Mohamed Ahmed Fouad Hassan
1 Talaat Harb Street, Attareen, Alexandria, Egypt
Post Code 21517, Alexandria, Egypt
Telephone: (+203) 4866537
Mobile: (+966) 54 3371157 – (+966) 50 7666544 -- (+20) 111 4866537-- (+20) 106 0031960
E-mail: mohamedfouad@outlook.com mohamed.fouad@jomel-ksa.com
PERSONAL INFORMATION:
 Date of Birth: November 16, 1985
 Gender: Male
 Marital Status: Married
 Nationality: Egyptian
 Military Service: Exempted
 Driving License: Valid
 Passport: Valid
 Residence: Saudi Arabia
CAREER OBJECTIVE:
Obtain a challenging position in engineering career in a reputable organization that will allow for growth
and career development and enrich my experience.
EMPLOYMENT HISTORY:
1 January 2016 till
now
Jomel – Jubail O&M limited 2.75 GW & 800,000 m3/day desalination
(US $ 3.4 billion project – world’s largest power and desalination plant)
Job Title:
Major Overhauls and Projects Engineer.
Responsibilities
 Planning and execution of all major projects activities.
 Manage project expenditure.
 Overhauls planning and delivery.
 Engineering support for operations and maintenance in MI&E problems.
 Engineering review for gas turbines, steam turbines, generators and
auxiliaries.
 Managing all phases of GE technical information letters for GT, ST, GEN
and auxiliaries.
 Development and maintenance of integrated plan for outage management.
 Development of contractual arrangements with equipment/service providers
ensuring practical approach for procurement of parts, labor and services.
 Management of HSE activities required for overhauls and major projects.
1 December 2008 till
31 December 2015
Siemens O&M MidElec 3×60 MW V64.3 Siemens gas turbines
Job Title:
Senior Electrical Maintenance and Protection Engineer.
Responsibilities:
 Maintenance and troubleshooting of Electrical turbo generators,
33/11/6.6/0.4 kV switchgears, medium and low voltage transformers and
Auxiliaries.
 Maintenance of diesel generators (caterpillar 3616 – 7.2 MW).
 Maintenance of medium and low voltage motors.
 Maintaining medium voltage and low voltage circuit breakers (Siemens,
ABB, GE and ALSTOM).
 Commissioning, primarysecondary injection, Maintenance and configuring
of SIEMENS, AREVA and BASLER protection devices for medium and low
voltage switchgears.
 Maintenance and fault rectification for batteries and UPS systems.
 Maintenance and calibration of metering systems.
 Maintenance and inspection of OHTL and OPGW.
 Maintenance and troubleshooting of SFCSEE system.
 Preparing and implementing electrical modifications.
 Approval and reviewing of high voltage disconnections and isolations.
 Planning maintenance (routine work, fault correction and overhauls) for all
plant equipment’s using Siemens power plant management system CMMS
"BFS."++
 Planning, ordering spare parts and tools for preventive and corrective
maintenance and major overhauls.
 Supervising and attending the tests for MV circuit breakers during
overhauls.
 Prepare and review procedures and reports.
 Provide technical support to maintenance manager during minor/major
overhauls execution and identifying work scope and resources.
 Electrical workshop supervision.
 Supervising subcontractors and outsourcing workers.
 Technical reporting of maintenance and outages work to management and
clients.
PRACTICAL TRAINING:
3 July 2008 till
30 November
The Coca-Cola bottling company of Egypt – ABI "Electrical engineer - intern"
 Maintenance, operation and troubleshooting of PET line, Glass lines and
Auxiliaries.
 Designing and executing the new electrical installations.
 Monitoring and controlling maintenance costs.
 Designing of new lighting project.
Summer 2007 Alexandria Iron and Steel company "Electrical engineer - intern"
 Maintenance of DC & AC motors with high ratings.
 Maintenance of water and oil pump stations.
 Maintenance of 11000/400 volt power transformers.
 Lying down and termination of low voltage cables with different ratings.
 Maintenance of production line control system (ABB PLCs and systems).
 Complete awareness of every stage of the production process.
 Control of every rolling stage speed along the rolling line.
Summer 2006 PETROJET company "Electrical engineer - intern"
 Electrical installations for warehouse, workshop and administration building
in Alex fertilizers.
 Illumination and control installations.
