 The Nuclear power Corporation Of India Limited (NPCIL) is a government owned corporation
of India based in Mumbai.
 NPCIL is administrated by the Department of Atomic Energy (DAE) , Part of the Ministry of
Science and Technology.
 NPCIL was created in September 1987 as public limited company under the companies act
1956, "with the objective of undertaking the design, construction, operation and maintenance
of the atomic power stations for generation of electricity in pursuance of the schemes and
programmes of the Government of India under the provision of the Atomic Energy Act 1962."
All nuclear power plants operated by the company are certified for ISO-14001 (Environment
Management System).
 NPCIL is responsible for design, construction, commissioning and operation of nuclear power
reactors. Atomic Energy Act, 1962. NPCIL has also equity participation in BHAVINI, an
organization formed for implementation for Fast Breeder Reactors programme in the country
NUCLEAR POWER PLANT IN INDIA
OPERATING UNITS:-
1. Tarapura Atomic Power station : 2*160MW , 2*540MW
2. Rajasthan Atomic Power station :100MW,200MW,4*220MW
3. Madras Atomic Power station :2*220MW
4. Narora Atomic Power station :2*220MW
5. Kakrapar Atomic Power station :2*220MW
6. Kaiga Atomic Power station :4*220MW
7. Kundankulam Atomic Power station :1000MW
1.
RAJASTHAN ATOMIC POWER PLANT
 Rawatbhata remote town in Chittorgarh district about 64 kms from Kota, an
industrial city of Rajasthan.
 The land selected is in between Rana Pratap sagar dam & Gandhi sagar dam at
the right bank of Chambal River.
 The water from the reservoir of the Rana Pratap sagar Dam serves the
requirement of the Nuclear Power Plant.
 There are six PHWR unit. One 100 Mwe, One 200 MWe, Four 220 Mwe unit.
 For employees various colonies are constructed with all the domestic facilities.
INDIA INSTALLED CAPACITY & % SHARE BY
VARIOUS SOURCES
coal,62%
hydro,15%
wind,12%
gas+diesel,9%
nuclear,2%
coal hydro wind gas+diesel nuclear
 Present capacity – 2,98,000 MW
 Thermal – 71%
Coal – 62%
Gas – 8.5%
Diesel – 0.5%
 Hydro – 15.5%
 Wind / Renewable – 11.5%
 Nuclear – 2%
WHY SHOULD WE USE NUCLEAR ENERGY GENERATION ?
 Comparision of fuel required to generate 1MU electricity
COMPARISON OF FUELS
 1 kg fire wood 1 KWh
 1 kg coal 3 KWh
 1 kg oil. 4 KWh
 1 kg uranium. 50,000 KWh
 1 kg plutonium 60,00,000 KWh
NUCLEAR FISSION CHAIN
REACTION
NUCLEAR POWER PLANT LAYOUT (PHWR)
COMPONENT OF POWER PLANT
1. Reactor Building
2. Calandria
3. Steam generator
4. Turbine
5. Heat Exchanger
6. Moderator
7. Cooling tower
8. Waste Management plant
REACTOR BUILDING
COMPONENTS OF REACTOR BUILDING
 Calandria
 Control mechanism
 Heat exchanger
 Pumps
 Moderator
CALANDRIA
 It is heart of reactor and form the core of
reactor.
 It consist of:-
 Nuclear fuel
 control rods
 moderator
 It has 306 channels
in these 306 channels we have 12 fuel rod ,
in each fuel rod we have 19 pencil , each
pencil has 12 pellets of fuel .
FUEL BUNDLE
 Uranium fuel is used in the form of
Uranium dioxide (U2O).
 Natural Uranium contains-
0.71% U(235)
99.2% U(238)
0.0055% U(234)
 One bundle of fuel contains 19 pencil
(1,612 pencil)
 A fuel rod consist of 13.5 kg of fuel
HEAT EXCHANGER
 It has 2 different supply :-
1: D2O
2: DM
The D2O water will act as a Primary
supply
and DM water as a secondary supply
Heat of primary is transferred to
secondary supply
STEAM GENERATOR
 Here the K.E of steam is convered
to Electric energy.
It contains a set of turbines which
Are mounted on shaft of the
generator.
In RAPS generators are of :-
1. 1*110MW
2. 1*200MW
3. 4*220MW
TURBINE
 It converts kinetic energy of
steam into mechanical energy
 Rated speed: 3000 rpm
 Two turbine are used
 High pressure turbine
 Low pressure turbine
COOLING TOWER
 it is a specialized heat exchanger in
which air and water are brought into
direct contact with each other in order to
reduce the water temperature.
 The residual heat is condensed by the
help of cooling tower ‘
 There are two type of cooling tower
1) Natural draft cooling tower(NDCT)
2) Induced draft cooling tower(IDCT)
NATURAL DRAFT COOLING TOWER
INDUCED DRAFT COOLING TOWER
WASTE MANAGEMENT PLANT
 Here we have 3 types of wastes:-
1. Solid waste
2. Liquid waste
3. Gaseous waste
ENVIRONMENTAL MONITORING
 Environmental Survey Lab started functioning in the site prior to
commencement of operation of NPP.
 Samples of water, vegetation are periodically analyzed.
 No change is observed from the levels persisted earlier to plant operation.
 Abundant numbers of fishes and crocodiles are found in RAPS lake.
 Many animals have their home at RAPS exclusion zone like monkey,
peacock, deer ,etc.
 Many fruit bearing trees are seen around RAPS site
ANY QUERY ?
THANK YOU

