E-permit systems have seen rapid advancement in
recent years and are currently gaining increasing
attention in the global oil industry. At this point the
questions many people are asking is ‘why use a
computerised system for safety management’ and
‘what are the benefits’?

Engica Technology is a specialist supplier of
electronic safe systems of work with over 20 years
experience in safety and workflow management for
major oil and gas clients globally. This short article
will outline some of their experiences of the
practical issues and benefits relating to e-safety
management technology and examines what is
involved in the adoption and implementation of an
electronic safety system.

Rather than seeing electronic systems as a
revolutionary change in the way the safety process is
carried out, a more accurate perspective is that
computerised safety management is more of an
evolution in methodology and a good system will           guide users through the correct sequence of procedures
support and streamline the current process rather         and authorisations. The result is that more time can be
than replace it with a new one.                           spent on high value activities with an improvement in
                                                          control over safety issues.
With rising oil and gas prices there is considerable
pressure to carry out maintenance tasks quickly and       The Drive
maintain production levels; however, most oil
companies, safety professionals and senior operations     Aligned with the factors previously discussed, there is
staff would rather not have a serious incident on their   currently a major drive among companies in the
platform or processing plant because of the human         energy sector to standardise safety procedures across
consequences, and also financial cost of accidents, not   their assets. Energy operators have a number of issues
to mention the negative effect on the company’s           to handle influenced by international operation and
worldwide reputation.                                     rapid ownership and equity changes. The effects of
                                                          global expansion, ageing workforce, regional skills
In addition to this, the last thing any safety manager    shortfalls, increased staff mobility and contract
wants is for workers to switch onto autopilot and         outsourcing to mention a few, all bring a strain on
become complacent, which can easily occur with            safety knowledge and local practice. These effects
repetitive maintenance tasks that need to be completed    must be counterbalanced with techniques, not only to
quickly. The result can be careless safety assessments    maintain levels of safety but to strive to improve them.
and in the worst case scenario a major accident;
therefore the optimum situation is one in which it is     While companies require a single standard corporate
possible to complete the repetitive paperwork aspect of   safety system, they also want a system that is theirs,
the safety process in a minimal amount of time without    using their own documents and processes and one
compromising safety. This is where an electronic          that can meet the varied needs of different business
system plays a role and in fact a good system will also   units. Engica’s approach is not to assume that a single
strengthen the safety process with cross checks, which    ‘out of the box’ solution with, for example, preset        1


BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005
Technology & Services


                                                                flow of, for example, a toolbox or pre-work check
                                                                can be enforced by virtue of a signatory confirming its
                                                                physical performance and risk acceptability. Work
                                                                handover due to shift change, often a time that
                                                                requires particular care with respect to safety issues,
                                                                can be supported in a similar manner.

                                                                Isolation Management

                                                                Another important element of work safety that
    permits and workflow will satisfy all organisations. It     deserves special attention is the isolation of
    is recognised that radical changes to fit a software        equipment to ensure work can be carried out safely.
    solution in many cases could cause more problems            This process is managed by different companies and
    than solutions. Staff in general are used to their          industries in different ways. A variation of lockout
    existing paper-based systems that have been derived         methods such as keysafes/lockboxes and lockbars are
    over time within their organisation. What is                employed to ensure control over isolation and
    beneficial in many cases is a step enhancement to           de-isolation, as well as the method most widely used
    strengthen the process rather than radical change and       offshore of tagging isolation points. These systems
    a flexible system is essential to support this. It is the   vary considerably in complexity and because of this
    application of current or slightly enhanced permit and      the Q4 safety system has the capability to support
    certificate forms and safety processes within a new         each of the methods discussed. This ranges from the
    electronic system that will gain the acceptance of          printing of isolation lists and tags through to visibility
    users. One should not ignore that changing practices        of shared isolation points, cross locks and key
    takes time. The sensible approach is a step-by-step         cascades and graphical key safe planning.
    philosophy to accumulate a major step change.
                                                                Integration
    Using Technology
                                                                Q4’s system architecture also allows integration with
    The next question to ask is ‘what can technology do         an existing work management system to form a
    to help with various aspects of the safety                  seamless environment. For example, work orders and
    management process’?                                        work packs (sometimes known as modules) are
    The Q4 safety system, for example, combines all of the      presented to the permit and risk assessment process
    core elements of work flow, hazard mitigation and           electronically, bringing all of the elements into a
    permit procedural methods into a unified process            unified process. This provides a powerfully
    supported with relational intelligence. The safety          synchronised workflow and safety management and
    controls and execution activities are supplemented          unlocks maximum business benefits from close
    with intrinsically safe cross-check methods to add real     integration between systems. Interfaces with other
    value in improving the safety process in its preparation,   client software such as document management
    execution and return to service phases. The output is a     systems can also be created, allowing the attachment
    safety work pack detailing the procedures and               of electronic documents including permits and
    confirmation checks to support safe work.                   isolation diagrams (P&ID), work procedures and
                                                                photographs to safety documents.
    Knowledge-based Processing
                                                                Real Time Dashboard
    Knowledge-based processing of safety information,
    such as risk assessments and plant isolations, allied       Finally the Q4 ‘realtime dashboard’ provides browser
    with the capture of lessons learnt following work           based access to permit status from anywhere on the
    tasks, provide safety engineers with powerful tools to      network. The dashboard uses maps of the facility to
    process permits and certificates in an informed and         allow the user to navigate around views of the
    highly integrated manner.                                   platform or plant. Each view displays all active
                                                                permits and isolation certificates, along with any
    Rule and Role Based                                         active risk assessments that have no associated
                                                                permit/certificate. Expired documents are shown as
    A rule and role based flow process can be applied to        flashing and each document type has its own
    the Q4 safety system; configured to each permit or          customisable icon and colour.
    certificate type with authorisation signoffs. Each
    process automatically generates an electronic audit         Practical Issues
    trail, an approach in principle to strengthen the safety
2   checks and awareness of key personnel. The managed          Speed of Use


