Page 1 of 5
Naeem Altaf Chughtai
Senior Quantity Surveyor
Cell # +92 334 9362055
naeemaltaf1976@gmail.com
Skype (naeem.altaf76)
Education
 Government Polytechnic Institute Layyah
Punjab – Pakistan
B-Tech & Associate Engineer (CIVIL) 1992-1995
Professional Training  Green Line – Kuwait
(i) Attended Training Courses about “Estimation of Quantities in
construction Projects” with British Advisors in Kuwait.
 National Institute Of Design & Analyses
(ii) Attended Training Courses about “Building & Road Quantity
Survey” ( Grade Secured A+ )
 PDIL– Pakistan
(iii) Attended Training Courses about “HSE in construction Projects”
(iv) Attended Training Courses about “Primavera (P3) in construction
Projects”
(v) Attended Training Courses about “Habits of Effectiveness”
(vi) Attended Training Courses about “Organizational Change
Management”
 D-Tech – Pakistan
Word, Excel, Auto Cad. Eagle Point (Road Calc), Primavera (P3),SAP
2004
2011
No. of Year Experience
GCC Experience
(Kuwait)
18 Years
05 Years
Employment History Present
Senior Quantity Surveyor
Presson Descon International (Pvt.) Limited
Oil & Gas
Previous
Quantity Surveyor (Civil)
Green Line Co. (Kuwait)
Quantity Surveyor
Engineering Consultants international Co. Pak
Quantity Surveyor
Echo West International. Pak
Quantity Surveyor
Angola Enterprises. Pak
Quantity Surveyor
SINACO Engineers (Pvt.) Pak
2008 to date
2003 – 2008
2002 – 2003
2002 – 2002
1999 – 2002
1995 – 1999
Page 2 of 5
Honors & Awards
Objective
Best performance certificate as Senior Quantity Surveyor from Project SE/47
and SE/63 Kuwait.
 National Institute Of Design & Analyses
Attended Training Courses about “Building & Road Quantity
Survey” ( Grade Secured A+ )
1.Monthly Project Valuations & Final Accounts
I have been thoroughly involved to claim the works done based on the Project
BOQ, prepare monthly
Valuations and get it certified as soon possible. With my present employer I
have been associated concurrently with 3 projects. Besides this I am responsible
for Final Accounts of the completed projects including the As-built Drawings,
2 Financial Reports, Cost Control & Budget Preparation
I am directly involved with the monthly project financial reports. I am responsible
for reconciliation of work done for the previous month against monthly
valuations. Further, it’s my task to consult and prepare, in collaboration with
project manager, to advise senior management, on financial reports for current
month. I am actively involved in budget preparation and monitoring of the
projects for the purpose of cost controlling. It is done for all the major activities
based on the Cost Reports which are prepared on monthly basis for senior
management's review. Site Cost Reports includes reports on individual's
performance (Site Engineers, Foreman etc.), Material Reconciliations &
Wastage and Financial Situation of the projects.
3 Contractual Claims
I am actively involved with the contractual claims related to the company
projects. I am currently assisting the Contract’s Manager to assess the
possibilities for future claims.
4 Buildup of New Rates – Variations
I am actively involved and responsible for Variations and new rates analysis to
prepare and get approval from the consultants/client for all new works/variations
in the projects.
5 Project Recap
I have been actively involved in preparation of cash-flow charts, delivery
schedules, monthly monitoring etc.
Sub-Contractors Liaison and Valuations
I am directly responsible for inviting quotations for sub-contractors and liaise with
them till the finalization of the sub-contract agreements More than (5+13) = 18
years of experience in the Construction Industry of Quantity Surveyor in Kuwait
and Pakistan
Page 3 of 5
Career Highlights Presson Descon International Private Limited (PDIL) approved Senior
Quantity Surveyor their CPF & GPF Oil and Gas (MOL) & (PPL) Project.
(Pakistan).
Ministry of public works (MPW) approved Quantity Surveyor their sewerage
renovation project SE/47 & SE/63. (Kuwait).
