TAKIRA MOTORS
PRESENTED BY:
SHREY AGARWAL
SATISH PAHLAZANI
SANDEEP VIRMANI
SANJANA MANPASAND
SHIVANGI SRIVASTAVA
SALONI JAIN
SHILPA GODARA
PROCESS ANALYSIS
• PROCESS ANALYSIS IS THE DOCUMENTATION AND
DETAILED UNDERSTANDING OF HOW WORK IS
PERFORMED AND HOW IT CAN BE REDESIGNED.
• IF A MANAGER SUSPECTS THAT THE PROCESS CAN BE
IMPROVED, AN ANALYSIS SHOULD BE UNDERTAKEN.
• FIRST STEP IN PROCESS ANALYSIS IS TO UNDERSTAND
IT.
• THERE ARE FIVE STEPS INVOLVED.
• THE FIVE STEPS FORM AN ACRONYM: DMAIC
• (DEFINE-MEASURE-ANALYZE-IMPROVE-CONTROL).
STEP 1: DEFINE. WHAT PROCESS NEEDS TO BE IMPROVED?
• WHO WILL PARTICIPATE IN THE PROJECT FOR IMPROVING THIS
PROCESS?
• WHO ARE THE CUSTOMERS?
• WHO ARE THE WORKERS INVOLVED IN THE PROCESS?
STEP 2: MEASURE. WE CHART THE PROCESS WITH SOME SORT
OF FLOWCHART OR MAP. INPUT AND OUTPUT MEASUREMENTS
ARE DETERMINED. PRELIMINARY DATAARE COLLECTED.
STEP 3: ANALYZE. WHAT CAUSES PROBLEMS? REDUCE THE
LIST OF CAUSES.
STEP 4:IMPROVE. FIND SOLUTIONS FOR THE PROBLEM, AND
DESIGN AN IMPLEMENTATION PLAN.
STEP 5: CONTROL. MAKE SURE THE IMPROVED PROCESS STAYS
IN CONTROL.
TYPES OF PROCESSES
• PROJECTS: THESE GENERALLY RESULT IN AN OUTPUT
OF ONE. EXAMPLES INCLUDE CONSTRUCTING A
BUILDING OR CATERING A PARTY.
• JOB SHOPS: THIS TYPE OF PROCESS PRODUCES SMALL
BATCHES OF MANY DIFFERENT PRODUCTS. EACH
BATCH IS USUALLY CUSTOMIZED TO A SPECIFIC
CUSTOMER ORDER, AND EACH PRODUCT MAY REQUIRE
DIFFERENT STEPS AND PROCESSING TIMES.
• BATCH SHOPS: THESE PRODUCE PERIODIC BATCHES OF
THE SAME PRODUCT. BATCH SHOPS CAN PRODUCE
DIFFERENT PRODUCTS, BUT TYPICALLY ALL THE
PRODUCTS THEY PRODUCE FOLLOW THE SAME
PROCESS FLOW.
• FLOW LINES: THIS TYPE OF PROCESS CONSISTS OF
ESSENTIALLY INDEPENDENT STATIONS THAT
PRODUCE THE SAME OR VERY SIMILAR PARTS.
• ASSEMBLY LINES: THESE PRODUCE DISCRETE PARTS
FLOWING AT CONTROLLED RATES THROUGH A WELL-
DEFINED PROCESS. THE LINE MOVES THE PARTS TO
THE RESOURCES, AND EACH RESOURCE MUST
COMPLETE ITS TASK BEFORE THE LINE MOVES ON.
• CONTINUOUS FLOW PROCESSES: AS THE NAME
IMPLIES, THESE PROCESSES PRODUCE ITEMS
CONTINUOUSLY, USUALLY IN A HIGHLY AUTOMATED
PROCESS.
PROCESS
FLOWCHARTING
• PROCESS FLOWCHARTING IS THE USE OF A DIAGRAM
TO PRESENT THE MAJOR ELEMENTS OF A PROCESS
• THE BASIC ELEMENTS CAN INCLUDE TASKS OR
OPERATIONS, FLOWS OF MATERIALS OR CUSTOMERS,
DECISION POINTS, AND STORAGE AREAS OR QUEUES
• IT IS AN IDEAL METHODOLOGY BY WHICH TO BEGIN
ANALYZING A PROCESS
PERFORMANCE MEASUREMENT
PROCESS
• PERFORMANCE MEASURES ARE RECOGNIZED AS AN IMPORTANT
ELEMENT OF ALL TOTAL QUALITY MANAGEMENT PROGRAMS.
MANAGERS AND SUPERVISORS DIRECTING THE EFFORTS OF AN
ORGANIZATION OR A GROUP HAVE A RESPONSIBILITY TO KNOW HOW,
WHEN, AND WHERE TO INSTITUTE A WIDE RANGE OF CHANGES.
• AS A PROCESS, PERFORMANCE MEASUREMENT IS NOT SIMPLY
CONCERNED WITH COLLECTING DATAASSOCIATED WITH A
PREDEFINED PERFORMANCE GOAL OR STANDARD.
• PERFORMANCE MEASUREMENT IS BETTER THOUGHT OF AS AN
OVERALL MANAGEMENT SYSTEM INVOLVING PREVENTION AND
DETECTION AIMED AT ACHIEVING CONFORMANCE OF THE WORK
PRODUCT OR SERVICE TO YOUR CUSTOMER'S REQUIREMENTS.
• ADDITIONALLY, IT IS CONCERNED WITH PROCESS OPTIMIZATION
THROUGH INCREASED EFFICIENCY AND EFFECTIVENESS OF THE
PROCESS OR PRODUCT.
WHAT ARE PERFORMANCE MEASURES?
