From,
Vasant Kumar. M. Koli
Bhagyodaya Society
Darshan Apprt B/102
Chala – Daman Road ,VAPI
Dist. Valsad Pin : 396191 – Gujarat, INDIA
Tel : 00 91 260 246 5077 / 0091 9824939126
Email:kolivasant63@gmail.com
Sir,
Sub: Application for the Post of Senior Quantity Surveyor - Reg.
Having come to understand that you are looking for suitable Senior Quantity
Surveyor personnel for your esteemed organization, I would like to furnish my C.V
herewith, for your kind perusal and favorable consideration.
I have been employed in M/s Al Fahjan Dubai , U.A.E. as a Senior Quantity
Surveyor predominantly involved in construction of major highway, Strom water,
Sewerage and Water line projects, since 1985. presently I am working in Al Fahjan
– Abudhabi. Hope my present experience would find a suitable place in your
esteemed organization and I eagerly solicit your favorable orders.
Yours sincerely,
Vasant Kumar. M. Koli
00971 50 1323451
00971 55 3745808
Vasant Kumar. M. Koli –Quantity Surveyor
Objective
To work with a leading company where I can make into effect my potential and capabilities
to achieve good results. Keen to apply self-improvement techniques to promote quality of
output to the maximum level of excellence.
Personal Details:
Nationality
Date of birth
Passport No.
Marital Status
Visa Status
Languages known
Driving License
Computer Knowledge
:
:
:
:
:
:
:
:
Indian
1st
May 1963
K 7421426
Married
Employment
English, Hindi, Gujarati (Can speak, read and write) Arabic
and Urdu (Can speak only)
Valid U.A.E. Driving License(Automatic Vehicle)
Microsoft Office ( Excel)
Present Address : Post Box No. : 9733
ABUDHABI-U.A.E.
 Mobile : 050-1323451
: 055-3745808
Permanent Address : Bhagyodaya Society
Darshan Apprt B/102
Chala – Daman Road ,VAPI
Dist. Valsad Pin : 396191 – Gujarat, INDIA
Tel : 00 91 260 246 5077 / 0091 9824939126
Email : kolivasant63@gmail.com
Educational Qualification:
 Academic :Diploma in Civil Engineering( 3 Year-Diploma) (1983)
Experience Summary and Profile: 30.0
year in U.A.E.
8 Year(2008-todate) Quantity Surveyor in Dubai & Abu Dhabi-U.A.E.
1 Year(2007) Quantity Surveyor Doha -Qatar
13 Year(1994-2006) Chief Surveyor/Quantity Surveyor in U.A.E.
8Year(1986-1993) Surveyor in U.A.E.
1Year(1985) Supervisor in Govt. Of India (N.W.D.A.)
Project Completed Sucessfully as Quantity Surveyor
Sr Nr Location
Working
With Name of Project Consultant Client
Contract
Duration
Budget
1 Abudhabi
Consultan
t
Improvement of
Mafraq to Al Ghwaifat
Border Post Highway
Section-3B Al Mirfa to
Abu Al Abyad
Dorsch MUSANADA
Jan-2016
to Till to
date
991
Million
2
Al Ain
Contractor Construction Works for
Replacement and
Enhancement of
Septic Tank in Alain
Part-2
MWH ADSSC
NOV-2014
to Dec-
2015
97 Million
3
Al Ain
Contractor
Shiebat Al Watah
Development
WS Atkins
Alain
Municipality
April-2014
to Till to
December-
2014
204 Million
4
Abu
Dhabi
Contractor
Parking for adnoc
head quarter
RTS Adnoc
Oct-2013
to March-
2014
12 Million
5
Abu
Dhabi
Contractor
940/3 Dorsch
Abu Dhabi
Municipality
Jan-2012
To Sep-
2013
106 Million
6
Abu
Dhabi
Contractor
Maintenance Aecom
Abu Dhabi
Municipality
Dec-2011
To Sep-
2013
98 Million
7 Dubai
Contractor
R-816 Al-Turath RTA
Jan-2010
To Nov-
2010
93 Million
8 Dubai
Contractor
R-931 Aecom RTA
Feb 2008
To Dec-
2009
88 Million
9 Qatar
Contractor
Azizia Project GEIC
Public
Works
Authority
(Road
Affairs)
ASHGHAL
Jan-2007
To Dec-
2007
46 Million
10 Al Ain
Contractor
Solid Waste
Management,
Entec
Europe
Alain
Municipality
Dec. 2003
To
Dec.2006
120 Million
CURRENT EMPLOYMENT
Dorsch Gruppe
Project : January-2016 to Till to Date