                              BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005
How Electronic Permit to Work Systems Can Improve Work Safety

                                                          approach to projects is vital. This ensures that
Even the most functionally rich system if tediously       companies realise the core improvements in
slow will result in operators finding ways of             efficiency and increased adherence to safety best
bypassing the system. After all, a good system is about   practice, which are an essential element in the
providing information in order to give more time to       current constantly evolving industry.
the consideration of the safety issues, risk assessment
and precautions relating to the tasks at hand, not just   Safety is no doubt one of the top priorities to
to act as an executive safeguard to litigation. The       operators and introducing a step improvement
measure should be at least equal, if not quicker than,    change to safety methods needs a plan, resource and
manual methods.                                           a supplier with the necessary expertise.

Natural Use                                               An electronic system can be installed and configured
                                                          quite quickly onto an organisation’s network. A
Systems designed for rocket scientists are only           summary of elements associated with an electronic
appropriate for rocket scientists. This does not mean     system configuration will now follow.
that some training is not required, but it does mean
that the system should provide an intuitive and           • Configuration of screen and hardcopy permit and
consistent interface at each stage or phase of the          certificate forms along with state flow logic.
safety assessment or permit assembly. Q4 systems have     • Entry of authorisation personnel and permissions.
been developed by standing over the shoulders of          • Collation of plant isolation information.
safety engineers and watching experienced and             • Collation of risk assessment information.
novice users use the system many times to refine its      • Configuration of site drawing for digital dashboard.
interface. It is not valid to accept incoherency,         • Integration with existing and other work
blaming it on technology shortfalls. This has led to        management systems.
the development of on-screen permits and forms that
accurately reflect existing paper permits or isolation    It is the definition and the adoption programme that
certificates. The simulation of paper methods with        needs special attention. As one might imagine, the
data enhancing reflect natural processing rather than     definition stage presents a series of challenges to
separate element screens. This is known as ‘what you      obtain agreement if methods are going to be
see is what you get’ (WYSIWYG).                           improved over the existing process rather than
                                                          merely replicating a current system setup. For the
Other factors come to bear where certain types of         offshore oil and gas industry scheduling project team
repetitive work require processing. Processing that       discussions should be factored into the plan. Always
takes excessive time will inevitably be bypassed by       put in place a project manager with the authority
staff. This situation has to be avoided and can be        level to facilitate and make decisions. Allocate
accomplished with features such as a risk assessment      realistic timescales but with hard target milestones.
library and process route. This still ensures a risk      All these points may seem evident, as are the reasons
assessment and signoff process, but provides an           why many software systems are delayed. Engica are
effectively streamlined method for this type of work.     here to help with the process.

Adoption and Implementation                               Training

Engica have built up an extensive knowledge base of       Quality training is fundamental to the use of a safety
the key issues relating to the adoption and               management system. Central to the Q4 safety system
implementation of safety systems through the              are a series of training packages to make the system
delivery of projects for major operators such as          work effectively for all staff and contract personnel
Chevron Texaco, BP, Marathon Oil, Kerr McGee              and instil confidence in the system. In addition,
and Qatargas. This expertise in ensuring installations    purpose-built e-learning courses can be designed as
are rolled out on time and within budget has often        part of the overall project. The e-learning courses are
been in challenging locations such as the South           tailored around the necessary level of knowledge
China Sea, offshore Angola and the North Sea.             each user group’s needs.
Experience has also been gained through working in
a diverse range of operating environments,                Some aspects pertaining to offshore sites are:
encompassing both offshore and onshore facilities
such as platforms, floating production storage and        •   project management;
offload (vessels) (FPSOs), liquified natural gas (LNG)    •   awareness and communication campaign;
plants and refineries.                                    •   purpose-built e-training adoption packages;
                                                          •   procedure manuals;
The important thing to note is that an innovative         •   super user and administration system training;        3


BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005
Technology & Services


    • mass staff training; and                                 safety engineer. The next decade will see substantial
    • offshore handholding.                                    improvements as more companies adopt electronic
                                                               methodologies and new developments evolve to
    Languages                                                  improve industry best practice.