PERFORMANCE MEASURES QUANTITATIVELY TELL US
SOMETHING IMPORTANT ABOUT OUR PRODUCTS, SERVICES,
AND THE PROCESSES THAT PRODUCE THEM. THEY ARE A TOOL
TO HELP US UNDERSTAND, MANAGE, AND IMPROVE WHAT OUR
ORGANIZATIONS DO. PERFORMANCE MEASURES LET US KNOW:
• HOW WELL WE ARE DOING
• IF WE ARE MEETING OUR GOALS
• IF OUR CUSTOMERS ARE SATISFIED
• IF OUR PROCESSES ARE IN STATISTICAL CONTROL
• IF AND WHERE IMPROVEMENTS ARE NECESSARY.
BOTTLENECK ACTIVITY
• A POINT OF CONGESTION IN A SYSTEM THAT OCCURS WHEN
WORKLOADS ARRIVE AT A GIVEN POINT MORE QUICKLY THAN THAT
POINT CAN HANDLE THEM. THE INEFFICIENCIES BROUGHT ABOUT BY
THE BOTTLENECK OFTEN CREATE A QUEUE AND A LONGER OVERALL
CYCLE TIME.
• THE TERM BOTTLENECK REFERS TO THE SHAPE OF A BOTTLE AND THE
FACT THAT THE BOTTLE'S NECK IS THE NARROWEST POINT, AND THUS
THE MOST LIKELY PLACE FOR CONGESTION TO OCCUR, SLOWING
DOWN THE FLOW OF LIQUID FROM THE BOTTLE. THE TERM IS USED TO
DESCRIBE POINTS OF CONGESTION IN EVERYTHING FROM COMPUTER
NETWORKS TO A FACTORYASSEMBLY LINE.
FOR EXAMPLE, A COMPANY WHOSE PRODUCT IS IN HIGH DEMAND
MAY SEE ITS SHIPPING DEPARTMENT RECEIVE PURCHASE ORDERS
MORE QUICKLY THAN THE PRODUCTS CAN BE SHIPPED OUT, THUS
CAUSING A BOTTLENECK.
• IDENTIFYING BOTTLENECKS
A BOTTLENECK IN THE MANUFACTURING PROCESS CAN BE DIFFICULT
TO IDENTIFY IN A COMPLEX SYSTEM. THE BOTTLENECK CAN BE
FOUND BY LOOKING AT EACH SEQUENCE OF THE PROCESS
INDIVIDUALLY AND MEASURING THE PRODUCTION LEVELAT EACH
STEP. IF A PARTICULAR SEQUENCE HAS A LOW PRODUCTION LEVEL,
THEN IT IS THE SOURCE OF THE BOTTLENECK. IT SHOULD BE NOTED
THAT THERE CAN BE MULTIPLE BOTTLENECKS WITHIN A COMPLEX
SYSTEM.
• SOLVING BOTTLENECK PROBLEMS
A BOTTLENECK CAN BE SOLVED BY ADJUSTING THE PRODUCTION
LEVEL IN THE SEQUENCE WHERE THE BOTTLENECK IS HAPPENING.
THIS MIGHT BE ACHIEVED BY INSTALLING MORE EFFICIENT
EQUIPMENT OR, SOMETIMES, BY INCREASING LABOR. IN SOME
SITUATIONS, IT MAY NOT BE POSSIBLE TO INCREASE PRODUCTION IN
THAT AREAAND IT MAY BE MORE EFFICIENT TO REDUCE PRODUCTION
CAPABILITIES IN THE OTHER AREAS IN ORDER TO CREATE EFFICIENCY.
CYCLE TIME
• THE PERIOD REQUIRED TO COMPLETE
ONE CYCLE OF AN OPERATION; OR TO
COMPLETE A FUNCTION, JOB,
OR TASK FROM START TO FINISH. CYCLE
TIME IS USED IN DIFFERENTIATING
TOTAL DURATION OF A PROCESS FROM
ITS RUN TIME.
• CYCLE TIME = AVERAGE TIME BETWEEN
COMPLETION OF UNITS
CYCLE TIME EXAMPLE
• SUPPOSE YOU HAD TO PRODUCE 600
UNITS IN 80 HOURS TO MEET THE
DEMAND REQUIREMENTS OF A PRODUCT.
WHAT IS THE CYCLE TIME TO MEET THIS
DEMAND REQUIREMENT?
• CYCLE TIME= 80X60/600
= 8 MINS
THROUGHPUT TIME
• THROUGHPUT TIME IS THE AMOUNT OF TIME IT TAKES FOR A
MANUFACTURER TO MAKE A PRODUCT.
• THE THROUGHPUT TIME OF A PRODUCT IS CALCULATED BY
ADDING THE
o PROCESS TIME,
o INSPECTION TIME,
o MOVE TIME, AND
o WAIT TIME.
• THROUGHPUT TIME= PROCESS TIME+ INSPECTION TIME+ MOVE
TIME + WAIT TIME
THROUGHPUT TIME
• AVERAGE TIME A CUSTOMER SPENDS IN A BANK
• AVERAGE TIME A BOOK STAYS AT THE AMAZON.COM’S WAREHOUSE
• HOW DO WE MEASURE THROUGHPUT TIME?
Customer arrives Service begins Service ends
Throughput Time
Waiting Processing
Book arrives Stored Order arrives Picked Packaged Shipped
Throughput Time
Cycle time is the time taken by the longest activity (here it is 7 min).
Throughput time is 46 min.