 Installation of earthing system.
 Installing of electrical distribution power panels.
Summer 2004 Gulf company for construction "Electrical engineer - intern"
 Electrical installations for 3 residential buildings including the panels, risers
and the interior wiring.
EDUCATION BACKGROUND:
September 2008 up
to date
MSc. Electrical power engineering
 Premasters course – power division
2003 – 2008 Bachelor of electrical power engineering
 University: Alexandria University
 Department: Electrical Engineering (Power, Machines and control)
 Grade: Good Last year grade: Good Project grade : Excellent
Project: Planning, Design & Electric Automation of a Seven Star Hotel. Typical
to “Ibis hotel”
Major Fields of Study
 Power Systems and electrical machines.
 Automation and Control Engineering.
 Microprocessor Based Controllers and Embedded Systems.
 Industrial Electronics and Electric Drives.
1990 – 2003 E.B.S. (ElNasr Boys’ school) High school certificate (primary, preparatory and
secondary)
 Overall grade: Excellent 95.5%
COURSES:
Technical training
Courses
 DIGSI Basic protection and control functions (SIEMENS Power Academy –
Germany).
 PLC (SIEMENS S7-200).
 Project Management Professional (PMP) ® 5th Edition (New Horizons).
 Oracle Primavera P6 R15.1 (New Horizons).
 Fire prevention program (NIOSH institute).
 Human performance fundamental (Siemens).
 First aid (Egyptian Red Crescent).
English courses  Upper intermediate course level 10 in the AMIDEAST.
Activities during
university period
 Automation and PLC systems
1. Grains packing process.
2. Product count and distinguish with respect to size and material.
3. Traffic flow control.
4. Chemical mixing process.
5. Elevator system, gate control.
 Embedded Systems:
1. Digital Universal Protection Relay.
2. HVAC Control, Temperature Control.
3. Lighting control, Access Control.
4. Voltage Control of I.M. and Firing Control of 3-Phase Inverters.
 MATLAB:
Power Flow Analysis Of (N) Buses Power Grid, T.L calculator.
SKILLS:
Computer Skills  DIGSI 4.8, MICOM (AREVA), BASLER, MicroWIN and Step7.
 AutoCAD, MATLAB, Eagle, Powerx, Ecodial and Dialux.
 Assembly, Basic, Embedded Basic, ATMEL and AVR.
 Windows, MS Office, Internet, Linux Ubuntu and Dos.
 Computer hardware, troubleshooting and maintenance.
Language Skills  Arabic: Mother Tongue
 English: Excellent command of written and spoken
Soft Skills  Interactive fast enough to learn new technologies and sciences.
 Highly communication and presentation skills.
 Work in a group or individually according to the job requirements.
 Ability to set and achieve goals and to work under pressure.
 Hard worker, don’t mind working for long hours / weekends.
 Don’t mind working outside Alexandria or Egypt.
Hobbies  Drawing, Photography, Playing karate and swimming
Other  Attended ELECTRIX 2006, 2007, 2009, 2010 and 2011.
 Attending the Automation Technology Exhibition, Egypt 2008.
 Participating in the Graduation Projects Exhibition, EED 2008.
 Attended Cairo ICT 2006.
Professional references
Mr. Khaled Hanafy Maintenance Manager (Siemens) Telephone +20 (3) 450-0084 Mobile +20 (100) 178-0071
khaled.hanafy@siemens.com
Mr. Stefan Wiese Plant Manager Service Fossil Power Generation (Siemens) Telephone +49 (9131) 188-3679 Mobile +49
(162) 277-9987 stefan.weise@siemens.com
Mr. Uwe Sicks Midelec Station Manager (Siemens) Telephone +20 (3) 450 0088 Mobile +20 (102) 008 8590
uwe.sicks@siemens.com
Mr. Youssef Haridy Senior Operation Engineer (Siemens) Telephone +20 (3) 450-0086 Mobile +20 (100) 607-8321
youssef.haridy@siemens.com
Mr. Essam Hashem Engineering manager (Coca-cola ABI plant) Mobile +20 (128) 079-9400
essam.hashem@cocacolaegypt.com
Mr. Ahmed Zaaafran Engineering manager (Crush Plant) Mobile +20 (128) 319-0008
ahmed.zaaafaran@cocacolaegypt.com
Mr. Hesham Maher Engineering manager (AJE Egypt) Mobile +20 (109) 655-5667
hesham.maher.eg@ajegroup.com

Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects Engineer

  • 1.