National Highway (NHA) Authority approved Quantity Surveyor their Karachi
Northern Bypass Project (Package I). (Pakistan).
Communication & Works Department (PMU) approved Quantity Surveyor their
Lahore Ring Road Project. (Pakistan).
Worked as an integral link between Client, Consultant and Architect s.
Capable to review Construction drawings/ Contract documents, computing
quantity, evaluation of submittals from sub contractors and suggesting
alternatives, Co-ordination work with the Construction Management with respect
to the cost implication & successful completion on the project in time
Experienced in wide range of construction activities, familiar with international
standards.
/Personal Information Date of Birth : November 10, 1976
Nationality : Pakistani
Languages
Passport No
International Driving
License
:
:
:
English, Urdu, Arabic
AG1771982
KUWAIT & PAKISTAN
Experience Profile Present
Senior Quantity Surveyor
Presson Descon International (Pvt.) Limited
Project: Manzalai Field Development Surface Facilities (MOL) & ADHI
LPG/NGL Recovery Plant III (PPL)
Ø value of the projects is USD 120 million
Ø value of the projects is USD 220 million
Ø value of the projects is USD 100 million
Responsibility:
Responsible for scrutiny of Contract documents, reviewing Contractors
Interim payment application against all supporting documents. Preparation
of payment certificates, Project evaluation and monitoring progress of
Contractors work, keeping track of variations, Correspondence on
contractual matters, suggesting alternatives for cost implication, Rate
Analysis negotiation with Contractor to finalize the non-BOQ items.
Floating enquiry for invoices.
Verification/checking of As Built drawings submitted by the Contractor
against the shop drawings
Review of Final payment Certificate to the Contractor
Page 4 of 5
Previous
Senior Quantity Surveyor (Civil)
Green Line Co. (Kuwait)
Project: Kuwait Renovation Phase VII & VIII, SE/47 &SE/63
Ø value of the projects is KD 14 million & 10 million
Replacement of existing Sewers, manholes and House Connections in
Sabahiya residential area and construction of a major trunk sewer
1000mm dia of 7000m including microtunnelling construction of 5500m.
Total length of sewer is 87000m and total no manholes is 2800 nos., sizes
from 1000mm to 2000mm dia at the depth from 1.5m to 13.5m and total
3500 nos. of house connections.
Kuwait Sewerage Renovation Phase VII SE/63
Total value of the project is KD 10 million. Replacement of existing
Sewers, manholes and House Connections in Bneid Al Gar, Soor street &
Fahahell residential area and construction of a major trunk sewer 1600mm
dia including microtunnelling construction of 14600m. Total length of
sewer is 32000m and total no manholes is 951 nos., sizes from 1000mm
to 2000mm dia at the depth from 1.5m to 13.5m and total 1500 nos. of
house connections.
Responsibility:
Responsible for scrutiny of Contract documents, preparation of bill of
quantities, budget, monitoring cost & invoicing, correspondence of
contractual mattes, contract negotiation, preparation of rate analysis for
non BOQ items, keeping track of variation, preparation extra claims
floating enquires & submittals to the Client/Consultant, preparation of
monthly running payments of the entire projects to submit to the (Gulf
Consults international Kuwait).
Quantity Surveyor
Engineering Consultants international Co. Pak
Project: Karachi Northern Bypass
Ø Project cost. 1598 million (PR)
Ø 4- lane Karachi Northern Bypass Project (Package I) (32 Km long).
Ø Flay Over (6 No).
Ø Bridges (8 No).
Ø Box Culverts (78 No).
Responsibility:
Responsible for scrutiny of Contract documents, reviewing Contractors Interim
payment application against all supporting documents. Preparation of payment
certificates, Project evaluation and monitoring progress of Contractors work,
keeping track of variations, Correspondence on contractual matters, suggesting
alternatives for cost implication, Rate Analysis negotiation with Contractor to
finalize the non-BOQ items.
