Here is my updated presentation on the NREL Research Support Facility including slides on NREL's energy performance data from it's first year of operation.
9. 2. Highly Desirable
800 staff Capacity Flexible workspace
25kBTU/sf/year Support future technologies
Architectural integrity “How to” manual
Honor future staff needs Real-time PR” campaign
Measurable ASHRAE 90.1 Secure collaboration with outsiders
Support culture and amenities Building information modeling
Expandable building Substantial Completion by 2010
Ergonomics
10. 3. If Possible
Net zero design approach
Most energy efficient building in the world
LEED Platinum Plus
ASHRAE 90.1 + 50%
Visual displays of current energy efficiency
Support public tours
National and global recognition and awards
Support personnel turnover
11.
12.
13. I want a green building
Design a LEED <rating> building
Design a building to use 30% less
energy than ASHRAE 90.1-2004
Design a building to use less than
25,000 BTU/sqft
Design a net zero energy building
14.
15.
16. Performance Cost Control /
Objective / Risk Management
Energy Target
INTEGRATED DELIVERY
Front Loaded + Bridge the Gap
Energy Driven Between Design +
Design Occupancy
17. Risk
Design competition
50% of Phase 1 fee at risk Reward
Energy performance requirement High profile project
LEED Platinum requirement Design fees (within GMP)
Guaranteed maximum price Award Incentive Fee
Risk Management
Design-Build partnership
Share risks
Ability to control decisions
18.
19.
20.
21.
22. COMPETITION DESIGN CONSTRUCTION OPERATIONS
CHARRETTE MODEL
AS-DESIGNED MODEL
LEED MODEL + BASELINE
AS-BUILT MODEL
M&V MODEL
23. DATA CENTER CRAWLSPACE
ENERGY THERMAL
MODEL MODEL
WHOLE TRANSPIRED
NATURAL
BUILDING SOLAR
VENTILATION
ENERGY COLLECTOR
MODEL
MODEL MODEL
LIGHTING +
PV
THERMAL DAYLIGHTING
MODEL
BRIDGING MODEL
MODEL
24.
25. Net Zero Site Energy Building
Net Zero Source Energy Building
Net Zero Energy Emissions Building
Net Zero Energy Cost Building
26. Passive Design Efficient Systems Renewable Energy
Integrated Delivery
50. RSF II
RSF
RSF Staff Parking
RSF Visitor Parking
51.
52. 138,000 SF $39M Firm Fixed Price
525 Occupants $34M Construction
Expansion of RSF Complete Fall 2011
53.
54. Cost per Square Foot
Gold
Silver
Other
$-
$100
$200
$300
$400
$500
$600
Certified
Platinum
Heifer International Center
NVCI Cancer Research
Kitsap County Admin Building
The Signature Centre
Great River Energy Headquarters
Ft. Carson Brigade/Battalion HQ
NREL Research Support Facility
International Fund for Animal Welfare
RSF Cost: $259/SF
Omega Center
Chevron Office
Bremerton BEQ
University of Denver Sturm College
Naval Facilities
Ft. Lewis Barracks and Dinning
Dillard University
EPA Region 8 Headquarters
Fernald Visitors Center
Average Cost: $334/SF
Commerce City Civic Center
Leo Trombatore Office
ASU School of Journalism
ASU College of Nursing & Health
Federal Reserve Bank of Kansas City
Leprino Building
San Joaquin Admin Building
Las Cruces Courthouse
NASA Sustainability Base
Applied Research & Development
Aircraft RSF
National Association of Realtors
Oregon Sustainability
Fort Bragg Forces Command HQ
San Joaquin Comm. College
DC Federal Building
Source: DBIA Project Database
59. New Building = 35 kBtu/SF/year
Leased Building = 133 kBtu/SF/year
Annual Energy Savings = $275,590
60. 20 Year NPV = $4.4M or $20/SF
30 Year NPV = $6.0M or $27/SF
61. Energy Use Intensity:
2030 Baseline LEED Baseline Design/Actual
137
kBtu/SF/year
55
kBtu/SF/year
35
kBtu/SF/year
Net Zero Energy Building (After PV):
Site ZEB Source ZEB Emissions ZEB
0
kBtu/SF/year
-20
kBtu/SF/year
-5
LB CO2e/SF/year
B
Classification
B
Classification
B
Classification
65. Energy Efficiency Design Requirements
• 25 kBtu/ft2/yr for standard office space occupant density and data center
loads
• Demand side energy use goal, not including renewables
• Normalized up to 35.1 kBtu/ft2/yr for better space efficiency and to account for full data
center load
• On site renewables sized to offset site energy use to reach net zero annual
use References:
https://www.energystar.gov/index.cfm?c=new_bldg_design.bus_target_finder
http://eere.buildinggreen.com/mtxview.cfm?CFID=46438782&CFTOKEN=31996638
http://femp.buildinggreen.com/overview.cfm?ProjectID=864
140
120
100
Annual EUI (kBtu/ft2)
80
Site Mounted PV
Roof Mounted PV
60 Data Center
Whole Building
Credit: Chad Lobato/NREL
40
20
0
Old NREL/DOE Typical Denver ENERGY STAR 75 Average LEED ENERGY STAR 90 EPA Region 8 RSF RSF Renewable
Leased Office Office Building Office Building Office Building Office Building Office Production
Building Denver, CO
66 Innovation for Our Energy Future
66. Measured Versus Modeled Monthly and Cumulative EUI
4.5 36
The PV system is sized
for an annual EUI of
35.1 kBtu/ft2.
