T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Supervision
Prof. Dr. Ibrahim
Mahariq
Department of Electrical
Engineering
TAA. University
Ankara , Turkey
ibmahariq@gmail.com
Turkey – Ankara 10 - 5 - 2016
University of Turkish Aeronautical Association
Faculty of engineering EEE department
1
Presented by
Omar Saadi Alshear
Department of Electrical
Engineering
TAA. University
Ankara , Turkey
omarsaad529@gmail.com
2
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
DISCUSSION
DEFINITION OF THE TRANSFORMER
TEST REQUIRMENTS
TESTING OF TRANSFORMER
ROUTINE TESTS
REGULAR MAINTENANCE FOR POWER TRANSFORMERS
3
Transformer is a static device which
transforms A.C electrical power from one
voltage to another
Voltage keeping
The frequency same by
Electromagnetic induction
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
4
IRON CORE
5
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
DISCUSSION
DEFINITION OF THE TRANSFORMER
TEST REQUIRMENTS
TESTING OF TRANSFORMER
ROUTINE TESTS
REGULAR MAINTENANCE FOR POWER TRANSFORMERS
6
1- NAME PLATE FOR TRANSFORMER
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
S.N: 925 554
1 = 5 0 K V A
2 = 1 0 0 K V A
3 = 2 0 0 K V A
4 = 3 0 0 K V A
5 = 5 0 0 K V A
6 = 8 0 0 K V A
7 = 1 0 0 0 K V A
8 = 1 5 0 0 K V A
TEST REQUIREMENTS
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
7
2-TESTING DEVICES
TEST REQUIREMENTS
3- SAFETY EQUIPMENT
4 - MECHANICAL EQUIPMENT
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
8
TEST REQUIREMENTS
9
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
DISCUSSION
DEFINITION OF THE TRANSFORMER
TEST REQUIRMENTS
TESTING OF TRANSFORMER
ROUTINE TESTS
REGULAR MAINTENANCE FOR POWER TRANSFORMERS
10
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
TESTING OF TRANSFORMER
Types of testing
1- Routine tests
2- Type tests
3- Special tests
1-ROUTINE TESTS
11
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1.1- Measurement of voltage ratio
1.2-Vector group verification
1.3-Measurement of winding resistance
1.4-Impedance voltage test(z)
1.5-Dielectrics Test
A-Measurement of insulation resistance.
B- Dissipation power factor / insulation power factor (tan∂)
C- OIL TEST
TESTING OF TRANSFORMER
THESE TESTS ARE CARRIED OUT ON ONE TRANSFORMER OF
THE LOT.
12
2.1- All routine tests.
2.2- Additionally following tests are included in type
tests.
A- Lightening impulse test.
B- Temperature rise test.
2- TYPE TESTS
TESTING OF TRANSFORMER
13
3.1- Measurement of zero Phase sequence.
3.2- Measurement of acoustic noise level.
3.3- Measurement of harmonics of the no load current.
3.4- Magnetic balance test.
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
3-SPECIAL TESTS
TESTING OF TRANSFORMER
14
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
DISCUSSION
DEFINITION OF THE TRANSFORMER
TEST REQUIRMENTS
TESTING OF TRANSFORMER
ROUTINE TESTS
REGULAR MAINTENANCE FOR POWER TRANSFORMERS
15
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Transformer Breakdowns
16
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Sources of faults in transformer
17
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
18
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Apply Tests Routine on Power Transformer
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYnd11
1-ROUTINE TESTS
19
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
6- Equipment used : Transformer Turns Ratiometer ( T T R)
1- This test measures the voltage ratio as per the customer’s
requirement.
2- V1/V2 = N1/N2
3-The voltage ratio is equal to the turns ratio in a transformer. Using
this principle, the turns ratio is measured with the help of a turns ratio
meter. If it is correct , then the voltage ratio is assumed to be correct.
4- apply the rated ratio for all tab (1-17).
5-apply the rated ratio for (132 kv,33kv 11kv)
1-1-Measurement of voltage ratio
20
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
Rated ratio (Ynd11)H.V-L.V=( 132/ √3 ) / 11.5=6.6227 FOR TAP (9)
Tap pos. TAP Voltage
(kv)
(A-N) / (a-c)
(Measured
value)
(B-N) / (b-a)
(Measured
value)
(C-N) / (c-b)
(Measured
value)
Rated Ratio
(Rated value )
1 145.2 / 11.5
9
10
11
132.0 (132 ⁄ √3) ⁄ 11.5 = 6.627
17 118.8
1-1-Measurement of voltage ratio
21
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
