SlideShare a Scribd company logo
(PICK N PLACE)
Faculty Incharge :
Ajay Sharma
Technical Head :
Shivam Khandelwal
Event Head :
Hardik Deokar
CHAMELI DEVI GROUP
OF INSTITUTIONS, INDORE
CONTENTS
 INTRODUCTION
 RULES
 HISTORY OF PICK N PLACE EVENT AT CDGI
 PRESENT AND FUTURE ASPECT FOR THIS EVENT
 MODIFICATION WHICH CAN HELP TO INCREASE
THE NO. OF PARTICIPATING TEAM
 APPLICATION OF PICK N PLACE ROBOT.
 CONCLUSION
INTRODUCTION-
The picker to catch and the placer to drop must not be two
different machines but only the one, amalgamated. The strength
of lifting and the precision of putting the mass should be enabled
in your bot concurrently. So, pick out such a powerful object and
hit .
ARENA OF PICK N PLACE
 Above is the required arena for pick n place
 Different object is kept in the way of arena to perform
pick and place.
RULES:
 WEIGHT STATEMENT::
Design a machine (manual control) which has the ability to lift a
specified weight and then clear the track in minimum time. Both
wired and wireless bots will be allowed.
RULES CONT.
 Dimensions and Fabrication:-Maximum dimension of the
bot should not exceed 40*40*40(l*b*h)cms.
 There will be no limitation on weight to particular bot.
 Readymade lego kits are not allowed.
 Bot must be manually controlled (It may be wired or
wireless).
 In case of wireless bot it must be operated on dual frequency
to avoid interference.
 Bot should be insulated properly.
 Battery and power:Power supply should not exceed 18V
(DC).
General rules:
 Team members cannot exceed more than 4(All the
participants must be from a registered engineering
college).
 Maximum time for the completion of task is 10 minutes.
 Dragging is not allowed at the time of object picking.
 After picking the different object bot have to clear the
specified track.
 More than one object can be picked at a time.
 On the basis of points & time taken to complete the task,
teams will be selected for next round.
General rules Cont.
 Point will be considered only when the task has been
completed cleanly.
 More than one object can be added at the start of the game.
 Material of the object is not disclosed before the start of
event.
 After picking the object, if the object falls down in the middle
of the track any where then some point will be deducted.
 Judges Decision will be considered as final decision.
 Minor changes in rules and track may occur at the time of
event as per our convenience
History of pick n place event at cdgi:-
 Cdgi started this event in 2009.
 No. of participant increased successively every year.
 From last year citronics (2014) record approx~30 teams
participated in these event.
 Registration fees for pick n place last year is Rs-250 per team,
therefore 250*30= Rs 7500,and
 1 prize is of worth ~ Rs 8000/-
 Means there is negligible amount of loss with regard to this event.
PRESENT & FUTURE ASPECT FOR
THIS EVENT-
 With regard to present scenario in citronics 2015,the no. of
participating teams is most probably increase by 30+ (last
record).
 Due to advancement in electronics and automation the need
of automation engineers need is increases rapidly, and pick
and place gives the correct platform to show the talent for
engineers.
 These events is apart from event like-race, drag, soccer, sumo
etc, and these event is only organized by some of premier
institute like-IIT INDORE,IIT BOMBAY,IIT GUWAHATI
,in indore only few college like SGSITS, MEDICAPS, IIST,
ACROPOLIS, LNCT & CDGI.
 Cdgi is the only institute in indore who is organizing these
event even before IIT INDORE.
PRESENT & FUTURE ASPECT FOR
THIS EVENT-
 Due to uniqueness of these it will increase credibly of our
institute
 Pick n place event need only one time investment, therefore
more candidates try for it.
 With regard to future aspect no. of colleges are increasing
who have started organizing these event.
 Last year citronics2k14 winner (2) position, college name –
CSIT,DURG started these event since last year and they
influenced by our event, when our college team participated
in durg at that time they came to know about this.
MODIFICATION WHICH CAN
HELP TO INCREASE THE NO. OF
PARTICIPATING TEAM-
 Earlier in pick n place we used to pick the object and place it. in
both the round first and final both,
 instead of doing that these time in first round the bot have to hit
the ball in hole.
 Hole is made in the arena, the ball can be hit in the hole by either
picking or dragging.
 Advantage of above is that the participant of other event like race,
soccer can easily participate in these event without making any
modification in their bot.
 By making above changes Without altering Our motto of pick n
place we can seek maximum no. of participant.
 Successively in the second round only those bot are allowed that
having any handy help in their bot for picking.
Modified arena and event.
CONCLUSION
 Due to successful history of pick n place event, definitely will
play an role of very unique event and we expect number of
participating team nearly about 40+
THANK YOU
IF ANY QUESTION PLZ ASK