More Related Content

Similar to Operations management takira motors

Agile_Software_Development_SCRUM_18Jan2022.pptx
Agile_Software_Development_SCRUM_18Jan2022.pptxAgile_Software_Development_SCRUM_18Jan2022.pptx
Agile_Software_Development_SCRUM_18Jan2022.pptx
Ahmed Badr Eldin, EMBA, PMP, ITIL
 
Agile vs Waterfall Project management
Agile vs Waterfall  Project management Agile vs Waterfall  Project management
Agile vs Waterfall Project management
Kostiantyn Trefiak
 
Just in time
Just in timeJust in time
Just in time
shashank1220734
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
Seta Wicaksana
 
8 -scheduling_and_executing_operations
8  -scheduling_and_executing_operations8  -scheduling_and_executing_operations
8 -scheduling_and_executing_operations
kamelliachaichi
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
Thomas Almore
 
Inventory control management
Inventory control managementInventory control management
Inventory control management
aroramahesh
 
Basic of work study
Basic of work studyBasic of work study
Basic of work study
rakibul Islam
 
Process Wind Tunnel in Insurance
Process Wind Tunnel in InsuranceProcess Wind Tunnel in Insurance
Process Wind Tunnel in Insurance
Sudhendu Rai
 
6. Process-Flow Analysis.pdf
6. Process-Flow Analysis.pdf6. Process-Flow Analysis.pdf
6. Process-Flow Analysis.pdf
RaheelMansoor4
 
Supply Chain Management - An Introduction
Supply Chain Management - An IntroductionSupply Chain Management - An Introduction
Supply Chain Management - An Introduction
Naveen Dandge
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal
 
Just In Time & Kanban
Just In Time & KanbanJust In Time & Kanban
Just In Time & Kanban
Abhishek Sakharkar
 
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIPPRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
Syarel Saz
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 
The Devops Handbook
The Devops HandbookThe Devops Handbook
The Devops Handbook
Harish Kamugakudi Marimuthu
 
TRAINING_ ISO 9001 - rev 0.pptx
TRAINING_ ISO 9001 - rev 0.pptxTRAINING_ ISO 9001 - rev 0.pptx
TRAINING_ ISO 9001 - rev 0.pptx
Umesh Sakhareliya
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
Indira Gapuzan
 