TEST:
TR.
1-1-Measurement of voltage ratio
a
N
VECT. GROUP: Ynd11 FOR H.V – L.V
b
c
CBA
L.V
H.V
M.V
Ratio meter
a
c
b
n
a
TR.
N
The no-load deviation of the turn ratios
should be ≤ % 0,5
22
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
APPLLY THIS LAW
1-1-Measurement of voltage ratio
.
23
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
The use of modern equipment
1-1-Measurement of voltage ratio
TTR (Transformer Turns Ratio)
This test is very important for an engineer to figure out
directional connectivity for transformers.
(( Dy11 ,Yd11, Dy1,Yd1))
24
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1-2-Vector Group Verification
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
25
Dy11
Yd11
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
26
Yd1
Dy1
27
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Steps to implement the test
1-2-Vector Group Verification
STEP 2
S.C
STEP 3
Take V
B-b , B-c ,C-b , C-c
STEP 1
Connect H.V
28
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Dy11
Yd11
Dy1
Yd1
Dd0
1-2-Vector Group Verification
C-b > C-c ≈ B-b ≈ B-c B-c > B-b ≈ C-c ≈ C-b B-c ≈ C-b>B-b ≈ C-c
Yy0
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
29
This test measures the resistance of the H.V , M.V& L.V
winding. The values of resistance should be balance for all
three phases and should match the designed values.
Equipment used : Digital resistance meter.
1-3-Measurement of winding resistance
D.C RESISTANCE
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
30
Tap pos. A-N
ohm
B-N
ohm
C-N
ohm
Resistance
3-ph
Oil Temp Rest. At
75C˚
1
9 0.4108 0.4104 0.4192 1.2305 19C˚ 1.5023
17
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
FOR H.V, USES TAP POS. 1-9-17
FOR M.V , USES TAP POS. 1-3 -5
FOR L.V , USES TAP POS. 1
1-3-Measurement of winding resistance
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
31
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
WHEATSTON BRIDGE
a
N
WIND. REST. FOR H.V
b
c
CBA
L.V
H.V
M.V
WHEATSTON BRIDGE
a
c
b
n
a
TR.
N
1-3-Measurement of winding resistance
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
32
Where :
T: CONSTANT ==234.5. for copper
T1: 75C˚
T2: The temperature at which the
measurement (19C ˚).
Rt1: Resistance value at the temperature
(75C ˚).
Rt2: Resistance value at measured
temperature
Rt1=1.502326 ohm
RESISTANCE WINDINGS AT 75 C˚
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
33
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
VOLTMETER – AMMETER
Apply ohm law D.C
12V
A
A
A
C
B
C
B
BC
N
N
A
H.V
M.V
L.V
1-3-Measurement of winding resistance
V
V
V
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
34
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
WINDING REST. H.V
The use of modern equipment
a
N
b
c CBA
L.V
H.V
M.Va
c
b
n
a
TR.
N
2
1
1-3-Measurement of winding resistance
The use of modern equipment
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
35
What is the benefit of?
1- It is to compare the design calculations in terms of volumes
conductors used
2- Resistance winding test used in calculating copper losses
1-3-Measurement of winding resistance
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
36
A A
A
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
VOLTMETER - AMMETER
1-4-IMPEDANCE VOLTAGE TEST(Z)
37
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Tap pos. A-B B-C C-A A B C
1 420V 422V 429V 3.5AMP 3.3AMP 3.4AMP
9
17
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
IMPEDANCE VOLTAGE (Z) :( H.V—L.V) (1,9,17) TAP POS.
IMPEDANCE VOLTAGE (Z) :( H.V—M.V) (1,9,17) TAP POS.
IMPEDANCE VOLTAGE TEST(Z)
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
38
Why do we apply the equation below?
Z=+ -7.5% FOR TWO
WINDINGS
Z=+ - 10%FOR THREE
WINDINGS
FOR EXAMPLE:
Rated voltage =145.2kv , Rated current =250.5
Applied voltage Measured current
AB=420 A=3.5
BC=422 B=3.3
CA=429 C=3.4
Apply the law :
IMPEDANCE VOLTAGE TEST(Z)
39
What is the benefit of?
1- In the case of connecting a power transformer in parallel with the other
Test engineer must calculate the value of impedance. A impedance value should
be close.
2- When measuring three windings currents, they are roughly equal. In the case
of a damage in one winding .the current size. it will be bigger than two windings
