SlideShare a Scribd company logo
Designed for use within
Oil & Gas,Power,Chemical,Facility / Utility,Construction,Pharmaceuticals,
Steel industries,offshore complexes and others
http://www.ask-ehs.com
e-PTW
permit to work complete solutions e -PTW
Isolation
management
Permit monitoring
Job Safety
Analysis
Certificates
Warning & Alerts
External
references
Role based
authorization
Permits
Knowledge
sharing
Area map
01
02
03
04
05
06
08
09
09
Contents
Introduction
Permit Control
Isolation & Control
Job Safety Analysis
Features
Our Approach & Implementation
System Configuration
Summary
Support
Contents
e-PTW
Whye-PTW?
For lengthy, intricate, and voluminous jobs engaging large
number of agencies and work-force and tackling variety of
hazardous work situation with application of lockout-tagout
isolation systems, it becomes a gigantic work to run about, contact
people personally,take their clearances,making entries on the forms with
signatureetc.
When the control centers are located at far distances and in tough geographical
terrain,exercisingphysicalcontrolbecomesextremelytediousandtimeconsuming
If any reference is needed with previous jobs undertaken earlier,one has to search the
samephysicallyfrommaintainedlibraryofdocuments
The authority in command is faced with large number of PTW applications for the
various location of the complex and he has to scrutinize among them taking into
considerationtheentireworkprocess
e-PTW software proves to be a very useful and convenient tool to establish Control, Co-
ordination and Communication following correct work sequences among the participating
agenciesthroughcomputersystem,facilitating:
Full view of the entire work scenario to enable the in charge to take correct and fast
decision
Right,definiteandquickcommunication
Smoothflowofwork,savingtime,avoidinglengthypaperwork
Easy&quicklyretrievaldatabank
ASK-EHS has successfully designed custom-made module and implemented the above
required system in India & abroad which are excellent by working the entire satisfaction of
the clients.
Introduction “Make it Safe. Make it Happen”
e-PTW permit to work complete solutions
Introduction
01
Management of permit to work documents and certificates.System supports the full cycle
of Permits and Certificates and comes with a customized workflow to validate steps to
promotesafeworkingpractices.
FEATURING
Notification generation
Permit creation
Role & Rule controlled
Awareness & Acknowledgement
Concurrence & Authorization
Email notification
Issue & Surrender control
Re-issue control
Issue for testing
Valid to & Expiry
Surprise inspection by safety team
Full audit trail & History
Gas testing
Related safety documents
Attachment
TYPE OF DOCUMENTS
Risk Assessment (JHA,JSA,TRA)
Hot work permit
Cold work permit
Isolation certificate
Confined space certificate
Radiography certificate
Scaffolding certificate
Dive certificate
Excavation certificate
Gas testing records
e-PTW controls the sequence of
status changes a permit is moved
throughduringitslifecyclewithits
flow engine.The software provides
facility to authorized parties to
mention all necessary procedures,
isolations and authorization are
completed before moving to the
nextstageinthesequence.
e-PTW manages the entire permit
process, including: granting
permission,preparing&approving
a permit, issuing it for work to
commence,testing it and closing it
followingjobcompletion.
PERMIT FLOW
STATE EXAMPLES
Raised
Submitted
Approved
Available
Issued
Surrendered
Closed
Cancelled
On Hold
History
PermitControl
02
Permit Control “Everybody understands simplicity”
Isolation(LOTO)
Certificates
Job Safety Anal.
Dashboard
Visual Display
Gas
Testing
Work
Request
Authorised
Prepared
Assigned
Issued
Closed
Re-Validated
Expired
Hard
Copy
Email
Concur
Isolation&Control
03
Isolation & Control “Making plant SAFE to work on”
FEATURING
Isolation points & types
Isolation states
Shared isolations
Procedure attachments
Tag & lock box detail
Audit & History
e-PTW system facilities barcode tag labels and
RFID tag item identification technology.Mobile
devices can be used to upload specified
isolation points in order to provide plant
engineers the ability to locate and confirm the
isolationpointsasspecified.
Appropriate isolation sequences and individual
points are provided to the user to perform and
confirmtheworkusingRFIDplantidentification
and matching tag label barcodes. On
completion, the information can be uploaded
to affirm specified isolation points have been
applied. The system facilities de-isolation
procedureinasimilarmanner.
ISOLATION POINT VERIFICATION
e-PTW contains feature to manage the entire isolation process with
controls and checks to support logical process flow, ensuring the
synchronizationofplantisolationwithpermits.
The software guides users through the process by selecting the
isolations required while checking if they are already being shared by
otherwork.
The isolation & de-isolation process can be managed with Lock orTag
control. It gives engineer the ability to print out Isolations list & Tags
that can be taken to the worksite and used to carry out the required
isolationswhicharethenrecodedinthesoftware.
1.Build an Isolation
3.Do Isolation
4.Confirm Done in System
2.Print Isolation Lists & Tags
Job Safety Analysis
Job safety analysis provides the work team with identified hazards, controls, barriers and
safety documents that require communicating prior to work commencement.The JSA can
act as or support a Toolbox Talk where the individual input, agreement, roles and
responsibilitiescanbeagreedwiththeworkingpartypriortostartingwork.
CLEAR WORKING PARTY COMMUNICATION
Followingtaskdefinitionthejobcanbebrokendownintoaseriesofworksteps,eachbeing
recorded on the JSA.Each work step is then analyzed separately to determine the potential
hazardsrelatedtoit.
Aclient-specificHazardlibraryisprovidedtostimulatethoughtandtoassistindefiningthe
hazardsandcontrolsofeachworkstep.
Draft JSAs can be printed and used to visit the worksite to evaluate the hazard present,
followedwiththeJSAupdate,refinementandadditionofhazardsandcontrols.
Supplementary assessments such as materials, hazards, lifting plans or crafts can also be
supportedwiththedocumentattachmentfacilitiesofthesystem.
JSA STEPS
Work Request,Define and
Categorize Work
Raise JSA and define the
Equipment and Work Scope
Form a JSA Team (if required)
Define Work Steps
Conduct Work Site Assessment
Conduct Risk Assessment
Identify all the Hazards and
determine risk ratings
Assign controls to risks that
are not acceptable
Determine risk ratings after
controls are applied
Re-assign controls until all
risks are acceptable
Finalize documents
Submit for approval
Approve or Re-Assess
1
2
3
4
5
6
7
8
6.1
6.2
6.3
6.4
6.5
“PR
O
VID
IN
G
A
STR
U
C
TU
R
ED
M
ETH
O
D
A
PPLIED
TO
W
O
R
K
PR
A
C
TIC
ES
TO
M
A
N
A
G
E
TH
E
R
ISK
O
F
A
C
C
ID
EN
TS
D
U
R
IN
G
W
O
R
K
A
C
TIVITIES”
JobSafetyAnalysis
04
05
Features
Knowledgesharing
Knowledge-based processing of safety information, such as JSA, Isolations, allied
with the capture of lesson learnt following work tasks and experiences gathered at
work sites during execution of actual job, provide safety engineers and other
associated agencies with powerful tool to process permits and certificates in an
informedandhighlyintegratedmanner.
Isolationmanagement
Applicationmaintainsrecordofeachequipment,theirisolationpointsandisolation
procedurewith relevant aids like actual photographs,drawings and diagrams.It can
incorporatetheusesapplicationofdifferentLock-out/Tag-outaccessories.
AreaMap
Area map is an aerial view of the plant layout which depicts the current status of
permitsissuedandapplicationwaiting
Identified dangerous zone classification, content of area, danger from &
associatedriskfactor
Colorcodesandsymbolsidentifythenatureofpermits
Identificationmarksfordifferentpermitswiththeirbriefworkdescription
Withasingleclick,entirestatusofpermitsandapplicationappears
Identificationmarksfordifferentisolationpointswithstatus
Unique identification marks for confined space and continuous gas testing
monitoringdepicted
Warning & Alerts
Softwarewarnissuerifpermitbeingraisedcoincideswithapermitincurrentuseon
samelocationorgridreference,therebysavingtimeandeffort