More Related Content

Viewers also liked

Servo Based 5 Axis Robotic Arm Project Report
Servo Based 5 Axis Robotic Arm Project ReportServo Based 5 Axis Robotic Arm Project Report
Servo Based 5 Axis Robotic Arm Project Report
Robo India
 
Wireless Pick and Place Surveillance Robot
Wireless Pick and Place Surveillance RobotWireless Pick and Place Surveillance Robot
Wireless Pick and Place Surveillance Robot
Zeenat Saba Khan
 
Pick and place Line following robot report
Pick and place Line following robot reportPick and place Line following robot report
Pick and place Line following robot report
Pradeep Yadav
 
Robot Arm
Robot ArmRobot Arm
Robot Arm
mzis
 
All About Honda Cafe Racer
All About Honda Cafe Racer All About Honda Cafe Racer
All About Honda Cafe Racer
marycrown
 
Enhanced robotic arm Abstract
Enhanced robotic arm AbstractEnhanced robotic arm Abstract
Enhanced robotic arm AbstractAshok Fair
 
Wireless controlled robotic arm
Wireless controlled robotic armWireless controlled robotic arm
Wireless controlled robotic arm
mundaa
 
Pneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotPneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place Robot
Abhijeet Pawar
 
Industrial robotics
Industrial roboticsIndustrial robotics
Industrial robotics
Home
 
Smt Equipments (Pick And Place, Solder Paste Screen
Smt Equipments (Pick And Place, Solder Paste ScreenSmt Equipments (Pick And Place, Solder Paste Screen
Smt Equipments (Pick And Place, Solder Paste Screen
Naresh Sharma
 
ROBOTIC ARM
ROBOTIC ARMROBOTIC ARM
ROBOTIC ARM
lavanya kaluri
 
Line following robot - Mini project
Line following robot - Mini projectLine following robot - Mini project
Line following robot - Mini project
Amit Upadhye
 
Wireless robot ppt
Wireless robot pptWireless robot ppt
Wireless robot pptVarun B P
 
Industrial robotics pick & place
Industrial robotics pick & placeIndustrial robotics pick & place
Industrial robotics pick & place
Robotics Solutions
 
Mineral water plants consultancy
Mineral water plants consultancy Mineral water plants consultancy
Mineral water plants consultancy
Robotics Solutions
 
Introduction To Robotics
Introduction To RoboticsIntroduction To Robotics
Introduction To Roboticsparthmullick
 

Viewers also liked (17)

Servo Based 5 Axis Robotic Arm Project Report
Servo Based 5 Axis Robotic Arm Project ReportServo Based 5 Axis Robotic Arm Project Report
Servo Based 5 Axis Robotic Arm Project Report
 
Wireless Pick and Place Surveillance Robot
Wireless Pick and Place Surveillance RobotWireless Pick and Place Surveillance Robot
Wireless Pick and Place Surveillance Robot
 
Pick and place Line following robot report
Pick and place Line following robot reportPick and place Line following robot report
Pick and place Line following robot report
 
Robot Arm
Robot ArmRobot Arm
Robot Arm
 
All About Honda Cafe Racer
All About Honda Cafe Racer All About Honda Cafe Racer
All About Honda Cafe Racer
 
