SlideShare a Scribd company logo
1 of 14
Download to read offline
Portfolio of Jay Mehta
E-mail: jay.mehta2@gmail.com Tel: (416) -398-3718
Short Resume
Master of Design Industrial Design Center,
(Industrial Design) Indian Institute Of Technology
Mumbai, India
Bachelor of Engineering M.S. University, Baroda
(Mechanical Engineering)
Professional Affiliation Member of Professional Engineers Ontario.
(PEO)
Technical Skills
SolidWorks 2011, Pro Engineer Wildfire 3.0, Inventor 2010, Catia V5 R 19,
AutoCad 2011
Engineering and Product Development Skills
I am an Engineering Manager in a fast-paced tier 2 automotive injection
moulding environment with excellent knowledge of
 Materials (plastics)
 Injection moulding process
 Primary and secondary tooling and
 Product development, and prototype testing.
 New Program launch procedures
I have a proven success record in providing manufactureable, material
saving, cost effective, and time efficient engineering solutions.
Managerial Skills
I also possess strong analytical, organizational, communication skills,
and have the ability to manage multiple programs effectively in a multi-
disciplinary team environment. I believe I quickly establish great rap-
port with staff, vendors, and clients. I work well in team environments,
as well as independently.
AutomotiveProducts Engineering Manager Nov. 2005 to May 2008
Design Engineer Nov. 2002 to Oct. 2005
ISO/TS 16949:20002 Certified Company
Tier 2 Automotive Injection Moulder
Organizational Chart at Tri-Star Plastics Inc.
Executed product planning, product design, and product development, of follow-
ing new product program for Chevrolet SSR and Silverado program through
MSB/Tarxine Automotive Products Ltd. For ABC Group
Task include:
 Composed Project Plan and PPAP documents using
APQP tools. Liaised with customer’s engineering, qual-
ity and marketing personals.
 Inspecting and Improving moulds to eliminate defects
and impart process robustness.
 Set up work cells, define quality parameters, and proc-
ess control .
 Streamline operations.
 Co-ordinate with the customers engineers quality
managers.
 Calculated Cpk’s. and preformed process capability
studies.
AutomotiveProducts
Liaised with:
 Erwin de Vlas - Quality Manager (ABC group)
 Saud Ahmed - Project Engineer (ABC group)
 Michael Scraba - Quality Engineer (MSB Plastics)
 Joe Wolak - General Manager( Tarxien)
AutomotiveProducts
Executed Chevrolet SSR and Silverado program through MSB
Plastics/Tarxine Automotive Products Ltd. For ABC Group
Task Included:
 Design and development
 Tool built
 Validate the product
 Composed APQP, PPAP, (part approval ) docu-
mentation and liaison with customers engi-
neers.
 Design and Set up product testing
The task was to design a range of Brake and Fuel
pipe retainer clips for various GM car models.
Some of the GM car models on which these clips
are used are :
GMX 365/367/ 211/23(Grand
Prix, Buick Allure, Impala, and Monte Carlo).
Executed product planning, product design, and product development,
of following new product programs for Atlas Fluid Systems (Martinrea
Industries Ltd.)
AutomotiveProducts
Liaised with:
 David W. Burton -Director of Mfg.
 Joe Wakula— General Manager
 Don Hale– Engineering
Manager
Executed product planning, product design, and product development,
of following new product program for Chevrolet Impala (GMX 211) for
Polycon Industries
Task included:
 Collecting 3D CAD data, understanding client requirements,
and getting quotes for tool build.
 Laying down tool specifications for robust process capabili-
ties.
 Co-coordinating tool build, running trials, and validating
the tool and process.
 Composed PPAP part submission and approval documen-
tations. Performed tool capability studies, and calculated
Cpk’s.
 Setting up work cell, laying down quality norms, and train-
ing quality technicians.
AutomotiveProducts
Liaised with:
 Sinisa Andrasic - Program Manager
 Dwight Buckle— Sr. Product Engineer
 Mike Emeneau- Supplier Q A Liaison
 Jayson Charette—Omega Tool
Executed product planning, and product development, of Omron seat-
ing switches for GMX245 6 -Way Seat Switches
Task include:
 Collecting 3D CAD data, understanding
client requirements, and getting quotes
for tool build.
 Laying down tool specifications for ro-
bust process capabilities.
 Co-coordinating tool build, running tri-
als, and validating the tool and process.
 Composed APQP and PPAP documenta-
tion for over 20 different products and
got Omron’s approval over a period of 5
years.
 Setting up work cell, laying down qual-
ity norms and training quality techni-
cians.
AutomotiveProducts
Liaised with:
 Warren Van Drine— Commodity Manager
 Walter Lazaruk— Production Supervisor
 Craig Osmond— Q A Manager
Task Included:
 Identifying the design flaws with the smooth operation of
the automated assembly , taking up the problems with the
supplier, and modifying the machine.
 Set-up the work cell for efficient operation, composing and
implementing operating procedures, and training the op-
erators.
 Liaised and negotiated with the vendor to rectify the short
coming without increasing cost or delay the work.
Executed product planning, product design, and product development, of GMT
600 Door Lock Assembly system for ITW Deltar Canada
AutomotiveProducts
Liaised with Vendor:
 Craig Engineers Ltd.
Task Included:
 Identifying the root cause of part fail-
ure, and modifications needed in de-
sign to prevent premature part fail-
ure.
 Convinced customer for needed engi-
neering changes.
 Liaised and negotiated with the ven-
Executed product planning, product design, and product development, of Ford
Excursion Applique for Dortec Industries. Also resolved problem of pre-mature
part failure
AutomotiveProducts
Liaised with customer and mould
vendor:
 Dortec Industries
 Mantec Tool and Mould Inc.
Lifter for forming this undercut area, is
getting grabbed and also has a play.
While moving, it distorts the adjoining
surface area, and hence the vestige
mark.
It was observed that the lifter forming
the undercut area of the part at 2 places
 Overhead pneumatic feed line for complete plant
 Silo to bulk store pellets and resin granules
 Overhead crane for 30 ton capacity
 Machine installation Krauss Maffei 550 and 720 and Van Dorn-Demag 1760 and
2200
 Plant layout improvements
Oversaw Installation and commissioning of following plant accessoriesAutomotiveProducts
ROLE PLAYED:
Laid down specifications, evaluated quotation, liaised and negotiated
with vendors
 Tool repair and rectification cost
 Preventive maintenance
 Machine down time
 Part rejection
 Productivity report of secondary operations
 Inter-department man-power deployment
Periodically monitored and review of following reports with aim to continu-
ously improve plant’s operating efficiency
AutomotiveProducts
 Team member to implement ISO/TS 16949:20002 Certification.
 Composed R& D documentation for SR&ED tax credits from the financial
year 2000 to present. Participated in the audit and interview process. The
company received nearly its entire claim as a result. Lead a team of Re-
search and Development in conducting experimental research on more
than 25 products. Company qualified claims worth 8.5 million since then.
over saw implementation of following
AutomotiveProducts