More Related Content

What's hot

NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015
LekhraJ Meena
 
Hybrid power generation system
Hybrid power generation systemHybrid power generation system
Hybrid power generation system
Alok Kumar Singh
 
Nuclear Power Plant Presentation
Nuclear Power Plant PresentationNuclear Power Plant Presentation
Nuclear Power Plant Presentation
Sanket Jain
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
vishalgohel12195
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
Sai Omkar
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
Hussan Sheikh
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Naveed Ahmed
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Npcil
NpcilNpcil
Hybrid solar wind power generation system
Hybrid solar wind power generation systemHybrid solar wind power generation system
Hybrid solar wind power generation system
Saurabh Pandey
 
Nuclear powerplant
Nuclear powerplantNuclear powerplant
Nuclear powerplant
Ratan Debnath
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
kirbadh
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
AMANDEEP MANDAL
 
nuclear powerplant ppt
nuclear powerplant pptnuclear powerplant ppt
nuclear powerplant ppt
Rakesh Amanta
 
Solar Mini grid, Nano grid, Micro grid
Solar Mini grid, Nano grid, Micro gridSolar Mini grid, Nano grid, Micro grid
Solar Mini grid, Nano grid, Micro grid
MD Jannatul Giyem
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
tavinav
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
Sagar Mehta
 
Project Report Hydraulic Power Plant
Project Report Hydraulic Power PlantProject Report Hydraulic Power Plant
Project Report Hydraulic Power Plant
Sanjay Duttamukhya
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
snelkoli
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Shaik Afzal
 

What's hot (20)

NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015
 
Hybrid power generation system
Hybrid power generation systemHybrid power generation system
Hybrid power generation system
 
Nuclear Power Plant Presentation
Nuclear Power Plant PresentationNuclear Power Plant Presentation
Nuclear Power Plant Presentation
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Npcil
NpcilNpcil
Npcil
 
Hybrid solar wind power generation system
Hybrid solar wind power generation systemHybrid solar wind power generation system
Hybrid solar wind power generation system
 
Nuclear powerplant
Nuclear powerplantNuclear powerplant
Nuclear powerplant
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
nuclear powerplant ppt
nuclear powerplant pptnuclear powerplant ppt
nuclear powerplant ppt
 
Solar Mini grid, Nano grid, Micro grid
Solar Mini grid, Nano grid, Micro gridSolar Mini grid, Nano grid, Micro grid
Solar Mini grid, Nano grid, Micro grid
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
Project Report Hydraulic Power Plant
Project Report Hydraulic Power PlantProject Report Hydraulic Power Plant
Project Report Hydraulic Power Plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 