Quantity Surveyor
Echo West International. Pak
Project: Hala to Moro
Ø Project cost. 452 million (RS)
Page 5 of 5
Ø 2- lane Hala – Moro Additional Carriage way 109 Km long).
Ø 4- lane Hala – Moro Bypass Additional Carriage way (22 Km long).
Responsibility:
Responsibilities were preparation of monthly running payments of the entire
projects to submit to the (Engineering Consultants international),
correspondence on contractual matters, keeping track of variation and
documentation of the same, preparation of daily
Progress reports on works, labour employment, material received on site, pricing
of non BOQ items, interim payment certificates, escalation bill and draw X-
Section in (Road Calc) & Auto Cad etc.
Quantity Surveyor
Angola Enterprises. Pak
Project: Defiance road & Farm to Market Roads
Ø 4- lane Defiance road (4 KM long)
Ø 4- lane Access road to New Airport Terminal (8 KM long)
Ø Farm to Market Roads (4*32=128 KM long)
Responsibility
Worked as In charge of entire civil works. The responsibilities were checking
contract documents for any discrepancies, informing Clients of such and
obtaining clarification with additional vital information, preparation of sketches
and submittals and obtaining approval from
Consultant, co-coordinating work between Subcontractor, construction
Management team and Consultant for various contracts, keeping record of
checklist, checking levels & coordinating, set control, quality control attending
weekly progress meetings, monitoring various activities with respect to CPM
program, allocation of manpower, equipment & material, preparation of monthly
running payments of the entire projects to submit to the (National Engineering
Consultants international) Consisting of , escalation bill and earth work draw X-
Section in (Road Calc) & Auto Cad , Concrete works; structures asphalt
pavements and pavement structure etc.
Quantity Surveyor
SINACO Engineers (Pvt.) Pak
Project:
Ø Attock Industrial Products Ltd., Rawat Rawalpindi, including buildings and
roads.
Ø Thermal Power Station (Housing Complex including internal roads, water
supply, sewerage, drainage, parking lots)
Ø Link roads and housing complex in Multan.
Responsibility
Duties include the estimation of quantities for earthwork, buildings, drainage
works, concrete structures and pavement works. Preparation of bills for
completed works of the project during every month.

CV Senior Quantity Surveyor(CIVIL)

  • 1.
    Page 1 of5 Naeem Altaf Chughtai Senior Quantity Surveyor Cell # +92 334 9362055 naeemaltaf1976@gmail.com Skype (naeem.altaf76) Education  Government Polytechnic Institute Layyah Punjab – Pakistan B-Tech & Associate Engineer (CIVIL) 1992-1995 Professional Training  Green Line – Kuwait (i) Attended Training Courses about “Estimation of Quantities in construction Projects” with British Advisors in Kuwait.  National Institute Of Design & Analyses (ii) Attended Training Courses about “Building & Road Quantity Survey” ( Grade Secured A+ )  PDIL– Pakistan (iii) Attended Training Courses about “HSE in construction Projects” (iv) Attended Training Courses about “Primavera (P3) in construction Projects” (v) Attended Training Courses about “Habits of Effectiveness” (vi) Attended Training Courses about “Organizational Change Management”  D-Tech – Pakistan Word, Excel, Auto Cad. Eagle Point (Road Calc), Primavera (P3),SAP 2004 2011 No. of Year Experience GCC Experience (Kuwait) 18 Years 05 Years Employment History Present Senior Quantity Surveyor Presson Descon International (Pvt.) Limited Oil & Gas Previous Quantity Surveyor (Civil) Green Line Co. (Kuwait) Quantity Surveyor Engineering Consultants international Co. Pak Quantity Surveyor Echo West International. Pak Quantity Surveyor Angola Enterprises. Pak Quantity Surveyor SINACO Engineers (Pvt.) Pak 2008 to date 2003 – 2008 2002 – 2003 2002 – 2002 1999 – 2002 1995 – 1999
  • 2.