    International installations with regard to native          Engica    Technology        provides     software,
    language operators, such as China and Kazakhstan,          implementation and integration for mission critical
    have to be borne in mind. The Q4 safety system has         maintenance and safety management. ■
    been purposely designed for multi-lingual
    deployment and has the ability to run dual language
    versions simultaneously.                                      Contact Information

    Synopsis                                                      For more information:

    The age of electronic safe systems of work is taking          Website: http://www.engica.com
    shape and there are a number of further techniques
    not covered in this short article that can also assist a




4


                              BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005

More Related Content

What's hot

Q4 Product Safety Demo
Q4 Product Safety DemoQ4 Product Safety Demo
Q4 Product Engineering Demo
Q4 Product Engineering DemoQ4 Product Engineering Demo
Q4 Product Engineering Demo
Engica Technology Systems International
 
Stream Line Scaffolding Management Through Software
Stream Line Scaffolding Management Through SoftwareStream Line Scaffolding Management Through Software
Stream Line Scaffolding Management Through Software
ASK EHS Engineering & Consultants
 
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
ASK EHS Engineering & Consultants
 
Engica Q4 CMMS brochure
Engica Q4 CMMS brochureEngica Q4 CMMS brochure
On premise vs cloud server
On premise vs cloud serverOn premise vs cloud server
On premise vs cloud server
ASK EHS Engineering & Consultants
 
I safety ppt
I safety ppt I safety ppt
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company BrochureIschia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Thorne & Derrick International
 
Scaffolding Management Software ASK EHS
Scaffolding Management Software ASK EHSScaffolding Management Software ASK EHS
Scaffolding Management Software ASK EHS
ASK EHS Engineering & Consultants
 
Computer System Validation – Reduce Costs and Avoid 483s
Computer System Validation – Reduce Costs and Avoid 483sComputer System Validation – Reduce Costs and Avoid 483s
Computer System Validation – Reduce Costs and Avoid 483s
Referral
 
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Stork
 
Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...
Sterling Medical Devices
 
How can managed services improve your SAP security and compliance? [Webinar]
How can managed services improve your SAP security and compliance? [Webinar]How can managed services improve your SAP security and compliance? [Webinar]
How can managed services improve your SAP security and compliance? [Webinar]
akquinet enterprise solutions GmbH
 
DME EQ Manager - Medical device management
DME EQ Manager -  Medical device management DME EQ Manager -  Medical device management
DME EQ Manager - Medical device management
Herman Moes
 
Towards new shores with cross-system SoD analyses. [Webinar]
Towards new shores with cross-system SoD analyses. [Webinar]Towards new shores with cross-system SoD analyses. [Webinar]
Towards new shores with cross-system SoD analyses. [Webinar]
akquinet enterprise solutions GmbH
 
Behavior Based Safety
Behavior Based Safety Behavior Based Safety
Behavior Based Safety
ASK EHS Engineering & Consultants
 
IndySoft Leaflet
IndySoft LeafletIndySoft Leaflet
IndySoft LeafletJake Bishop
 
What if a hacker has already broken in when your IT auditor is at the door? H...
What if a hacker has already broken in when your IT auditor is at the door? H...What if a hacker has already broken in when your IT auditor is at the door? H...
What if a hacker has already broken in when your IT auditor is at the door? H...
akquinet enterprise solutions GmbH
 

What's hot (20)

Q4 Product Safety Demo
Q4 Product Safety DemoQ4 Product Safety Demo
Q4 Product Safety Demo
 
Q4 Product Engineering Demo
Q4 Product Engineering DemoQ4 Product Engineering Demo
Q4 Product Engineering Demo
 
Stream Line Scaffolding Management Through Software
Stream Line Scaffolding Management Through SoftwareStream Line Scaffolding Management Through Software
Stream Line Scaffolding Management Through Software
 
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
 
Engica Q4 CMMS brochure
Engica Q4 CMMS brochureEngica Q4 CMMS brochure
Engica Q4 CMMS brochure
 
On premise vs cloud server
On premise vs cloud serverOn premise vs cloud server
On premise vs cloud server
 
I safety ppt
I safety ppt I safety ppt
I safety ppt
 
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company BrochureIschia ATEX Inspection - Paperless Efficiency Company Brochure
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
 
Scaffolding Management Software ASK EHS
Scaffolding Management Software ASK EHSScaffolding Management Software ASK EHS
Scaffolding Management Software ASK EHS
 
AGSL brochure
AGSL brochureAGSL brochure
AGSL brochure
 
Computer System Validation – Reduce Costs and Avoid 483s
Computer System Validation – Reduce Costs and Avoid 483sComputer System Validation – Reduce Costs and Avoid 483s
Computer System Validation – Reduce Costs and Avoid 483s
 
2016_Brochure_Book
2016_Brochure_Book2016_Brochure_Book
2016_Brochure_Book
 
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
 
Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...
 