remaining. This gives an indication of the presence of a defect in winding.
3- Read the short circuit level
FOR EXAMPLE:
Rated voltage =145.2kv , Rated current =250.5
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
IMPEDANCE VOLTAGE TEST(Z)
40
The dielectrics are separation between the parts of the
electrical system, and it may be solid or gaseous or liquid or
free space , and there is no insulating material full electrical
insulation , there is a certain electric current passes through it ,
in spite of the low value of the electric current .You should
know the value of this electric current.
The dielectric value less over a period of time. Because of their
exposure to different pressures
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1-5-Dielectrics Test
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
41
Types of dielectric tests
1- Measurement of insulation resistance
2- Dissipation power factor / insulation power factor (tan∂)
3- Test oil
1-5-Dielectrics Test
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
42
1- Measures the insulation resistance of HV & LV windings with respect
to earth (body) and between LV & HV winding.
2- Voltage used: 1000 V to 5000 V
3- Recommended Values are ( M)Ohms for HV & 500 Mohms for LV.
4- Equipment used: MEGGER IS USED.
1-5-1- Measurement of insulation resistance.
43
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYn0d11
insulation resistance :( H.V—L.V)
a
N
b
c
CBA
L.V 11.5kv
H.V 132kv
M.V33kv
a
c
b
n
a
TR.
N
1-5-1- Measurement of insulation resistance.
44
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1-5-1- Measurement of insulation resistance.
45
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
this test done on the electrical transformer to see the quality
of isolators used in the TRANSFORMER WINDINGS . and
isolators operate among themselves capacitors as in the
illustration.
1-5-2-Dissipation power factor
132 kv
33 kv
11.5 kv
46
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1- In capacitor ideal has no losses. The electric current
precedes voltage an angle of (90˚).
1-5-2-Dissipation power factor
47
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
2- In practical, all capacitors find where the loss in
insulation
1-5-2-Dissipation power factor
48
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1-5-2-Dissipation power factor
49
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1-5-2-Dissipation power factor
50
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
TESTING
REPEAT THIS TEST:
M-HLE :MEDIUM – HIGH , LOW , EARTH
L-HME : LOW – HIGH , MEDIUM , EARTH
H-M / H-L / M-L /
a
N
b
c
CBA
L.V 11.5kv
H.V 132kv
M.V33kv
a
c
b
n
a
TR.
N
Tan
1-5-2-Dissipation power factor
e
51
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1-5-2-Dissipation power factor
To find good values
52
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1- Oil breakdown voltage is checked
as per IS-335.
100 mm L X 70 mm B X 80 mm Ht.
glass pot.
500ml Oil sample.
2- Spherical electrodes with gap of 2.5
mm
3- Recommended value : 60KV
4- Equipment used : OIL BDV TEST SET.
1-5-3- OIL TEST
53
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
DISCUSSION
DEFINITION OF THE TRANSFORMER
TEST REQUIRMENTS
TESTING OF TRANSFORMER
ROUTINE TESTS
REGULAR MAINTENANCE FOR POWER TRANSFORMERS
54
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
1- Periodic checking of
any loose connections of
the terminations of HV &
LV side.
Regular maintenance for power transformers
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
55
2-Breather examination.
Dehydration of Silica gel if
necessary.
3-Explosion vent diaphragm
examination.
4-Conservator to be cleaned
from inside after every three
years.
Regular maintenance for power transformers
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
56
5- Regular inspection of OIL &
WINDING TEMPERATURE METER
readings.
6- Cleanliness in the Substation yard
with all nets, vines, shrubs removed.
Regular maintenance for power transformers
57
Thank you for your
attention!
Questions?
TESTING AND MAINTENANCE OF POWER
TRANSFORMER
University of Turkish Aeronautical
Association
Faculty of engineering EEE department
T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

