SlideShare a Scribd company logo
Orville Shaw
5804 57THAve Beaumont Ab. T4X 1A9 | 780-919-5268 | orvilleshaw@gmail.com
Objective
· To be part of a team environment working towards a successful project completion. I would like to grow with each
project I am a part of gaining more experience and knowledge from the construction team.
QUALIFICATIONS
· Master Electrician Alberta, April 2005
· Electrical Journeyman’s License in Saskatchewan, Jan 2012
· Electrical Certificate of Qualification British Columbia, 1999
· Red SealJourneyman Electrician, 1996
· 10 Years in The Canadian Armed Forces (Navy) – Honorable Discharge.
Skills & Abilities
· Working as part of the construction team as an E/I Inspector.
· Able to read and understand IFC Drawings and PID’s.
· Follows The CEC and The Clients Specifications Manuals.
· A great deal of field experience in the oil and gas industry with some commercial experience.
RESPONSIBILITIES
· Issue work permits on a daily basis to the contractors.
· Ensure contractors are filling out safety forms prior to work commencing.
· Ensure contractors and their workers are following all respective safety policies and wearing all their PPE.
· Inspect daily work, ensuring a high standard of quality workmanship.
· Inspect work that it meets all CEC and Client Spec’s as required.
· Sign and code daily work tickets.
· Sign and code material tickets. Check tickets against back up supplied by contractor if required.
· Enter and keep cost tracker up to date.
· Work closely with the contractor and engineering firm to determine cost saving methods of installations.
· Work closely with Mechanical team to avoid rework if at all possible.
· Witness QAQC and Pre-Commissioning of systems.
· Sign off on QAQC and Pre-commissioning documentation, ensuring Red lines and ITP requirements have been met.
· Sending in Daily / Weekly reports as required.Being part of team meetings and conference calls as required.
WORK HISTORY
· Pembina Pipeline Corporation. Feb 2016 toPresent. Lator Pump Station
· Husky Edam East SAGD Project. Mar. 2015 toFeb 2016 Husky Edam East & Vawn SAGD Project
· NEP Canada. Oct. 2014 toFeb. 2015 Compressor and Booster site
· Talisman Energy. Mar.2014 toSept 2014 3 Compressor, booster sites
· Canexus NATO Project Jul. 2013 toMar. 2014 Train Loading Facility.
Page 2
· CNRL Britnell Field. May. 2012 toJune.2013 Polymer Injection Well sites
· Husky Pikes Peak South. Sept.2011 toMar. 2012. SAGD Project.
PREVIOUS
· I worked as an Owner/ Field supervisor for Delta Electric and Elite Controls. Elite Controls was based out of Fort
McMurray and Delta Electric was based in Lacombe. Both companies were involved in the oil/ Gas industry along with
commercial/residential in both areas. The work involved the co-ordination of manpower and materials on site,
estimating projects and supervising the installations.
· I also worked as a sub-contractor with a tooled truck from 2003 until2008.The companies I worked for were
· Pronghorn Controls in Fort McMurray at the Deer Creek SAGD plant for Total as the Site Superintendent and as the
project superintendent on the Fort Hills Pilot Project.
· Spider Electric located in Medicine Hat Ab. I ran small to medium size projects in Southern Alberta and
Saskatchewan which included SCADA upgrades for Anadarko, well sites on the Suffield Block for Encana and a major
upgrade for Husky’s Bow Island Plant south of Medicine Hat.
· GrizzlyElectric in Wabasca,Ab. Working on wellhead pump installations, upgrades towell pad sites.
· IBEW 424, Foreman 1999 – 2003.
· Worked on Major Projects in the Fort McMurray area at Suncor Co-Generation units, Suncor Millenium Project, Shell
Muskeg Project Phase 1,Joffre Expansion Project close to Red Deer Ab.
· Syndicated Technologies 1991 – 1999
· Started Electrical Apprenticeship with Bouchard Electric which in turn became Syndicated Technologies, earned my
Journeyman Certificate while in their employ.
· Canadian Armed Forces,1981 – 1991
· Became a member of the Canadian Navy as a Marine Electrician, served on three different ships and a tour at Fllet
Diving Unit Pacific. Attained the rankof Master Seaman.
· Honorably Discharged in Feb. 1991.
REFERENCES
Available upon request.

