DECISIONS THAT ARE CARRIED OUT TO RESOLVE THE PROBLEMS
ARISING DUE TO
CHANGE IN DESIGN DURING THE CONSTRUCTION PHASE OF THE
PROJECT
2
TOPIC FOR THE CASE STUDY
3
CASE STUDY PROJECT
• Construction of a 19-storey residential
high-rise building in College Station.
• The purpose-built property will serve
students at Texas A&M University.
• After construction it will be the tallest
building in the College Station.
• https://www.kbtx.com/2021/04/07/new-
high-rise-planned-for-northgate/
• Size – 608,000 SF
• Total Units – 298
PROJECT HIGHLIGHTS
4
315 COLLEGE MAIN STUDENT HOUSING PROJECT
Expected
completion
Summer 2023
5
Before After
315 COLLEGE MAIN STUDENT HOUSING PROJECT
PROJECT STAKEHOLDERS
6
Owner
Parallel Company
Architect
Rhode Partners
Inc.
General
Contractor
Rogers-O’Brien
Construction
Structural
Engineer
RLG Consulting
Engineers
Civil Engineer
Jones Carter
Geotechnical
Engineer
ECS
MEP Engineer
V3 Consulting
Engineers
Interior Design
LEVY
Low Voltage
InfiniSys
315 COLLEGE MAIN STUDENT HOUSING PROJECT
PROJECT WORKFLOW & TARGETED PHASE
7
315 COLLEGE MAIN STUDENT HOUSING PROJECT
Construction Phase
Modification in Design
PROJECT WORKFLOW & TARGETED PHASE
8
315 COLLEGE MAIN STUDENT HOUSING PROJECT
• How the information is transferred
from the site to the concerned
authority, if something goes wrong
during the construction activity ?
• What decisions made in course of
accommodating the changes in
design ?
• Who makes the required decision ?
• How the feasibility of the updated
design is checked ?
• How does this design modification
affects the other disciplines ?
• What are the obstructions
encountered ?
9 Pile Installation -
https://www.youtube.com/watch?v=p3tzvx9-E_I
What if the
installation
of pile goes
wrong !!
Stages of Pile Installation
PROBLEM STATEMENT
10
315 COLLEGE MAIN STUDENT HOUSING PROJECT
The superstructure of the building is supported by the pile foundation below the ground.
During the installation of a pile, the wire that holds the rebar cage in place until the grout
cures got slipped and the cage dropped to the bottom of the hole.
Decisions to be taken –
1) What to do with the failed pile ?
2) Additional piles or change in pile cap dimensions are required ?
3) Does this require modification in design of the footing ?
4) Is the proposed modification feasible and does it affect any other discipline ?
5) Who will pay for the installation of additional piles and the enlargement of the pile
caps?
FLOW
OF
INFORMATION
11
12
315 COLLEGE MAIN STUDENT HOUSING PROJECT
• Abandon the slipped pile
• Drill & install 3 new piles
• Expand pile cap dimensions
• Change in reinforcement
configuration
• Chip down the abandoned pile
DECISIONS TAKEN
Who took these
decisions ?
Structural Engineer
Figure
–
Engineer’s
Response
on
the
RFI
proposing
the
changes
13
315 COLLEGE MAIN STUDENT HOUSING PROJECT
DECISIONS TAKEN
Who will pay for the installation of the additional piles and the enlargement of the pile
caps ?
The subcontractor who was
responsible for setting the rebar
cages and securing them.
Responsibility lied with the
subcontractor as it was their job to
successfully install the pile in place.
(As per the Agreement between GC
& the subcontractor)
Why ?
14
315 COLLEGE MAIN STUDENT HOUSING PROJECT
Clash Resolution through
BIM
FEASIBILITY CHECK OF THE MODIFIED DESIGN
A clash was detected in
the 3D model when the
updated design was fed
into the centralized BIM
model.
Enlarged Pile
Cap
Plumbing
Line
Decisions Taken -
• Re-route the plumbing line
• Provide sufficient space between the plumbing
line & the enlarged pile cap
Mutually agreed decision by MEP and
structural engineer along with the
consideration of the general contractor.
15
315 COLLEGE MAIN STUDENT HOUSING PROJECT
CHALLENGES ENCOUNTERED
Getting a response to an RFI a potentially weeks-
long process of shuffling the request among the
subs, GC, architects, and designers.
RFI’s
Response
It usually created more and more questions
before one admits that everyone needs to sit
down together to hash out the answer.
“Slip-Sheeting” updated pages into the
drawings and even copying
handwritten revisions from the old
sheets to the new ones!
Figure
–
A
typical
RFI
cycle
315 COLLEGE MAIN STUDENT HOUSING PROJECT
CHALLENGES ENCOUNTERED
Difficulty in Integration of Information
GC uses
Procore
Architect does
not uses
Procore
16
Information handling is difficult
when the different stakeholders are
using different project management
tools !
This leads to additional efforts at
the general contractor’s end in
passing or requesting any
information
17
315 COLLEGE MAIN STUDENT HOUSING PROJECT
CHALLENGES ENCOUNTERED
Unavailability of field-staff friendly tools
Design
changes
Ground & Field Staff - Not aware of the changes taking place in design & schedule.
Site
Team/Crew
!
Less time for preparation Delay in the construction process
Field Staff Friendly Tool
Seamless information transfer between the
general contractor, subcontractors, & the crews.
END OF THE
PRESENTATION
THANK YOU