Location hazard warning with danger zone classification ensures that users are
aware of the potential dangers, so that the appropriate protection and control
measurescanbetaken
Reminderforthepermitvalidityexpired
State-flow also encompasses email, concurrence, notifications, lesson learned, gas
testingandmanyothertriggerfeaturestosupportthesafetyprocesses
External References
Facility to attach any external references in form of electronic document such as
workprocedures,photographs,drawing,diagramsetc.
Permit Monitoring
Facilitatestomaintainlogofongoingpermitswithwirelesshandhelddevices
Dynamic monitoring
The safety team should remain aware of the potential for new hazards as work
progressand not become complacent.If necessary,they should STOPTHE JOB and
requesttore-assessthetask.
Permit Tracker
Trackthepermitsanditscurrentstatus
Management Information
Rule-based structure within a defined authorization process and flexible analysis
functionsdeliver‘real-time’managementinformation
Built in management reports like permit issued, suspended permits, Isolation list,
JSAlist,Hazardslistetc.
Graphicalpresentationofhistorytocarryoutstatisticalanalysis
System supports all reports,permits and certificates to be exported as PDF files for
easydistributionpurpose
Complex Job-history
Complex job having large number of permits have been planned, executed and
closed,thesamewillbekeptinstoragesequentiallyforreference
Gas test monitoring
Logofcontinuous/frequentgastestdatausingwirelesshandhelddevices
Approval Mechanism
Thismechanismvalidatesboththeusersandthedatabeforeallowingachange.
Features
Security
System offers advanced configurable security features extending to single sign-
on,securityswitching,rollandskillmatching
OurApproach&Implementation
06
Our Approach & Implementation “In your game, “good enough” isn’t just good enough”
The strength of ASK-EHS lies in its pool of
talent, exper tise, experience and
resourcefulness in software solution. Our
strength in software solution acquires
exclusivereputationfromthefactthatwenot
only develop and deliver software to our
clientsbutalsoworkhand-in-handwiththem
to implement the requisite measures at work
places. Our composite team takes the full
responsibility of software implantation; train
the client to use and execute the software
application in real-time environment with
confidence and competence, thereby
deriving full benefit from the software
application. A qualified team of project
leaders, computer programmers, software
testing professionals and implementation
specialist take-up software and technical
developmentandimplementationworks.
5.Go-Live
4.Training
3.Testing
2.Software Configuration
1.Requirements
OurApproach&Implementation
07
Our Approach & Implementation
Requirements
The initial stage will confirm the objectives and scope of the project,identify tasks
tobecarriedoutanddeterminesoftwareconfiguration.
1
Software Configuration
This stage involves making the baseline software work the way a customer wants.
A core element to this process is to build a set of WYSIWYG.These are data input
screensthatcloselyresemblestheresultinghardcopyprintoutsandrulelogic.
2
Testing
Testing is normally split into two phases, Factory Acceptance Testing (FAT) and
UserAcceptanceTesting(UAT)
3
Training
While administrator and customer project manager will have undergone
sufficient training to enable them to participate in tasks such as process mapping,
FATandUAT,additionalstafftrainingisstillrequired.
Formal, role-specific training and assessment materials have to be prepared, IT
staff needs formal training on system administration and we normally organize
roll-outtrainingsessionsledbytheadministratortoprovideconfidence.
4
Go-Live
With preparation, configuration, testing and training completed we reach the
moment everyone has been working for – go-live. Staff should be aware of the
impending switch from an existing system to an electronic system from a
combinationofaco-ordinateawarenesscampaignandroll-outtraining.
Final data is set up,software is installed and tested on user workstations and key
users are selected to begin the process of using the system to process the live
data.
ASK-EHS provides on-site support to staff during this early confidence building
stageandfinallytheprojectissignedoffandformallyhandedovertotheASK-EHS
supportdepartmentwhoprovideongoingsupportasandwhenrequired.
5
SystemConfiguration
08
System Configuration “Your system, your rules”
Permits and Certificates – ability to operate client specific forms for all
document types in the form of software screens that closely represent the
paper JSA, Permits and Certificates. The system supports any number of
types, which has its own layout, logic and data to provide users with
immediatefamiliarityandrulebased.
Hard copy Certificates and Permits – The format of printed Permits and
documents is also client specific.ASK-EHS has implemented different sizes,
color, styles, watermarks, single/double side and continuation sheet
handlingonmanyprintertypes.
Isolation and Lock-out / Tag-out methods – The software can be
configuredtomatchthefullrangeofmethodsusedbydifferentcompanies
forisolationprocedurewithfeaturesandprocessflowtosupporttheuseof
isolation certificates or the alternative method of showing isolations on
permits. A range of Lock-out/Tag-out methods are matched to suit client
preferencestailor-madetags.
Hazard & Control library – Risk assessment is supported by Hazard library.
This can be changed by client to contain their own applicable hazards and
potential controls.The library can be added to and developed by the client
toevolveasnewhazardandcontrolsarerecognizedthroughworktasks.
Userroles&rights–ability to assign specific rolesand rights to authorized
persontoview,add,edite-PTWsystemvariousstages.
Integration – e-PTW system is open for integration to other systems.The
multi-tier object-oriented architecture with its fully exposed APIs is
designedtocommunicatewithothersystemslikeMSDS,SAP,ERPsystems.
A core design goal of e-PTW system is to provide you with a system
that adapts to your process and required permit forms and
checklists, rather than forcing procedural change to match the
software. The architecture allows the system to be configured precise
requirements using instruction sets that are utilized by you. Some of the
commonconfigurationfeaturesare;
Summary
09
Summary “Improved Safety, Cost Reduction, Improved Uptime”
Although cost benefits are secondary to that of safety it is beneficial to understand that
adopting an electronic safe system of work can substantially contribute to the goal of
operatingexcellencewhilereducingoperationalcostsrelativelywell.
In summary, benefits are based on more effective and efficient administration systems to
enforce safety procedures prior to, during and after work activities as well as achieving
fewerincidentsduetogreatersafetyvigilance.
BETTER
Isolation points & types
Information
Assessment
Knowledge
Rule adoption
Process
Transparency
Application
Responsibility
Communication
Awareness
Behavior
Audit
PERSONAL ADVANTAGES
Easier to access the process
Knowledge and awareness
Quick availibity of authorities
without any personal
communication
EXTRA CONTROL
Cross checks
Role checks
Alerts
Planning & Awareness
Quality
Statistical Analysis
History
BETTER COMMUNICATION
Central information
Faster communication
Confirmed communication
OPERATIONAL EFFECTIVENESS
Increased efficiency
Increased Uptime
Lower operational cost
C
A
H
HC
A
Hot Work
Permit No: 50
Hydro testing
Support
Support
We pride ourselves in our excellent quality
of support, which ranges from helpdesk, to
system upgrades, maintenance and
administration.Our team is smart and experienced
enoughintheEHSandITdomains.
*This document, or any related presentation about ASK-EHS’ strategy, strength and possible future
developments,directions and functionality of products and/or platforms,areall subject tochange and may
be changed by ASK-EHS at any time due to any reason without notice.The information in this document is
notacommitment,promiseorlegalobligationtodeliveranymaterial,codeorfunctionality.
Instant Online Support
Email :
Website :
Contact No.:+91 98251 00917
info@ask-ehs.com
http://www.ask-ehs.com
Looking for more information?
Contact ASK-EHS’representative today!