Quality CONTROL BY PIYUSH GUPTA
Quality CONTROL BY PIYUSH GUPTAQuality CONTROL BY PIYUSH GUPTA
Quality CONTROL BY PIYUSH GUPTA
Piyush gupta Gupta
 

Similar to Operations management takira motors (20)

Agile_Software_Development_SCRUM_18Jan2022.pptx
Agile_Software_Development_SCRUM_18Jan2022.pptxAgile_Software_Development_SCRUM_18Jan2022.pptx
Agile_Software_Development_SCRUM_18Jan2022.pptx
 
Agile vs Waterfall Project management
Agile vs Waterfall  Project management Agile vs Waterfall  Project management
Agile vs Waterfall Project management
 
Just in time
Just in timeJust in time
Just in time
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
8 -scheduling_and_executing_operations
8  -scheduling_and_executing_operations8  -scheduling_and_executing_operations
8 -scheduling_and_executing_operations
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
 
Inventory control management
Inventory control managementInventory control management
Inventory control management
 
Basic of work study
Basic of work studyBasic of work study
Basic of work study
 
Process Wind Tunnel in Insurance
Process Wind Tunnel in InsuranceProcess Wind Tunnel in Insurance
Process Wind Tunnel in Insurance
 
6. Process-Flow Analysis.pdf
6. Process-Flow Analysis.pdf6. Process-Flow Analysis.pdf
6. Process-Flow Analysis.pdf
 
Supply Chain Management - An Introduction
Supply Chain Management - An IntroductionSupply Chain Management - An Introduction
Supply Chain Management - An Introduction
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Just In Time & Kanban
Just In Time & KanbanJust In Time & Kanban
Just In Time & Kanban
 
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIPPRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
PRESENTATION LI / INDUSTRIAL TRAINING / INTERNSHIP
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
The Devops Handbook
The Devops HandbookThe Devops Handbook
The Devops Handbook
 
TRAINING_ ISO 9001 - rev 0.pptx
TRAINING_ ISO 9001 - rev 0.pptxTRAINING_ ISO 9001 - rev 0.pptx
TRAINING_ ISO 9001 - rev 0.pptx
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Quality CONTROL BY PIYUSH GUPTA
Quality CONTROL BY PIYUSH GUPTAQuality CONTROL BY PIYUSH GUPTA
Quality CONTROL BY PIYUSH GUPTA
 

Recently uploaded

A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 

Recently uploaded (20)