More Related Content

What's hot

Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
l control single phase rectifier
l control single phase rectifierl control single phase rectifier
l control single phase rectifierZahid Nawaz
 
Ee6378 linear regulators
Ee6378 linear regulatorsEe6378 linear regulators
Ee6378 linear regulatorsssuser2038c9
 
Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...IJERD Editor
 
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...Abhishek Choksi
 
2 transistor thyristor
2 transistor thyristor2 transistor thyristor
2 transistor thyristorRaghu Selvaraj
 
power electronics (Study Materials)
power electronics (Study Materials)power electronics (Study Materials)
power electronics (Study Materials)Samsu Deen
 
Multi phase Star Rectifier
Multi phase Star Rectifier Multi phase Star Rectifier
Multi phase Star Rectifier ZunAib Ali
 
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...ZunAib Ali
 
Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7guest8ae54cfb
 
Unit 1 thyristors protection
Unit 1 thyristors protectionUnit 1 thyristors protection
Unit 1 thyristors protectionEr.Meraj Akhtar
 
Knee point & primary current injection test
Knee point & primary current injection testKnee point & primary current injection test
Knee point & primary current injection testBasudev patra
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 

What's hot (20)

Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
l control single phase rectifier
l control single phase rectifierl control single phase rectifier
l control single phase rectifier
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
 
Ee6378 linear regulators
Ee6378 linear regulatorsEe6378 linear regulators
Ee6378 linear regulators
 
Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...Knee-Point Voltage Determination for Current Transformer Functional Identific...
Knee-Point Voltage Determination for Current Transformer Functional Identific...
 
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...
O.C & S.C Test, Sumpner or back to back Test, Condition for maximum efficienc...
 
2 transistor thyristor
2 transistor thyristor2 transistor thyristor
2 transistor thyristor
 
power electronics (Study Materials)
power electronics (Study Materials)power electronics (Study Materials)
power electronics (Study Materials)
 
Dead time pwm
Dead time pwmDead time pwm
Dead time pwm
 
Multi phase Star Rectifier
Multi phase Star Rectifier Multi phase Star Rectifier
Multi phase Star Rectifier
 
tca785
tca785tca785
tca785
 
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
Sinusoidal PWM and Space Vector Modulation For Two Level Voltage Source Conve...
 
Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7
 
DC DC Converter
DC DC ConverterDC DC Converter
DC DC Converter
 
Unit 1 thyristors protection
Unit 1 thyristors protectionUnit 1 thyristors protection
Unit 1 thyristors protection
 
Knee point & primary current injection test
Knee point & primary current injection testKnee point & primary current injection test
Knee point & primary current injection test
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
Transformer tests
Transformer testsTransformer tests
Transformer tests
 

Viewers also liked

Leadersurf: A Leadership Development Program Like No Other
Leadersurf: A Leadership Development Program Like No OtherLeadersurf: A Leadership Development Program Like No Other
Leadersurf: A Leadership Development Program Like No Otherbformato
 
Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...
Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...
Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...Mary Stacey
 