More Related Content

Similar to Patel01.pptx

Doing more with less
Doing more with lessDoing more with less
Doing more with less
mnico
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
Sean O' Leary
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
Sean O' Leary
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
Sean O' Leary
 
Enhancing graduate attributes in foundation engineering
Enhancing graduate attributes in foundation engineeringEnhancing graduate attributes in foundation engineering
Enhancing graduate attributes in foundation engineering
Thanikachalam Vedhathiri
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
Kenrick Ramos
 
Final report 85,91,109
Final report 85,91,109Final report 85,91,109
Final report 85,91,109
PavithranKarthickeya
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
ProSIM R & D Pvt. Ltd.
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
Krystian Gnysinski
 
CV
CVCV
Achieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable HousingAchieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable Housing
Open Architecture Collaborative
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overview
andyonan
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overview
coreysanders
 
Dylan Kissinger project list
Dylan Kissinger project listDylan Kissinger project list
Dylan Kissinger project list
Dylan Kissinger
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
stan wilczynski
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
stan wilczynski
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
stan wilczynski
 
Reports on Precast System
Reports on Precast System Reports on Precast System
Reports on Precast System
Rising Sher
 
Bj Byrnes Graduate
Bj Byrnes GraduateBj Byrnes Graduate
Bj Byrnes Graduate
bj byrnes
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
Mohamed Salah
 

Similar to Patel01.pptx (20)

Doing more with less
Doing more with lessDoing more with less
Doing more with less
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Enhancing graduate attributes in foundation engineering
Enhancing graduate attributes in foundation engineeringEnhancing graduate attributes in foundation engineering
Enhancing graduate attributes in foundation engineering
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
Final report 85,91,109
Final report 85,91,109Final report 85,91,109
Final report 85,91,109
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
 
CV
CVCV
CV
 
Achieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable HousingAchieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable Housing
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overview
 
DProfiler Overview
DProfiler OverviewDProfiler Overview
DProfiler Overview
 
Dylan Kissinger project list
Dylan Kissinger project listDylan Kissinger project list
Dylan Kissinger project list
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
Reports on Precast System
Reports on Precast System Reports on Precast System
Reports on Precast System
 
Bj Byrnes Graduate
Bj Byrnes GraduateBj Byrnes Graduate
Bj Byrnes Graduate
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 