More Related Content

What's hot

2016 Resume_Quality Engineer v3
2016 Resume_Quality Engineer v32016 Resume_Quality Engineer v3
2016 Resume_Quality Engineer v3
Wes Louie
 
Current Resume 1-25-2016
Current Resume 1-25-2016 Current Resume 1-25-2016
Current Resume 1-25-2016
Dutton W
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
Shanmu S
 
Tool room & engineering manager
Tool room & engineering managerTool room & engineering manager
Tool room & engineering manager
rislam2008
 
Priyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career SnapshotPriyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career Snapshot
priyanka shrivastava
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
arvindblr
 
Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
Utpal BOSE
 
Resume - Manufacturing Engineer
Resume - Manufacturing EngineerResume - Manufacturing Engineer
Resume - Manufacturing Engineer
Shameer KC
 
Nagesh babu_CV_July_Fx2016
Nagesh babu_CV_July_Fx2016 Nagesh babu_CV_July_Fx2016
Nagesh babu_CV_July_Fx2016
Nagesh Babu h k
 
CV Anjani kumar CMM & QA Engineer
CV Anjani kumar CMM & QA Engineer  CV Anjani kumar CMM & QA Engineer
CV Anjani kumar CMM & QA Engineer
Anjani kumar
 
All Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - SupportAll Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - Support
Derek Gresler
 
Resume-Avin Gureja
Resume-Avin GurejaResume-Avin Gureja
Resume-Avin Gureja
Avin Gureja
 

What's hot (20)

Engels_Resume
Engels_ResumeEngels_Resume
Engels_Resume
 
2016 Resume_Quality Engineer v3
2016 Resume_Quality Engineer v32016 Resume_Quality Engineer v3
2016 Resume_Quality Engineer v3
 
Current Resume 1-25-2016
Current Resume 1-25-2016 Current Resume 1-25-2016
Current Resume 1-25-2016
 
Rupali Arora(CV)
Rupali Arora(CV)Rupali Arora(CV)
Rupali Arora(CV)
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
 
Tool room & engineering manager
Tool room & engineering managerTool room & engineering manager
Tool room & engineering manager
 
Priyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career SnapshotPriyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career Snapshot
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
 
Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
 
Resume - Manufacturing Engineer
Resume - Manufacturing EngineerResume - Manufacturing Engineer
Resume - Manufacturing Engineer
 