4.0 32
3.5 28
PV
3.0 24
Data Center
Annual EUI (kBtu/ft2)
Mechanical Systems
Plug Loads
2.5 20
Monthly EUI (kBtu/ft2)
Lighting
Heating
2.0 16 Cooling
Model Annual EUI
RSF Annual EUI
1.5 12
1.0 8
Credit: Chad Lobato/NREL
0.5 4
0.0 0
RSF
RSF
RSF
RSF
RSF
RSF
RSF
RSF
RSF
RSF
RSF
RSF
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Model
PV
Note: The annual EUI values
are demand side values
and do not include the
67 Innovation for Our Energy Future
67. October 2010 – September 2011 Lighting Power Density
0.35
0.33
0.30
0.28
0.25
Model Average
October 2010
0.23
November 2010
Power Density (W/ft2)
0.20 December 2010
January 2011
0.18 February 2011
March 2011
0.15
April 2011
0.13 May 2011
June 2011
0.10 July 2011
August 2011
0.08
September 2011
0.05
0.03
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Credit: Chad Lobato/NREL Time of Day
Innovation for Our Energy Future
68. October 2010 – September 2011 Plug Load Power
Density
0.65
0.60
0.55
0.50
0.45
0.40
Power Density (W/ft2)
0.35 Credit: Matthew Luckwitz/NREL
0.30 Model Average
October 2010
0.25 November 2010
December 2010
0.20
January 2011
February 2011
0.15
March 2011
0.10 April 2011
May 2011
0.05 June 2011
July 2011
0.00 August 2011
0 2 4 6 8 10 12 14 16 18 20 22 24 September 2011
Credit: Chad Lobato/NREL Time of Day Note: The elevators are included in the plug loads
Innovation for Our Energy Future
69. Data Center PUE
1.50 100
1.40 85
1.30 70
Outdoor Temperature ( F)
1.20 55
RSF Data Center PUE
PUE
1.10 40 Outdoor Temperature
1.00 25
0.90 10
0.80 -5
0.70 -20
10/1/10 11/30/10 1/29/11 3/30/11 5/29/11 7/28/11 9/26/11
Innovation for Our Energy Future
70. October 2010 – September 2011 Mechanical System
Power Density
0.25
Note: Control of the VFDs was
optimized in late October
0.23 2010, resulting in energy savings
0.20
Note: Control of the dampers was
optimized in April 2011, resulting in
0.18 energy savings Model Average
October 2010
November 2010
Power Density (W/ft2)
0.15
December 2010
January 2011
0.13 February 2011
March 2011
0.10 April 2011
May 2011
June 2011
0.08
July 2011
August 2011
0.05 September 2011
0.03
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Note: The mechanical load is
Credit: Chad Lobato/NREL Time of Day
comprised of only fans and pumps
Innovation for Our Energy Future
71. October 2010 – September 2011 PV System Power
Output
900
Testing and commissioning of the 524
800
kW Visitors Parking Lot PV system
occurred in June. The system became
fully operational in July, giving a total
system size of 973 kW.
700
Model Average 449kW
600 Model Average 973kW
December 2010
January 2011
Power (kW)
500
February 2011
March 2011
400 April 2011
May 2011
June 2011
300 July 2011
August 2011
September 2011
200
October 2011
100
0
0 2 4 6 8 10 12 14 16 18 20 22 24
Credit: Chad Lobato/NREL Time of Day Note: 1156 kW Parking Garage PV system yet to be installed.
72 Innovation for Our Energy Future