How can managed services improve your SAP security and compliance? [Webinar]
How can managed services improve your SAP security and compliance? [Webinar]How can managed services improve your SAP security and compliance? [Webinar]
How can managed services improve your SAP security and compliance? [Webinar]
 
DME EQ Manager - Medical device management
DME EQ Manager -  Medical device management DME EQ Manager -  Medical device management
DME EQ Manager - Medical device management
 
Towards new shores with cross-system SoD analyses. [Webinar]
Towards new shores with cross-system SoD analyses. [Webinar]Towards new shores with cross-system SoD analyses. [Webinar]
Towards new shores with cross-system SoD analyses. [Webinar]
 
Behavior Based Safety
Behavior Based Safety Behavior Based Safety
Behavior Based Safety
 
IndySoft Leaflet
IndySoft LeafletIndySoft Leaflet
IndySoft Leaflet
 
What if a hacker has already broken in when your IT auditor is at the door? H...
What if a hacker has already broken in when your IT auditor is at the door? H...What if a hacker has already broken in when your IT auditor is at the door? H...
What if a hacker has already broken in when your IT auditor is at the door? H...
 

Viewers also liked

Permit to work
Permit to workPermit to work
Permit to work
Alan Bassett
 
Permit to work
Permit to workPermit to work
Permit to work
Nikhil Barshettiwar
 
Work permit system
Work permit systemWork permit system
Work permit system
Bimal Chandra Das
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Worklifecombo
 
Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 

Viewers also liked (7)

Permit to work
Permit to workPermit to work
Permit to work
 
Permit to work
Permit to workPermit to work
Permit to work
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Cold Work Permit
Cold Work PermitCold Work Permit
Cold Work Permit
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
Work permit system
Work permit systemWork permit system
Work permit system
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 

Similar to Electronic permit to work

Engica ptw-electronic-permit-to-work-step-change-
Engica ptw-electronic-permit-to-work-step-change-Engica ptw-electronic-permit-to-work-step-change-
Engica ptw-electronic-permit-to-work-step-change-
Risman BizNet
 
Centralizing security on the mainframe
Centralizing security on the mainframeCentralizing security on the mainframe
Centralizing security on the mainframeArun Gopinath
 
Pcms vs paper
Pcms vs paperPcms vs paper
Pcms vs paper
Risman BizNet
 
Scada implement secure - architecture
Scada implement secure - architectureScada implement secure - architecture
Scada implement secure - architecture
Felipe Prado
 
Technical Paper for ASPF 2012 - Choosing the right SIS
Technical Paper for ASPF 2012 - Choosing the right SISTechnical Paper for ASPF 2012 - Choosing the right SIS
Technical Paper for ASPF 2012 - Choosing the right SISAlvin CJ Chin
 
NetSpi Whitepaper: Hardening Critical Systems At Electrical Utilities
NetSpi Whitepaper: Hardening Critical Systems At Electrical UtilitiesNetSpi Whitepaper: Hardening Critical Systems At Electrical Utilities
NetSpi Whitepaper: Hardening Critical Systems At Electrical Utilities
CoreTrace Corporation
 
Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...
Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...
Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...
ijcisjournal
 
How auditable is your disaster recovery program
How auditable is your disaster recovery programHow auditable is your disaster recovery program
How auditable is your disaster recovery programgeekmodeboy
 
· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx
· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx
· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx
LynellBull52
 
Authentication_Best_Practices_WP(EN)_web
Authentication_Best_Practices_WP(EN)_webAuthentication_Best_Practices_WP(EN)_web
Authentication_Best_Practices_WP(EN)_webSafeNet
 
ICISS Newsletter Sept 14
ICISS Newsletter Sept 14ICISS Newsletter Sept 14
ICISS Newsletter Sept 14
Capt SB Tyagi, COAC'CC*,FISM,CSC,
 
Managing Compliance
Managing ComplianceManaging Compliance
Managing Compliance
SecPod Technologies
 
Automated Incident Handling Using SIM
Automated Incident Handling Using SIMAutomated Incident Handling Using SIM
Automated Incident Handling Using SIM
Anton Chuvakin
 
Advantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfAdvantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdf
Olivia Wilson
 
Advantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfAdvantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdf
Harry George
 
Advantages of Electronic Permit System
Advantages of Electronic Permit SystemAdvantages of Electronic Permit System
Advantages of Electronic Permit System
Olivia Wilson
 
Building a Product Security Practice in a DevOps World
Building a Product Security Practice in a DevOps WorldBuilding a Product Security Practice in a DevOps World
Building a Product Security Practice in a DevOps World
Arun Prabhakar
 
Criterion 1A - 4 - MasteryPros and Cons Thoroughly compares the
Criterion 1A - 4 - MasteryPros and Cons Thoroughly compares theCriterion 1A - 4 - MasteryPros and Cons Thoroughly compares the
Criterion 1A - 4 - MasteryPros and Cons Thoroughly compares the
CruzIbarra161
 