Similar to nuclear power plant ppt RAPS

npcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdfnpcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdf
SamarthBhatnagar14
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
hariom nagar
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
naitik997
 
Hydro electricity and hydro power plant
Hydro electricity and hydro power plantHydro electricity and hydro power plant
Hydro electricity and hydro power plant
Raj Kumar Parihar
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant
Omraj Singh
 
Steam powerplant by polayya chintada
Steam powerplant by polayya chintadaSteam powerplant by polayya chintada
Steam powerplant by polayya chintada
POLAYYA CHINTADA
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Navin Pathak
 
Nuclear reactor in india
Nuclear reactor in indiaNuclear reactor in india
Nuclear reactor in india
Vibha Anand
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
abdul mohammad
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
Ajmal Khan
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
Ajmal Khan
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
Ajmal Khan
 
Power point presentation on Nuclear Power in India
Power point presentation on Nuclear Power in IndiaPower point presentation on Nuclear Power in India
Power point presentation on Nuclear Power in India
MoniSarker
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
DS Group (Dharampal Satyapal Limited)
 
Group 8-A Section.pptx
Group 8-A Section.pptxGroup 8-A Section.pptx
Group 8-A Section.pptx
DheerajGowda25
 
Energy Resources
Energy ResourcesEnergy Resources
Energy Resources
AFAQAHMED JAMADAR
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Abha Tripathi
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
Aditya Shekhar
 

Similar to nuclear power plant ppt RAPS (20)

npcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdfnpcilrawatbhatappt-150902080527-lva1-app6891.pdf
npcilrawatbhatappt-150902080527-lva1-app6891.pdf
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
 
Hydro electricity and hydro power plant
Hydro electricity and hydro power plantHydro electricity and hydro power plant
Hydro electricity and hydro power plant
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant
 
Steam powerplant by polayya chintada
Steam powerplant by polayya chintadaSteam powerplant by polayya chintada
Steam powerplant by polayya chintada
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
 
Nuclear reactor in india
Nuclear reactor in indiaNuclear reactor in india
Nuclear reactor in india
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
Power point presentation on Nuclear Power in India
Power point presentation on Nuclear Power in IndiaPower point presentation on Nuclear Power in India
Power point presentation on Nuclear Power in India
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
 
Group 8-A Section.pptx
Group 8-A Section.pptxGroup 8-A Section.pptx
Group 8-A Section.pptx
 
Arun
ArunArun
Arun
 
Energy Resources
Energy ResourcesEnergy Resources
Energy Resources
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 