Designation :Quantity Surveyor
Project :Improvement of Mafraq to Al Ghwaifat Border Post
: :Highway Section;3B Al Mirfa to Abu Al Abyad
Client : MUSANADA
MACE
Period : January-2015 to Dec-2015
Designation :Quantity Surveyor
Project :Construction Works for Replacement and
Enhancement of Septic Tanks in Alain Part-2
Client : ADSSC
AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-Abudhabi
Period : April-2014 to Till todate
Designation : Quantity Surveyor
Project : (1)Shiebat al watah Development Infrastructure Construction
Works Zone-B at Alain
Client : Alain Municipality
AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-Abudhabi
Period : Jan-2010 to March-2014
Designation : Quantity Surveyor
Project : (1)Roads and Parking in Abudhabi city(940/3)
(2) Maintenance and Rehabitation and additional works for
Roads and Bridges in Abudhabi-Island
Client : Government of Abudhabi Municipality
AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-DUBAI
Period : Feb-2008 to Dec-2009
Designation Quantity Surveyor
Project : Contract-R / 931, Levelling and roads in Oud Al Muteena-2
Client : RTA
Project Scope of Work : Construction of Dual Carriageway and Internal Roads
Including all like duct work, Embankment cut & fill
Nael & Bin Harmal Hydroexport Qatar, Doha, State of Qatar.
Period : January2007 to November2007
Designation : Quantity Surveyor
Project : Main Roads at Al Azeezia
Client : PUBLIC WORKS AUTHORITY (Road Affairs) ASHGHAL
Project Scope of Work :Construction of Double lane carriage way with 4m medians with
Interlocking tiles, 2.5m width parking lanes on both sides, 2m width
foot path with interlocking tiles on both sides, Trench soak ways
according to corridor widths, Catch pit chambers, soak way
chambers, storm water carrier lines with &without Land Drains,
Manholes ranging from internal diameter 1200mm to 2200mm &
Depth ranging from 3.00m to 8.5 m, KAHRAMMA WATER D.I Pipes
ranging from 600mm, 400mm, 300mm, 200mm, 150mm, &100mm
associated with line valves, Air release valve, washing valve
chambers. fire hydrants correspondingly with cast in site chambers &
Pre cast Chambers. Relocation works for QATAR TELECOM &
KAHRAMMA ELECTRICAL such as re alignment of cables,
construction of joint boxes, Protection works & ducts works for road
crossings, positioning of street lighting works according corridor
widths & construction of high mask luminaries 25m & 30m inside
Round about, realignment of foul sewer lines by bringing them into
reservation of corridors, Land aquistation, demolition of buildings
inside selected corridor, Road markings, Fixing of Traffic sign boards
according to Qatar Traffic Manual, fixing of Pre cast concrete
Bollards at desired locations, fixing road buttons & construction of
speed humps by Interlocking tiles At locations specified by local
authorities.
Responsibility : I am associated with total independent Quantity survey works for
main roads at Al Azizia project a Nael & Bin Harmal Hydroexport
Experience Details
1 M/s Nael & Bin Harmal Hydroexport Est.,
Al Ain, U.A.E
Period Dec. 2003 to Dec.2006
Job Title Quantity Surveyor /Chief Surveyor
Project Solid Waste Management, Al Ain.
Consultant M/s. Entec Europe Ltd
Responsibilities I was associated with total independent Quantity survey
works for transfer station, clinical waste incinerator, sorting
station & landfill (first time introduce in U.A.E.) under the
supervision of M/s Entec Europe Ltd Consultant, having
responsibility of all survey works and taking approval from
TPD (Al Ain). Preparing shop drawing and as-built drawing.