Small BusinessThe Importance, Need and Why Business Insurance
Small BusinessThe Importance, Need and Why Business InsuranceSmall BusinessThe Importance, Need and Why Business Insurance
Small BusinessThe Importance, Need and Why Business InsuranceTerina Lancaster
 
2014 Burren Executive Leadership Retreat Testimonials_f
2014 Burren Executive Leadership Retreat Testimonials_f2014 Burren Executive Leadership Retreat Testimonials_f
2014 Burren Executive Leadership Retreat Testimonials_fMary Stacey
 
Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016Anand Doshi
 
Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017
Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017
Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017Tony Terrones
 
Adaptive leadership
Adaptive leadershipAdaptive leadership
Adaptive leadershipASAF HUMAYUN
 

Viewers also liked (10)

Grammar 1st
Grammar 1stGrammar 1st
Grammar 1st
 
Leadersurf: A Leadership Development Program Like No Other
Leadersurf: A Leadership Development Program Like No OtherLeadersurf: A Leadership Development Program Like No Other
Leadersurf: A Leadership Development Program Like No Other
 
Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...
Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...
Growing Adaptive Leadership Networks_RRU_Oct 2015_forLinkedInF3[Compatibility...
 
The Graphic Design Process
The Graphic Design ProcessThe Graphic Design Process
The Graphic Design Process
 
Small BusinessThe Importance, Need and Why Business Insurance
Small BusinessThe Importance, Need and Why Business InsuranceSmall BusinessThe Importance, Need and Why Business Insurance
Small BusinessThe Importance, Need and Why Business Insurance
 
Custom ERPNext Solutions
Custom ERPNext SolutionsCustom ERPNext Solutions
Custom ERPNext Solutions
 
2014 Burren Executive Leadership Retreat Testimonials_f
2014 Burren Executive Leadership Retreat Testimonials_f2014 Burren Executive Leadership Retreat Testimonials_f
2014 Burren Executive Leadership Retreat Testimonials_f
 
Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016
 
Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017
Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017
Curso Universitario de Formación en Ultrasonido Obgin. Mar del Plata 2017
 
Adaptive leadership
Adaptive leadershipAdaptive leadership
Adaptive leadership
 

Similar to Omar saady

Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.Geetesh Verma
 
891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgearmichaeljmack
 
Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2koperundeviG
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfNguyenXuanTung12
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
236793460 ee6361-electric-circuit-lab-docx
236793460 ee6361-electric-circuit-lab-docx236793460 ee6361-electric-circuit-lab-docx
236793460 ee6361-electric-circuit-lab-docxhomeworkping3
 
Matery training ICT ( IN Circuit Test Machine)
Matery training ICT ( IN Circuit Test Machine)Matery training ICT ( IN Circuit Test Machine)
Matery training ICT ( IN Circuit Test Machine)Arif Aji
 
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...ijiert bestjournal
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptChristinaBoyd12
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.pptsantubanga333
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptssuser1f60f6
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2IAEME Publication
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdfvikram desai
 

Similar to Omar saady (20)

Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
 
L38 3ph im
L38 3ph imL38 3ph im
L38 3ph im
 
Transformer
TransformerTransformer
Transformer
 
891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear891 Switchboard vs. 1558 Switchgear
891 Switchboard vs. 1558 Switchgear
 
Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2
 
Power-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdfPower-Transformer-Testing-Brochure-ENU.pdf
Power-Transformer-Testing-Brochure-ENU.pdf
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
236793460 ee6361-electric-circuit-lab-docx
236793460 ee6361-electric-circuit-lab-docx236793460 ee6361-electric-circuit-lab-docx
236793460 ee6361-electric-circuit-lab-docx
 
Matery training ICT ( IN Circuit Test Machine)
Matery training ICT ( IN Circuit Test Machine)Matery training ICT ( IN Circuit Test Machine)
Matery training ICT ( IN Circuit Test Machine)
 
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
1 7
1 71 7
1 7
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 
Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
 
Em manual 1
Em manual 1Em manual 1
Em manual 1
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Omar saady