nuclear power plant ppt RAPS

  • 1. Aryabhatta Collage of Engineering and Research Centre ,Ajmer SUBMITTED TO: Prof. Dheeraj Singodia Department of Electrical Engineering RAWATBHATA ATOMIC POWER STATION SUBMITTED BY: Deepak Kumar Kumawat Final year 13EAJEE013
  • 2. NUCLEAR POWER CORPORATION OF INDIA LIMITED  The Nuclear power Corporation Of India Limited (NPCIL) is a government owned corporation of India based in Mumbai.  NPCIL is administrated by the Department of Atomic Energy (DAE) , Part of the Ministry of Science and Technology.  NPCIL was created in September 1987 as public limited company under the companies act 1956, "with the objective of undertaking the design, construction, operation and maintenance of the atomic power stations for generation of electricity in pursuance of the schemes and programmes of the Government of India under the provision of the Atomic Energy Act 1962." All nuclear power plants operated by the company are certified for ISO-14001 (Environment Management System).  NPCIL is responsible for design, construction, commissioning and operation of nuclear power reactors. Atomic Energy Act, 1962. NPCIL has also equity participation in BHAVINI, an organization formed for implementation for Fast Breeder Reactors programme in the country
  • 4. OPERATING UNITS:- 1. Tarapura Atomic Power station : 2*160MW , 2*540MW 2. Rajasthan Atomic Power station :100MW,200MW,4*220MW 3. Madras Atomic Power station :2*220MW 4. Narora Atomic Power station :2*220MW 5. Kakrapar Atomic Power station :2*220MW 6. Kaiga Atomic Power station :4*220MW 7. Kundankulam Atomic Power station :1000MW 1.
  • 5. RAJASTHAN ATOMIC POWER PLANT  Rawatbhata remote town in Chittorgarh district about 64 kms from Kota, an industrial city of Rajasthan.  The land selected is in between Rana Pratap sagar dam & Gandhi sagar dam at the right bank of Chambal River.  The water from the reservoir of the Rana Pratap sagar Dam serves the requirement of the Nuclear Power Plant.  There are six PHWR unit. One 100 Mwe, One 200 MWe, Four 220 Mwe unit.  For employees various colonies are constructed with all the domestic facilities.
  • 6. INDIA INSTALLED CAPACITY & % SHARE BY VARIOUS SOURCES coal,62% hydro,15% wind,12% gas+diesel,9% nuclear,2% coal hydro wind gas+diesel nuclear  Present capacity – 2,98,000 MW  Thermal – 71% Coal – 62% Gas – 8.5% Diesel – 0.5%  Hydro – 15.5%  Wind / Renewable – 11.5%  Nuclear – 2%
  • 7. WHY SHOULD WE USE NUCLEAR ENERGY GENERATION ?  Comparision of fuel required to generate 1MU electricity
  • 8. COMPARISON OF FUELS  1 kg fire wood 1 KWh  1 kg coal 3 KWh  1 kg oil. 4 KWh  1 kg uranium. 50,000 KWh  1 kg plutonium 60,00,000 KWh
  • 10. NUCLEAR POWER PLANT LAYOUT (PHWR)
  • 11. COMPONENT OF POWER PLANT 1. Reactor Building 2. Calandria 3. Steam generator 4. Turbine 5. Heat Exchanger 6. Moderator 7. Cooling tower 8. Waste Management plant
  • 13. COMPONENTS OF REACTOR BUILDING  Calandria  Control mechanism  Heat exchanger  Pumps  Moderator
  • 14. CALANDRIA  It is heart of reactor and form the core of reactor.  It consist of:-  Nuclear fuel  control rods  moderator  It has 306 channels in these 306 channels we have 12 fuel rod , in each fuel rod we have 19 pencil , each pencil has 12 pellets of fuel .
  • 15. FUEL BUNDLE  Uranium fuel is used in the form of Uranium dioxide (U2O).  Natural Uranium contains- 0.71% U(235) 99.2% U(238) 0.0055% U(234)  One bundle of fuel contains 19 pencil (1,612 pencil)  A fuel rod consist of 13.5 kg of fuel
  • 16. HEAT EXCHANGER  It has 2 different supply :- 1: D2O 2: DM The D2O water will act as a Primary supply and DM water as a secondary supply Heat of primary is transferred to secondary supply
  • 17. STEAM GENERATOR  Here the K.E of steam is convered to Electric energy. It contains a set of turbines which Are mounted on shaft of the generator. In RAPS generators are of :- 1. 1*110MW 2. 1*200MW 3. 4*220MW
  • 18. TURBINE  It converts kinetic energy of steam into mechanical energy  Rated speed: 3000 rpm  Two turbine are used  High pressure turbine  Low pressure turbine
  • 19. COOLING TOWER  it is a specialized heat exchanger in which air and water are brought into direct contact with each other in order to reduce the water temperature.  The residual heat is condensed by the help of cooling tower ‘  There are two type of cooling tower 1) Natural draft cooling tower(NDCT) 2) Induced draft cooling tower(IDCT)
  • 22. WASTE MANAGEMENT PLANT  Here we have 3 types of wastes:- 1. Solid waste 2. Liquid waste 3. Gaseous waste
  • 23. ENVIRONMENTAL MONITORING  Environmental Survey Lab started functioning in the site prior to commencement of operation of NPP.  Samples of water, vegetation are periodically analyzed.  No change is observed from the levels persisted earlier to plant operation.  Abundant numbers of fishes and crocodiles are found in RAPS lake.  Many animals have their home at RAPS exclusion zone like monkey, peacock, deer ,etc.  Many fruit bearing trees are seen around RAPS site
  • 24.