More Related Content

What's hot

Work permit system
Work permit systemWork permit system
Work permit system
Bimal Chandra Das
 
OSHA Emergency Response Plan
OSHA Emergency Response PlanOSHA Emergency Response Plan
OSHA Emergency Response Plan
uk29652
 
Confined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHAConfined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHA
Atlantic Training, LLC.
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding PptColleen True
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
Lucy Reimer
 
Conducting Hot Work Operations
Conducting Hot Work OperationsConducting Hot Work Operations
Conducting Hot Work Operations
Aaron Johnson
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
Mirza Saifullah Baig
 
Hse plan
Hse plan Hse plan
Hse plan
Sunil Arora
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
Asif Khan
 
Work permit
Work permitWork permit
Work permit
Bhuvana govind
 
Machine guards
Machine guardsMachine guards
Machine guards
Balakhan Karim
 
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docxEXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
Dwarika Bhushan Sharma
 
Pre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdfPre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdf
AssyaMohammed
 
Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
Ali Kamal Mostofa Rubel
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
Dan Gauthier
 

What's hot (20)

Work permit system
Work permit systemWork permit system
Work permit system
 
OSHA Emergency Response Plan
OSHA Emergency Response PlanOSHA Emergency Response Plan
OSHA Emergency Response Plan
 
Height work permit
Height work permitHeight work permit
Height work permit
 
Confined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHAConfined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHA
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
 
Safety induction presentation
Safety induction presentationSafety induction presentation
Safety induction presentation
 
Conducting Hot Work Operations
Conducting Hot Work OperationsConducting Hot Work Operations
Conducting Hot Work Operations
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
 
Hse plan
Hse plan Hse plan
Hse plan
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
Work permit
Work permitWork permit
Work permit
 
Emergency Response Plan
Emergency Response PlanEmergency Response Plan
Emergency Response Plan
 
Machine guards
Machine guardsMachine guards
Machine guards
 
shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docxEXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
EXCAVATION PERMIT Form # HSEQ - EP Rev 3.docx
 
Pre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdfPre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdf
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
 

Similar to Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazard Analysis

Engica Q4 Safety brocure - Permit to Work - ISSOW
Engica Q4 Safety brocure - Permit to Work - ISSOWEngica Q4 Safety brocure - Permit to Work - ISSOW
Engica Q4 Safety brocure - Permit to Work - ISSOW
Engica Technology Systems International
 
Electronic permit to work
Electronic permit to workElectronic permit to work
Electronic permit to work
Risman BizNet
 
e-PTW
e-PTWe-PTW
Sample penetration testing agreement for core infrastructure
Sample penetration testing agreement for core infrastructureSample penetration testing agreement for core infrastructure
Sample penetration testing agreement for core infrastructure
David Sweigert
 
