass Production
A B C D SOP MP ELV
End-of-Life
Vehicles
Important Fact:
Summary
1.  Legal, International and OEM specific regulations governs the
Automotive Industry
2.  Vehicle manufacturers SOP doesn’t move
3.  Delays in the PLM process could lead to exclusion from entire
product cycle and will impact financial performance
4.  Management visibility and involvement is paramount in order
to preserve margins and credibility
5.  Protecting customer launch is key to success and repeat
business
6.  Engage customers in early discussion on P&P changes
7.  Do not get caught unaware - develop own PLM process and
Automotive specific technology roadmap

More Related Content

What's hot

Manufacturing Execution System
Manufacturing Execution SystemManufacturing Execution System
Manufacturing Execution SystemAnand Subramaniam
 
Case History of ISO 14224 Application in the QGOG Offshore Drilling Fleet
Case History of ISO 14224 Application in the QGOG Offshore Drilling FleetCase History of ISO 14224 Application in the QGOG Offshore Drilling Fleet
Case History of ISO 14224 Application in the QGOG Offshore Drilling FleetTony Ciliberti PE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...
Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...
Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...Ena Perica
 
Snap Fit Design by Neeraj Kumar Jha
Snap Fit Design by Neeraj Kumar JhaSnap Fit Design by Neeraj Kumar Jha
Snap Fit Design by Neeraj Kumar JhaAnkit Srivastava
 
PLM Implementation services
PLM Implementation servicesPLM Implementation services
PLM Implementation servicesGeometric Ltd.
 
How to leverage the Functional Mock-up Interface (FMI) for Model Based System...
How to leverage the Functional Mock-up Interface (FMI) for Model Based System...How to leverage the Functional Mock-up Interface (FMI) for Model Based System...
How to leverage the Functional Mock-up Interface (FMI) for Model Based System...Siemens PLM Software
 
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Victor Mitov
 
Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...
Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...
Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...Siemens PLM Software
 
Dfmea for engine systems
Dfmea for engine systemsDfmea for engine systems
Dfmea for engine systemsKamal Vora
 
Reliability prediction of electronic components
Reliability prediction of electronic componentsReliability prediction of electronic components
Reliability prediction of electronic componentsPRANAY GUPTA
 
Evolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedEvolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedSamuel Festus
 

What's hot (20)

Manufacturing Execution System
Manufacturing Execution SystemManufacturing Execution System
Manufacturing Execution System
 
Guide to Product Lifecycle Management
Guide to Product Lifecycle ManagementGuide to Product Lifecycle Management
Guide to Product Lifecycle Management
 
Case History of ISO 14224 Application in the QGOG Offshore Drilling Fleet
Case History of ISO 14224 Application in the QGOG Offshore Drilling FleetCase History of ISO 14224 Application in the QGOG Offshore Drilling Fleet
Case History of ISO 14224 Application in the QGOG Offshore Drilling Fleet
 
Scope of work
Scope of workScope of work
Scope of work
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...
Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...
Chevron richmond refinery pipe rupture and fire (6.8.2012, report draft for p...
 
Product Backlog Management
Product Backlog ManagementProduct Backlog Management
Product Backlog Management
 
Snap Fit Design by Neeraj Kumar Jha
Snap Fit Design by Neeraj Kumar JhaSnap Fit Design by Neeraj Kumar Jha
Snap Fit Design by Neeraj Kumar Jha
 
PLM Implementation services
PLM Implementation servicesPLM Implementation services
PLM Implementation services
 
How to leverage the Functional Mock-up Interface (FMI) for Model Based System...
How to leverage the Functional Mock-up Interface (FMI) for Model Based System...How to leverage the Functional Mock-up Interface (FMI) for Model Based System...
How to leverage the Functional Mock-up Interface (FMI) for Model Based System...
 
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
 
Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...
Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...
Automating 1D/3D CFD analysis workflows – Speed up design exploration of a Y-...
 