More Related Content

What's hot

IAS Resume 2015
IAS Resume 2015IAS Resume 2015
IAS Resume 2015ian south
 
David Seslar resume 2015
David Seslar                resume 2015David Seslar                resume 2015
David Seslar resume 2015david seslar
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Crosstown TO
 
G.N Engineering
G.N EngineeringG.N Engineering
G.N Engineering
guest90ce1a3
 
CV G_Tetreault - (HDM-Red Seal)
CV G_Tetreault - (HDM-Red Seal)CV G_Tetreault - (HDM-Red Seal)
CV G_Tetreault - (HDM-Red Seal)Gaetan T
 
MattSmithCV. 2016mod
MattSmithCV. 2016modMattSmithCV. 2016mod
MattSmithCV. 2016modMatthew Smith
 
Greg King Resume
Greg King ResumeGreg King Resume
Greg King ResumeGreg King
 
ResumeofJohnLarkins2016
ResumeofJohnLarkins2016ResumeofJohnLarkins2016
ResumeofJohnLarkins2016John Larkins
 
Completed case study usa - wv dot - version 1.1 - en
Completed case study   usa - wv dot - version 1.1 - en Completed case study   usa - wv dot - version 1.1 - en
Completed case study usa - wv dot - version 1.1 - en Ascorel
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015ATTA DEMETRE
 

What's hot (20)

IAS Resume 2015
IAS Resume 2015IAS Resume 2015
IAS Resume 2015
 
David Seslar resume 2015
David Seslar                resume 2015David Seslar                resume 2015
David Seslar resume 2015
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
 
jahangir
jahangirjahangir
jahangir
 
G.N Engineering
G.N EngineeringG.N Engineering
G.N Engineering
 
resume
resumeresume
resume
 
AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3
 
Shelby's Resume
Shelby's ResumeShelby's Resume
Shelby's Resume
 
CV G_Tetreault - (HDM-Red Seal)
CV G_Tetreault - (HDM-Red Seal)CV G_Tetreault - (HDM-Red Seal)
CV G_Tetreault - (HDM-Red Seal)
 
Geoff Fox GF1 (1)
Geoff Fox GF1 (1)Geoff Fox GF1 (1)
Geoff Fox GF1 (1)
 
MattSmithCV. 2016mod
MattSmithCV. 2016modMattSmithCV. 2016mod
MattSmithCV. 2016mod
 
LINCOLN WILLS CV 1
LINCOLN WILLS CV 1LINCOLN WILLS CV 1
LINCOLN WILLS CV 1
 
CVLA updated
CVLA updatedCVLA updated
CVLA updated
 
Greg King Resume
Greg King ResumeGreg King Resume
Greg King Resume
 
Zeshan Iltaf C.V
Zeshan Iltaf C.VZeshan Iltaf C.V
Zeshan Iltaf C.V
 
Resume
ResumeResume
Resume
 
ResumeofJohnLarkins2016
ResumeofJohnLarkins2016ResumeofJohnLarkins2016
ResumeofJohnLarkins2016
 
Completed case study usa - wv dot - version 1.1 - en
Completed case study   usa - wv dot - version 1.1 - en Completed case study   usa - wv dot - version 1.1 - en
Completed case study usa - wv dot - version 1.1 - en
 
Resume Sept. 2016
Resume Sept. 2016Resume Sept. 2016
Resume Sept. 2016
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
 

Similar to Orville Shaw

GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning managerMartin Bennie
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
Michael Corcoran
 
Tom paterson-resume
Tom paterson-resumeTom paterson-resume
Tom paterson-resume
Thomas Paterson
 
Tom Paterson-resume
Tom Paterson-resumeTom Paterson-resume
Tom Paterson-resume
Thomas Paterson
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
rana maqsood
 
Darren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formattedDarren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formatteddarren sahlen
 
BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015Brendan Andrews
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 

Similar to Orville Shaw (20)

GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
SABER CV
SABER CVSABER CV
SABER CV
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
Mr Khater Updated CV
Mr  Khater Updated CVMr  Khater Updated CV
Mr Khater Updated CV
 
MNC-14
MNC-14MNC-14
MNC-14
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 
Cv qa qc 15th july m
Cv qa qc 15th july mCv qa qc 15th july m
Cv qa qc 15th july m
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
Tom paterson-resume
Tom paterson-resumeTom paterson-resume
Tom paterson-resume
 