Dynamic RWX ACM Model Optimizing the Risk on Real Time Unix File System
Dynamic RWX ACM Model Optimizing the Risk on Real Time Unix File SystemDynamic RWX ACM Model Optimizing the Risk on Real Time Unix File System
Dynamic RWX ACM Model Optimizing the Risk on Real Time Unix File System
Radita Apriana
 
EMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENT
EMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENTEMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENT
EMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENT
IJNSA Journal
 

Similar to Electronic permit to work (20)

Engica ptw-electronic-permit-to-work-step-change-
Engica ptw-electronic-permit-to-work-step-change-Engica ptw-electronic-permit-to-work-step-change-
Engica ptw-electronic-permit-to-work-step-change-
 
Centralizing security on the mainframe
Centralizing security on the mainframeCentralizing security on the mainframe
Centralizing security on the mainframe
 
Pcms vs paper
Pcms vs paperPcms vs paper
Pcms vs paper
 
Scada implement secure - architecture
Scada implement secure - architectureScada implement secure - architecture
Scada implement secure - architecture
 
Technical Paper for ASPF 2012 - Choosing the right SIS
Technical Paper for ASPF 2012 - Choosing the right SISTechnical Paper for ASPF 2012 - Choosing the right SIS
Technical Paper for ASPF 2012 - Choosing the right SIS
 
NetSpi Whitepaper: Hardening Critical Systems At Electrical Utilities
NetSpi Whitepaper: Hardening Critical Systems At Electrical UtilitiesNetSpi Whitepaper: Hardening Critical Systems At Electrical Utilities
NetSpi Whitepaper: Hardening Critical Systems At Electrical Utilities
 
Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...
Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...
Dynamic Validity Period Calculation of Digital Certificates Based on Aggregat...
 
How auditable is your disaster recovery program
How auditable is your disaster recovery programHow auditable is your disaster recovery program
How auditable is your disaster recovery program
 
· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx
· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx
· Processed on 09-Dec-2014 901 PM CST · ID 488406360 · Word .docx
 
Authentication_Best_Practices_WP(EN)_web
Authentication_Best_Practices_WP(EN)_webAuthentication_Best_Practices_WP(EN)_web
Authentication_Best_Practices_WP(EN)_web
 
ICISS Newsletter Sept 14
ICISS Newsletter Sept 14ICISS Newsletter Sept 14
ICISS Newsletter Sept 14
 
Managing Compliance
Managing ComplianceManaging Compliance
Managing Compliance
 
Automated Incident Handling Using SIM
Automated Incident Handling Using SIMAutomated Incident Handling Using SIM
Automated Incident Handling Using SIM
 
Advantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfAdvantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdf
 
Advantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdfAdvantages of Electronic Permit System.pdf
Advantages of Electronic Permit System.pdf
 
Advantages of Electronic Permit System
Advantages of Electronic Permit SystemAdvantages of Electronic Permit System
Advantages of Electronic Permit System
 
Building a Product Security Practice in a DevOps World
Building a Product Security Practice in a DevOps WorldBuilding a Product Security Practice in a DevOps World
Building a Product Security Practice in a DevOps World
 
Criterion 1A - 4 - MasteryPros and Cons Thoroughly compares the
Criterion 1A - 4 - MasteryPros and Cons Thoroughly compares theCriterion 1A - 4 - MasteryPros and Cons Thoroughly compares the
Criterion 1A - 4 - MasteryPros and Cons Thoroughly compares the
 
Dynamic RWX ACM Model Optimizing the Risk on Real Time Unix File System
Dynamic RWX ACM Model Optimizing the Risk on Real Time Unix File SystemDynamic RWX ACM Model Optimizing the Risk on Real Time Unix File System
Dynamic RWX ACM Model Optimizing the Risk on Real Time Unix File System
 
EMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENT
EMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENTEMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENT
EMPLOYEE TRUST BASED INDUSTRIAL DEVICE DEPLOYMENT AND INITIAL KEY ESTABLISHMENT
 

More from Risman BizNet

How to do business in qatar v2 @risman biznet
How to do business in qatar v2 @risman biznetHow to do business in qatar v2 @risman biznet
How to do business in qatar v2 @risman biznet
Risman BizNet
 
Uhy profile presentation @ risman biznet
Uhy profile presentation @ risman biznetUhy profile presentation @ risman biznet
Uhy profile presentation @ risman biznet
Risman BizNet
 
Communique issue 7 july2012
Communique   issue 7 july2012Communique   issue 7 july2012
Communique issue 7 july2012
Risman BizNet
 
Dukhan Toastmasters Grand Ceremony 2012
Dukhan Toastmasters Grand Ceremony 2012Dukhan Toastmasters Grand Ceremony 2012
Dukhan Toastmasters Grand Ceremony 2012
Risman BizNet
 
Feat flexible pipe
Feat flexible pipeFeat flexible pipe
Feat flexible pipe
Risman BizNet
 
Communique issue2
Communique issue2Communique issue2
Communique issue2
Risman BizNet
 
Reducing risk protecting people
Reducing risk protecting peopleReducing risk protecting people
Reducing risk protecting people
Risman BizNet
 