2 M/s Nael Construction & Contrating.,
Dubai
Period June 2002 to Nov. 2003
Job Title Chief Surveyor
Project Irrigation Mains For Desert Afforestation in
Jebal – Ali (DS-173)
Consultant M/s. Al Turath / Dr. Ahmed Abdul Warith
Responsibilities I was associated with total independent survey works for
Irrigation Pipe Line Projects leading a team of eight
surveyors and support staff worked under the supervision of
M/s Al Turath / AAW Consultant having responsibility of all
survey works and taking approval from Dubai Municipality.
Preparing shop drawing and as-built drawing, Preparing
daily, weekly and monthly progress reports.
3 M/s Nael & Bin Harmal Hydroexport Est.,
Al Ain, U.A.E
Period Feb. 2001 to May. 2002
Job Title Chief Surveyor / Assistant Engineer
Project Roads, Storm water Drainage & Sewer in Al Ouha
Extension Area (Contract : M24A) &
Development of Nadood Jaham Area with the Border
Road in Al Ain (Contract : 0050)
Irrigation Mains for Desert Afforestation in Jebal – Ali
(DS-173)
Consultant M/s. W. S. Atkins & Partners Overseas (M24A)
M/s. Maunsell Consultancy (NJ)
Responsibilities Storm water and Wastewater works, I was associated with
total independent survey works for two different projects
leading a team of seven surveyors and support staff worked
under the supervision of WS Atkins and Maunsell Consultant
having responsibility of all survey works and taking approval
from T.P.D. Preparing shop drawing and as-built drawing,
Preparing daily, weekly and monthly progress reports.
4 M/s Al Marmar Gen. Cont. Co. (W.L.L), Al Ain, U.A.E.
Subsidiary Of M/s Bin Hafeez Establishment, Abu Dhabi, U.A.E
Period Feb. 2000 to Jan. 2001
Job Title Chief Surveyor
Project Construction of Road & Bridge to connect Falaj Hazza &
El Muwaiji Areas
Consultant Dr. AHMED ABDEL WARITH
Responsibilities: Associated with total independent survey works. My Job
involves planning for work distribution to subordinates about
day to day work execution of works should be completed as
per the technical specification & approving the work by
consultant. All the setting out approved taken from T.P.D.
also. Co-ordination with the Q.S. Department & Drafting
section for the preparation of shop drawing as-built drawing,
Tender Survey, and work out quantity for new projects,
quantity takeoff as per site measurement, preparing daily,
weekly and monthly progress reports.
Period June 1998 to Jan. 2000
Job Title Chief Surveyor
Project Construction and Paving of Internal Roads for Low cost
Houses at Al Salamat & Al Maqam
Consultant Conseco International Ltd.
Responsibility Associated with total independent survey works. Worked
under the supervision of Conseco International Ltd.
Consulting Engineers. During the leave period of Q.S. had
worked as acting Q.S. My Job involves planning for work
distribution to subordinates about day to day work execution
of works should be completed as per the technical
specification & approving the work by consultant. All the
setting out approved taken from T.P.D. also. Co-ordination
with the Q.S. Department & Drafting section for the
preparation of shop drawing as-built drawing, Tender
Survey, and work out quantity for new projects, quantity
takeoff as per site measurement, preparing daily, weekly and
monthly progress reports.
Period January 1996 – May 1998
Job Title Chief Surveyor
Project Esharig Stage 1 and 2 of Al Ain Municipality projects for
the Construction of Roads, Parking Area, Storm and
Wastewater drainage.
Consultant Dr. Ahmed Abdel Warith
Responsibility Associated with total independent survey works. Negotiating
with the Consultant & leading team of Eight Surveyors
support of staff. Worked under the supervision of Dr. Ahmed
Abdel Warith Consulting Engineers. During the leave period
of Q.S. had worked as acting Q.S. My Job involves
planning for work distribution to subordinates about day to
day work execution of works should be completed as per the
technical specification & approving the work by consultant.
All the setting out approved taken from T.P.D. also. Co-
ordination with the Q.S. Department & Drafting section for
the preparation of shop drawing as-built drawing, Tender
Survey, and work out quantity for new projects, quantity
takeoff as per site measurement, preparing daily, weekly and
monthly progress reports.