Enhanced robotic arm Abstract
Enhanced robotic arm AbstractEnhanced robotic arm Abstract
Enhanced robotic arm Abstract
 
Wireless controlled robotic arm
Wireless controlled robotic armWireless controlled robotic arm
Wireless controlled robotic arm
 
Pneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotPneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place Robot
 
Industrial robotics
Industrial roboticsIndustrial robotics
Industrial robotics
 
Smt Equipments (Pick And Place, Solder Paste Screen
Smt Equipments (Pick And Place, Solder Paste ScreenSmt Equipments (Pick And Place, Solder Paste Screen
Smt Equipments (Pick And Place, Solder Paste Screen
 
ROBOTIC ARM
ROBOTIC ARMROBOTIC ARM
ROBOTIC ARM
 
Line following robot - Mini project
Line following robot - Mini projectLine following robot - Mini project
Line following robot - Mini project
 
Wireless robot ppt
Wireless robot pptWireless robot ppt
Wireless robot ppt
 
Industrial robotics pick & place
Industrial robotics pick & placeIndustrial robotics pick & place
Industrial robotics pick & place
 
Mineral water plants consultancy
Mineral water plants consultancy Mineral water plants consultancy
Mineral water plants consultancy
 
Introduction To Robotics
Introduction To RoboticsIntroduction To Robotics
Introduction To Robotics
 
Robotics project ppt
Robotics project pptRobotics project ppt
Robotics project ppt
 

Similar to Pick n place bot final

Intelligent chak wipe system
Intelligent chak wipe systemIntelligent chak wipe system
Intelligent chak wipe system
Deepak Vishwakarma
 
IRJET- Conclusive Bike Selector System(CBS2)
IRJET-  	  Conclusive Bike Selector System(CBS2)IRJET-  	  Conclusive Bike Selector System(CBS2)
IRJET- Conclusive Bike Selector System(CBS2)
IRJET Journal
 
EffiCycle report_LUMINIOUS_2014
EffiCycle report_LUMINIOUS_2014EffiCycle report_LUMINIOUS_2014
EffiCycle report_LUMINIOUS_2014Raj Kadecha
 
IRJET- Instructorless Driving Test
IRJET- Instructorless Driving TestIRJET- Instructorless Driving Test
IRJET- Instructorless Driving Test
IRJET Journal
 
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET Journal
 
National Defence Academy Pune Recruitment 2014
National Defence Academy Pune Recruitment 2014 National Defence Academy Pune Recruitment 2014
National Defence Academy Pune Recruitment 2014
ranjith yeen
 
Go kart design project presentation
Go kart design project presentationGo kart design project presentation
Go kart design project presentation
ARAVALI INSTITUTE OF TECHNICAL STUDIES
 
National Competition - World Robot Olympiad WRO - Syria 2018
National Competition - World Robot Olympiad WRO - Syria 2018National Competition - World Robot Olympiad WRO - Syria 2018
National Competition - World Robot Olympiad WRO - Syria 2018
Tarek Sheikh AL-Shbab
 
Govt. ITI Jogindernagar
Govt. ITI JogindernagarGovt. ITI Jogindernagar
Govt. ITI Jogindernagar
NaveenKumari8
 
Final Year Project Report on Self Tacit Zone (Location Based Android App)
Final Year Project Report on Self Tacit Zone (Location Based Android App)Final Year Project Report on Self Tacit Zone (Location Based Android App)
Final Year Project Report on Self Tacit Zone (Location Based Android App)
Parthik Poshiya
 
2010 Simulated Car Racing Championship @ CIG-2010
2010 Simulated Car Racing Championship @ CIG-20102010 Simulated Car Racing Championship @ CIG-2010
2010 Simulated Car Racing Championship @ CIG-2010Daniele Loiacono
 
IRJET- Monowheel Motorcycle
IRJET-  	  Monowheel MotorcycleIRJET-  	  Monowheel Motorcycle
IRJET- Monowheel Motorcycle
IRJET Journal
 