PTW Software An Ultimate Safety Solution.pdf
PTW Software An Ultimate Safety Solution.pdfPTW Software An Ultimate Safety Solution.pdf
PTW Software An Ultimate Safety Solution.pdf
ASK EHS Engineering & Consultants
 
CPD_Data_OPERATOR
CPD_Data_OPERATORCPD_Data_OPERATOR
CPD_Data_OPERATORGemma Booth
 
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
eldhoev
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
Harry George
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
Harry George
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdf
Olivia Wilson
 
Computerized System Validation.vinay (1).pptx
Computerized  System  Validation.vinay (1).pptxComputerized  System  Validation.vinay (1).pptx
Computerized System Validation.vinay (1).pptx
KIET GROUP OF INSITITUTE
 
Automated-test-equipment-Blog-Digilogic Systems
Automated-test-equipment-Blog-Digilogic SystemsAutomated-test-equipment-Blog-Digilogic Systems
Automated-test-equipment-Blog-Digilogic Systems
Digilogic Systems
 
Testability
TestabilityTestability
What is a Firewall Risk Assessment?
What is a Firewall Risk Assessment?What is a Firewall Risk Assessment?
What is a Firewall Risk Assessment?
VISTA InfoSec
 
IBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdfIBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdf
PhanThnh52
 
Backtrack manual Part1
Backtrack manual Part1Backtrack manual Part1
Backtrack manual Part1
Nutan Kumar Panda
 
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company BrochureIschia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Thorne & Derrick International
 
LIMS-for-Government-Regulatory-Labs.pdf
LIMS-for-Government-Regulatory-Labs.pdfLIMS-for-Government-Regulatory-Labs.pdf
LIMS-for-Government-Regulatory-Labs.pdf
Agaram Technologies
 
Comptia security-sy0-401
Comptia security-sy0-401Comptia security-sy0-401
Comptia security-sy0-401
pgupta101
 
Digitize Safety with Field ID
Digitize Safety with Field IDDigitize Safety with Field ID
Digitize Safety with Field ID
Field-ID
 

Similar to Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazard Analysis (20)

Engica Q4 Safety brocure - Permit to Work - ISSOW
Engica Q4 Safety brocure - Permit to Work - ISSOWEngica Q4 Safety brocure - Permit to Work - ISSOW
Engica Q4 Safety brocure - Permit to Work - ISSOW
 
Electronic permit to work
Electronic permit to workElectronic permit to work
Electronic permit to work
 
e-PTW
e-PTWe-PTW
e-PTW
 
Sample penetration testing agreement for core infrastructure
Sample penetration testing agreement for core infrastructureSample penetration testing agreement for core infrastructure
Sample penetration testing agreement for core infrastructure
 
PTW Software An Ultimate Safety Solution.pdf
PTW Software An Ultimate Safety Solution.pdfPTW Software An Ultimate Safety Solution.pdf
PTW Software An Ultimate Safety Solution.pdf
 
CPD_Data_OPERATOR
CPD_Data_OPERATORCPD_Data_OPERATOR
CPD_Data_OPERATOR
 
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
 
An Abridged to Permit to Work Systems
An Abridged to Permit to Work SystemsAn Abridged to Permit to Work Systems
An Abridged to Permit to Work Systems
 
An Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdfAn Abridged to Permit to Work Systems.pdf
An Abridged to Permit to Work Systems.pdf
 
Computerized System Validation.vinay (1).pptx
Computerized  System  Validation.vinay (1).pptxComputerized  System  Validation.vinay (1).pptx
Computerized System Validation.vinay (1).pptx
 
Automated-test-equipment-Blog-Digilogic Systems
Automated-test-equipment-Blog-Digilogic SystemsAutomated-test-equipment-Blog-Digilogic Systems
Automated-test-equipment-Blog-Digilogic Systems
 
Testability
TestabilityTestability
Testability
 
What is a Firewall Risk Assessment?
What is a Firewall Risk Assessment?What is a Firewall Risk Assessment?
What is a Firewall Risk Assessment?
 
IBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdfIBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdf
 
Backtrack manual Part1
Backtrack manual Part1Backtrack manual Part1
Backtrack manual Part1
 
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company BrochureIschia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
 
LIMS-for-Government-Regulatory-Labs.pdf
LIMS-for-Government-Regulatory-Labs.pdfLIMS-for-Government-Regulatory-Labs.pdf
LIMS-for-Government-Regulatory-Labs.pdf
 
Comptia security-sy0-401
Comptia security-sy0-401Comptia security-sy0-401
Comptia security-sy0-401
 
Digitize Safety with Field ID
Digitize Safety with Field IDDigitize Safety with Field ID
Digitize Safety with Field ID
 

More from ASK EHS Engineering & Consultants

Safety Observation Through Digital Lens.pdf
Safety Observation Through Digital Lens.pdfSafety Observation Through Digital Lens.pdf
Safety Observation Through Digital Lens.pdf
ASK EHS Engineering & Consultants
 
Digital Transformation in Hazard Reporting.pdf
Digital Transformation in Hazard Reporting.pdfDigital Transformation in Hazard Reporting.pdf
Digital Transformation in Hazard Reporting.pdf
ASK EHS Engineering & Consultants
 
The Future of Safety Observations (1).pdf
The Future of Safety Observations (1).pdfThe Future of Safety Observations (1).pdf
The Future of Safety Observations (1).pdf
ASK EHS Engineering & Consultants
 
Data Analytics & EHS.pdf
Data Analytics & EHS.pdfData Analytics & EHS.pdf
Data Analytics & EHS.pdf
ASK EHS Engineering & Consultants
 
EHS and Advanced Data Analytics.pdf
EHS and Advanced Data Analytics.pdfEHS and Advanced Data Analytics.pdf
EHS and Advanced Data Analytics.pdf
ASK EHS Engineering & Consultants
 
EHS and Sustainability.pdf
EHS and Sustainability.pdfEHS and Sustainability.pdf
EHS and Sustainability.pdf
ASK EHS Engineering & Consultants
 