Resume-Aero
Resume-AeroResume-Aero
Resume-Aero
 
Resume_Pranab Kumar Samanta
Resume_Pranab Kumar SamantaResume_Pranab Kumar Samanta
Resume_Pranab Kumar Samanta
 
Nagesh babu_CV_July_Fx2016
Nagesh babu_CV_July_Fx2016 Nagesh babu_CV_July_Fx2016
Nagesh babu_CV_July_Fx2016
 
CV Anjani kumar CMM & QA Engineer
CV Anjani kumar CMM & QA Engineer  CV Anjani kumar CMM & QA Engineer
CV Anjani kumar CMM & QA Engineer
 
din_CVM2[2]
din_CVM2[2]din_CVM2[2]
din_CVM2[2]
 
QA ENGINEER new
QA ENGINEER newQA ENGINEER new
QA ENGINEER new
 
KARTHIK CV
KARTHIK CVKARTHIK CV
KARTHIK CV
 
All Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - SupportAll Interior Customer - Boeing - Manufacturer - Support
All Interior Customer - Boeing - Manufacturer - Support
 
updated CV (2)
updated CV (2)updated CV (2)
updated CV (2)
 
Resume-Avin Gureja
Resume-Avin GurejaResume-Avin Gureja
Resume-Avin Gureja
 

Similar to Jay Portfolio - Engineering Manager

INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
SUYASH TRIVEDI
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
guestc9e91c
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
Brendan Salmond
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
Gary Shelton
 
Tapan_Pandya_Resume
Tapan_Pandya_ResumeTapan_Pandya_Resume
Tapan_Pandya_Resume
Tapan Pandya
 

Similar to Jay Portfolio - Engineering Manager (20)

141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume of mechanical engineer
Resume of mechanical engineerResume of mechanical engineer
Resume of mechanical engineer
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
 
Rich Belfiore 2015
Rich Belfiore 2015Rich Belfiore 2015
Rich Belfiore 2015
 
Vivek_Kukade
Vivek_KukadeVivek_Kukade
Vivek_Kukade
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
Tapan_Pandya_Resume
Tapan_Pandya_ResumeTapan_Pandya_Resume
Tapan_Pandya_Resume
 
Mark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost Resume For Upload
Mark Yost Resume For Upload
 
Gokula_Gopinath_Resume
Gokula_Gopinath_ResumeGokula_Gopinath_Resume
Gokula_Gopinath_Resume
 
Kumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-ResumeKumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-Resume
 
Mark young resume_2016_may
Mark young resume_2016_mayMark young resume_2016_may
Mark young resume_2016_may
 
Moldflow Analysis Presentation
Moldflow Analysis PresentationMoldflow Analysis Presentation
Moldflow Analysis Presentation
 