    Page 2 of5 Honors & Awards Objective Best performance certificate as Senior Quantity Surveyor from Project SE/47 and SE/63 Kuwait.  National Institute Of Design & Analyses Attended Training Courses about “Building & Road Quantity Survey” ( Grade Secured A+ ) 1.Monthly Project Valuations & Final Accounts I have been thoroughly involved to claim the works done based on the Project BOQ, prepare monthly Valuations and get it certified as soon possible. With my present employer I have been associated concurrently with 3 projects. Besides this I am responsible for Final Accounts of the completed projects including the As-built Drawings, 2 Financial Reports, Cost Control & Budget Preparation I am directly involved with the monthly project financial reports. I am responsible for reconciliation of work done for the previous month against monthly valuations. Further, it’s my task to consult and prepare, in collaboration with project manager, to advise senior management, on financial reports for current month. I am actively involved in budget preparation and monitoring of the projects for the purpose of cost controlling. It is done for all the major activities based on the Cost Reports which are prepared on monthly basis for senior management's review. Site Cost Reports includes reports on individual's performance (Site Engineers, Foreman etc.), Material Reconciliations & Wastage and Financial Situation of the projects. 3 Contractual Claims I am actively involved with the contractual claims related to the company projects. I am currently assisting the Contract’s Manager to assess the possibilities for future claims. 4 Buildup of New Rates – Variations I am actively involved and responsible for Variations and new rates analysis to prepare and get approval from the consultants/client for all new works/variations in the projects. 5 Project Recap I have been actively involved in preparation of cash-flow charts, delivery schedules, monthly monitoring etc. Sub-Contractors Liaison and Valuations I am directly responsible for inviting quotations for sub-contractors and liaise with them till the finalization of the sub-contract agreements More than (5+13) = 18 years of experience in the Construction Industry of Quantity Surveyor in Kuwait and Pakistan
  • 3.
    Page 3 of5 Career Highlights Presson Descon International Private Limited (PDIL) approved Senior Quantity Surveyor their CPF & GPF Oil and Gas (MOL) & (PPL) Project. (Pakistan). Ministry of public works (MPW) approved Quantity Surveyor their sewerage renovation project SE/47 & SE/63. (Kuwait). National Highway (NHA) Authority approved Quantity Surveyor their Karachi Northern Bypass Project (Package I). (Pakistan). Communication & Works Department (PMU) approved Quantity Surveyor their Lahore Ring Road Project. (Pakistan). Worked as an integral link between Client, Consultant and Architect s. Capable to review Construction drawings/ Contract documents, computing quantity, evaluation of submittals from sub contractors and suggesting alternatives, Co-ordination work with the Construction Management with respect to the cost implication & successful completion on the project in time Experienced in wide range of construction activities, familiar with international standards. /Personal Information Date of Birth : November 10, 1976 Nationality : Pakistani Languages Passport No International Driving License : : : English, Urdu, Arabic AG1771982 KUWAIT & PAKISTAN Experience Profile Present Senior Quantity Surveyor Presson Descon International (Pvt.) Limited Project: Manzalai Field Development Surface Facilities (MOL) & ADHI LPG/NGL Recovery Plant III (PPL) Ø value of the projects is USD 120 million Ø value of the projects is USD 220 million Ø value of the projects is USD 100 million Responsibility: Responsible for scrutiny of Contract documents, reviewing Contractors Interim payment application against all supporting documents. Preparation of payment certificates, Project evaluation and monitoring progress of Contractors work, keeping track of variations, Correspondence on contractual matters, suggesting alternatives for cost implication, Rate Analysis negotiation with Contractor to finalize the non-BOQ items. Floating enquiry for invoices. Verification/checking of As Built drawings submitted by the Contractor against the shop drawings Review of Final payment Certificate to the Contractor
  • 4.