Software Solutions for HSE Management in Data Centers.pdf
Software Solutions for HSE Management in Data Centers.pdfSoftware Solutions for HSE Management in Data Centers.pdf
Software Solutions for HSE Management in Data Centers.pdf
ASK EHS Engineering & Consultants
 
HSE Training & Employee Awareness in Data Centers.pdf
HSE Training & Employee Awareness in Data Centers.pdfHSE Training & Employee Awareness in Data Centers.pdf
HSE Training & Employee Awareness in Data Centers.pdf
ASK EHS Engineering & Consultants
 
Site EHS Manager vs. Safety Officer.pdf
Site EHS Manager vs. Safety Officer.pdfSite EHS Manager vs. Safety Officer.pdf
Site EHS Manager vs. Safety Officer.pdf
ASK EHS Engineering & Consultants
 
Environmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdfEnvironmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdf
ASK EHS Engineering & Consultants
 
CaseStudy-Navin-Fluorine-Safe
CaseStudy-Navin-Fluorine-SafeCaseStudy-Navin-Fluorine-Safe
CaseStudy-Navin-Fluorine-Safe
ASK EHS Engineering & Consultants
 
CaseStudy-Global healthcare company-PPT.pdf
CaseStudy-Global healthcare company-PPT.pdfCaseStudy-Global healthcare company-PPT.pdf
CaseStudy-Global healthcare company-PPT.pdf
ASK EHS Engineering & Consultants
 
CaseStudy-Leading producer and distributor of natural gas
CaseStudy-Leading producer and distributor of natural gasCaseStudy-Leading producer and distributor of natural gas
CaseStudy-Leading producer and distributor of natural gas
ASK EHS Engineering & Consultants
 
Best Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdfBest Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdf
ASK EHS Engineering & Consultants
 
How to make cast house operations more efficient.pdf
How to make cast house operations more efficient.pdfHow to make cast house operations more efficient.pdf
How to make cast house operations more efficient.pdf
ASK EHS Engineering & Consultants
 
CaseStudy-A renowned data center platform company
CaseStudy-A renowned data center platform companyCaseStudy-A renowned data center platform company
CaseStudy-A renowned data center platform company
ASK EHS Engineering & Consultants
 
CaseStudy-A Leading Pan-Asian Steel Manufacturer
CaseStudy-A Leading Pan-Asian Steel ManufacturerCaseStudy-A Leading Pan-Asian Steel Manufacturer
CaseStudy-A Leading Pan-Asian Steel Manufacturer
ASK EHS Engineering & Consultants
 
CaseStudy-Leading Natural Gas manufacturer-PPT.pdf
CaseStudy-Leading Natural Gas manufacturer-PPT.pdfCaseStudy-Leading Natural Gas manufacturer-PPT.pdf
CaseStudy-Leading Natural Gas manufacturer-PPT.pdf
ASK EHS Engineering & Consultants
 
Emergency Renewable
Emergency RenewableEmergency Renewable
Steps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdfSteps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdf
ASK EHS Engineering & Consultants
 

More from ASK EHS Engineering & Consultants (20)

Safety Observation Through Digital Lens.pdf
Safety Observation Through Digital Lens.pdfSafety Observation Through Digital Lens.pdf
Safety Observation Through Digital Lens.pdf
 
Digital Transformation in Hazard Reporting.pdf
Digital Transformation in Hazard Reporting.pdfDigital Transformation in Hazard Reporting.pdf
Digital Transformation in Hazard Reporting.pdf
 
The Future of Safety Observations (1).pdf
The Future of Safety Observations (1).pdfThe Future of Safety Observations (1).pdf
The Future of Safety Observations (1).pdf
 
Data Analytics & EHS.pdf
Data Analytics & EHS.pdfData Analytics & EHS.pdf
Data Analytics & EHS.pdf
 
EHS and Advanced Data Analytics.pdf
EHS and Advanced Data Analytics.pdfEHS and Advanced Data Analytics.pdf
EHS and Advanced Data Analytics.pdf
 
EHS and Sustainability.pdf
EHS and Sustainability.pdfEHS and Sustainability.pdf
EHS and Sustainability.pdf
 
Software Solutions for HSE Management in Data Centers.pdf
Software Solutions for HSE Management in Data Centers.pdfSoftware Solutions for HSE Management in Data Centers.pdf
Software Solutions for HSE Management in Data Centers.pdf
 
HSE Training & Employee Awareness in Data Centers.pdf
HSE Training & Employee Awareness in Data Centers.pdfHSE Training & Employee Awareness in Data Centers.pdf
HSE Training & Employee Awareness in Data Centers.pdf
 
Site EHS Manager vs. Safety Officer.pdf
Site EHS Manager vs. Safety Officer.pdfSite EHS Manager vs. Safety Officer.pdf
Site EHS Manager vs. Safety Officer.pdf
 
Environmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdfEnvironmental Impact Assessment for Data Center Facilities.pdf
Environmental Impact Assessment for Data Center Facilities.pdf
 
CaseStudy-Navin-Fluorine-Safe
CaseStudy-Navin-Fluorine-SafeCaseStudy-Navin-Fluorine-Safe
CaseStudy-Navin-Fluorine-Safe
 
CaseStudy-Global healthcare company-PPT.pdf
CaseStudy-Global healthcare company-PPT.pdfCaseStudy-Global healthcare company-PPT.pdf
CaseStudy-Global healthcare company-PPT.pdf
 
CaseStudy-Leading producer and distributor of natural gas
CaseStudy-Leading producer and distributor of natural gasCaseStudy-Leading producer and distributor of natural gas
CaseStudy-Leading producer and distributor of natural gas
 
Best Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdfBest Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdf
 
How to make cast house operations more efficient.pdf
How to make cast house operations more efficient.pdfHow to make cast house operations more efficient.pdf
How to make cast house operations more efficient.pdf
 
CaseStudy-A renowned data center platform company
CaseStudy-A renowned data center platform companyCaseStudy-A renowned data center platform company
CaseStudy-A renowned data center platform company
 
CaseStudy-A Leading Pan-Asian Steel Manufacturer
CaseStudy-A Leading Pan-Asian Steel ManufacturerCaseStudy-A Leading Pan-Asian Steel Manufacturer
CaseStudy-A Leading Pan-Asian Steel Manufacturer
 