What is Design Assurance Engineering (DAE)?
What is Design Assurance Engineering (DAE)?What is Design Assurance Engineering (DAE)?
What is Design Assurance Engineering (DAE)?
 
Plm overview
Plm overviewPlm overview
Plm overview
 
Pipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & MaintenancePipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & Maintenance
 
Dfmea for engine systems
Dfmea for engine systemsDfmea for engine systems
Dfmea for engine systems
 
PLM Introduction
PLM IntroductionPLM Introduction
PLM Introduction
 
Introdution to POF reliability methods
Introdution to POF reliability methodsIntrodution to POF reliability methods
Introdution to POF reliability methods
 
Reliability prediction of electronic components
Reliability prediction of electronic componentsReliability prediction of electronic components
Reliability prediction of electronic components
 
Evolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedEvolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managed
 

Viewers also liked

flow production excecution
flow production excecutionflow production excecution
flow production excecutionSutan_PP
 
The role and social responsibilities entrepeneur towards
The role and social responsibilities entrepeneur towardsThe role and social responsibilities entrepeneur towards
The role and social responsibilities entrepeneur towardsNATASHYA AYUNIE
 
Adoption of the Material Flow Cost Accounting approach to integrate physical ...
Adoption of the Material Flow Cost Accounting approach to integrate physical ...Adoption of the Material Flow Cost Accounting approach to integrate physical ...
Adoption of the Material Flow Cost Accounting approach to integrate physical ...Filippo Tresca
 
Study of outbound logistics in Singapore shipping industry
Study of outbound logistics in Singapore shipping industryStudy of outbound logistics in Singapore shipping industry
Study of outbound logistics in Singapore shipping industrySoham Pablo
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Kiran Walimbe
 
Distribution Structure using outbound logistics
Distribution Structure using outbound logisticsDistribution Structure using outbound logistics
Distribution Structure using outbound logisticsPiyush Virmani
 
Material management flow and DRP
Material management flow and DRPMaterial management flow and DRP
Material management flow and DRPSana Fatima
 
Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0
Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0
Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0Vinay Prajapati
 
Manual on material_flow_cost_accounting_iso 14051-2014
Manual on material_flow_cost_accounting_iso 14051-2014Manual on material_flow_cost_accounting_iso 14051-2014
Manual on material_flow_cost_accounting_iso 14051-2014zubeditufail
 
Automation process -BMW case study
Automation process -BMW case studyAutomation process -BMW case study
Automation process -BMW case studyCALM-SUTRA
 
Material management & Inventory control
Material management & Inventory controlMaterial management & Inventory control
Material management & Inventory controlDushyant Kalchuri
 
Manufacturing process & assembly of automobile
Manufacturing process & assembly of automobileManufacturing process & assembly of automobile
Manufacturing process & assembly of automobileYashraj Patil
 
Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)vins049
 

Viewers also liked (20)

Scm
Scm Scm
Scm
 
flow production excecution
flow production excecutionflow production excecution
flow production excecution
 
The role and social responsibilities entrepeneur towards
The role and social responsibilities entrepeneur towardsThe role and social responsibilities entrepeneur towards
The role and social responsibilities entrepeneur towards
 
Adoption of the Material Flow Cost Accounting approach to integrate physical ...
Adoption of the Material Flow Cost Accounting approach to integrate physical ...Adoption of the Material Flow Cost Accounting approach to integrate physical ...
Adoption of the Material Flow Cost Accounting approach to integrate physical ...
 
