BALLAST
• Ballast is the granular material usually broken
stone or any other suitable material which is
spread on the top of railway formation and
around the sleepers.
FUNCTIONS OF BALLAST
• Ballast in railway track performs the following
functions.
• (i) To hold the sleepers in position and
preventing the lateral and longitudinal
movement.
• (ii) To distribute the axle load uniform from
sleepers to a large area of formation.
• (iii) To provide elasticity to the track. It acts as
elastic mat between subgrade and sleepers.
• (iv) To provide easy means of maintaining the
correct levels of the two rails in a track.
• (v) To drain rain water from the track.
• (vi) To prevent the growth of weeds inside the
track..
CHARACTERISTICS OF GOOD BALLAST
• (i) It should have sufficient strength to resist
crushing under heavy loads of moving trains.
• (ii) It should be durable enough to resist
abrasion and weathering action.
• (iii) It should have rough and angular surface
so as to provide good lateral and longitudinal
stability to the sleepers.
• (iv) It should have good workability so that it
can be easily spread of formation.
• (v) It should be cheaply available in sufficient
quantity near and along the track.
• (vi) It should not make the track dusty or
muddy due to its crushing to powder under
wheel loads.
• (vii) It should allow for easy and quick
drainage of the track.
• (viii) It should not have any chemical action on
metal sleepers and rails.
TYPES OF BALLAST
• In India, the following materials are used as ballast.
• (i) Broken stone.
• (ii) Gravel
• (iii) Sand
• (iv) Ashes or cinders
• (v) Kankar
• (vi) Moorum
• vii) Blast furnace slag
• (viii) Brick ballast
• (ix) Selected earth
(i)BROKEN STONE:
• This is the best type of ballast as it possesses
all the characteristics of a good ballast.
• It holds the track to correct alignment and
gradient due to its high interlocking action.
• The stones which are non porous, hard and do
not flake on breaking should be used.
• Igneous rocks such as granite, quartzite and
trap make excellent ballast.
• This type of ballast is used for high speed
tracks.
• ADVANTAGES
• a. It is hard and resist crushing under heavy
loads.
• b. It has angular and rough surface and hence
gives more stability to the sleepers.
• c. Its drainage property is excellent.
• DISADVANTAGES
• (a) It is expensive.
• (b) It is not so easily available.
(ii)GRAVEL:
• Gravel is the second best material for ballast.
This is obtained either from river beds or from
gravel pits and has smooth rounded fragments.
• Gravel obtained from pits usually contains
earth which should be removed by washing.
• Gravel obtained from river beds is screened
and required size gravel is used.
• Larger size gravels are broken into required
size. Round edges gravels are broken to
increase their interlocking action.
ADVANTAGES
• (a) Gravel is cheaper than stone ballast.
• (b) The drainage property of gravel excellent.
• (c) It holds the track to correct alignment and
gradient.
• (d) It is east to use gravel ballast than stone
ballast at certain places where formation is
unstable.
DISADVANTAGES
• (a) It requires screening before use due to
large variation in size.
• (b) Gravel obtained from pits requires
washing.
• (c) Due to round faces the packing under
sleepers is loose.
• (d) Gravel easily roll down due to vibrations.
(iii)SAND:
• Sand is reasonably a good material for the
ballast. Coarse sand is generally preferred to
fine sand for ballast. This type of ballast is
suitable for packing pot sleepers. It is used
only on unimportant tracks.
• ADVANTAGES
• (a) It is a cheap material.
• (b) It is available in large quantities.
• (c) It has good drainage properties.
• (d) Sand ballast produces a silent track.
• DISADVANTAGES
• (a) It has no stability and gets disturbed by the
vibrations caused by moving train.
• (b) It causes wear of rail, seats and keys.
(iv) ASHES OR CINDERS:
• These are waste products obtained from steam
locomotives.
• ADVANTAGES
• (a) It is a cheaper ballast material.
• (b) It has very good drainage quality.
• (c) It is available in large quantities and hence
can be used in emergency.
• (d) The handling and transportation are easy.
• DISADVANTAGES
• (a) It is very soft and gets crumbled to powder
under heavy loads.
• (b) It has got corrosive quality and corrode
steel sleepers and foot of the rails.
(v)KANKAR:
• It is natural material in the form of nodules from which
lime is prepared.
• ADVANTAGES
• (a) It is cheaper.
• (b) It has good drainage property.
• DISADVANTAGES
• (a) It is soft and crumbles to powder under traffic load.
• (b) The track laid on kankar ballast are difficult to
maintain.
• (c) It has corrosive quality.
(vi)MOORUM:
• It is a soft aggregate and is obtained by the decomposition
of laterite. It has red or yellow colour. It is used in
unimportant lines and sidings.
• ADVANTAGES
• (a) It is easily available in most parts of India.
• (b) It has good drainage properties.
• (c) It is used as blanket for new embankment.
• DISADVANTAGES
• (a) It is soft and easily crumbles to powder under heavy
loads.
• (b) Maintenance of track laid on moorum ballast is very
difficult.
(vii)BLAST FURNANCE SLAG:
• It is a waste product obtained from the blast furnace of
steel industry. High grade slag fulfils all the
characteristics of good ballast.
• ADVANTAGES
• (a) It is a cheap material. (b) It has good drainage
properties. (c) It is a strong material. (d) It holds the
track in correct alignment and gradient.
DISADVANTAGES
• (a) It is not available in large quantity. (b) Spreading of
this material on the formation is difficult. (c)
Maintenance of track laid on slag ballast is difficult.
(iv)BRICK BALLAST:
• At places where good ballast material is not
available over-burnt bricks are broken into
suitable size to be used as ballast.
ADVANTAGES
• (a) It is a cheap material. (b) It prevents growth of
vegetation. (c) It has good drainage properties.
DISADVANTAGES
• (a) It is soft and easily crumbles to powder under
heavy loads. (b) The rails laid over such ballast
get corrugated.
(ix)SELECTED EARTH:
• Hardened clay and decomposed rock are suitable
for use as ballast.
• When tracks are laid on new formation, then
sleepers are packed with earth for a few months.
• When the formation is consolidated and surface
becomes hard, good type of ballast is laid.
• The use of earth ballast in the beginning is to
prevent the loss of good ballast by sinking into
soft formation.
…Part -4