 M/s. Saif Bin Darwish Gen. Cont. Co., Abu Dhabi (Dec. 1985 to Sept. 1995)
Period Jan. 1994 to Sept. 1995
Position Chief Surveyor
Project Al Shuwaib Project of P.W.D. Abu Dhabi (Shuwaib)
Consultant Fredric R. Harris
Responsibilities Having internal Roads, Stormwater and Wastewater works,
including pumping station, lifting station and treatment plant
etc. I was associated with total independent survey works
leading a team of six surveyors and support staff worked
under the supervision of F.R.H. Inc. Consultant having
responsibility of all survey works and taking approval from
T.P.D. Preparing shop drawing and as-built drawing,
Preparing daily, weekly and monthly progress reports.
Period Sept. 1993 to Dec. 1993
Position Senior Surveyor
Project Shahama interchange Project Abu Dhabi – Dubai Main Road
and interchange from Shahama to main Road.
Consultant Halcrow International
Responsibility Job involves setting out, preparing drawings for site condition and
handing over to consultant profile works etc.
Period Jan. 1991 to Aug. 1993
Position Senior Surveyor
Project Internal Roads, Storm & Wastewater in Baniyas (Abu Dhabi)
EB-05-06 Project including Pumping Station
Consultant Dorsch International & D.I.W.I.
Responsibility Job involves setting out, preparing profile work settlement and as-
built drawings.
Period Dec. 1990 to May 1991
Position Quantity Surveyor & Senior Surveyor
Project SHJ-RAK and Shj Dhaid Road Maintenance Project of Dubai
Municipality
Consultant Jozy and Partners
Responsibility Preparing all measurement sheet, taking approval from
consultant, setting out for side slopes, slope protection spill way
works, guard rails etc.
Period June 1990 to Nov. 1990
Position Senior Surveyor
Project Sweihan Dune Sand levelling project of Al Ain Municipality
Consultant Alexander & Gibbs International
Responsibility Job involves setting out, preparing cross section before levelling
and cross section after levelling also. Daily measurement sheet of
work done.
Period Dec. 1989 to May 1990
Position Senior Surveyor
Project Al Ain Camel Race Road & Quttara Road Projects Al Ain
Responsibility Job involves setting out, profile work and preparing as-built
drawings according to site measurement.
Period June 1988 to Nov. 1989
Position Surveyor
Project Abu Dhabi Trip Project (18 MC Project)
Consultant D.C.I.L.
Responsibility Associated with the pipe line and road work.
Period Nov. 1986 to May 1988
Position Surveyor
Project Shahama & Shamha Internal Road Project at Shahama
(Abu Dhabi).
Consultant Roughton and Partners
Responsibility Job involves setting out, profile work and daily measurement
according and taking approval from consultant.
Period Dec. 1985 to Oct. 1986
Position Surveyor
Project Abu Dhabi Trip Project (Contract No. 13)
Consultant D.C.I.L.
Responsibility Associated with pipe levelling and taking approval from
consultant.
Period April 1985 to Nov. 1985
Position Supervisor
Project N.W.D.A. (Govt. India)
Responsibility Job involves canal survey planning work, preparing site
details like contours, raifall data collection and details about
the land either it is private property or Government etc.
Period June 1983 to Mar. 1985
Position Site Engineer
Worked with a private firm (builder) having construction of
residential villas building upto 4 floors. Responsibility was
supervision advise to site workers according to drawing,
labour control and preparing daily report of work and
material also.
Period June 1988 to Nov. 1989
Position Surveyor
Project Abu Dhabi Trip Project (18 MC Project)
Consultant D.C.I.L.
Responsibility Associated with the pipe line and road work.
Period Nov. 1986 to May 1988
Position Surveyor
Project Shahama & Shamha Internal Road Project at Shahama
(Abu Dhabi).
Consultant Roughton and Partners
Responsibility Job involves setting out, profile work and daily measurement
according and taking approval from consultant.
Period Dec. 1985 to Oct. 1986
Position Surveyor
Project Abu Dhabi Trip Project (Contract No. 13)
Consultant D.C.I.L.
Responsibility Associated with pipe levelling and taking approval from
consultant.
Period April 1985 to Nov. 1985
Position Supervisor
Project N.W.D.A. (Govt. India)
Responsibility Job involves canal survey planning work, preparing site
details like contours, raifall data collection and details about
the land either it is private property or Government etc.