Retail logistics1
Retail logistics1Retail logistics1
Retail logistics1
 
Study of outbound logistics in Singapore shipping industry
Study of outbound logistics in Singapore shipping industryStudy of outbound logistics in Singapore shipping industry
Study of outbound logistics in Singapore shipping industry
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
 
Distribution Structure using outbound logistics
Distribution Structure using outbound logisticsDistribution Structure using outbound logistics
Distribution Structure using outbound logistics
 
Le tra sap
Le tra sapLe tra sap
Le tra sap
 
Material management flow and DRP
Material management flow and DRPMaterial management flow and DRP
Material management flow and DRP
 
Vda process auditing
Vda process auditingVda process auditing
Vda process auditing
 
Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0
Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0
Outbound Logistics of AMUL and Liverpool (An Apparel Company, India) v2.0
 
Manual on material_flow_cost_accounting_iso 14051-2014
Manual on material_flow_cost_accounting_iso 14051-2014Manual on material_flow_cost_accounting_iso 14051-2014
Manual on material_flow_cost_accounting_iso 14051-2014
 
Automation process -BMW case study
Automation process -BMW case studyAutomation process -BMW case study
Automation process -BMW case study
 
Inbound outbound
Inbound outboundInbound outbound
Inbound outbound
 
Material management & Inventory control
Material management & Inventory controlMaterial management & Inventory control
Material management & Inventory control
 
Material Management & Inventory Management
Material Management & Inventory ManagementMaterial Management & Inventory Management
Material Management & Inventory Management
 
Materials management ppt
Materials management pptMaterials management ppt
Materials management ppt
 
Manufacturing process & assembly of automobile
Manufacturing process & assembly of automobileManufacturing process & assembly of automobile
Manufacturing process & assembly of automobile
 
Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)Basics of SAP for noobs (dummies)
Basics of SAP for noobs (dummies)
 

Similar to Automotive PLM Gates

H&T_Company Profile
H&T_Company ProfileH&T_Company Profile
H&T_Company ProfileGary Wang
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptxsonutyagi20
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplifiedcbb010
 
GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02Albert Escala
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Managerjaymehta2
 
Risk based conceptual design delivery
Risk based conceptual design deliveryRisk based conceptual design delivery
Risk based conceptual design deliveryNNE
 
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualLuisa Polanco
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability ConsultantMunirhaq
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engerkinguler
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentationmdmilward
 
KML Automotive Business
KML Automotive BusinessKML Automotive Business
KML Automotive BusinessKML Autoparts
 
Guidelines for creating a qm certificate for delivery in product lifecycle ma...
Guidelines for creating a qm certificate for delivery in product lifecycle ma...Guidelines for creating a qm certificate for delivery in product lifecycle ma...
Guidelines for creating a qm certificate for delivery in product lifecycle ma...ritenpatel
 
Webinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamerWebinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamerIntland Software GmbH
 
1 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-151 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-15Jim Rinehart
 
009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015atlmarketing
 

Similar to Automotive PLM Gates (20)

H&T_Company Profile
H&T_Company ProfileH&T_Company Profile
H&T_Company Profile
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
PS19 SQA Presentation
PS19 SQA PresentationPS19 SQA Presentation
PS19 SQA Presentation
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Using Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A SimplifiedUsing Doors® And Taug2® To Support A Simplified
Using Doors® And Taug2® To Support A Simplified
 
GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Manager
 
Risk based conceptual design delivery
Risk based conceptual design deliveryRisk based conceptual design delivery
Risk based conceptual design delivery
 
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_eng
 
Ppaptr
PpaptrPpaptr
Ppaptr
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentation
 
KML Automotive Business
KML Automotive BusinessKML Automotive Business
KML Automotive Business
 
RADIX Presentation
RADIX PresentationRADIX Presentation
RADIX Presentation
 
Guidelines for creating a qm certificate for delivery in product lifecycle ma...
Guidelines for creating a qm certificate for delivery in product lifecycle ma...Guidelines for creating a qm certificate for delivery in product lifecycle ma...
Guidelines for creating a qm certificate for delivery in product lifecycle ma...
 
Webinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamerWebinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamer
 
1 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-151 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-15
 
009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015
 
Mecosoft Product Development Lifecycle
Mecosoft Product Development LifecycleMecosoft Product Development Lifecycle
Mecosoft Product Development Lifecycle
 

Automotive PLM Gates

  • 1. Abe Salloum Automotive Needs and Requirements
  • 2. Content §  Automotive Needs and Requirements §  Product Life Cycle Management (PLM) §  PLM Gates Key Requirements §  PLM Summary
  • 3. Automotive Needs And Requirements VDA 2 QA of deliveries VDA 3 (Part 1 and 2) Reliability assurance at suppliers and OEM‘s VDA 4 and VDA 4.3 QA before serial production VDA 5 MSA VDA 6.3 Process Audit 2010 VDA 13 Development of SW band systems VDA 19 Technical cleanness VDA RGA Maturity level assurance for new parts incl. components requirements VDA RPP & FAA Robust production process AIAG 2nd edition APQP LEGAL REQUIREMENTS INTERNATIONAL REQ’TS AUTOMOTIVE OEM REQ’T AUTOMOTIVE SUPPLIER DIN ISO 9000 VDA, AIAG & ISO/TS-16949 QSK, special terms,.. SUPPLIER BUSINESS PROCESS Highly Regulated & Rigid Industry INPUT OUTPUT
  • 4. Project Related Requirements VDA 2 VDA 3 (1&2) VDA 4 & 4.3 VDA 13 VDA 19 VDA RPP Supplier selection, QA agreement, Production process and product approval Part 1 - Reliability management over PLM Part 2 - Methods and tools to estimate reliability Risk analyses (FMEA, FTA and SWOT, Poke Yoke) Development of software band systems – requirements for processes and products Technical cleanliness in assembly, environment, Logistics, Personnel and Assembly Equip. Robust Production Processes implemented, Evaluated, influencing factors, and Improvement
  • 5. Project Related Requirements VDA 2 VDA 3 (1&2) VDA 4 & 4.3 VDA 13 VDA 19 VDA RPP Supplier selection, QA agreement, Production process and product approval Part 1 - Reliability management over PLM Part 2 - Methods and tools to estimate reliability Risk analyses (FMEA, FTA and SWOT, Poke Yoke) Development of software band systems – requirements for processes and products Technical cleanliness in assembly, environment, Logistics, Personnel and Assembly Equip. Robust Production Processes implemented, Evaluated, influencing factors, and Improvement
  • 6. Project Related Requirements VDA 2 VDA 3 (1&2) VDA 4 & 4.3 VDA 13 VDA 19 VDA RPP Supplier selection, QA agreement, Production process and product approval Part 1 - Reliability management over PLM Part 2 - Methods and tools to estimate reliability Risk analysis (FMEA, FTA and SWOT, Poke Yoke) Development of software band systems – requirements for processes and products Technical cleanliness in assembly, environment, Logistics, Personnel and Assembly Equip. Robust Production Processes implemented, Evaluated, influencing factors, and Improvement
  • 7. Project Related Requirements VDA 2 VDA 3 (1&2) VDA 4 & 4.3 VDA 13 VDA 19 VDA RPP Supplier selection, QA agreement, Production process and product approval Part 1 - Reliability management over PLM Part 2 - Methods and tools to estimate reliability Risk analyses (FMEA, FTA and SWOT, Poke Yoke) Development of software band systems – requirements for processes and products Technical cleanliness in assembly, environment, Logistics, Personnel and Assembly Equip. Robust Production Processes implemented, Evaluated, influencing factors, and Improvement
  • 8. Project Related Requirements VDA 2 VDA 3 (1&2) VDA 4 & 4.3 VDA 13 VDA 19 VDA RPP Supplier selection, QA agreement, Production process and product approval Part 1 - Reliability management over PLM Part 2 - Methods and tools to estimate reliability Risk analyses (FMEA, FTA and SWOT, Poke Yoke) Development of software band systems – requirements for processes and products Technical cleanliness in assembly, environment, Logistics, Personnel and Assembly Equip. Robust Production Processes implemented, Evaluated, influencing factors, and Improvement