CaseStudy-Leading Natural Gas manufacturer-PPT.pdf
CaseStudy-Leading Natural Gas manufacturer-PPT.pdfCaseStudy-Leading Natural Gas manufacturer-PPT.pdf
CaseStudy-Leading Natural Gas manufacturer-PPT.pdf
 
Emergency Renewable
Emergency RenewableEmergency Renewable
Emergency Renewable
 
Steps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdfSteps of an ideal LOTO Procedure.pdf
Steps of an ideal LOTO Procedure.pdf
 

Recently uploaded

Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604
Fermin Galan
 
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
XfilesPro
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
AMB-Review
 
May Marketo Masterclass, London MUG May 22 2024.pdf
May Marketo Masterclass, London MUG May 22 2024.pdfMay Marketo Masterclass, London MUG May 22 2024.pdf
May Marketo Masterclass, London MUG May 22 2024.pdf
Adele Miller
 
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
Tier1 app
 
Into the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdfInto the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdf
Ortus Solutions, Corp
 
Graphic Design Crash Course for beginners
Graphic Design Crash Course for beginnersGraphic Design Crash Course for beginners
Graphic Design Crash Course for beginners
e20449
 
2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx
Georgi Kodinov
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
Globus
 
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns
 
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Mind IT Systems
 
How Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptxHow Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptx
wottaspaceseo
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
informapgpstrackings
 
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Globus
 
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Anthony Dahanne
 
Navigating the Metaverse: A Journey into Virtual Evolution"
Navigating the Metaverse: A Journey into Virtual Evolution"Navigating the Metaverse: A Journey into Virtual Evolution"
Navigating the Metaverse: A Journey into Virtual Evolution"
Donna Lenk
 
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptxTop Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
rickgrimesss22
 
First Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User EndpointsFirst Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User Endpoints
Globus
 
Cracking the code review at SpringIO 2024
Cracking the code review at SpringIO 2024Cracking the code review at SpringIO 2024
Cracking the code review at SpringIO 2024
Paco van Beckhoven
 
A Sighting of filterA in Typelevel Rite of Passage
A Sighting of filterA in Typelevel Rite of PassageA Sighting of filterA in Typelevel Rite of Passage
A Sighting of filterA in Typelevel Rite of Passage
Philip Schwarz
 

Recently uploaded (20)

Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604
 
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
 
May Marketo Masterclass, London MUG May 22 2024.pdf
May Marketo Masterclass, London MUG May 22 2024.pdfMay Marketo Masterclass, London MUG May 22 2024.pdf
May Marketo Masterclass, London MUG May 22 2024.pdf
 
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
 
Into the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdfInto the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdf
 
Graphic Design Crash Course for beginners
Graphic Design Crash Course for beginnersGraphic Design Crash Course for beginners
Graphic Design Crash Course for beginners
 
2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
 
Prosigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns: Transforming Business with Tailored Technology Solutions
Prosigns: Transforming Business with Tailored Technology Solutions
 
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...
 
How Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptxHow Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptx
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
 
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
 
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
 
Navigating the Metaverse: A Journey into Virtual Evolution"
Navigating the Metaverse: A Journey into Virtual Evolution"Navigating the Metaverse: A Journey into Virtual Evolution"
Navigating the Metaverse: A Journey into Virtual Evolution"
 
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptxTop Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
 
First Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User EndpointsFirst Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User Endpoints
 
Cracking the code review at SpringIO 2024
Cracking the code review at SpringIO 2024Cracking the code review at SpringIO 2024
Cracking the code review at SpringIO 2024
 
A Sighting of filterA in Typelevel Rite of Passage
A Sighting of filterA in Typelevel Rite of PassageA Sighting of filterA in Typelevel Rite of Passage
A Sighting of filterA in Typelevel Rite of Passage
 

Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazard Analysis

  • 1. Designed for use within Oil & Gas,Power,Chemical,Facility / Utility,Construction,Pharmaceuticals, Steel industries,offshore complexes and others http://www.ask-ehs.com e-PTW permit to work complete solutions e -PTW Isolation management Permit monitoring Job Safety Analysis Certificates Warning & Alerts External references Role based authorization Permits Knowledge sharing Area map
  • 2. 01 02 03 04 05 06 08 09 09 Contents Introduction Permit Control Isolation & Control Job Safety Analysis Features Our Approach & Implementation System Configuration Summary Support Contents e-PTW
  • 3. Whye-PTW? For lengthy, intricate, and voluminous jobs engaging large number of agencies and work-force and tackling variety of hazardous work situation with application of lockout-tagout isolation systems, it becomes a gigantic work to run about, contact people personally,take their clearances,making entries on the forms with signatureetc. When the control centers are located at far distances and in tough geographical terrain,exercisingphysicalcontrolbecomesextremelytediousandtimeconsuming If any reference is needed with previous jobs undertaken earlier,one has to search the samephysicallyfrommaintainedlibraryofdocuments The authority in command is faced with large number of PTW applications for the various location of the complex and he has to scrutinize among them taking into considerationtheentireworkprocess e-PTW software proves to be a very useful and convenient tool to establish Control, Co- ordination and Communication following correct work sequences among the participating agenciesthroughcomputersystem,facilitating: Full view of the entire work scenario to enable the in charge to take correct and fast decision Right,definiteandquickcommunication Smoothflowofwork,savingtime,avoidinglengthypaperwork Easy&quicklyretrievaldatabank ASK-EHS has successfully designed custom-made module and implemented the above required system in India & abroad which are excellent by working the entire satisfaction of the clients. Introduction “Make it Safe. Make it Happen” e-PTW permit to work complete solutions Introduction 01
  • 4. Management of permit to work documents and certificates.System supports the full cycle of Permits and Certificates and comes with a customized workflow to validate steps to promotesafeworkingpractices. FEATURING Notification generation Permit creation Role & Rule controlled Awareness & Acknowledgement Concurrence & Authorization Email notification Issue & Surrender control Re-issue control Issue for testing Valid to & Expiry Surprise inspection by safety team Full audit trail & History Gas testing Related safety documents Attachment TYPE OF DOCUMENTS Risk Assessment (JHA,JSA,TRA) Hot work permit Cold work permit Isolation certificate Confined space certificate Radiography certificate Scaffolding certificate Dive certificate Excavation certificate Gas testing records e-PTW controls the sequence of status changes a permit is moved throughduringitslifecyclewithits flow engine.The software provides facility to authorized parties to mention all necessary procedures, isolations and authorization are completed before moving to the nextstageinthesequence. e-PTW manages the entire permit process, including: granting permission,preparing&approving a permit, issuing it for work to commence,testing it and closing it followingjobcompletion. PERMIT FLOW STATE EXAMPLES Raised Submitted Approved Available Issued Surrendered Closed Cancelled On Hold History PermitControl 02 Permit Control “Everybody understands simplicity” Isolation(LOTO) Certificates Job Safety Anal. Dashboard Visual Display Gas Testing Work Request Authorised Prepared Assigned Issued Closed Re-Validated Expired Hard Copy Email Concur
  • 5. Isolation&Control 03 Isolation & Control “Making plant SAFE to work on” FEATURING Isolation points & types Isolation states Shared isolations Procedure attachments Tag & lock box detail Audit & History e-PTW system facilities barcode tag labels and RFID tag item identification technology.Mobile devices can be used to upload specified isolation points in order to provide plant engineers the ability to locate and confirm the isolationpointsasspecified. Appropriate isolation sequences and individual points are provided to the user to perform and confirmtheworkusingRFIDplantidentification and matching tag label barcodes. On completion, the information can be uploaded to affirm specified isolation points have been applied. The system facilities de-isolation procedureinasimilarmanner. ISOLATION POINT VERIFICATION e-PTW contains feature to manage the entire isolation process with controls and checks to support logical process flow, ensuring the synchronizationofplantisolationwithpermits. The software guides users through the process by selecting the isolations required while checking if they are already being shared by otherwork. The isolation & de-isolation process can be managed with Lock orTag control. It gives engineer the ability to print out Isolations list & Tags that can be taken to the worksite and used to carry out the required isolationswhicharethenrecodedinthesoftware. 1.Build an Isolation 3.Do Isolation 4.Confirm Done in System 2.Print Isolation Lists & Tags
  • 6. Job Safety Analysis Job safety analysis provides the work team with identified hazards, controls, barriers and safety documents that require communicating prior to work commencement.The JSA can act as or support a Toolbox Talk where the individual input, agreement, roles and responsibilitiescanbeagreedwiththeworkingpartypriortostartingwork. CLEAR WORKING PARTY COMMUNICATION Followingtaskdefinitionthejobcanbebrokendownintoaseriesofworksteps,eachbeing recorded on the JSA.Each work step is then analyzed separately to determine the potential hazardsrelatedtoit. Aclient-specificHazardlibraryisprovidedtostimulatethoughtandtoassistindefiningthe hazardsandcontrolsofeachworkstep. Draft JSAs can be printed and used to visit the worksite to evaluate the hazard present, followedwiththeJSAupdate,refinementandadditionofhazardsandcontrols. Supplementary assessments such as materials, hazards, lifting plans or crafts can also be supportedwiththedocumentattachmentfacilitiesofthesystem. JSA STEPS Work Request,Define and Categorize Work Raise JSA and define the Equipment and Work Scope Form a JSA Team (if required) Define Work Steps Conduct Work Site Assessment Conduct Risk Assessment Identify all the Hazards and determine risk ratings Assign controls to risks that are not acceptable Determine risk ratings after controls are applied Re-assign controls until all risks are acceptable Finalize documents Submit for approval Approve or Re-Assess 1 2 3 4 5 6 7 8 6.1 6.2 6.3 6.4 6.5 “PR O VID IN G A STR U C TU R ED M ETH O D A PPLIED TO W O R K PR A C TIC ES TO M A N A G E TH E R ISK O F A C C ID EN TS D U R IN G W O R K A C TIVITIES” JobSafetyAnalysis 04
  • 7. 05 Features Knowledgesharing Knowledge-based processing of safety information, such as JSA, Isolations, allied with the capture of lesson learnt following work tasks and experiences gathered at work sites during execution of actual job, provide safety engineers and other associated agencies with powerful tool to process permits and certificates in an informedandhighlyintegratedmanner. Isolationmanagement Applicationmaintainsrecordofeachequipment,theirisolationpointsandisolation procedurewith relevant aids like actual photographs,drawings and diagrams.It can incorporatetheusesapplicationofdifferentLock-out/Tag-outaccessories. AreaMap Area map is an aerial view of the plant layout which depicts the current status of permitsissuedandapplicationwaiting Identified dangerous zone classification, content of area, danger from & associatedriskfactor Colorcodesandsymbolsidentifythenatureofpermits Identificationmarksfordifferentpermitswiththeirbriefworkdescription Withasingleclick,entirestatusofpermitsandapplicationappears Identificationmarksfordifferentisolationpointswithstatus Unique identification marks for confined space and continuous gas testing monitoringdepicted Warning & Alerts Softwarewarnissuerifpermitbeingraisedcoincideswithapermitincurrentuseon samelocationorgridreference,therebysavingtimeandeffort Location