Assessment Practical/Observation
Student Name CIT Number
Competency Title, Code
and Banner Code
CRN
Advanced Roofs - CPCCCA3009B
OCTAGONAL END
Assessment Type โ˜ In the workplace โ˜’ Simulated environment โ˜ Other
Other Team Members
Student Statement: This assessment is my own work. Any ideas and comments made by other people have been
acknowledged. I understand that by emailing or submitting this assessment electronically, I agree to this statement.
Student Signature Date
PRIVACY DISCLAIMER: CIT is collecting your personal information for assessment purposes. The information will only be used in accordance
with the CIT Privacy Policy.
Assessor Feedback (also complete observation checklist and questions on last page)
๏ฑ Student provided with feedback
Attempt 1 โ˜ Satisfactory โ˜ Not Yet Satisfactory Date / /
Attempt 2 โ˜ Satisfactory โ˜ Not Yet Satisfactory Date / /
Assessor
Name
Assessor Signature
Note to Assessor: Please record any reasonable adjustment that has occurred for this assessment.
Instructions to Assessor
Work, Health and Safety: A work health and safety check of the assessment environment is to be conducted prior to the assessment and any
hazards addressed appropriately.
List the assessment range and conditions, time and materials on the next page
These sections should be detailed enough for multiple assessors to consistently implement the assessment and include details of location, time
restrictions, level of assistance permitted (if any), WHS, environment protocols, etc. The student should have access to techniques, procedures,
information, resources and aids which would normally be available in the workplace. Include if open or closed book.
Materials provided may include: assessment paper, site plan, text, internet access, etc.
Materials supplied by student may include: personal protective equipment
A
d
v
a
n
c
e
d
R
o
o
f
s
O
c
t
a
g
o
n
a
l
ยฉ Canberra Institute of Technology RTO Code 0101 Page 2 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Information for Students: You may have two (2) attempts for this assessment.
โ€ข If your first attempt is not successful, your teacher will discuss your results with you and will arrange a
second attempt.
โ€ข If your second attempt is not successful, you will be required to re-enrol in this unit.
Only one re-assessment attempt will be granted for each assessment item.
Time Allowed: 4 hours
Materials Provided by Assessor: All materials and tools required to complete the task will be provided.
Materials and Equipment to be Supplied by the Student: Personal protective equipment PPE and nail bag.
Assessment Range and Conditions: Assessment will be conducted in simulated work environment CIT
Bruce under teacher supervision at all times. if at any stage the assessors deem the assessment to be
unsafe it will be stopped. Access to all resources, manual and standards is permitted. All mobile phones
are to be switch off.
Assessment Criteria: To achieve a Satisfactory result, your assessor will be looking for your ability to
demonstrate the key skills/tasks/knowledge detailed in the Assessment Task to industry standard.
The criteria that you will be assessed for this task are:
Planning and Processes Planned, organised task and perform work following
accepted industry processes and standards.
Take responsibility for own
outputs in work and learning
Actively participated and engaged as an individual and/or
team member in all tasks and activities.
Specifications Job meets specification requirements, to industry standard
Time Management Task achieved within time and available information
requirements
Communication Written and oral communication met minimal job /task
requirements
WH&S Maintain a safe work environment and complied with
WHS regulations supervisor instructions and used
appropriate PPE for required tasks
Clean-Up Materials, tools and equipment are stored in line with
instruction. Area is left clean and free from hazards
ยฉ Canberra Institute of Technology RTO Code 0101 Page 3 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
INSTRUCTIONS:
You are required to construct a โ€œOCTAGONAL ENDโ€™ Pitched Roof.
Using the plans provided, you are required to:
1. Complete the JSA and Toolbox talk for this Practical Assessment
Class participation activity on Ready Skills. Your trainer will form an
open discussion to assist with completing both the JSA & Toolbox talk activities.
2. Select all hand & power tools required for this Practical Assessment
Class participation activity with Toolbox Talk. Your trainer will form an
open discussion to assist with completing this activity.
3. Select all materials required for this Practical Assessment
Class participation activity with Toolbox Talk. Your trainer will form an
open discussion to assist with completing this activity.
4. Complete all calculations required for measuring, marking & cutting roof framing
members
Students will need a pencil, eraser & a scientific calculator.
Your trainer will supply worksheets for all roof member calculations.
Students are required to successfully complete all calculations and