5steps to risk assessment
5steps to risk assessment5steps to risk assessment
5steps to risk assessment
Risman BizNet
 
Merck case history
Merck case historyMerck case history
Merck case history
Risman BizNet
 
Qatar National Sport Day in Dukhan
Qatar National Sport Day in DukhanQatar National Sport Day in Dukhan
Qatar National Sport Day in Dukhan
Risman BizNet
 
International & humorous speech contest
International & humorous speech contestInternational & humorous speech contest
International & humorous speech contest
Risman BizNet
 
Spring fair2012 dukhan english school
Spring fair2012 dukhan english schoolSpring fair2012 dukhan english school
Spring fair2012 dukhan english school
Risman BizNet
 
Problem Solving Methode
Problem Solving Methode Problem Solving Methode
Problem Solving Methode
Risman BizNet
 
Communique issue 3
Communique issue 3Communique issue 3
Communique issue 3
Risman BizNet
 
JRC Children Drawing Competition2012
JRC Children Drawing Competition2012JRC Children Drawing Competition2012
JRC Children Drawing Competition2012
Risman BizNet
 
Communique issue 4
Communique   issue 4Communique   issue 4
Communique issue 4
Risman BizNet
 
Coaching manual 14_19
Coaching manual 14_19Coaching manual 14_19
Coaching manual 14_19
Risman BizNet
 
Brochure triconex emergency_shutdownsystemssolutions_03-10
Brochure triconex emergency_shutdownsystemssolutions_03-10Brochure triconex emergency_shutdownsystemssolutions_03-10
Brochure triconex emergency_shutdownsystemssolutions_03-10
Risman BizNet
 
7 keajaiban-rezeki
7 keajaiban-rezeki7 keajaiban-rezeki
7 keajaiban-rezeki
Risman BizNet
 
Judging workshop 23 12-11-@risman
Judging workshop 23 12-11-@rismanJudging workshop 23 12-11-@risman
Judging workshop 23 12-11-@risman
Risman BizNet
 

More from Risman BizNet (20)

How to do business in qatar v2 @risman biznet
How to do business in qatar v2 @risman biznetHow to do business in qatar v2 @risman biznet
How to do business in qatar v2 @risman biznet
 
Uhy profile presentation @ risman biznet
Uhy profile presentation @ risman biznetUhy profile presentation @ risman biznet
Uhy profile presentation @ risman biznet
 
Communique issue 7 july2012
Communique   issue 7 july2012Communique   issue 7 july2012
Communique issue 7 july2012
 
Dukhan Toastmasters Grand Ceremony 2012
Dukhan Toastmasters Grand Ceremony 2012Dukhan Toastmasters Grand Ceremony 2012
Dukhan Toastmasters Grand Ceremony 2012
 
Feat flexible pipe
Feat flexible pipeFeat flexible pipe
Feat flexible pipe
 
Communique issue2
Communique issue2Communique issue2
Communique issue2
 
Reducing risk protecting people
Reducing risk protecting peopleReducing risk protecting people
Reducing risk protecting people
 
5steps to risk assessment
5steps to risk assessment5steps to risk assessment
5steps to risk assessment
 
Merck case history
Merck case historyMerck case history
Merck case history
 
Qatar National Sport Day in Dukhan
Qatar National Sport Day in DukhanQatar National Sport Day in Dukhan
Qatar National Sport Day in Dukhan
 
International & humorous speech contest
International & humorous speech contestInternational & humorous speech contest
International & humorous speech contest
 
Spring fair2012 dukhan english school
Spring fair2012 dukhan english schoolSpring fair2012 dukhan english school
Spring fair2012 dukhan english school
 
Problem Solving Methode
Problem Solving Methode Problem Solving Methode
Problem Solving Methode
 
Communique issue 3
Communique issue 3Communique issue 3
Communique issue 3
 
JRC Children Drawing Competition2012
JRC Children Drawing Competition2012JRC Children Drawing Competition2012
JRC Children Drawing Competition2012
 
Communique issue 4
Communique   issue 4Communique   issue 4
Communique issue 4
 
Coaching manual 14_19
Coaching manual 14_19Coaching manual 14_19
Coaching manual 14_19
 
Brochure triconex emergency_shutdownsystemssolutions_03-10
Brochure triconex emergency_shutdownsystemssolutions_03-10Brochure triconex emergency_shutdownsystemssolutions_03-10
Brochure triconex emergency_shutdownsystemssolutions_03-10
 
7 keajaiban-rezeki
7 keajaiban-rezeki7 keajaiban-rezeki
7 keajaiban-rezeki
 
Judging workshop 23 12-11-@risman
Judging workshop 23 12-11-@rismanJudging workshop 23 12-11-@risman
Judging workshop 23 12-11-@risman
 

Recently uploaded

Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
madhavlakhanpal29
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
7sd8fier
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
smpc3nvg
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
7 Alternatives to Bullet Points in PowerPoint
7 Alternatives to Bullet Points in PowerPoint7 Alternatives to Bullet Points in PowerPoint
7 Alternatives to Bullet Points in PowerPoint
Alvis Oh
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 