  • 1. Presented by Othman Al Darraji Department of Electrical Engineering TAA. University Ankara , Turkey otomn_kh@yahoo.com T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Supervision Prof. Dr. Ibrahim Mahariq Department of Electrical Engineering TAA. University Ankara , Turkey ibmahariq@gmail.com Turkey – Ankara 10 - 5 - 2016 University of Turkish Aeronautical Association Faculty of engineering EEE department 1 Presented by Omar Saadi Alshear Department of Electrical Engineering TAA. University Ankara , Turkey omarsaad529@gmail.com
  • 2. 2 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS
  • 3. 3 Transformer is a static device which transforms A.C electrical power from one voltage to another Voltage keeping The frequency same by Electromagnetic induction T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
  • 4. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 4 IRON CORE
  • 5. 5 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS
  • 6. 6 1- NAME PLATE FOR TRANSFORMER T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R S.N: 925 554 1 = 5 0 K V A 2 = 1 0 0 K V A 3 = 2 0 0 K V A 4 = 3 0 0 K V A 5 = 5 0 0 K V A 6 = 8 0 0 K V A 7 = 1 0 0 0 K V A 8 = 1 5 0 0 K V A TEST REQUIREMENTS
  • 7. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 7 2-TESTING DEVICES TEST REQUIREMENTS
  • 8. 3- SAFETY EQUIPMENT 4 - MECHANICAL EQUIPMENT T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 8 TEST REQUIREMENTS
  • 9. 9 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS
  • 10. 10 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R TESTING OF TRANSFORMER Types of testing 1- Routine tests 2- Type tests 3- Special tests
  • 11. 1-ROUTINE TESTS 11 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1.1- Measurement of voltage ratio 1.2-Vector group verification 1.3-Measurement of winding resistance 1.4-Impedance voltage test(z) 1.5-Dielectrics Test A-Measurement of insulation resistance. B- Dissipation power factor / insulation power factor (tan∂) C- OIL TEST TESTING OF TRANSFORMER
  • 12. THESE TESTS ARE CARRIED OUT ON ONE TRANSFORMER OF THE LOT. 12 2.1- All routine tests. 2.2- Additionally following tests are included in type tests. A- Lightening impulse test. B- Temperature rise test. 2- TYPE TESTS TESTING OF TRANSFORMER
  • 13. 13 3.1- Measurement of zero Phase sequence. 3.2- Measurement of acoustic noise level. 3.3- Measurement of harmonics of the no load current. 3.4- Magnetic balance test. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 3-SPECIAL TESTS TESTING OF TRANSFORMER
  • 14. 14 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS
  • 15. 15 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Transformer Breakdowns
  • 16. 16 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Sources of faults in transformer
  • 17. 17 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R
  • 18. 18 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Apply Tests Routine on Power Transformer Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYnd11 1-ROUTINE TESTS
  • 19. 19 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 6- Equipment used : Transformer Turns Ratiometer ( T T R) 1- This test measures the voltage ratio as per the customer’s requirement. 2- V1/V2 = N1/N2 3-The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct. 4- apply the rated ratio for all tab (1-17). 5-apply the rated ratio for (132 kv,33kv 11kv) 1-1-Measurement of voltage ratio
  • 20. 20 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 Rated ratio (Ynd11)H.V-L.V=( 132/ √3 ) / 11.5=6.6227 FOR TAP (9) Tap pos. TAP Voltage (kv) (A-N) / (a-c) (Measured value) (B-N) / (b-a) (Measured value) (C-N) / (c-b) (Measured value) Rated Ratio (Rated value ) 1 145.2 / 11.5 9 10 11 132.0 (132 ⁄ √3) ⁄ 11.5 = 6.627 17 118.8 1-1-Measurement of voltage ratio
  • 21. 21 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R TEST: TR. 1-1-Measurement of voltage ratio a N VECT. GROUP: Ynd11 FOR H.V – L.V b c CBA L.V H.V M.V Ratio meter a c b n a TR. N
  • 22. The no-load deviation of the turn ratios should be ≤ % 0,5 22 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R APPLLY THIS LAW 1-1-Measurement of voltage ratio