to write these dimensions on the attached rafter drawings.
5. Construct both Major & Minor roofs
In teams of 2, students are to construct the OCTAGONAL END Pitched Roof.
Using 70 x 35 mgp10 pine. Students are to set-out, measure & cut 1 pattern
Common Rafter & 1 pattern Hip Rafter. Once your trainer has inspected &
confirmed these rafters, you may then proceed to setting out the roof frame member
locations and constructing your OCTAGONAL END pitched roof.
6. Take photographs of completed Practical Assessment activity & upload to drop-box
Use your phone and the ready skills app, take a few photographs of the completed Roof
and a photograph of your completed calculations sheet.
These are to be submittedintoreadyskills.
7. Dismantle, de-nail roof frame & return all tools to store.
Roof model to be SAFELY de-constructed, ALL fixings removed.
Any re-usable timber lengths are to be stowed in racks.
All small timber pieces placed in scrap bins and work area cleaned.
All tools are to be returned to the store.
You MUST report any tool defects or damage to your trainer.
ยฉ Canberra Institute of Technology RTO Code 0101 Page 4 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Student Checklist ๎ƒง
T1 Student actively participated in a toolbox talk and agreed to its content โ˜
Student contributed to the development of a JSA and its control rating, with consideration to environmental
requirements
โ˜
Student correctly selected and used PPE for given tasks โ˜
Student carried out task in accordance with the JSA and organisational policies and procedures. โ˜
T2 Student used written and verbal communication skills during this topic, also completed the non-verbal
communication document
โ˜
Student worked with others in a team to achieve given tasks โ˜
T3 Student was able to interpret and apply relevant work instruction and complete all documentation given. โ˜
Student was able to read and interpret plans, site drawings and specifications โ˜
T4 Student listed and selected the correct materials for the given tasks โ˜
Student listed and selected the correct tools for the given tasks โ˜
โ˜
Student checked tool and equipment for serviceability and reported any faults to the appropriate person โ˜
T5 Working in small groups the student communicated and coordinated with the team to set out roof
members for an octagonal end roof
The task:
โ€ข Student set out the top plate for roofing members according to plans and calculations
โ€ข Ridge board was cut and marked to plans and calculations
โ€ข Common rafter were cut to the correct length including birds mouth, ridge reduction and eave
overhang to meet drawings and calculations
โ€ข Hip rafters were cut to the correct length including birds mouth, ridge reduction and eave overhang
to meet drawings and calculations
โ€ข Creeper and valley rafters are cut to meet drawings and calculations
โ€ข Student installed Rafters in correct sequence
โ˜
T6 Working in small groups the student communicated and coordinated with the team to install roof supports
for an oblique end roof
The task:
โ€ข Student cut and installed under purlins according to drawings and specs
โ€ข Student cut and installed struts according to drawing and specs
โ€ข Trimmers are fitted to gable ends and a verge rafter installed according to drawings and specs
โ€ข Student was able to show and communicate where and how a fire system would be installed
โ˜
T7 Student had been assessed and uploaded photos of task to eLearn before clean up commenced โ˜
Student de-constructed the task in a safe and methodical system โ˜
All material was disposed of appropriately, reusing and recycling materials when applicable โ˜
ยฉ Canberra Institute of Technology RTO Code 0101 Page 5 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Calculate rafters for the octagonal bay end
Based on the steel frame in the barn, measure and calculate the following measurements, the attached
plans on this document may help you.
1 roof span
2 half span
3 degree
4 degree
5 plan length
6 plan length
Eave span 300mm
Rafter spacing 450mm
ยฉ Canberra Institute of Technology RTO Code 0101 Page 6 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
1 half span rafter 7 hip half span
2 eave rafter 8 hip rise
3 deg rafter 9 rafter line length of hip
4 rafter line length 10 hip deg
5 eave RLL 11 hip eave
6 ridge reduction
(on the angle)
12 hip eave RLL
My Roof Pitch:__________
Note: You may need to refer to the
plans on page 5 to help solve some
of these equations
ยฉ Canberra Institute of Technology RTO Code 0101 Page 7 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
This drawing is to show placement and connection points. You must use the pitch and
measurements given and calculated from this document.
This document simulates a working site specifications document, you will need to
gather the complete picture of this job from multiple pages and sections of
information and bring it all together to complete the task.
Note: Under-perlins break the span of the rafter in half
Collar ties stop the rafters from spreading