  • 9. Project Related Requirements VDA 2 VDA 3 (1&2) VDA 4 & 4.3 VDA 13 VDA 19 VDA RPP Supplier selection, QA agreement, Production process and product approval Part 1 - Reliability management over PLM Part 2 - Methods and tools to estimate reliability Risk analyses (FMEA, FTA and SWOT, Poke Yoke) Development of software band systems – requirements for processes and products Technical cleanliness in assembly, environment, Logistics, Personnel and Assembly Equip. Robust Production Processes implemented, Evaluated, influencing factors, and Improvement
  • 10. Product Life Cycle management (PLM) Development Delays Inevitably Lead to Poor SOP Performance – Contribution Margin Drainer [effort] [units] [time] SOP Product Development Gates Today’s Performance Needed Performance PLM Maturity Gates effort units Important Fact:
  • 11. PLM Gating Process Off-Process A B C D SOP MP ELV Home Location 100 80 60 40 20 DesignReadiness Mass Production Prototype Off-tool End-of-Life Vehicles Start of Production Product Development Gates Management Support is Paramount at Gate Reviews – Removing Roadblocks Important Fact:
  • 12. Prototype Gate Key Requirements A B C D SOP MP ELV 100 80 60 40 20 DesignReadiness Prototype Product Development Gates Planning and Resources Allocation is Paramount at This Gate – Quality not Quantity §  Customer Requirements §  Feasibility Study §  ESI §  Design Goals §  Quality Plan §  Lessons Learned §  Teams and Tools! Important Fact:
  • 13. Off Tool Gate Key Requirements 100 80 60 40 20 DesignReadiness Prototype Product Development Gates In Depth and on Time Design Reviews Will Save the Organization Significant Embarrassment Down the Road Off-tool §  Design Verification §  Critical Char Ctrl §  Supplier Selection & Award §  dFMEA §  DFA, DFM §  Industrialization Concept A B C D SOP MP ELV Important Fact:
  • 14. Off Process Gate Key Requirements 10 0 80 60 40 20 DesignReadiness Prototype Product Development Gates Product Industrialization - Optimized Cell Design and NO Significant Changes Off-tool §  pFMEA §  Process Capability plan §  MSA §  Process Optimization §  Supplier Readiness Off-Process A B C D SOP MP ELV Important Fact:
  • 15. Home Location Gate Key Requirements 100 80 60 40 20 DesignReadiness Prototype Product Development Gates Equipments Validation, Material Flow, Line Readiness Leading to Successful PPAP Off-tool § PFD § Process Verification § Process Control Plan § EE training § Capability study § PPAP Off-Process Home Location A B C D SOP MP ELV Important Fact:
  • 16. SOP Gate Key Gate Requirements 100 80 60 40 20 DesignReadiness Prototype Product Development Gates Safe Launch and Quick Response is Key During Production Ramp up Off-tool §  R@R Volume Ramp §  EE Readiness §  Safe Launch §  Launch Voice of Customer Off-Process Home Location Start of Production A B C D SOP MP ELV Important Fact:
  • 17. Mass-Production Gate Key Req’ts 100 80 60 40 20 DesignReadiness Prototype Product Development Gates Variation Control and Continuous Improvements Off-tool §  Variations Control §  Delivered Quality §  Analysis TAT Off-Process Home Location Start of Production Mass Production A B C D SOP MP ELV Important Fact:
  • 18. ELV Gate Key Requirements 100 80 60 40 20 DesignReadiness Prototype Product Development Gates Proper Materials Disposition – Good Corporate Stewardship Off-tool § Warranty Mgmt. § Service agreement § HAZMAT Off-Process Home Location Start of Production Mass Production A B C D SOP MP ELV End-of-Life Vehicles Important Fact:
  • 19. Summary 1.  Legal, International and OEM specific regulations governs the Automotive Industry 2.  Vehicle manufacturers SOP doesn’t move 3.  Delays in the PLM process could lead to exclusion from entire product cycle and will impact financial performance 4.  Management visibility and involvement is paramount in order to preserve margins and credibility 5.  Protecting customer launch is key to success and repeat business 6.  Engage customers in early discussion on P&P changes 7.  Do not get caught unaware - develop own PLM process and Automotive specific technology roadmap