Recently uploaded (20)

Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
7 Alternatives to Bullet Points in PowerPoint
7 Alternatives to Bullet Points in PowerPoint7 Alternatives to Bullet Points in PowerPoint
7 Alternatives to Bullet Points in PowerPoint
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 

Electronic permit to work

  • 1. Technology & Services How Electronic Permit to Work Systems Can Improve Work Safety a report by Engica Technology E-permit systems have seen rapid advancement in recent years and are currently gaining increasing attention in the global oil industry. At this point the questions many people are asking is ‘why use a computerised system for safety management’ and ‘what are the benefits’? Engica Technology is a specialist supplier of electronic safe systems of work with over 20 years experience in safety and workflow management for major oil and gas clients globally. This short article will outline some of their experiences of the practical issues and benefits relating to e-safety management technology and examines what is involved in the adoption and implementation of an electronic safety system. Rather than seeing electronic systems as a revolutionary change in the way the safety process is carried out, a more accurate perspective is that computerised safety management is more of an evolution in methodology and a good system will guide users through the correct sequence of procedures support and streamline the current process rather and authorisations. The result is that more time can be than replace it with a new one. spent on high value activities with an improvement in control over safety issues. With rising oil and gas prices there is considerable pressure to carry out maintenance tasks quickly and The Drive maintain production levels; however, most oil companies, safety professionals and senior operations Aligned with the factors previously discussed, there is staff would rather not have a serious incident on their currently a major drive among companies in the platform or processing plant because of the human energy sector to standardise safety procedures across consequences, and also financial cost of accidents, not their assets. Energy operators have a number of issues to mention the negative effect on the company’s to handle influenced by international operation and worldwide reputation. rapid ownership and equity changes. The effects of global expansion, ageing workforce, regional skills In addition to this, the last thing any safety manager shortfalls, increased staff mobility and contract wants is for workers to switch onto autopilot and outsourcing to mention a few, all bring a strain on become complacent, which can easily occur with safety knowledge and local practice. These effects repetitive maintenance tasks that need to be completed must be counterbalanced with techniques, not only to quickly. The result can be careless safety assessments maintain levels of safety but to strive to improve them. and in the worst case scenario a major accident; therefore the optimum situation is one in which it is While companies require a single standard corporate possible to complete the repetitive paperwork aspect of safety system, they also want a system that is theirs, the safety process in a minimal amount of time without using their own documents and processes and one compromising safety. This is where an electronic that can meet the varied needs of different business system plays a role and in fact a good system will also units. Engica’s approach is not to assume that a single strengthen the safety process with cross checks, which ‘out of the box’ solution with, for example, preset 1 BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005
  • 2. Technology & Services flow of, for example, a toolbox or pre-work check can be enforced by virtue of a signatory confirming its physical performance and risk acceptability. Work handover due to shift change, often a time that requires particular care with respect to safety issues, can be supported in a similar manner. Isolation Management Another important element of work safety that permits and workflow will satisfy all organisations. It deserves special attention is the isolation of is recognised that radical changes to fit a software equipment to ensure work can be carried out safely. solution in many cases could cause more problems This process is managed by different companies and than solutions. Staff in general are used to their industries in different ways. A variation of lockout existing paper-based systems that have been derived methods such as keysafes/lockboxes and lockbars are over time within their organisation. What is employed to ensure control over isolation and beneficial in many cases is a step enhancement to de-isolation, as well as the method most widely used strengthen the process rather than radical change and offshore of tagging isolation points. These systems a flexible system is essential to support this. It is the vary considerably in complexity and because of this application of current or slightly enhanced permit and the Q4 safety system has the capability to support certificate forms and safety processes within a new each of the methods discussed. This ranges from the electronic system that will gain the acceptance of printing of isolation lists and tags through to visibility users. One should not ignore that changing practices of shared isolation points, cross locks and key takes time. The sensible approach is a step-by-step cascades and graphical key safe planning. philosophy to accumulate a major step change. Integration Using Technology Q4’s system architecture also allows integration with The next question to ask is ‘what can technology do an existing work management system to form a to help with various aspects of the safety seamless environment. For example, work orders and management process’? work packs (sometimes known as modules) are The Q4 safety system, for example, combines all of the presented to the permit and risk assessment process core elements of work flow, hazard mitigation and electronically, bringing all of the elements into a permit procedural methods into a unified process unified process. This provides a powerfully supported with relational intelligence. The safety synchronised workflow and safety management and controls and execution activities are supplemented unlocks maximum business benefits from close with intrinsically safe cross-check methods to add real integration between systems. Interfaces with other value in improving the safety process in its preparation, client software such as document management execution and return to service phases. The output is a systems can also be created, allowing the attachment safety work pack detailing the procedures and of electronic documents including permits and confirmation checks to support safe work. isolation diagrams (P&ID), work procedures and photographs to safety documents. Knowledge-based Processing Real Time Dashboard Knowledge-based processing of safety