Patel01.pptx

  • 1. CASE STUDY PRESENTATION COSC 642 CONSTRUCTION INFORMATION TECHNOLOGY PROFESSOR – DR. JULIAN KANG Presented by - Parth Patel Department of Construction Science Texas A & M University
  • 2. DECISIONS THAT ARE CARRIED OUT TO RESOLVE THE PROBLEMS ARISING DUE TO CHANGE IN DESIGN DURING THE CONSTRUCTION PHASE OF THE PROJECT 2 TOPIC FOR THE CASE STUDY
  • 4. • Construction of a 19-storey residential high-rise building in College Station. • The purpose-built property will serve students at Texas A&M University. • After construction it will be the tallest building in the College Station. • https://www.kbtx.com/2021/04/07/new- high-rise-planned-for-northgate/ • Size – 608,000 SF • Total Units – 298 PROJECT HIGHLIGHTS 4 315 COLLEGE MAIN STUDENT HOUSING PROJECT Expected completion Summer 2023
  • 5. 5 Before After 315 COLLEGE MAIN STUDENT HOUSING PROJECT
  • 6. PROJECT STAKEHOLDERS 6 Owner Parallel Company Architect Rhode Partners Inc. General Contractor Rogers-O’Brien Construction Structural Engineer RLG Consulting Engineers Civil Engineer Jones Carter Geotechnical Engineer ECS MEP Engineer V3 Consulting Engineers Interior Design LEVY Low Voltage InfiniSys 315 COLLEGE MAIN STUDENT HOUSING PROJECT
  • 7. PROJECT WORKFLOW & TARGETED PHASE 7 315 COLLEGE MAIN STUDENT HOUSING PROJECT Construction Phase Modification in Design
  • 8. PROJECT WORKFLOW & TARGETED PHASE 8 315 COLLEGE MAIN STUDENT HOUSING PROJECT • How the information is transferred from the site to the concerned authority, if something goes wrong during the construction activity ? • What decisions made in course of accommodating the changes in design ? • Who makes the required decision ? • How the feasibility of the updated design is checked ? • How does this design modification affects the other disciplines ? • What are the obstructions encountered ?
  • 9. 9 Pile Installation - https://www.youtube.com/watch?v=p3tzvx9-E_I What if the installation of pile goes wrong !! Stages of Pile Installation
  • 10. PROBLEM STATEMENT 10 315 COLLEGE MAIN STUDENT HOUSING PROJECT The superstructure of the building is supported by the pile foundation below the ground. During the installation of a pile, the wire that holds the rebar cage in place until the grout cures got slipped and the cage dropped to the bottom of the hole. Decisions to be taken – 1) What to do with the failed pile ? 2) Additional piles or change in pile cap dimensions are required ? 3) Does this require modification in design of the footing ? 4) Is the proposed modification feasible and does it affect any other discipline ? 5) Who will pay for the installation of additional piles and the enlargement of the pile caps?
  • 12. 12 315 COLLEGE MAIN STUDENT HOUSING PROJECT • Abandon the slipped pile • Drill & install 3 new piles • Expand pile cap dimensions • Change in reinforcement configuration • Chip down the abandoned pile DECISIONS TAKEN Who took these decisions ? Structural Engineer Figure – Engineer’s Response on the RFI proposing the changes
  • 13. 13 315 COLLEGE MAIN STUDENT HOUSING PROJECT DECISIONS TAKEN Who will pay for the installation of the additional piles and the enlargement of the pile caps ? The subcontractor who was responsible for setting the rebar cages and securing them. Responsibility lied with the subcontractor as it was their job to successfully install the pile in place. (As per the Agreement between GC & the subcontractor) Why ?
  • 14. 14 315 COLLEGE MAIN STUDENT HOUSING PROJECT Clash Resolution through BIM FEASIBILITY CHECK OF THE MODIFIED DESIGN A clash was detected in the 3D model when the updated design was fed into the centralized BIM model. Enlarged Pile Cap Plumbing Line Decisions Taken - • Re-route the plumbing line • Provide sufficient space between the plumbing line & the enlarged pile cap Mutually agreed decision by MEP and structural engineer along with the consideration of the general contractor.
  • 15. 15 315 COLLEGE MAIN STUDENT HOUSING PROJECT CHALLENGES ENCOUNTERED Getting a response to an RFI a potentially weeks- long process of shuffling the request among the subs, GC, architects, and designers. RFI’s Response It usually created more and more questions before one admits that everyone needs to sit down together to hash out the answer. “Slip-Sheeting” updated pages into the drawings and even copying handwritten revisions from the old sheets to the new ones! Figure – A typical RFI cycle
  • 16. 315 COLLEGE MAIN STUDENT HOUSING PROJECT CHALLENGES ENCOUNTERED Difficulty in Integration of Information GC uses Procore Architect does not uses Procore 16 Information handling is difficult when the different stakeholders are using different project management tools ! This leads to additional efforts at the general contractor’s end in passing or requesting any information
  • 17. 17 315 COLLEGE MAIN STUDENT HOUSING PROJECT CHALLENGES ENCOUNTERED Unavailability of field-staff friendly tools Design changes Ground & Field Staff - Not aware of the changes taking place in design & schedule. Site Team/Crew ! Less time for preparation Delay in the construction process Field Staff Friendly Tool Seamless information transfer between the general contractor, subcontractors, & the crews.