More Related Content

Similar to Octagonal End_Student Assessment.pdf

Practical Assessment 1 - Reinforcement
Practical Assessment 1 - ReinforcementPractical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
Canberra Institute of technology
ย 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
Canberra Institute of technology
ย 
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairsPractical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
Canberra Institute of technology
ย 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
Canberra Institute of technology
ย 
NBA
NBANBA
NBA
SHIMI S L
ย 
2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes
CITPainting
ย 
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITIONStudent Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
Canberra Institute of technology
ย 
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eavesPractical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eaves
Canberra Institute of technology
ย 
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eavesPractical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eaves
Canberra Institute of technology
ย 

Similar to Octagonal End_Student Assessment.pdf (9)

Practical Assessment 1 - Reinforcement
Practical Assessment 1 - ReinforcementPractical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
ย 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
ย 
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairsPractical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
ย 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
ย 
NBA
NBANBA
NBA
ย 
2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes
ย 
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITIONStudent Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
ย 
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eavesPractical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eaves
ย 
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eavesPractical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eaves
ย 

More from Canberra Institute of technology

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Canberra Institute of technology
ย 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Canberra Institute of technology
ย 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
Canberra Institute of technology
ย 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
Canberra Institute of technology
ย 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
Canberra Institute of technology
ย 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
Canberra Institute of technology
ย 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
Canberra Institute of technology
ย 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
Canberra Institute of technology
ย 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
Canberra Institute of technology
ย 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
Canberra Institute of technology
ย 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Canberra Institute of technology
ย 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
Canberra Institute of technology
ย 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
Canberra Institute of technology
ย 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
Canberra Institute of technology
ย 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
Canberra Institute of technology
ย 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
Canberra Institute of technology
ย 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
Canberra Institute of technology
ย 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
Canberra Institute of technology
ย 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
Canberra Institute of technology
ย 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
Canberra Institute of technology
ย 

More from Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
ย 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
ย 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
ย 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
ย 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
ย 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
ย 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
ย 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
ย 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
ย 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
ย 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
ย 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
ย 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
ย 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
ย 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
ย 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
ย 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
ย 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
ย 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
ย 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
ย 

Recently uploaded

Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
JomonJoseph58
ย 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
indexPub
ย 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
National Information Standards Organization (NISO)
ย 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Henry Hollis
ย 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
ย 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
ย 
How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17
Celine George
ย 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
ย 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
Iris Thiele Isip-Tan
ย 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
ย 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
ย 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
Mohammad Al-Dhahabi
ย 
How to Predict Vendor Bill Product in Odoo 17
How to Predict Vendor Bill Product in Odoo 17How to Predict Vendor Bill Product in Odoo 17
How to Predict Vendor Bill Product in Odoo 17
Celine George
ย 
Nutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour TrainingNutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour Training
melliereed
ย 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
ย 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
nitinpv4ai
ย 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
ImMuslim
ย 
Prรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Prรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Prรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
ย 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
ย 
Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...
Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...
Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...
Nguyen Thanh Tu Collection
ย 

Recently uploaded (20)

Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
ย 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
ย 
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
Jemison, MacLaughlin, and Majumder "Broadening Pathways for Editors and Authors"
ย 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
ย 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
ย 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
ย 
How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17
ย 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
ย 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
ย 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
ย 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
ย 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
ย 
How to Predict Vendor Bill Product in Odoo 17
How to Predict Vendor Bill Product in Odoo 17How to Predict Vendor Bill Product in Odoo 17
How to Predict Vendor Bill Product in Odoo 17
ย 
Nutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour TrainingNutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour Training
ย 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
ย 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
ย 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
ย 
Prรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Prรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Prรฉsentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
ย 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
ย 
Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...
Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...
Bร€I TแบฌP Bแป” TRแปข TIแบพNG ANH LแปšP 9 Cแบข Nฤ‚M - GLOBAL SUCCESS - Nฤ‚M HแปŒC 2024-2025 - ...
ย 