    Mohamed Ahmed FouadHassan 1 Talaat Harb Street, Attareen, Alexandria, Egypt Post Code 21517, Alexandria, Egypt Telephone: (+203) 4866537 Mobile: (+966) 54 3371157 – (+966) 50 7666544 -- (+20) 111 4866537-- (+20) 106 0031960 E-mail: mohamedfouad@outlook.com mohamed.fouad@jomel-ksa.com PERSONAL INFORMATION:  Date of Birth: November 16, 1985  Gender: Male  Marital Status: Married  Nationality: Egyptian  Military Service: Exempted  Driving License: Valid  Passport: Valid  Residence: Saudi Arabia CAREER OBJECTIVE: Obtain a challenging position in engineering career in a reputable organization that will allow for growth and career development and enrich my experience. EMPLOYMENT HISTORY: 1 January 2016 till now Jomel – Jubail O&M limited 2.75 GW & 800,000 m3/day desalination (US $ 3.4 billion project – world’s largest power and desalination plant) Job Title: Major Overhauls and Projects Engineer. Responsibilities  Planning and execution of all major projects activities.  Manage project expenditure.  Overhauls planning and delivery.  Engineering support for operations and maintenance in MI&E problems.  Engineering review for gas turbines, steam turbines, generators and auxiliaries.  Managing all phases of GE technical information letters for GT, ST, GEN and auxiliaries.  Development and maintenance of integrated plan for outage management.  Development of contractual arrangements with equipment/service providers ensuring practical approach for procurement of parts, labor and services.  Management of HSE activities required for overhauls and major projects. 1 December 2008 till 31 December 2015 Siemens O&M MidElec 3×60 MW V64.3 Siemens gas turbines Job Title: Senior Electrical Maintenance and Protection Engineer. Responsibilities:  Maintenance and troubleshooting of Electrical turbo generators, 33/11/6.6/0.4 kV switchgears, medium and low voltage transformers and Auxiliaries.  Maintenance of diesel generators (caterpillar 3616 – 7.2 MW).  Maintenance of medium and low voltage motors.  Maintaining medium voltage and low voltage circuit breakers (Siemens, ABB, GE and ALSTOM).  Commissioning, primarysecondary injection, Maintenance and configuring of SIEMENS, AREVA and BASLER protection devices for medium and low voltage switchgears.  Maintenance and fault rectification for batteries and UPS systems.  Maintenance and calibration of metering systems.  Maintenance and inspection of OHTL and OPGW.
  • 2.
     Maintenance andtroubleshooting of SFCSEE system.  Preparing and implementing electrical modifications.  Approval and reviewing of high voltage disconnections and isolations.  Planning maintenance (routine work, fault correction and overhauls) for all plant equipment’s using Siemens power plant management system CMMS "BFS."++  Planning, ordering spare parts and tools for preventive and corrective maintenance and major overhauls.  Supervising and attending the tests for MV circuit breakers during overhauls.  Prepare and review procedures and reports.  Provide technical support to maintenance manager during minor/major overhauls execution and identifying work scope and resources.  Electrical workshop supervision.  Supervising subcontractors and outsourcing workers.  Technical reporting of maintenance and outages work to management and clients. PRACTICAL TRAINING: 3 July 2008 till 30 November The Coca-Cola bottling company of Egypt – ABI "Electrical engineer - intern"  Maintenance, operation and troubleshooting of PET line, Glass lines and Auxiliaries.  Designing and executing the new electrical installations.  Monitoring and controlling maintenance costs.  Designing of new lighting project. Summer 2007 Alexandria Iron and Steel company "Electrical engineer - intern"  Maintenance of DC & AC motors with high ratings.  Maintenance of water and oil pump stations.  Maintenance of 11000/400 volt power transformers.  Lying down and termination of low voltage cables with different ratings.  Maintenance of production line control system (ABB PLCs and systems).  Complete awareness of every stage of the production process.  Control of every rolling stage speed along the rolling line. Summer 2006 PETROJET company "Electrical engineer - intern"  Electrical installations for warehouse, workshop and administration building in Alex fertilizers.  Illumination and control installations.  Installation of earthing system.  Installing of electrical distribution power panels. Summer 2004 Gulf company for construction "Electrical engineer - intern"  Electrical installations for 3 residential buildings including the panels, risers and the interior wiring. EDUCATION BACKGROUND: September 2008 up to date MSc. Electrical power engineering  Premasters course – power division 2003 – 2008 Bachelor of electrical power engineering  University: Alexandria University  Department: Electrical Engineering (Power, Machines and control)
  • 3.