More Related Content

What's hot

Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types17CE67
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and railsDeven Diran
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepRAMPRASAD KUMAWAT
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionBathla Tuition Centre
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringLatif Hyder Wadho
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Railway station and YARD
Railway station and YARD Railway station and YARD
Railway station and YARD Dhruv Makadia
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdfTVijayaGowri
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport EngineeringEmaan Sharma
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railwayRAMPRASAD KUMAWAT
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric designVijai Krishnan V
 

What's hot (20)

Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Railway station and YARD
Railway station and YARD Railway station and YARD
Railway station and YARD
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 

Similar to Permanent Way of Railway & Components ?(part -1,2,3,4,5)

Heavy construction equipment
Heavy construction equipmentHeavy construction equipment
Heavy construction equipmentPritesh Parmar
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018ishwar dhakad
 
PILE FOUNDATION (basics)
PILE FOUNDATION (basics)PILE FOUNDATION (basics)
PILE FOUNDATION (basics)Gaurav Paliwal
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1AJEETH B
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTUVATSAL PATEL
 
Vikash9887106700 l&t ppt
Vikash9887106700 l&t pptVikash9887106700 l&t ppt
Vikash9887106700 l&t pptIrshad Khan
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfTVijayaGowri
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfTURUMELLAVIJAYAGOWRI
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxsurekha1287
 
GT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxGT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxAPURWAYAWALE
 
Lec 7 pile foundation
Lec 7 pile foundationLec 7 pile foundation
Lec 7 pile foundationGhulam Yasin
 
Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)S M Rahat Rahman
 
Highway engg. (road m aterial)
Highway engg. (road m aterial)Highway engg. (road m aterial)
Highway engg. (road m aterial)meenakshi sharma
 

Similar to Permanent Way of Railway & Components ?(part -1,2,3,4,5) (20)

Heavy construction equipment
Heavy construction equipmentHeavy construction equipment
Heavy construction equipment
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018
 
PILE FOUNDATION (basics)
PILE FOUNDATION (basics)PILE FOUNDATION (basics)
PILE FOUNDATION (basics)
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
 
Types of pavement
Types of pavementTypes of pavement
Types of pavement
 
Module 1.pdf
Module 1.pdfModule 1.pdf
Module 1.pdf
 
Module 1.docx
Module 1.docxModule 1.docx
Module 1.docx
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
Vikash9887106700 l&t ppt
Vikash9887106700 l&t pptVikash9887106700 l&t ppt
Vikash9887106700 l&t ppt
 
railwaypartPPT
railwaypartPPTrailwaypartPPT
railwaypartPPT
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
 
GT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxGT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptx
 
Lec 7 pile foundation
Lec 7 pile foundationLec 7 pile foundation
Lec 7 pile foundation
 
Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)
 
Highway engg. (road m aterial)
Highway engg. (road m aterial)Highway engg. (road m aterial)
Highway engg. (road m aterial)
 
Railway track
Railway trackRailway track
Railway track
 
pile_foundation_1.ppt
pile_foundation_1.pptpile_foundation_1.ppt
pile_foundation_1.ppt
 

More from RAMPRASAD KUMAWAT

Construction Material: timber
Construction Material: timber Construction Material: timber
Construction Material: timber RAMPRASAD KUMAWAT
 
Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction RAMPRASAD KUMAWAT
 
Conventional Construction : steel
Conventional Construction : steelConventional Construction : steel
Conventional Construction : steelRAMPRASAD KUMAWAT
 
Conventional construction of Timber
Conventional construction of TimberConventional construction of Timber
Conventional construction of TimberRAMPRASAD KUMAWAT
 
Working Drawing Building Layout Architectural
Working Drawing Building Layout ArchitecturalWorking Drawing Building Layout Architectural
Working Drawing Building Layout ArchitecturalRAMPRASAD KUMAWAT
 
Building Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site PlanBuilding Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site PlanRAMPRASAD KUMAWAT
 
Infrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage SystemInfrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage SystemRAMPRASAD KUMAWAT
 
Infrastructure of Building & canal
Infrastructure of  Building & canalInfrastructure of  Building & canal
Infrastructure of Building & canalRAMPRASAD KUMAWAT
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...RAMPRASAD KUMAWAT
 
Parks and Recreation center
Parks and Recreation center Parks and Recreation center
Parks and Recreation center RAMPRASAD KUMAWAT
 
element of commercial building
element of commercial buildingelement of commercial building
element of commercial buildingRAMPRASAD KUMAWAT
 

More from RAMPRASAD KUMAWAT (20)

fault & faulting
fault & faultingfault & faulting
fault & faulting
 
Fold
FoldFold
Fold
 
Construction Material: timber
Construction Material: timber Construction Material: timber
Construction Material: timber
 
Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction
 
Conventional Construction : steel
Conventional Construction : steelConventional Construction : steel
Conventional Construction : steel
 
Conventional construction of Timber
Conventional construction of TimberConventional construction of Timber
Conventional construction of Timber
 
Construction Masonry
Construction MasonryConstruction Masonry
Construction Masonry
 
concept of green buildings
concept of green buildingsconcept of green buildings
concept of green buildings
 
Building Bye-laws
Building  Bye-lawsBuilding  Bye-laws
Building Bye-laws
 
Working Drawing Building Layout Architectural
Working Drawing Building Layout ArchitecturalWorking Drawing Building Layout Architectural
Working Drawing Building Layout Architectural
 
Building Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site PlanBuilding Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site Plan
 
Ground Support System
Ground Support System Ground Support System
Ground Support System
 
Infrastructure of Dam
Infrastructure of DamInfrastructure of Dam
Infrastructure of Dam
 
Infrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage SystemInfrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage System
 
Infrastructure of Bridges
Infrastructure of BridgesInfrastructure of Bridges
Infrastructure of Bridges
 
Infrastructure of Building & canal
Infrastructure of  Building & canalInfrastructure of  Building & canal
Infrastructure of Building & canal
 
water resources
water resourceswater resources
water resources
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...
 
Parks and Recreation center
Parks and Recreation center Parks and Recreation center
Parks and Recreation center
 
element of commercial building
element of commercial buildingelement of commercial building
element of commercial building
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Permanent Way of Railway & Components ?(part -1,2,3,4,5)