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
Atmiya Institute of Technology and Science (Past)
 
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET Journal
 
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty PresentationReplacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
JIMS Rohini Sector 5
 
Replacement Problem
Replacement ProblemReplacement Problem
Replacement Problem
JIMS Rohini Sector 5
 

Similar to Pick n place bot final (20)

Intelligent chak wipe system
Intelligent chak wipe systemIntelligent chak wipe system
Intelligent chak wipe system
 
IRJET- Conclusive Bike Selector System(CBS2)
IRJET-  	  Conclusive Bike Selector System(CBS2)IRJET-  	  Conclusive Bike Selector System(CBS2)
IRJET- Conclusive Bike Selector System(CBS2)
 
EffiCycle report_LUMINIOUS_2014
EffiCycle report_LUMINIOUS_2014EffiCycle report_LUMINIOUS_2014
EffiCycle report_LUMINIOUS_2014
 
GKDC Profile
GKDC ProfileGKDC Profile
GKDC Profile
 
IRJET- Instructorless Driving Test
IRJET- Instructorless Driving TestIRJET- Instructorless Driving Test
IRJET- Instructorless Driving Test
 
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
 
General rules
General rulesGeneral rules
General rules
 
National Defence Academy Pune Recruitment 2014
National Defence Academy Pune Recruitment 2014 National Defence Academy Pune Recruitment 2014
National Defence Academy Pune Recruitment 2014
 
Go kart design project presentation
Go kart design project presentationGo kart design project presentation
Go kart design project presentation
 
National Competition - World Robot Olympiad WRO - Syria 2018
National Competition - World Robot Olympiad WRO - Syria 2018National Competition - World Robot Olympiad WRO - Syria 2018
National Competition - World Robot Olympiad WRO - Syria 2018
 
SIDDHARTH GARKHAIL
SIDDHARTH GARKHAILSIDDHARTH GARKHAIL
SIDDHARTH GARKHAIL
 
Govt. ITI Jogindernagar
Govt. ITI JogindernagarGovt. ITI Jogindernagar
Govt. ITI Jogindernagar
 
Final Year Project Report on Self Tacit Zone (Location Based Android App)
Final Year Project Report on Self Tacit Zone (Location Based Android App)Final Year Project Report on Self Tacit Zone (Location Based Android App)
Final Year Project Report on Self Tacit Zone (Location Based Android App)
 
2010 Simulated Car Racing Championship @ CIG-2010
2010 Simulated Car Racing Championship @ CIG-20102010 Simulated Car Racing Championship @ CIG-2010
2010 Simulated Car Racing Championship @ CIG-2010
 
IRJET- Monowheel Motorcycle
IRJET-  	  Monowheel MotorcycleIRJET-  	  Monowheel Motorcycle
IRJET- Monowheel Motorcycle
 
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
 
Resume
ResumeResume
Resume
 
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
IRJET- Implementation of Data Acquisition System (DAQ) in an All Terrain Vehi...
 
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty PresentationReplacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
Replacement Problem - Dr. Bhupender SOM - JIMS Rohini Faculty Presentation
 