Tom Paterson-resume
Tom Paterson-resumeTom Paterson-resume
Tom Paterson-resume
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Darren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formattedDarren Sahlen Resume June 2014 formatted
Darren Sahlen Resume June 2014 formatted
 
scooby cv4
scooby cv4scooby cv4
scooby cv4
 
BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015
 
Anandakrishnan-resume s
Anandakrishnan-resume  sAnandakrishnan-resume  s
Anandakrishnan-resume s
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 

Orville Shaw

  • 1. Orville Shaw 5804 57THAve Beaumont Ab. T4X 1A9 | 780-919-5268 | orvilleshaw@gmail.com Objective · To be part of a team environment working towards a successful project completion. I would like to grow with each project I am a part of gaining more experience and knowledge from the construction team. QUALIFICATIONS · Master Electrician Alberta, April 2005 · Electrical Journeyman’s License in Saskatchewan, Jan 2012 · Electrical Certificate of Qualification British Columbia, 1999 · Red SealJourneyman Electrician, 1996 · 10 Years in The Canadian Armed Forces (Navy) – Honorable Discharge. Skills & Abilities · Working as part of the construction team as an E/I Inspector. · Able to read and understand IFC Drawings and PID’s. · Follows The CEC and The Clients Specifications Manuals. · A great deal of field experience in the oil and gas industry with some commercial experience. RESPONSIBILITIES · Issue work permits on a daily basis to the contractors. · Ensure contractors are filling out safety forms prior to work commencing. · Ensure contractors and their workers are following all respective safety policies and wearing all their PPE. · Inspect daily work, ensuring a high standard of quality workmanship. · Inspect work that it meets all CEC and Client Spec’s as required. · Sign and code daily work tickets. · Sign and code material tickets. Check tickets against back up supplied by contractor if required. · Enter and keep cost tracker up to date. · Work closely with the contractor and engineering firm to determine cost saving methods of installations. · Work closely with Mechanical team to avoid rework if at all possible. · Witness QAQC and Pre-Commissioning of systems. · Sign off on QAQC and Pre-commissioning documentation, ensuring Red lines and ITP requirements have been met. · Sending in Daily / Weekly reports as required.Being part of team meetings and conference calls as required. WORK HISTORY · Pembina Pipeline Corporation. Feb 2016 toPresent. Lator Pump Station · Husky Edam East SAGD Project. Mar. 2015 toFeb 2016 Husky Edam East & Vawn SAGD Project · NEP Canada. Oct. 2014 toFeb. 2015 Compressor and Booster site · Talisman Energy. Mar.2014 toSept 2014 3 Compressor, booster sites · Canexus NATO Project Jul. 2013 toMar. 2014 Train Loading Facility.
  • 2. Page 2 · CNRL Britnell Field. May. 2012 toJune.2013 Polymer Injection Well sites · Husky Pikes Peak South. Sept.2011 toMar. 2012. SAGD Project. PREVIOUS · I worked as an Owner/ Field supervisor for Delta Electric and Elite Controls. Elite Controls was based out of Fort McMurray and Delta Electric was based in Lacombe. Both companies were involved in the oil/ Gas industry along with commercial/residential in both areas. The work involved the co-ordination of manpower and materials on site, estimating projects and supervising the installations. · I also worked as a sub-contractor with a tooled truck from 2003 until2008.The companies I worked for were · Pronghorn Controls in Fort McMurray at the Deer Creek SAGD plant for Total as the Site Superintendent and as the project superintendent on the Fort Hills Pilot Project. · Spider Electric located in Medicine Hat Ab. I ran small to medium size projects in Southern Alberta and Saskatchewan which included SCADA upgrades for Anadarko, well sites on the Suffield Block for Encana and a major upgrade for Husky’s Bow Island Plant south of Medicine Hat. · GrizzlyElectric in Wabasca,Ab. Working on wellhead pump installations, upgrades towell pad sites. · IBEW 424, Foreman 1999 – 2003. · Worked on Major Projects in the Fort McMurray area at Suncor Co-Generation units, Suncor Millenium Project, Shell Muskeg Project Phase 1,Joffre Expansion Project close to Red Deer Ab. · Syndicated Technologies 1991 – 1999 · Started Electrical Apprenticeship with Bouchard Electric which in turn became Syndicated Technologies, earned my Journeyman Certificate while in their employ. · Canadian Armed Forces,1981 – 1991 · Became a member of the Canadian Navy as a Marine Electrician, served on three different ships and a tour at Fllet Diving Unit Pacific. Attained the rankof Master Seaman. · Honorably Discharged in Feb. 1991. REFERENCES Available upon request.