  • 1. DEPARTMENT OF CIVIL ENGINEERING Permanent way of Railway Salient Features and types of Components viz. Rails, Sleepers, Ballast, Rail Fastenings Types and Selection of Rail Gauges PART-3 Er. RAMPRASAD KUMAWAT (M.Tech)
  • 2. BALLAST • Ballast is the granular material usually broken stone or any other suitable material which is spread on the top of railway formation and around the sleepers.
  • 3. FUNCTIONS OF BALLAST • Ballast in railway track performs the following functions. • (i) To hold the sleepers in position and preventing the lateral and longitudinal movement. • (ii) To distribute the axle load uniform from sleepers to a large area of formation. • (iii) To provide elasticity to the track. It acts as elastic mat between subgrade and sleepers.
  • 4. • (iv) To provide easy means of maintaining the correct levels of the two rails in a track. • (v) To drain rain water from the track. • (vi) To prevent the growth of weeds inside the track..
  • 5. CHARACTERISTICS OF GOOD BALLAST • (i) It should have sufficient strength to resist crushing under heavy loads of moving trains. • (ii) It should be durable enough to resist abrasion and weathering action. • (iii) It should have rough and angular surface so as to provide good lateral and longitudinal stability to the sleepers. • (iv) It should have good workability so that it can be easily spread of formation.
  • 6. • (v) It should be cheaply available in sufficient quantity near and along the track. • (vi) It should not make the track dusty or muddy due to its crushing to powder under wheel loads. • (vii) It should allow for easy and quick drainage of the track. • (viii) It should not have any chemical action on metal sleepers and rails.
  • 7. TYPES OF BALLAST • In India, the following materials are used as ballast. • (i) Broken stone. • (ii) Gravel • (iii) Sand • (iv) Ashes or cinders • (v) Kankar • (vi) Moorum • vii) Blast furnace slag • (viii) Brick ballast • (ix) Selected earth
  • 8. (i)BROKEN STONE: • This is the best type of ballast as it possesses all the characteristics of a good ballast. • It holds the track to correct alignment and gradient due to its high interlocking action. • The stones which are non porous, hard and do not flake on breaking should be used.
  • 9. • Igneous rocks such as granite, quartzite and trap make excellent ballast. • This type of ballast is used for high speed tracks.
  • 10. • ADVANTAGES • a. It is hard and resist crushing under heavy loads. • b. It has angular and rough surface and hence gives more stability to the sleepers. • c. Its drainage property is excellent. • DISADVANTAGES • (a) It is expensive. • (b) It is not so easily available.
  • 11. (ii)GRAVEL: • Gravel is the second best material for ballast. This is obtained either from river beds or from gravel pits and has smooth rounded fragments. • Gravel obtained from pits usually contains earth which should be removed by washing. • Gravel obtained from river beds is screened and required size gravel is used.
  • 12. • Larger size gravels are broken into required size. Round edges gravels are broken to increase their interlocking action.
  • 13. ADVANTAGES • (a) Gravel is cheaper than stone ballast. • (b) The drainage property of gravel excellent. • (c) It holds the track to correct alignment and gradient. • (d) It is east to use gravel ballast than stone ballast at certain places where formation is unstable.
  • 14. DISADVANTAGES • (a) It requires screening before use due to large variation in size. • (b) Gravel obtained from pits requires washing. • (c) Due to round faces the packing under sleepers is loose. • (d) Gravel easily roll down due to vibrations.
  • 15. (iii)SAND: • Sand is reasonably a good material for the ballast. Coarse sand is generally preferred to fine sand for ballast. This type of ballast is suitable for packing pot sleepers. It is used only on unimportant tracks.
  • 16. • ADVANTAGES • (a) It is a cheap material. • (b) It is available in large quantities. • (c) It has good drainage properties. • (d) Sand ballast produces a silent track. • DISADVANTAGES • (a) It has no stability and gets disturbed by the vibrations caused by moving train. • (b) It causes wear of rail, seats and keys.
  • 17. (iv) ASHES OR CINDERS: • These are waste products obtained from steam locomotives. • ADVANTAGES • (a) It is a cheaper ballast material. • (b) It has very good drainage quality. • (c) It is available in large quantities and hence can be used in emergency. • (d) The handling and transportation are easy.
  • 18. • DISADVANTAGES • (a) It is very soft and gets crumbled to powder under heavy loads. • (b) It has got corrosive quality and corrode steel sleepers and foot of the rails.
  • 19. (v)KANKAR: • It is natural material in the form of nodules from which lime is prepared. • ADVANTAGES • (a) It is cheaper. • (b) It has good drainage property. • DISADVANTAGES • (a) It is soft and crumbles to powder under traffic load. • (b) The track laid on kankar ballast are difficult to maintain. • (c) It has corrosive quality.
  • 20.
  • 21. (vi)MOORUM: • It is a soft aggregate and is obtained by the decomposition of laterite. It has red or yellow colour. It is used in unimportant lines and sidings. • ADVANTAGES • (a) It is easily available in most parts of India. • (b) It has good drainage properties. • (c) It is used as blanket for new embankment. • DISADVANTAGES • (a) It is soft and easily crumbles to powder under heavy loads. • (b) Maintenance of track laid on moorum ballast is very difficult.
  • 22.
  • 23. (vii)BLAST FURNANCE SLAG: • It is a waste product obtained from the blast furnace of steel industry. High grade slag fulfils all the characteristics of good ballast. • ADVANTAGES • (a) It is a cheap material. (b) It has good drainage properties. (c) It is a strong material. (d) It holds the track in correct alignment and gradient. DISADVANTAGES • (a) It is not available in large quantity. (b) Spreading of this material on the formation is difficult. (c) Maintenance of track laid on slag ballast is difficult.
  • 24.
  • 25. (iv)BRICK BALLAST: • At places where good ballast material is not available over-burnt bricks are broken into suitable size to be used as ballast. ADVANTAGES • (a) It is a cheap material. (b) It prevents growth of vegetation. (c) It has good drainage properties. DISADVANTAGES • (a) It is soft and easily crumbles to powder under heavy loads. (b) The rails laid over such ballast get corrugated.
  • 26.
  • 27. (ix)SELECTED EARTH: • Hardened clay and decomposed rock are suitable for use as ballast. • When tracks are laid on new formation, then sleepers are packed with earth for a few months. • When the formation is consolidated and surface becomes hard, good type of ballast is laid. • The use of earth ballast in the beginning is to prevent the loss of good ballast by sinking into soft formation.