  • 23. . 23 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R The use of modern equipment 1-1-Measurement of voltage ratio TTR (Transformer Turns Ratio)
  • 24. This test is very important for an engineer to figure out directional connectivity for transformers. (( Dy11 ,Yd11, Dy1,Yd1)) 24 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1-2-Vector Group Verification
  • 25. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 25 Dy11 Yd11
  • 26. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 26 Yd1 Dy1
  • 27. 27 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Steps to implement the test 1-2-Vector Group Verification STEP 2 S.C STEP 3 Take V B-b , B-c ,C-b , C-c STEP 1 Connect H.V
  • 28. 28 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Dy11 Yd11 Dy1 Yd1 Dd0 1-2-Vector Group Verification C-b > C-c ≈ B-b ≈ B-c B-c > B-b ≈ C-c ≈ C-b B-c ≈ C-b>B-b ≈ C-c Yy0
  • 29. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 29 This test measures the resistance of the H.V , M.V& L.V winding. The values of resistance should be balance for all three phases and should match the designed values. Equipment used : Digital resistance meter. 1-3-Measurement of winding resistance D.C RESISTANCE
  • 30. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 30 Tap pos. A-N ohm B-N ohm C-N ohm Resistance 3-ph Oil Temp Rest. At 75C˚ 1 9 0.4108 0.4104 0.4192 1.2305 19C˚ 1.5023 17 Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 FOR H.V, USES TAP POS. 1-9-17 FOR M.V , USES TAP POS. 1-3 -5 FOR L.V , USES TAP POS. 1 1-3-Measurement of winding resistance
  • 31. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 31 Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 WHEATSTON BRIDGE a N WIND. REST. FOR H.V b c CBA L.V H.V M.V WHEATSTON BRIDGE a c b n a TR. N 1-3-Measurement of winding resistance
  • 32. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 32 Where : T: CONSTANT ==234.5. for copper T1: 75C˚ T2: The temperature at which the measurement (19C ˚). Rt1: Resistance value at the temperature (75C ˚). Rt2: Resistance value at measured temperature Rt1=1.502326 ohm RESISTANCE WINDINGS AT 75 C˚
  • 33. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 33 Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 VOLTMETER – AMMETER Apply ohm law D.C 12V A A A C B C B BC N N A H.V M.V L.V 1-3-Measurement of winding resistance V V V
  • 34. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 34 Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 WINDING REST. H.V The use of modern equipment a N b c CBA L.V H.V M.Va c b n a TR. N 2 1 1-3-Measurement of winding resistance The use of modern equipment
  • 35. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 35 What is the benefit of? 1- It is to compare the design calculations in terms of volumes conductors used 2- Resistance winding test used in calculating copper losses 1-3-Measurement of winding resistance
  • 36. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 36 A A A Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 VOLTMETER - AMMETER 1-4-IMPEDANCE VOLTAGE TEST(Z)
  • 37. 37 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Tap pos. A-B B-C C-A A B C 1 420V 422V 429V 3.5AMP 3.3AMP 3.4AMP 9 17 Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 IMPEDANCE VOLTAGE (Z) :( H.V—L.V) (1,9,17) TAP POS. IMPEDANCE VOLTAGE (Z) :( H.V—M.V) (1,9,17) TAP POS. IMPEDANCE VOLTAGE TEST(Z)
  • 38. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 38 Why do we apply the equation below? Z=+ -7.5% FOR TWO WINDINGS Z=+ - 10%FOR THREE WINDINGS FOR EXAMPLE: Rated voltage =145.2kv , Rated current =250.5 Applied voltage Measured current AB=420 A=3.5 BC=422 B=3.3 CA=429 C=3.4 Apply the law : IMPEDANCE VOLTAGE TEST(Z)
  • 39. 39 What is the benefit of? 1- In the case of connecting a power transformer in parallel with the other Test engineer must calculate the value of impedance. A impedance value should be close. 2- When measuring three windings currents, they are roughly equal. In the case of a damage in one winding .the current size. it will be bigger than two windings remaining. This gives an indication of the presence of a defect in winding. 3- Read the short circuit level FOR EXAMPLE: Rated voltage =145.2kv , Rated current =250.5 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R IMPEDANCE VOLTAGE TEST(Z)