information, such as risk assessments and plant isolations, allied Finally the Q4 ‘realtime dashboard’ provides browser with the capture of lessons learnt following work based access to permit status from anywhere on the tasks, provide safety engineers with powerful tools to network. The dashboard uses maps of the facility to process permits and certificates in an informed and allow the user to navigate around views of the highly integrated manner. platform or plant. Each view displays all active permits and isolation certificates, along with any Rule and Role Based active risk assessments that have no associated permit/certificate. Expired documents are shown as A rule and role based flow process can be applied to flashing and each document type has its own the Q4 safety system; configured to each permit or customisable icon and colour. certificate type with authorisation signoffs. Each process automatically generates an electronic audit Practical Issues trail, an approach in principle to strengthen the safety 2 checks and awareness of key personnel. The managed Speed of Use BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005
  • 3. How Electronic Permit to Work Systems Can Improve Work Safety approach to projects is vital. This ensures that Even the most functionally rich system if tediously companies realise the core improvements in slow will result in operators finding ways of efficiency and increased adherence to safety best bypassing the system. After all, a good system is about practice, which are an essential element in the providing information in order to give more time to current constantly evolving industry. the consideration of the safety issues, risk assessment and precautions relating to the tasks at hand, not just Safety is no doubt one of the top priorities to to act as an executive safeguard to litigation. The operators and introducing a step improvement measure should be at least equal, if not quicker than, change to safety methods needs a plan, resource and manual methods. a supplier with the necessary expertise. Natural Use An electronic system can be installed and configured quite quickly onto an organisation’s network. A Systems designed for rocket scientists are only summary of elements associated with an electronic appropriate for rocket scientists. This does not mean system configuration will now follow. that some training is not required, but it does mean that the system should provide an intuitive and • Configuration of screen and hardcopy permit and consistent interface at each stage or phase of the certificate forms along with state flow logic. safety assessment or permit assembly. Q4 systems have • Entry of authorisation personnel and permissions. been developed by standing over the shoulders of • Collation of plant isolation information. safety engineers and watching experienced and • Collation of risk assessment information. novice users use the system many times to refine its • Configuration of site drawing for digital dashboard. interface. It is not valid to accept incoherency, • Integration with existing and other work blaming it on technology shortfalls. This has led to management systems. the development of on-screen permits and forms that accurately reflect existing paper permits or isolation It is the definition and the adoption programme that certificates. The simulation of paper methods with needs special attention. As one might imagine, the data enhancing reflect natural processing rather than definition stage presents a series of challenges to separate element screens. This is known as ‘what you obtain agreement if methods are going to be see is what you get’ (WYSIWYG). improved over the existing process rather than merely replicating a current system setup. For the Other factors come to bear where certain types of offshore oil and gas industry scheduling project team repetitive work require processing. Processing that discussions should be factored into the plan. Always takes excessive time will inevitably be bypassed by put in place a project manager with the authority staff. This situation has to be avoided and can be level to facilitate and make decisions. Allocate accomplished with features such as a risk assessment realistic timescales but with hard target milestones. library and process route. This still ensures a risk All these points may seem evident, as are the reasons assessment and signoff process, but provides an why many software systems are delayed. Engica are effectively streamlined method for this type of work. here to help with the process. Adoption and Implementation Training Engica have built up an extensive knowledge base of Quality training is fundamental to the use of a safety the key issues relating to the adoption and management system. Central to the Q4 safety system implementation of safety systems through the are a series of training packages to make the system delivery of projects for major operators such as work effectively for all staff and contract personnel Chevron Texaco, BP, Marathon Oil, Kerr McGee and instil confidence in the system. In addition, and Qatargas. This expertise in ensuring installations purpose-built e-learning courses can be designed as are rolled out on time and within budget has often part of the overall project. The e-learning courses are been in challenging locations such as the South tailored around the necessary level of knowledge China Sea, offshore Angola and the North Sea. each user group’s needs. Experience has also been gained through working in a diverse range of operating environments, Some aspects pertaining to offshore sites are: encompassing both offshore and onshore facilities such as platforms, floating production storage and • project management; offload (vessels) (FPSOs), liquified natural gas (LNG) • awareness and communication campaign; plants and refineries. • purpose-built e-training adoption packages; • procedure manuals; The important thing to note is that an innovative • super user and administration system training; 3 BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005
  • 4. Technology & Services • mass staff training; and safety engineer. The next decade will see substantial • offshore handholding. improvements as more companies adopt electronic methodologies and new developments evolve to Languages improve industry best practice. International installations with regard to native Engica Technology provides software, language operators, such as China and Kazakhstan, implementation and integration for mission critical have to be borne in mind. The Q4 safety system has maintenance and safety management. ■ been purposely designed for multi-lingual deployment and has the ability to run dual language versions simultaneously. Contact Information Synopsis For more information: The age of electronic safe systems of work is taking Website: http://www.engica.com shape and there are a number of further techniques not covered in this short article that can also assist a 4 BUSINESS BRIEFING: EXPLORATION & PRODUCTION: THE OIL & GAS REVIEW 2005