Jay Portfolio - Engineering Manager

  • 1. Portfolio of Jay Mehta E-mail: jay.mehta2@gmail.com Tel: (416) -398-3718
  • 2. Short Resume Master of Design Industrial Design Center, (Industrial Design) Indian Institute Of Technology Mumbai, India Bachelor of Engineering M.S. University, Baroda (Mechanical Engineering) Professional Affiliation Member of Professional Engineers Ontario. (PEO) Technical Skills SolidWorks 2011, Pro Engineer Wildfire 3.0, Inventor 2010, Catia V5 R 19, AutoCad 2011 Engineering and Product Development Skills I am an Engineering Manager in a fast-paced tier 2 automotive injection moulding environment with excellent knowledge of  Materials (plastics)  Injection moulding process  Primary and secondary tooling and  Product development, and prototype testing.  New Program launch procedures I have a proven success record in providing manufactureable, material saving, cost effective, and time efficient engineering solutions. Managerial Skills I also possess strong analytical, organizational, communication skills, and have the ability to manage multiple programs effectively in a multi- disciplinary team environment. I believe I quickly establish great rap- port with staff, vendors, and clients. I work well in team environments, as well as independently.
  • 3. AutomotiveProducts Engineering Manager Nov. 2005 to May 2008 Design Engineer Nov. 2002 to Oct. 2005 ISO/TS 16949:20002 Certified Company Tier 2 Automotive Injection Moulder
  • 4. Organizational Chart at Tri-Star Plastics Inc.
  • 5. Executed product planning, product design, and product development, of follow- ing new product program for Chevrolet SSR and Silverado program through MSB/Tarxine Automotive Products Ltd. For ABC Group Task include:  Composed Project Plan and PPAP documents using APQP tools. Liaised with customer’s engineering, qual- ity and marketing personals.  Inspecting and Improving moulds to eliminate defects and impart process robustness.  Set up work cells, define quality parameters, and proc- ess control .  Streamline operations.  Co-ordinate with the customers engineers quality managers.  Calculated Cpk’s. and preformed process capability studies. AutomotiveProducts Liaised with:  Erwin de Vlas - Quality Manager (ABC group)  Saud Ahmed - Project Engineer (ABC group)  Michael Scraba - Quality Engineer (MSB Plastics)  Joe Wolak - General Manager( Tarxien)
  • 6. AutomotiveProducts Executed Chevrolet SSR and Silverado program through MSB Plastics/Tarxine Automotive Products Ltd. For ABC Group
  • 7. Task Included:  Design and development  Tool built  Validate the product  Composed APQP, PPAP, (part approval ) docu- mentation and liaison with customers engi- neers.  Design and Set up product testing The task was to design a range of Brake and Fuel pipe retainer clips for various GM car models. Some of the GM car models on which these clips are used are : GMX 365/367/ 211/23(Grand Prix, Buick Allure, Impala, and Monte Carlo). Executed product planning, product design, and product development, of following new product programs for Atlas Fluid Systems (Martinrea Industries Ltd.) AutomotiveProducts Liaised with:  David W. Burton -Director of Mfg.  Joe Wakula— General Manager  Don Hale– Engineering Manager
  • 8. Executed product planning, product design, and product development, of following new product program for Chevrolet Impala (GMX 211) for Polycon Industries Task included:  Collecting 3D CAD data, understanding client requirements, and getting quotes for tool build.  Laying down tool specifications for robust process capabili- ties.  Co-coordinating tool build, running trials, and validating the tool and process.  Composed PPAP part submission and approval documen- tations. Performed tool capability studies, and calculated Cpk’s.  Setting up work cell, laying down quality norms, and train- ing quality technicians. AutomotiveProducts Liaised with:  Sinisa Andrasic - Program Manager  Dwight Buckle— Sr. Product Engineer  Mike Emeneau- Supplier Q A Liaison  Jayson Charette—Omega Tool
  • 9. Executed product planning, and product development, of Omron seat- ing switches for GMX245 6 -Way Seat Switches Task include:  Collecting 3D CAD data, understanding client requirements, and getting quotes for tool build.  Laying down tool specifications for ro- bust process capabilities.  Co-coordinating tool build, running tri- als, and validating the tool and process.  Composed APQP and PPAP documenta- tion for over 20 different products and got Omron’s approval over a period of 5 years.  Setting up work cell, laying down qual- ity norms and training quality techni- cians. AutomotiveProducts Liaised with:  Warren Van Drine— Commodity Manager  Walter Lazaruk— Production Supervisor  Craig Osmond— Q A Manager
  • 10. Task Included:  Identifying the design flaws with the smooth operation of the automated assembly , taking up the problems with the supplier, and modifying the machine.  Set-up the work cell for efficient operation, composing and implementing operating procedures, and training the op- erators.  Liaised and negotiated with the vendor to rectify the short coming without increasing cost or delay the work. Executed product planning, product design, and product development, of GMT 600 Door Lock Assembly system for ITW Deltar Canada AutomotiveProducts Liaised with Vendor:  Craig Engineers Ltd.
  • 11. Task Included:  Identifying the root cause of part fail- ure, and modifications needed in de- sign to prevent premature part fail- ure.  Convinced customer for needed engi- neering changes.  Liaised and negotiated with the ven- Executed product planning, product design, and product development, of Ford Excursion Applique for Dortec Industries. Also resolved problem of pre-mature part failure AutomotiveProducts Liaised with customer and mould vendor:  Dortec Industries  Mantec Tool and Mould Inc. Lifter for forming this undercut area, is getting grabbed and also has a play. While moving, it distorts the adjoining surface area, and hence the vestige mark. It was observed that the lifter forming the undercut area of the part at 2 places
  • 12.  Overhead pneumatic feed line for complete plant  Silo to bulk store pellets and resin granules  Overhead crane for 30 ton capacity  Machine installation Krauss Maffei 550 and 720 and Van Dorn-Demag 1760 and 2200  Plant layout improvements Oversaw Installation and commissioning of following plant accessoriesAutomotiveProducts ROLE PLAYED: Laid down specifications, evaluated quotation, liaised and negotiated with vendors
  • 13.  Tool repair and rectification cost  Preventive maintenance  Machine down time  Part rejection  Productivity report of secondary operations  Inter-department man-power deployment Periodically monitored and review of following reports with aim to continu- ously improve plant’s operating efficiency AutomotiveProducts
  • 14.  Team member to implement ISO/TS 16949:20002 Certification.  Composed R& D documentation for SR&ED tax credits from the financial year 2000 to present. Participated in the audit and interview process. The company received nearly its entire claim as a result. Lead a team of Re- search and Development in conducting experimental research on more than 25 products. Company qualified claims worth 8.5 million since then. over saw implementation of following AutomotiveProducts