Replacement Problem
Replacement ProblemReplacement Problem
Replacement Problem
 

Recently uploaded

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

Pick n place bot final

  • 1. (PICK N PLACE) Faculty Incharge : Ajay Sharma Technical Head : Shivam Khandelwal Event Head : Hardik Deokar CHAMELI DEVI GROUP OF INSTITUTIONS, INDORE
  • 2. CONTENTS  INTRODUCTION  RULES  HISTORY OF PICK N PLACE EVENT AT CDGI  PRESENT AND FUTURE ASPECT FOR THIS EVENT  MODIFICATION WHICH CAN HELP TO INCREASE THE NO. OF PARTICIPATING TEAM  APPLICATION OF PICK N PLACE ROBOT.  CONCLUSION
  • 3. INTRODUCTION- The picker to catch and the placer to drop must not be two different machines but only the one, amalgamated. The strength of lifting and the precision of putting the mass should be enabled in your bot concurrently. So, pick out such a powerful object and hit .
  • 4. ARENA OF PICK N PLACE  Above is the required arena for pick n place  Different object is kept in the way of arena to perform pick and place.
  • 5. RULES:  WEIGHT STATEMENT:: Design a machine (manual control) which has the ability to lift a specified weight and then clear the track in minimum time. Both wired and wireless bots will be allowed.
  • 6. RULES CONT.  Dimensions and Fabrication:-Maximum dimension of the bot should not exceed 40*40*40(l*b*h)cms.  There will be no limitation on weight to particular bot.  Readymade lego kits are not allowed.  Bot must be manually controlled (It may be wired or wireless).  In case of wireless bot it must be operated on dual frequency to avoid interference.  Bot should be insulated properly.  Battery and power:Power supply should not exceed 18V (DC).
  • 7. General rules:  Team members cannot exceed more than 4(All the participants must be from a registered engineering college).  Maximum time for the completion of task is 10 minutes.  Dragging is not allowed at the time of object picking.  After picking the different object bot have to clear the specified track.  More than one object can be picked at a time.  On the basis of points & time taken to complete the task, teams will be selected for next round.
  • 8. General rules Cont.  Point will be considered only when the task has been completed cleanly.  More than one object can be added at the start of the game.  Material of the object is not disclosed before the start of event.  After picking the object, if the object falls down in the middle of the track any where then some point will be deducted.  Judges Decision will be considered as final decision.  Minor changes in rules and track may occur at the time of event as per our convenience
  • 9. History of pick n place event at cdgi:-  Cdgi started this event in 2009.  No. of participant increased successively every year.  From last year citronics (2014) record approx~30 teams participated in these event.  Registration fees for pick n place last year is Rs-250 per team, therefore 250*30= Rs 7500,and  1 prize is of worth ~ Rs 8000/-  Means there is negligible amount of loss with regard to this event.
  • 10. PRESENT & FUTURE ASPECT FOR THIS EVENT-  With regard to present scenario in citronics 2015,the no. of participating teams is most probably increase by 30+ (last record).  Due to advancement in electronics and automation the need of automation engineers need is increases rapidly, and pick and place gives the correct platform to show the talent for engineers.  These events is apart from event like-race, drag, soccer, sumo etc, and these event is only organized by some of premier institute like-IIT INDORE,IIT BOMBAY,IIT GUWAHATI ,in indore only few college like SGSITS, MEDICAPS, IIST, ACROPOLIS, LNCT & CDGI.  Cdgi is the only institute in indore who is organizing these event even before IIT INDORE.
  • 11. PRESENT & FUTURE ASPECT FOR THIS EVENT-  Due to uniqueness of these it will increase credibly of our institute  Pick n place event need only one time investment, therefore more candidates try for it.  With regard to future aspect no. of colleges are increasing who have started organizing these event.  Last year citronics2k14 winner (2) position, college name – CSIT,DURG started these event since last year and they influenced by our event, when our college team participated in durg at that time they came to know about this.
  • 12. MODIFICATION WHICH CAN HELP TO INCREASE THE NO. OF PARTICIPATING TEAM-  Earlier in pick n place we used to pick the object and place it. in both the round first and final both,  instead of doing that these time in first round the bot have to hit the ball in hole.  Hole is made in the arena, the ball can be hit in the hole by either picking or dragging.  Advantage of above is that the participant of other event like race, soccer can easily participate in these event without making any modification in their bot.  By making above changes Without altering Our motto of pick n place we can seek maximum no. of participant.  Successively in the second round only those bot are allowed that having any handy help in their bot for picking.
  • 14. CONCLUSION  Due to successful history of pick n place event, definitely will play an role of very unique event and we expect number of participating team nearly about 40+
  • 15. THANK YOU IF ANY QUESTION PLZ ASK