hazard warning with danger zone classification ensures that users are aware of the potential dangers, so that the appropriate protection and control measurescanbetaken Reminderforthepermitvalidityexpired State-flow also encompasses email, concurrence, notifications, lesson learned, gas testingandmanyothertriggerfeaturestosupportthesafetyprocesses External References Facility to attach any external references in form of electronic document such as workprocedures,photographs,drawing,diagramsetc. Permit Monitoring Facilitatestomaintainlogofongoingpermitswithwirelesshandhelddevices Dynamic monitoring The safety team should remain aware of the potential for new hazards as work progressand not become complacent.If necessary,they should STOPTHE JOB and requesttore-assessthetask. Permit Tracker Trackthepermitsanditscurrentstatus Management Information Rule-based structure within a defined authorization process and flexible analysis functionsdeliver‘real-time’managementinformation Built in management reports like permit issued, suspended permits, Isolation list, JSAlist,Hazardslistetc. Graphicalpresentationofhistorytocarryoutstatisticalanalysis System supports all reports,permits and certificates to be exported as PDF files for easydistributionpurpose Complex Job-history Complex job having large number of permits have been planned, executed and closed,thesamewillbekeptinstoragesequentiallyforreference Gas test monitoring Logofcontinuous/frequentgastestdatausingwirelesshandhelddevices Approval Mechanism Thismechanismvalidatesboththeusersandthedatabeforeallowingachange. Features Security System offers advanced configurable security features extending to single sign- on,securityswitching,rollandskillmatching
  • 8. OurApproach&Implementation 06 Our Approach & Implementation “In your game, “good enough” isn’t just good enough” The strength of ASK-EHS lies in its pool of talent, exper tise, experience and resourcefulness in software solution. Our strength in software solution acquires exclusivereputationfromthefactthatwenot only develop and deliver software to our clientsbutalsoworkhand-in-handwiththem to implement the requisite measures at work places. Our composite team takes the full responsibility of software implantation; train the client to use and execute the software application in real-time environment with confidence and competence, thereby deriving full benefit from the software application. A qualified team of project leaders, computer programmers, software testing professionals and implementation specialist take-up software and technical developmentandimplementationworks. 5.Go-Live 4.Training 3.Testing 2.Software Configuration 1.Requirements
  • 9. OurApproach&Implementation 07 Our Approach & Implementation Requirements The initial stage will confirm the objectives and scope of the project,identify tasks tobecarriedoutanddeterminesoftwareconfiguration. 1 Software Configuration This stage involves making the baseline software work the way a customer wants. A core element to this process is to build a set of WYSIWYG.These are data input screensthatcloselyresemblestheresultinghardcopyprintoutsandrulelogic. 2 Testing Testing is normally split into two phases, Factory Acceptance Testing (FAT) and UserAcceptanceTesting(UAT) 3 Training While administrator and customer project manager will have undergone sufficient training to enable them to participate in tasks such as process mapping, FATandUAT,additionalstafftrainingisstillrequired. Formal, role-specific training and assessment materials have to be prepared, IT staff needs formal training on system administration and we normally organize roll-outtrainingsessionsledbytheadministratortoprovideconfidence. 4 Go-Live With preparation, configuration, testing and training completed we reach the moment everyone has been working for – go-live. Staff should be aware of the impending switch from an existing system to an electronic system from a combinationofaco-ordinateawarenesscampaignandroll-outtraining. Final data is set up,software is installed and tested on user workstations and key users are selected to begin the process of using the system to process the live data. ASK-EHS provides on-site support to staff during this early confidence building stageandfinallytheprojectissignedoffandformallyhandedovertotheASK-EHS supportdepartmentwhoprovideongoingsupportasandwhenrequired. 5
  • 10. SystemConfiguration 08 System Configuration “Your system, your rules” Permits and Certificates – ability to operate client specific forms for all document types in the form of software screens that closely represent the paper JSA, Permits and Certificates. The system supports any number of types, which has its own layout, logic and data to provide users with immediatefamiliarityandrulebased. Hard copy Certificates and Permits – The format of printed Permits and documents is also client specific.ASK-EHS has implemented different sizes, color, styles, watermarks, single/double side and continuation sheet handlingonmanyprintertypes. Isolation and Lock-out / Tag-out methods – The software can be configuredtomatchthefullrangeofmethodsusedbydifferentcompanies forisolationprocedurewithfeaturesandprocessflowtosupporttheuseof isolation certificates or the alternative method of showing isolations on permits. A range of Lock-out/Tag-out methods are matched to suit client preferencestailor-madetags. Hazard & Control library – Risk assessment is supported by Hazard library. This can be changed by client to contain their own applicable hazards and potential controls.The library can be added to and developed by the client toevolveasnewhazardandcontrolsarerecognizedthroughworktasks. Userroles&rights–ability to assign specific rolesand rights to authorized persontoview,add,edite-PTWsystemvariousstages. Integration – e-PTW system is open for integration to other systems.The multi-tier object-oriented architecture with its fully exposed APIs is designedtocommunicatewithothersystemslikeMSDS,SAP,ERPsystems. A core design goal of e-PTW system is to provide you with a system that adapts to your process and required permit forms and checklists, rather than forcing procedural change to match the software. The architecture allows the system to be configured precise requirements using instruction sets that are utilized by you. Some of the commonconfigurationfeaturesare;
  • 11. Summary 09 Summary “Improved Safety, Cost Reduction, Improved Uptime” Although cost benefits are secondary to that of safety it is beneficial to understand that adopting an electronic safe system of work can substantially contribute to the goal of operatingexcellencewhilereducingoperationalcostsrelativelywell. In summary, benefits are based on more effective and efficient administration systems to enforce safety procedures prior to, during and after work activities as well as achieving fewerincidentsduetogreatersafetyvigilance. BETTER Isolation points & types Information Assessment Knowledge Rule adoption Process Transparency Application Responsibility Communication Awareness Behavior Audit PERSONAL ADVANTAGES Easier to access the process Knowledge and awareness Quick availibity of authorities without any personal communication EXTRA CONTROL Cross checks Role checks Alerts Planning & Awareness Quality Statistical Analysis History BETTER COMMUNICATION Central information Faster communication Confirmed communication OPERATIONAL EFFECTIVENESS Increased efficiency Increased Uptime Lower operational cost C A H HC A Hot Work Permit No: 50 Hydro testing Support Support We pride ourselves in our excellent quality of support, which ranges from helpdesk, to system upgrades, maintenance and administration.Our team is smart and experienced enoughintheEHSandITdomains. *This document, or any related presentation about ASK-EHS’ strategy, strength and possible future developments,directions and functionality of products and/or platforms,areall subject tochange and may be changed by ASK-EHS at any time due to any reason without notice.The information in this document is notacommitment,promiseorlegalobligationtodeliveranymaterial,codeorfunctionality. Instant Online Support Email : Website : Contact No.:+91 98251 00917 info@ask-ehs.com http://www.ask-ehs.com Looking for more information? Contact ASK-EHS’representative today!