Octagonal End_Student Assessment.pdf

  • 1. ยฉ Canberra Institute of Technology RTO Code 0101 Page 1 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Assessment Practical/Observation Student Name CIT Number Competency Title, Code and Banner Code CRN Advanced Roofs - CPCCCA3009B OCTAGONAL END Assessment Type โ˜ In the workplace โ˜’ Simulated environment โ˜ Other Other Team Members Student Statement: This assessment is my own work. Any ideas and comments made by other people have been acknowledged. I understand that by emailing or submitting this assessment electronically, I agree to this statement. Student Signature Date PRIVACY DISCLAIMER: CIT is collecting your personal information for assessment purposes. The information will only be used in accordance with the CIT Privacy Policy. Assessor Feedback (also complete observation checklist and questions on last page) ๏ฑ Student provided with feedback Attempt 1 โ˜ Satisfactory โ˜ Not Yet Satisfactory Date / / Attempt 2 โ˜ Satisfactory โ˜ Not Yet Satisfactory Date / / Assessor Name Assessor Signature Note to Assessor: Please record any reasonable adjustment that has occurred for this assessment. Instructions to Assessor Work, Health and Safety: A work health and safety check of the assessment environment is to be conducted prior to the assessment and any hazards addressed appropriately. List the assessment range and conditions, time and materials on the next page These sections should be detailed enough for multiple assessors to consistently implement the assessment and include details of location, time restrictions, level of assistance permitted (if any), WHS, environment protocols, etc. The student should have access to techniques, procedures, information, resources and aids which would normally be available in the workplace. Include if open or closed book. Materials provided may include: assessment paper, site plan, text, internet access, etc. Materials supplied by student may include: personal protective equipment A d v a n c e d R o o f s O c t a g o n a l
  • 2. ยฉ Canberra Institute of Technology RTO Code 0101 Page 2 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Information for Students: You may have two (2) attempts for this assessment. โ€ข If your first attempt is not successful, your teacher will discuss your results with you and will arrange a second attempt. โ€ข If your second attempt is not successful, you will be required to re-enrol in this unit. Only one re-assessment attempt will be granted for each assessment item. Time Allowed: 4 hours Materials Provided by Assessor: All materials and tools required to complete the task will be provided. Materials and Equipment to be Supplied by the Student: Personal protective equipment PPE and nail bag. Assessment Range and Conditions: Assessment will be conducted in simulated work environment CIT Bruce under teacher supervision at all times. if at any stage the assessors deem the assessment to be unsafe it will be stopped. Access to all resources, manual and standards is permitted. All mobile phones are to be switch off. Assessment Criteria: To achieve a Satisfactory result, your assessor will be looking for your ability to demonstrate the key skills/tasks/knowledge detailed in the Assessment Task to industry standard. The criteria that you will be assessed for this task are: Planning and Processes Planned, organised task and perform work following accepted industry processes and standards. Take responsibility for own outputs in work and learning Actively participated and engaged as an individual and/or team member in all tasks and activities. Specifications Job meets specification requirements, to industry standard Time Management Task achieved within time and available information requirements Communication Written and oral communication met minimal job /task requirements WH&S Maintain a safe work environment and complied with WHS regulations supervisor instructions and used appropriate PPE for required tasks Clean-Up Materials, tools and equipment are stored in line with instruction. Area is left clean and free from hazards
  • 3. ยฉ Canberra Institute of Technology RTO Code 0101 Page 3 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 INSTRUCTIONS: You are required to construct a โ€œOCTAGONAL ENDโ€™ Pitched Roof. Using the plans provided, you are required to: 1. Complete the JSA and Toolbox talk for this Practical Assessment Class participation activity on Ready Skills. Your trainer will form an open discussion to assist with completing both the JSA & Toolbox talk activities. 2. Select all hand & power tools required for this Practical Assessment Class participation activity with Toolbox Talk. Your trainer will form an open discussion to assist with completing this activity. 3. Select all materials required for this Practical Assessment Class participation activity with Toolbox Talk. Your trainer will form an open discussion to assist with completing this activity. 4. Complete all calculations required for measuring, marking & cutting roof framing members Students will need a pencil, eraser & a scientific calculator. Your trainer will supply worksheets for all roof member calculations. Students are required to successfully complete all calculations and to write these dimensions on the attached rafter drawings. 