Phases Gates


    Concept                       CONCEPT PHASE
    Creation




     Designing




      Brief
    w/marketing                   DESIGN PHASE




   Trend ,targ
   et, &
   projection
   modificatio

                                   C:Usersteddy
         1. Sketch/drawing.      DesktopMUKLUKS 2
         2. Color specification.
         3. Specification sheet.
         4. Outsole design.
         5. Target price.
                                    Turtle Sole 4.jpg
Tech package review




 Project allocation
                                  ENGINEERING PHASE
                                      INEERING PHASE
Last confirmation
                            C:Usersteddy
                          DesktopLast Applica
          1. Tech data.
          2.Modification on wood.
                      ion




                                          Upper pattern
   3D Engineering                                                              Material Specification
                                           Engineering



Tooling or PU epoxy
                                       Stitching & Lasting                            Cutting
mold for sampling




 Prototype & Fit test


          1. BOM.      (bill of material)
          2. CBD.      (cost break down)
          3.Sample tag.
          4. CCR/fitting report.
          5,Shell pattern.


                 C:Usersteddy          Z:                   Z:
               DesktopTall Suede   CommercializationP   Commercialization


      Market
      feedba
                                     PROTOTYPE PHASE




              Tear
   down / RFC
   ( last and
   pattern)
Last Grading


        1. BOM. (bill of material)
        2. CBD.     (cost break down)
                                      Z:Flow chartSOP
        3. Confirmed b/p.                of Paddle.xlsx
        4.Fitting report.
        5.Tentative SOP (standardized operation processes)S149#5(10-28-2010)VS(08-25).jpg


 Extreme size            SAMPLE PHASE
 Kick off .




                            Upper pattern
Tooling Grading                                     Material Ordering
                              Grading




   Sampling               Stitching & Lasting      Cutting & Preparing




 Extreme size
 Fit testing &
 construction




  Fianlizing
  looks & fit.




Full Size (Set A )
                         TRIAL PHASE
FSR texturing                   Handing & die cut        MTL cfm & BOM




                       Trial
               Run & FRS
               Fitting




                                                   Ramp phase


                    PT & SOP
                    siging off



                          Tech package confirmation:
                          1. BOM. (bill of material)
                          2. CBD.     (cost break down)
                          3.Sample tag.                     Z:SOP of Tall
                                                              Mukluks.pdf
                          4.Fitting report.
                          5. SOP (standardized operation processes)


            Production Samples




                       MFR


Central file= tech package + check and inspection reports.


       Z:QA                           C:Usersteddy
Bible,MQS,BOM,SOP                    Desktopflow chart
Phases gate final

Phases gate final

  • 1.
    Phases Gates Concept CONCEPT PHASE Creation Designing Brief w/marketing DESIGN PHASE Trend ,targ et, & projection modificatio C:Usersteddy 1. Sketch/drawing. DesktopMUKLUKS 2 2. Color specification. 3. Specification sheet. 4. Outsole design. 5. Target price. Turtle Sole 4.jpg Tech package review Project allocation ENGINEERING PHASE INEERING PHASE
  • 2.
    Last confirmation C:Usersteddy DesktopLast Applica 1. Tech data. 2.Modification on wood. ion Upper pattern 3D Engineering Material Specification Engineering Tooling or PU epoxy Stitching & Lasting Cutting mold for sampling Prototype & Fit test 1. BOM. (bill of material) 2. CBD. (cost break down) 3.Sample tag. 4. CCR/fitting report. 5,Shell pattern. C:Usersteddy Z: Z: DesktopTall Suede CommercializationP Commercialization Market feedba PROTOTYPE PHASE Tear down / RFC ( last and pattern)
  • 3.
    Last Grading 1. BOM. (bill of material) 2. CBD. (cost break down) Z:Flow chartSOP 3. Confirmed b/p. of Paddle.xlsx 4.Fitting report. 5.Tentative SOP (standardized operation processes)S149#5(10-28-2010)VS(08-25).jpg Extreme size SAMPLE PHASE Kick off . Upper pattern Tooling Grading Material Ordering Grading Sampling Stitching & Lasting Cutting & Preparing Extreme size Fit testing & construction Fianlizing looks & fit. Full Size (Set A ) TRIAL PHASE
  • 4.
    FSR texturing Handing & die cut MTL cfm & BOM Trial Run & FRS Fitting Ramp phase PT & SOP siging off Tech package confirmation: 1. BOM. (bill of material) 2. CBD. (cost break down) 3.Sample tag. Z:SOP of Tall Mukluks.pdf 4.Fitting report. 5. SOP (standardized operation processes) Production Samples MFR Central file= tech package + check and inspection reports. Z:QA C:Usersteddy Bible,MQS,BOM,SOP Desktopflow chart