A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 

Operations management takira motors

  • 1. TAKIRA MOTORS PRESENTED BY: SHREY AGARWAL SATISH PAHLAZANI SANDEEP VIRMANI SANJANA MANPASAND SHIVANGI SRIVASTAVA SALONI JAIN SHILPA GODARA
  • 2. PROCESS ANALYSIS • PROCESS ANALYSIS IS THE DOCUMENTATION AND DETAILED UNDERSTANDING OF HOW WORK IS PERFORMED AND HOW IT CAN BE REDESIGNED. • IF A MANAGER SUSPECTS THAT THE PROCESS CAN BE IMPROVED, AN ANALYSIS SHOULD BE UNDERTAKEN. • FIRST STEP IN PROCESS ANALYSIS IS TO UNDERSTAND IT. • THERE ARE FIVE STEPS INVOLVED. • THE FIVE STEPS FORM AN ACRONYM: DMAIC • (DEFINE-MEASURE-ANALYZE-IMPROVE-CONTROL).
  • 3. STEP 1: DEFINE. WHAT PROCESS NEEDS TO BE IMPROVED? • WHO WILL PARTICIPATE IN THE PROJECT FOR IMPROVING THIS PROCESS? • WHO ARE THE CUSTOMERS? • WHO ARE THE WORKERS INVOLVED IN THE PROCESS? STEP 2: MEASURE. WE CHART THE PROCESS WITH SOME SORT OF FLOWCHART OR MAP. INPUT AND OUTPUT MEASUREMENTS ARE DETERMINED. PRELIMINARY DATAARE COLLECTED. STEP 3: ANALYZE. WHAT CAUSES PROBLEMS? REDUCE THE LIST OF CAUSES. STEP 4:IMPROVE. FIND SOLUTIONS FOR THE PROBLEM, AND DESIGN AN IMPLEMENTATION PLAN. STEP 5: CONTROL. MAKE SURE THE IMPROVED PROCESS STAYS IN CONTROL.
  • 4. TYPES OF PROCESSES • PROJECTS: THESE GENERALLY RESULT IN AN OUTPUT OF ONE. EXAMPLES INCLUDE CONSTRUCTING A BUILDING OR CATERING A PARTY. • JOB SHOPS: THIS TYPE OF PROCESS PRODUCES SMALL BATCHES OF MANY DIFFERENT PRODUCTS. EACH BATCH IS USUALLY CUSTOMIZED TO A SPECIFIC CUSTOMER ORDER, AND EACH PRODUCT MAY REQUIRE DIFFERENT STEPS AND PROCESSING TIMES. • BATCH SHOPS: THESE PRODUCE PERIODIC BATCHES OF THE SAME PRODUCT. BATCH SHOPS CAN PRODUCE DIFFERENT PRODUCTS, BUT TYPICALLY ALL THE PRODUCTS THEY PRODUCE FOLLOW THE SAME PROCESS FLOW.
  • 5. • FLOW LINES: THIS TYPE OF PROCESS CONSISTS OF ESSENTIALLY INDEPENDENT STATIONS THAT PRODUCE THE SAME OR VERY SIMILAR PARTS. • ASSEMBLY LINES: THESE PRODUCE DISCRETE PARTS FLOWING AT CONTROLLED RATES THROUGH A WELL- DEFINED PROCESS. THE LINE MOVES THE PARTS TO THE RESOURCES, AND EACH RESOURCE MUST COMPLETE ITS TASK BEFORE THE LINE MOVES ON. • CONTINUOUS FLOW PROCESSES: AS THE NAME IMPLIES, THESE PROCESSES PRODUCE ITEMS CONTINUOUSLY, USUALLY IN A HIGHLY AUTOMATED PROCESS.
  • 6. PROCESS FLOWCHARTING • PROCESS FLOWCHARTING IS THE USE OF A DIAGRAM TO PRESENT THE MAJOR ELEMENTS OF A PROCESS • THE BASIC ELEMENTS CAN INCLUDE TASKS OR OPERATIONS, FLOWS OF MATERIALS OR CUSTOMERS, DECISION POINTS, AND STORAGE AREAS OR QUEUES • IT IS AN IDEAL METHODOLOGY BY WHICH TO BEGIN ANALYZING A PROCESS
  • 7.
  • 8.
  • 9. PERFORMANCE MEASUREMENT PROCESS • PERFORMANCE MEASURES ARE RECOGNIZED AS AN IMPORTANT ELEMENT OF ALL TOTAL QUALITY MANAGEMENT PROGRAMS. MANAGERS AND SUPERVISORS DIRECTING THE EFFORTS OF AN ORGANIZATION OR A GROUP HAVE A RESPONSIBILITY TO KNOW HOW, WHEN, AND WHERE TO INSTITUTE A WIDE RANGE OF CHANGES. • AS A PROCESS, PERFORMANCE MEASUREMENT IS NOT SIMPLY CONCERNED WITH COLLECTING DATAASSOCIATED WITH A PREDEFINED PERFORMANCE GOAL OR STANDARD. • PERFORMANCE MEASUREMENT IS BETTER THOUGHT OF AS AN OVERALL MANAGEMENT SYSTEM INVOLVING PREVENTION AND DETECTION AIMED AT ACHIEVING CONFORMANCE OF THE WORK PRODUCT OR SERVICE TO YOUR CUSTOMER'S REQUIREMENTS. • ADDITIONALLY, IT IS CONCERNED WITH PROCESS OPTIMIZATION THROUGH INCREASED EFFICIENCY AND EFFECTIVENESS OF THE PROCESS OR PRODUCT.