Period June 1983 to Mar. 1985
Position Site Engineer
Worked with a private firm (builder) having construction of
residential villas building upto 4 floors. Responsibility was
supervision advise to site workers according to drawing,
labour control and preparing daily report of work and
material also.

Quantity Surveyor CV

  • 1.
    From, Vasant Kumar. M.Koli Bhagyodaya Society Darshan Apprt B/102 Chala – Daman Road ,VAPI Dist. Valsad Pin : 396191 – Gujarat, INDIA Tel : 00 91 260 246 5077 / 0091 9824939126 Email:kolivasant63@gmail.com Sir, Sub: Application for the Post of Senior Quantity Surveyor - Reg. Having come to understand that you are looking for suitable Senior Quantity Surveyor personnel for your esteemed organization, I would like to furnish my C.V herewith, for your kind perusal and favorable consideration. I have been employed in M/s Al Fahjan Dubai , U.A.E. as a Senior Quantity Surveyor predominantly involved in construction of major highway, Strom water, Sewerage and Water line projects, since 1985. presently I am working in Al Fahjan – Abudhabi. Hope my present experience would find a suitable place in your esteemed organization and I eagerly solicit your favorable orders. Yours sincerely, Vasant Kumar. M. Koli 00971 50 1323451 00971 55 3745808
  • 2.
    Vasant Kumar. M.Koli –Quantity Surveyor Objective To work with a leading company where I can make into effect my potential and capabilities to achieve good results. Keen to apply self-improvement techniques to promote quality of output to the maximum level of excellence. Personal Details: Nationality Date of birth Passport No. Marital Status Visa Status Languages known Driving License Computer Knowledge : : : : : : : : Indian 1st May 1963 K 7421426 Married Employment English, Hindi, Gujarati (Can speak, read and write) Arabic and Urdu (Can speak only) Valid U.A.E. Driving License(Automatic Vehicle) Microsoft Office ( Excel) Present Address : Post Box No. : 9733 ABUDHABI-U.A.E.  Mobile : 050-1323451 : 055-3745808 Permanent Address : Bhagyodaya Society Darshan Apprt B/102 Chala – Daman Road ,VAPI Dist. Valsad Pin : 396191 – Gujarat, INDIA Tel : 00 91 260 246 5077 / 0091 9824939126 Email : kolivasant63@gmail.com Educational Qualification:  Academic :Diploma in Civil Engineering( 3 Year-Diploma) (1983) Experience Summary and Profile: 30.0 year in U.A.E.
  • 3.
    8 Year(2008-todate) QuantitySurveyor in Dubai & Abu Dhabi-U.A.E. 1 Year(2007) Quantity Surveyor Doha -Qatar 13 Year(1994-2006) Chief Surveyor/Quantity Surveyor in U.A.E. 8Year(1986-1993) Surveyor in U.A.E. 1Year(1985) Supervisor in Govt. Of India (N.W.D.A.) Project Completed Sucessfully as Quantity Surveyor Sr Nr Location Working With Name of Project Consultant Client Contract Duration Budget 1 Abudhabi Consultan t Improvement of Mafraq to Al Ghwaifat Border Post Highway Section-3B Al Mirfa to Abu Al Abyad Dorsch MUSANADA Jan-2016 to Till to date 991 Million 2 Al Ain Contractor Construction Works for Replacement and Enhancement of Septic Tank in Alain Part-2 MWH ADSSC NOV-2014 to Dec- 2015 97 Million 3 Al Ain Contractor Shiebat Al Watah Development WS Atkins Alain Municipality April-2014 to Till to December- 2014 204 Million 4 Abu Dhabi Contractor Parking for adnoc head quarter RTS Adnoc Oct-2013 to March- 2014 12 Million 5 Abu Dhabi Contractor 940/3 Dorsch Abu Dhabi Municipality Jan-2012 To Sep- 2013 106 Million 6 Abu Dhabi Contractor Maintenance Aecom Abu Dhabi Municipality Dec-2011 To Sep- 2013 98 Million 7 Dubai Contractor R-816 Al-Turath RTA Jan-2010 To Nov- 2010 93 Million 8 Dubai Contractor R-931 Aecom RTA Feb 2008 To Dec- 2009 88 Million 9 Qatar Contractor Azizia Project GEIC Public Works Authority (Road Affairs) ASHGHAL Jan-2007 To Dec- 2007 46 Million 10 Al Ain Contractor Solid Waste Management, Entec Europe Alain Municipality Dec. 2003 To Dec.2006 120 Million
  • 4.