  • 40. 40 The dielectrics are separation between the parts of the electrical system, and it may be solid or gaseous or liquid or free space , and there is no insulating material full electrical insulation , there is a certain electric current passes through it , in spite of the low value of the electric current .You should know the value of this electric current. The dielectric value less over a period of time. Because of their exposure to different pressures T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1-5-Dielectrics Test
  • 41. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 41 Types of dielectric tests 1- Measurement of insulation resistance 2- Dissipation power factor / insulation power factor (tan∂) 3- Test oil 1-5-Dielectrics Test
  • 42. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 42 1- Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding. 2- Voltage used: 1000 V to 5000 V 3- Recommended Values are ( M)Ohms for HV & 500 Mohms for LV. 4- Equipment used: MEGGER IS USED. 1-5-1- Measurement of insulation resistance.
  • 43. 43 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R Type: 132/33 / 11.5KV ,63 MVA VECT. GROUP: YnYn0d11 insulation resistance :( H.V—L.V) a N b c CBA L.V 11.5kv H.V 132kv M.V33kv a c b n a TR. N 1-5-1- Measurement of insulation resistance.
  • 44. 44 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1-5-1- Measurement of insulation resistance.
  • 45. 45 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R this test done on the electrical transformer to see the quality of isolators used in the TRANSFORMER WINDINGS . and isolators operate among themselves capacitors as in the illustration. 1-5-2-Dissipation power factor 132 kv 33 kv 11.5 kv
  • 46. 46 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1- In capacitor ideal has no losses. The electric current precedes voltage an angle of (90˚). 1-5-2-Dissipation power factor
  • 47. 47 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 2- In practical, all capacitors find where the loss in insulation 1-5-2-Dissipation power factor
  • 48. 48 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1-5-2-Dissipation power factor
  • 49. 49 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1-5-2-Dissipation power factor
  • 50. 50 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R TESTING REPEAT THIS TEST: M-HLE :MEDIUM – HIGH , LOW , EARTH L-HME : LOW – HIGH , MEDIUM , EARTH H-M / H-L / M-L / a N b c CBA L.V 11.5kv H.V 132kv M.V33kv a c b n a TR. N Tan 1-5-2-Dissipation power factor e
  • 51. 51 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1-5-2-Dissipation power factor To find good values
  • 52. 52 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1- Oil breakdown voltage is checked as per IS-335. 100 mm L X 70 mm B X 80 mm Ht. glass pot. 500ml Oil sample. 2- Spherical electrodes with gap of 2.5 mm 3- Recommended value : 60KV 4- Equipment used : OIL BDV TEST SET. 1-5-3- OIL TEST
  • 53. 53 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R DISCUSSION DEFINITION OF THE TRANSFORMER TEST REQUIRMENTS TESTING OF TRANSFORMER ROUTINE TESTS REGULAR MAINTENANCE FOR POWER TRANSFORMERS
  • 54. 54 T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 1- Periodic checking of any loose connections of the terminations of HV & LV side. Regular maintenance for power transformers
  • 55. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 55 2-Breather examination. Dehydration of Silica gel if necessary. 3-Explosion vent diaphragm examination. 4-Conservator to be cleaned from inside after every three years. Regular maintenance for power transformers
  • 56. T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R 56 5- Regular inspection of OIL & WINDING TEMPERATURE METER readings. 6- Cleanliness in the Substation yard with all nets, vines, shrubs removed. Regular maintenance for power transformers
  • 57. 57 Thank you for your attention! Questions? TESTING AND MAINTENANCE OF POWER TRANSFORMER University of Turkish Aeronautical Association Faculty of engineering EEE department T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R