     Grade: GoodLast year grade: Good Project grade : Excellent Project: Planning, Design & Electric Automation of a Seven Star Hotel. Typical to “Ibis hotel” Major Fields of Study  Power Systems and electrical machines.  Automation and Control Engineering.  Microprocessor Based Controllers and Embedded Systems.  Industrial Electronics and Electric Drives. 1990 – 2003 E.B.S. (ElNasr Boys’ school) High school certificate (primary, preparatory and secondary)  Overall grade: Excellent 95.5% COURSES: Technical training Courses  DIGSI Basic protection and control functions (SIEMENS Power Academy – Germany).  PLC (SIEMENS S7-200).  Project Management Professional (PMP) ® 5th Edition (New Horizons).  Oracle Primavera P6 R15.1 (New Horizons).  Fire prevention program (NIOSH institute).  Human performance fundamental (Siemens).  First aid (Egyptian Red Crescent). English courses  Upper intermediate course level 10 in the AMIDEAST. Activities during university period  Automation and PLC systems 1. Grains packing process. 2. Product count and distinguish with respect to size and material. 3. Traffic flow control. 4. Chemical mixing process. 5. Elevator system, gate control.  Embedded Systems: 1. Digital Universal Protection Relay. 2. HVAC Control, Temperature Control. 3. Lighting control, Access Control. 4. Voltage Control of I.M. and Firing Control of 3-Phase Inverters.  MATLAB: Power Flow Analysis Of (N) Buses Power Grid, T.L calculator. SKILLS: Computer Skills  DIGSI 4.8, MICOM (AREVA), BASLER, MicroWIN and Step7.  AutoCAD, MATLAB, Eagle, Powerx, Ecodial and Dialux.  Assembly, Basic, Embedded Basic, ATMEL and AVR.  Windows, MS Office, Internet, Linux Ubuntu and Dos.  Computer hardware, troubleshooting and maintenance. Language Skills  Arabic: Mother Tongue  English: Excellent command of written and spoken Soft Skills  Interactive fast enough to learn new technologies and sciences.  Highly communication and presentation skills.  Work in a group or individually according to the job requirements.  Ability to set and achieve goals and to work under pressure.  Hard worker, don’t mind working for long hours / weekends.  Don’t mind working outside Alexandria or Egypt. Hobbies  Drawing, Photography, Playing karate and swimming
  • 4.
    Other  AttendedELECTRIX 2006, 2007, 2009, 2010 and 2011.  Attending the Automation Technology Exhibition, Egypt 2008.  Participating in the Graduation Projects Exhibition, EED 2008.  Attended Cairo ICT 2006. Professional references Mr. Khaled Hanafy Maintenance Manager (Siemens) Telephone +20 (3) 450-0084 Mobile +20 (100) 178-0071 khaled.hanafy@siemens.com Mr. Stefan Wiese Plant Manager Service Fossil Power Generation (Siemens) Telephone +49 (9131) 188-3679 Mobile +49 (162) 277-9987 stefan.weise@siemens.com Mr. Uwe Sicks Midelec Station Manager (Siemens) Telephone +20 (3) 450 0088 Mobile +20 (102) 008 8590 uwe.sicks@siemens.com Mr. Youssef Haridy Senior Operation Engineer (Siemens) Telephone +20 (3) 450-0086 Mobile +20 (100) 607-8321 youssef.haridy@siemens.com Mr. Essam Hashem Engineering manager (Coca-cola ABI plant) Mobile +20 (128) 079-9400 essam.hashem@cocacolaegypt.com Mr. Ahmed Zaaafran Engineering manager (Crush Plant) Mobile +20 (128) 319-0008 ahmed.zaaafaran@cocacolaegypt.com Mr. Hesham Maher Engineering manager (AJE Egypt) Mobile +20 (109) 655-5667 hesham.maher.eg@ajegroup.com