    CURRENT EMPLOYMENT Dorsch Gruppe Project: January-2016 to Till to Date Designation :Quantity Surveyor Project :Improvement of Mafraq to Al Ghwaifat Border Post : :Highway Section;3B Al Mirfa to Abu Al Abyad Client : MUSANADA MACE Period : January-2015 to Dec-2015 Designation :Quantity Surveyor Project :Construction Works for Replacement and Enhancement of Septic Tanks in Alain Part-2 Client : ADSSC AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-Abudhabi Period : April-2014 to Till todate Designation : Quantity Surveyor Project : (1)Shiebat al watah Development Infrastructure Construction Works Zone-B at Alain Client : Alain Municipality AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-Abudhabi Period : Jan-2010 to March-2014 Designation : Quantity Surveyor Project : (1)Roads and Parking in Abudhabi city(940/3) (2) Maintenance and Rehabitation and additional works for Roads and Bridges in Abudhabi-Island Client : Government of Abudhabi Municipality AL FAHJAN TRANSPORTATION AND GENERAL CONTRACTING CO-DUBAI Period : Feb-2008 to Dec-2009 Designation Quantity Surveyor Project : Contract-R / 931, Levelling and roads in Oud Al Muteena-2 Client : RTA Project Scope of Work : Construction of Dual Carriageway and Internal Roads Including all like duct work, Embankment cut & fill Nael & Bin Harmal Hydroexport Qatar, Doha, State of Qatar. Period : January2007 to November2007 Designation : Quantity Surveyor Project : Main Roads at Al Azeezia Client : PUBLIC WORKS AUTHORITY (Road Affairs) ASHGHAL
  • 5.
    Project Scope ofWork :Construction of Double lane carriage way with 4m medians with Interlocking tiles, 2.5m width parking lanes on both sides, 2m width foot path with interlocking tiles on both sides, Trench soak ways according to corridor widths, Catch pit chambers, soak way chambers, storm water carrier lines with &without Land Drains, Manholes ranging from internal diameter 1200mm to 2200mm & Depth ranging from 3.00m to 8.5 m, KAHRAMMA WATER D.I Pipes ranging from 600mm, 400mm, 300mm, 200mm, 150mm, &100mm associated with line valves, Air release valve, washing valve chambers. fire hydrants correspondingly with cast in site chambers & Pre cast Chambers. Relocation works for QATAR TELECOM & KAHRAMMA ELECTRICAL such as re alignment of cables, construction of joint boxes, Protection works & ducts works for road crossings, positioning of street lighting works according corridor widths & construction of high mask luminaries 25m & 30m inside Round about, realignment of foul sewer lines by bringing them into reservation of corridors, Land aquistation, demolition of buildings inside selected corridor, Road markings, Fixing of Traffic sign boards according to Qatar Traffic Manual, fixing of Pre cast concrete Bollards at desired locations, fixing road buttons & construction of speed humps by Interlocking tiles At locations specified by local authorities. Responsibility : I am associated with total independent Quantity survey works for main roads at Al Azizia project a Nael & Bin Harmal Hydroexport Experience Details 1 M/s Nael & Bin Harmal Hydroexport Est., Al Ain, U.A.E Period Dec. 2003 to Dec.2006 Job Title Quantity Surveyor /Chief Surveyor Project Solid Waste Management, Al Ain. Consultant M/s. Entec Europe Ltd Responsibilities I was associated with total independent Quantity survey works for transfer station, clinical waste incinerator, sorting station & landfill (first time introduce in U.A.E.) under the supervision of M/s Entec Europe Ltd Consultant, having responsibility of all survey works and taking approval from TPD (Al Ain). Preparing shop drawing and as-built drawing. 2 M/s Nael Construction & Contrating., Dubai Period June 2002 to Nov. 2003 Job Title Chief Surveyor Project Irrigation Mains For Desert Afforestation in Jebal – Ali (DS-173)
  • 6.