    Page 4 of5 Previous Senior Quantity Surveyor (Civil) Green Line Co. (Kuwait) Project: Kuwait Renovation Phase VII & VIII, SE/47 &SE/63 Ø value of the projects is KD 14 million & 10 million Replacement of existing Sewers, manholes and House Connections in Sabahiya residential area and construction of a major trunk sewer 1000mm dia of 7000m including microtunnelling construction of 5500m. Total length of sewer is 87000m and total no manholes is 2800 nos., sizes from 1000mm to 2000mm dia at the depth from 1.5m to 13.5m and total 3500 nos. of house connections. Kuwait Sewerage Renovation Phase VII SE/63 Total value of the project is KD 10 million. Replacement of existing Sewers, manholes and House Connections in Bneid Al Gar, Soor street & Fahahell residential area and construction of a major trunk sewer 1600mm dia including microtunnelling construction of 14600m. Total length of sewer is 32000m and total no manholes is 951 nos., sizes from 1000mm to 2000mm dia at the depth from 1.5m to 13.5m and total 1500 nos. of house connections. Responsibility: Responsible for scrutiny of Contract documents, preparation of bill of quantities, budget, monitoring cost & invoicing, correspondence of contractual mattes, contract negotiation, preparation of rate analysis for non BOQ items, keeping track of variation, preparation extra claims floating enquires & submittals to the Client/Consultant, preparation of monthly running payments of the entire projects to submit to the (Gulf Consults international Kuwait). Quantity Surveyor Engineering Consultants international Co. Pak Project: Karachi Northern Bypass Ø Project cost. 1598 million (PR) Ø 4- lane Karachi Northern Bypass Project (Package I) (32 Km long). Ø Flay Over (6 No). Ø Bridges (8 No). Ø Box Culverts (78 No). Responsibility: Responsible for scrutiny of Contract documents, reviewing Contractors Interim payment application against all supporting documents. Preparation of payment certificates, Project evaluation and monitoring progress of Contractors work, keeping track of variations, Correspondence on contractual matters, suggesting alternatives for cost implication, Rate Analysis negotiation with Contractor to finalize the non-BOQ items. Quantity Surveyor Echo West International. Pak Project: Hala to Moro Ø Project cost. 452 million (RS)
  • 5.
    Page 5 of5 Ø 2- lane Hala – Moro Additional Carriage way 109 Km long). Ø 4- lane Hala – Moro Bypass Additional Carriage way (22 Km long). Responsibility: Responsibilities were preparation of monthly running payments of the entire projects to submit to the (Engineering Consultants international), correspondence on contractual matters, keeping track of variation and documentation of the same, preparation of daily Progress reports on works, labour employment, material received on site, pricing of non BOQ items, interim payment certificates, escalation bill and draw X- Section in (Road Calc) & Auto Cad etc. Quantity Surveyor Angola Enterprises. Pak Project: Defiance road & Farm to Market Roads Ø 4- lane Defiance road (4 KM long) Ø 4- lane Access road to New Airport Terminal (8 KM long) Ø Farm to Market Roads (4*32=128 KM long) Responsibility Worked as In charge of entire civil works. The responsibilities were checking contract documents for any discrepancies, informing Clients of such and obtaining clarification with additional vital information, preparation of sketches and submittals and obtaining approval from Consultant, co-coordinating work between Subcontractor, construction Management team and Consultant for various contracts, keeping record of checklist, checking levels & coordinating, set control, quality control attending weekly progress meetings, monitoring various activities with respect to CPM program, allocation of manpower, equipment & material, preparation of monthly running payments of the entire projects to submit to the (National Engineering Consultants international) Consisting of , escalation bill and earth work draw X- Section in (Road Calc) & Auto Cad , Concrete works; structures asphalt pavements and pavement structure etc. Quantity Surveyor SINACO Engineers (Pvt.) Pak Project: Ø Attock Industrial Products Ltd., Rawat Rawalpindi, including buildings and roads. Ø Thermal Power Station (Housing Complex including internal roads, water supply, sewerage, drainage, parking lots) Ø Link roads and housing complex in Multan. Responsibility Duties include the estimation of quantities for earthwork, buildings, drainage works, concrete structures and pavement works. Preparation of bills for completed works of the project during every month.