Temporary site cables are a flexible solution for temporarily connecting equipment in high voltage networks during construction projects, repairs, or emergencies. They allow transmission lines to be rapidly restored when faults occur. The cables can be quickly installed between transformers and switchgear or overhead lines while work is being done in substations. They have pre-installed terminations for easy handling, come in standard lengths up to 500 meters, and can be used immediately in any weather or temperature conditions to restore power reliability.