    Consultant M/s. AlTurath / Dr. Ahmed Abdul Warith Responsibilities I was associated with total independent survey works for Irrigation Pipe Line Projects leading a team of eight surveyors and support staff worked under the supervision of M/s Al Turath / AAW Consultant having responsibility of all survey works and taking approval from Dubai Municipality. Preparing shop drawing and as-built drawing, Preparing daily, weekly and monthly progress reports. 3 M/s Nael & Bin Harmal Hydroexport Est., Al Ain, U.A.E Period Feb. 2001 to May. 2002 Job Title Chief Surveyor / Assistant Engineer Project Roads, Storm water Drainage & Sewer in Al Ouha Extension Area (Contract : M24A) & Development of Nadood Jaham Area with the Border Road in Al Ain (Contract : 0050) Irrigation Mains for Desert Afforestation in Jebal – Ali (DS-173) Consultant M/s. W. S. Atkins & Partners Overseas (M24A) M/s. Maunsell Consultancy (NJ) Responsibilities Storm water and Wastewater works, I was associated with total independent survey works for two different projects leading a team of seven surveyors and support staff worked under the supervision of WS Atkins and Maunsell Consultant having responsibility of all survey works and taking approval from T.P.D. Preparing shop drawing and as-built drawing, Preparing daily, weekly and monthly progress reports. 4 M/s Al Marmar Gen. Cont. Co. (W.L.L), Al Ain, U.A.E. Subsidiary Of M/s Bin Hafeez Establishment, Abu Dhabi, U.A.E Period Feb. 2000 to Jan. 2001 Job Title Chief Surveyor Project Construction of Road & Bridge to connect Falaj Hazza & El Muwaiji Areas Consultant Dr. AHMED ABDEL WARITH Responsibilities: Associated with total independent survey works. My Job involves planning for work distribution to subordinates about day to day work execution of works should be completed as per the technical specification & approving the work by consultant. All the setting out approved taken from T.P.D. also. Co-ordination with the Q.S. Department & Drafting
  • 7.
    section for thepreparation of shop drawing as-built drawing, Tender Survey, and work out quantity for new projects, quantity takeoff as per site measurement, preparing daily, weekly and monthly progress reports. Period June 1998 to Jan. 2000 Job Title Chief Surveyor Project Construction and Paving of Internal Roads for Low cost Houses at Al Salamat & Al Maqam Consultant Conseco International Ltd. Responsibility Associated with total independent survey works. Worked under the supervision of Conseco International Ltd. Consulting Engineers. During the leave period of Q.S. had worked as acting Q.S. My Job involves planning for work distribution to subordinates about day to day work execution of works should be completed as per the technical specification & approving the work by consultant. All the setting out approved taken from T.P.D. also. Co-ordination with the Q.S. Department & Drafting section for the preparation of shop drawing as-built drawing, Tender Survey, and work out quantity for new projects, quantity takeoff as per site measurement, preparing daily, weekly and monthly progress reports. Period January 1996 – May 1998 Job Title Chief Surveyor Project Esharig Stage 1 and 2 of Al Ain Municipality projects for the Construction of Roads, Parking Area, Storm and Wastewater drainage. Consultant Dr. Ahmed Abdel Warith Responsibility Associated with total independent survey works. Negotiating with the Consultant & leading team of Eight Surveyors support of staff. Worked under the supervision of Dr. Ahmed Abdel Warith Consulting Engineers. During the leave period of Q.S. had worked as acting Q.S. My Job involves planning for work distribution to subordinates about day to day work execution of works should be completed as per the technical specification & approving the work by consultant. All the setting out approved taken from T.P.D. also. Co- ordination with the Q.S. Department & Drafting section for the preparation of shop drawing as-built drawing, Tender Survey, and work out quantity for new projects, quantity takeoff as per site measurement, preparing daily, weekly and monthly progress reports.  M/s. Saif Bin Darwish Gen. Cont. Co., Abu Dhabi (Dec. 1985 to Sept. 1995) Period Jan. 1994 to Sept. 1995
  • 8.