5. Construct both Major & Minor roofs In teams of 2, students are to construct the OCTAGONAL END Pitched Roof. Using 70 x 35 mgp10 pine. Students are to set-out, measure & cut 1 pattern Common Rafter & 1 pattern Hip Rafter. Once your trainer has inspected & confirmed these rafters, you may then proceed to setting out the roof frame member locations and constructing your OCTAGONAL END pitched roof. 6. Take photographs of completed Practical Assessment activity & upload to drop-box Use your phone and the ready skills app, take a few photographs of the completed Roof and a photograph of your completed calculations sheet. These are to be submittedintoreadyskills. 7. Dismantle, de-nail roof frame & return all tools to store. Roof model to be SAFELY de-constructed, ALL fixings removed. Any re-usable timber lengths are to be stowed in racks. All small timber pieces placed in scrap bins and work area cleaned. All tools are to be returned to the store. You MUST report any tool defects or damage to your trainer.
  • 4. ยฉ Canberra Institute of Technology RTO Code 0101 Page 4 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Student Checklist ๎ƒง T1 Student actively participated in a toolbox talk and agreed to its content โ˜ Student contributed to the development of a JSA and its control rating, with consideration to environmental requirements โ˜ Student correctly selected and used PPE for given tasks โ˜ Student carried out task in accordance with the JSA and organisational policies and procedures. โ˜ T2 Student used written and verbal communication skills during this topic, also completed the non-verbal communication document โ˜ Student worked with others in a team to achieve given tasks โ˜ T3 Student was able to interpret and apply relevant work instruction and complete all documentation given. โ˜ Student was able to read and interpret plans, site drawings and specifications โ˜ T4 Student listed and selected the correct materials for the given tasks โ˜ Student listed and selected the correct tools for the given tasks โ˜ โ˜ Student checked tool and equipment for serviceability and reported any faults to the appropriate person โ˜ T5 Working in small groups the student communicated and coordinated with the team to set out roof members for an octagonal end roof The task: โ€ข Student set out the top plate for roofing members according to plans and calculations โ€ข Ridge board was cut and marked to plans and calculations โ€ข Common rafter were cut to the correct length including birds mouth, ridge reduction and eave overhang to meet drawings and calculations โ€ข Hip rafters were cut to the correct length including birds mouth, ridge reduction and eave overhang to meet drawings and calculations โ€ข Creeper and valley rafters are cut to meet drawings and calculations โ€ข Student installed Rafters in correct sequence โ˜ T6 Working in small groups the student communicated and coordinated with the team to install roof supports for an oblique end roof The task: โ€ข Student cut and installed under purlins according to drawings and specs โ€ข Student cut and installed struts according to drawing and specs โ€ข Trimmers are fitted to gable ends and a verge rafter installed according to drawings and specs โ€ข Student was able to show and communicate where and how a fire system would be installed โ˜ T7 Student had been assessed and uploaded photos of task to eLearn before clean up commenced โ˜ Student de-constructed the task in a safe and methodical system โ˜ All material was disposed of appropriately, reusing and recycling materials when applicable โ˜
  • 5. ยฉ Canberra Institute of Technology RTO Code 0101 Page 5 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Calculate rafters for the octagonal bay end Based on the steel frame in the barn, measure and calculate the following measurements, the attached plans on this document may help you. 1 roof span 2 half span 3 degree 4 degree 5 plan length 6 plan length Eave span 300mm Rafter spacing 450mm
  • 6. ยฉ Canberra Institute of Technology RTO Code 0101 Page 6 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 1 half span rafter 7 hip half span 2 eave rafter 8 hip rise 3 deg rafter 9 rafter line length of hip 4 rafter line length 10 hip deg 5 eave RLL 11 hip eave 6 ridge reduction (on the angle) 12 hip eave RLL My Roof Pitch:__________ Note: You may need to refer to the plans on page 5 to help solve some of these equations
  • 7. ยฉ Canberra Institute of Technology RTO Code 0101 Page 7 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 This drawing is to show placement and connection points. You must use the pitch and measurements given and calculated from this document. This document simulates a working site specifications document, you will need to gather the complete picture of this job from multiple pages and sections of information and bring it all together to complete the task. Note: Under-perlins break the span of the rafter in half Collar ties stop the rafters from spreading