  • 10. WHAT ARE PERFORMANCE MEASURES? PERFORMANCE MEASURES QUANTITATIVELY TELL US SOMETHING IMPORTANT ABOUT OUR PRODUCTS, SERVICES, AND THE PROCESSES THAT PRODUCE THEM. THEY ARE A TOOL TO HELP US UNDERSTAND, MANAGE, AND IMPROVE WHAT OUR ORGANIZATIONS DO. PERFORMANCE MEASURES LET US KNOW: • HOW WELL WE ARE DOING • IF WE ARE MEETING OUR GOALS • IF OUR CUSTOMERS ARE SATISFIED • IF OUR PROCESSES ARE IN STATISTICAL CONTROL • IF AND WHERE IMPROVEMENTS ARE NECESSARY.
  • 11. BOTTLENECK ACTIVITY • A POINT OF CONGESTION IN A SYSTEM THAT OCCURS WHEN WORKLOADS ARRIVE AT A GIVEN POINT MORE QUICKLY THAN THAT POINT CAN HANDLE THEM. THE INEFFICIENCIES BROUGHT ABOUT BY THE BOTTLENECK OFTEN CREATE A QUEUE AND A LONGER OVERALL CYCLE TIME. • THE TERM BOTTLENECK REFERS TO THE SHAPE OF A BOTTLE AND THE FACT THAT THE BOTTLE'S NECK IS THE NARROWEST POINT, AND THUS THE MOST LIKELY PLACE FOR CONGESTION TO OCCUR, SLOWING DOWN THE FLOW OF LIQUID FROM THE BOTTLE. THE TERM IS USED TO DESCRIBE POINTS OF CONGESTION IN EVERYTHING FROM COMPUTER NETWORKS TO A FACTORYASSEMBLY LINE. FOR EXAMPLE, A COMPANY WHOSE PRODUCT IS IN HIGH DEMAND MAY SEE ITS SHIPPING DEPARTMENT RECEIVE PURCHASE ORDERS MORE QUICKLY THAN THE PRODUCTS CAN BE SHIPPED OUT, THUS CAUSING A BOTTLENECK.
  • 12. • IDENTIFYING BOTTLENECKS A BOTTLENECK IN THE MANUFACTURING PROCESS CAN BE DIFFICULT TO IDENTIFY IN A COMPLEX SYSTEM. THE BOTTLENECK CAN BE FOUND BY LOOKING AT EACH SEQUENCE OF THE PROCESS INDIVIDUALLY AND MEASURING THE PRODUCTION LEVELAT EACH STEP. IF A PARTICULAR SEQUENCE HAS A LOW PRODUCTION LEVEL, THEN IT IS THE SOURCE OF THE BOTTLENECK. IT SHOULD BE NOTED THAT THERE CAN BE MULTIPLE BOTTLENECKS WITHIN A COMPLEX SYSTEM. • SOLVING BOTTLENECK PROBLEMS A BOTTLENECK CAN BE SOLVED BY ADJUSTING THE PRODUCTION LEVEL IN THE SEQUENCE WHERE THE BOTTLENECK IS HAPPENING. THIS MIGHT BE ACHIEVED BY INSTALLING MORE EFFICIENT EQUIPMENT OR, SOMETIMES, BY INCREASING LABOR. IN SOME SITUATIONS, IT MAY NOT BE POSSIBLE TO INCREASE PRODUCTION IN THAT AREAAND IT MAY BE MORE EFFICIENT TO REDUCE PRODUCTION CAPABILITIES IN THE OTHER AREAS IN ORDER TO CREATE EFFICIENCY.
  • 13. CYCLE TIME • THE PERIOD REQUIRED TO COMPLETE ONE CYCLE OF AN OPERATION; OR TO COMPLETE A FUNCTION, JOB, OR TASK FROM START TO FINISH. CYCLE TIME IS USED IN DIFFERENTIATING TOTAL DURATION OF A PROCESS FROM ITS RUN TIME. • CYCLE TIME = AVERAGE TIME BETWEEN COMPLETION OF UNITS
  • 14. CYCLE TIME EXAMPLE • SUPPOSE YOU HAD TO PRODUCE 600 UNITS IN 80 HOURS TO MEET THE DEMAND REQUIREMENTS OF A PRODUCT. WHAT IS THE CYCLE TIME TO MEET THIS DEMAND REQUIREMENT? • CYCLE TIME= 80X60/600 = 8 MINS
  • 15. THROUGHPUT TIME • THROUGHPUT TIME IS THE AMOUNT OF TIME IT TAKES FOR A MANUFACTURER TO MAKE A PRODUCT. • THE THROUGHPUT TIME OF A PRODUCT IS CALCULATED BY ADDING THE o PROCESS TIME, o INSPECTION TIME, o MOVE TIME, AND o WAIT TIME. • THROUGHPUT TIME= PROCESS TIME+ INSPECTION TIME+ MOVE TIME + WAIT TIME
  • 16. THROUGHPUT TIME • AVERAGE TIME A CUSTOMER SPENDS IN A BANK • AVERAGE TIME A BOOK STAYS AT THE AMAZON.COM’S WAREHOUSE • HOW DO WE MEASURE THROUGHPUT TIME? Customer arrives Service begins Service ends Throughput Time Waiting Processing Book arrives Stored Order arrives Picked Packaged Shipped Throughput Time
  • 17. Cycle time is the time taken by the longest activity (here it is 7 min). Throughput time is 46 min.