    Position Chief Surveyor ProjectAl Shuwaib Project of P.W.D. Abu Dhabi (Shuwaib) Consultant Fredric R. Harris Responsibilities Having internal Roads, Stormwater and Wastewater works, including pumping station, lifting station and treatment plant etc. I was associated with total independent survey works leading a team of six surveyors and support staff worked under the supervision of F.R.H. Inc. Consultant having responsibility of all survey works and taking approval from T.P.D. Preparing shop drawing and as-built drawing, Preparing daily, weekly and monthly progress reports. Period Sept. 1993 to Dec. 1993 Position Senior Surveyor Project Shahama interchange Project Abu Dhabi – Dubai Main Road and interchange from Shahama to main Road. Consultant Halcrow International Responsibility Job involves setting out, preparing drawings for site condition and handing over to consultant profile works etc. Period Jan. 1991 to Aug. 1993 Position Senior Surveyor Project Internal Roads, Storm & Wastewater in Baniyas (Abu Dhabi) EB-05-06 Project including Pumping Station Consultant Dorsch International & D.I.W.I. Responsibility Job involves setting out, preparing profile work settlement and as- built drawings. Period Dec. 1990 to May 1991 Position Quantity Surveyor & Senior Surveyor Project SHJ-RAK and Shj Dhaid Road Maintenance Project of Dubai Municipality Consultant Jozy and Partners Responsibility Preparing all measurement sheet, taking approval from consultant, setting out for side slopes, slope protection spill way works, guard rails etc. Period June 1990 to Nov. 1990 Position Senior Surveyor Project Sweihan Dune Sand levelling project of Al Ain Municipality Consultant Alexander & Gibbs International Responsibility Job involves setting out, preparing cross section before levelling and cross section after levelling also. Daily measurement sheet of work done. Period Dec. 1989 to May 1990 Position Senior Surveyor Project Al Ain Camel Race Road & Quttara Road Projects Al Ain Responsibility Job involves setting out, profile work and preparing as-built drawings according to site measurement.
  • 9.
    Period June 1988to Nov. 1989 Position Surveyor Project Abu Dhabi Trip Project (18 MC Project) Consultant D.C.I.L. Responsibility Associated with the pipe line and road work. Period Nov. 1986 to May 1988 Position Surveyor Project Shahama & Shamha Internal Road Project at Shahama (Abu Dhabi). Consultant Roughton and Partners Responsibility Job involves setting out, profile work and daily measurement according and taking approval from consultant. Period Dec. 1985 to Oct. 1986 Position Surveyor Project Abu Dhabi Trip Project (Contract No. 13) Consultant D.C.I.L. Responsibility Associated with pipe levelling and taking approval from consultant. Period April 1985 to Nov. 1985 Position Supervisor Project N.W.D.A. (Govt. India) Responsibility Job involves canal survey planning work, preparing site details like contours, raifall data collection and details about the land either it is private property or Government etc. Period June 1983 to Mar. 1985 Position Site Engineer Worked with a private firm (builder) having construction of residential villas building upto 4 floors. Responsibility was supervision advise to site workers according to drawing, labour control and preparing daily report of work and material also.
  • 10.
    Period June 1988to Nov. 1989 Position Surveyor Project Abu Dhabi Trip Project (18 MC Project) Consultant D.C.I.L. Responsibility Associated with the pipe line and road work. Period Nov. 1986 to May 1988 Position Surveyor Project Shahama & Shamha Internal Road Project at Shahama (Abu Dhabi). Consultant Roughton and Partners Responsibility Job involves setting out, profile work and daily measurement according and taking approval from consultant. Period Dec. 1985 to Oct. 1986 Position Surveyor Project Abu Dhabi Trip Project (Contract No. 13) Consultant D.C.I.L. Responsibility Associated with pipe levelling and taking approval from consultant. Period April 1985 to Nov. 1985 Position Supervisor Project N.W.D.A. (Govt. India) Responsibility Job involves canal survey planning work, preparing site details like contours, raifall data collection and details about the land either it is private property or Government etc. Period June 1983 to Mar. 1985 Position Site Engineer Worked with a private firm (builder) having construction of residential villas building upto 4 floors. Responsibility was supervision advise to site workers according to drawing, labour control and preparing daily report of work and material also.