MOCK DRILL ORGANISED AT
NOKIA PLOT 25, GURGAON.
DATE:- 21/11/2016.
Prepared By :- ARITRO MUKHERJEE
A
G
E
N
D
A
1. Building Infrastructure Details.
2. ERT Members Details.
3. Building Evacuation Details.
4. Evacuation Highlights.
5. Fire Safety Training By Trainer.
BUILDING INFRASTRUTURE DETAILS
No. of Blocks: 4
Block A&B Ground Floor – 12906 sq. feet
Block A&B First Floor – 11948 sq. feet
Block C – 33878 sq. feet
Nokia University (Part of Block – C)
Block D – 18698 sq. feet
Canteen – 6064 sq. feet
Utility Blocks – 50106 sq. feet
No. of Washrooms: 15 Nos.
ERT MEMBERS DETAILS
S.NO Name Emp. ID Mobile No.
1 S.K. MISHRA FG0000025 9891303200
2 V.K. MALIK FG0001199 9911871515
3 SUNIL CHAWLA PGT000250 9999178641
4 RAVI SHARMA PGT000070 8010870109
5 RITA ARORA FG1000476 9711411628
6 JYOTI KUKREJA FG0001226 9958890450
7 ASHISH GHILDIYAL R-3207 9990333276
8 ARITRO MUKERJEE R-3379 9899076706
9 YUVRAJ SINGH C-135649 9911581326
10 SHILPI SG -330 7827831449
BUILDING EVACUATION DETAILS
5 – Title of the document or activity name – Month XX, 2016 – Insert tab > Header/Footer
Evacuation started at 1530 Hrs after siren got activated.
ERT Members was instructing the employees to follow the emergency routes.
All employees gathered at the Emergency Assembly Area at 1537 Hrs.
 Total numbers of employees was 288 ( NOKIA(247), Sodexo(29), Terrier(12).
 Total headcount at Assembly area was 241
 47 Employee had not participated in Drill.
EVACUATION HIGHLIGHTS.
.
EVACUATION HIGHLIGHTS..
EVACUATION HIGHLIGHTS..
EVACUATION HIGHLIGHTS..
EVACUATION HIGHLIGHTS..
ERT MEMBERS TRAINING IN PROGRESS
11 – Title of the document or activity name – Month XX, 2012 – Insert tab > Header/Footer
THANK YOU

New Mock Drill Ppt from Nokia fALU Plot 25

  • 1.
    MOCK DRILL ORGANISEDAT NOKIA PLOT 25, GURGAON. DATE:- 21/11/2016. Prepared By :- ARITRO MUKHERJEE
  • 2.
    A G E N D A 1. Building InfrastructureDetails. 2. ERT Members Details. 3. Building Evacuation Details. 4. Evacuation Highlights. 5. Fire Safety Training By Trainer.
  • 3.
    BUILDING INFRASTRUTURE DETAILS No.of Blocks: 4 Block A&B Ground Floor – 12906 sq. feet Block A&B First Floor – 11948 sq. feet Block C – 33878 sq. feet Nokia University (Part of Block – C) Block D – 18698 sq. feet Canteen – 6064 sq. feet Utility Blocks – 50106 sq. feet No. of Washrooms: 15 Nos.
  • 4.
    ERT MEMBERS DETAILS S.NOName Emp. ID Mobile No. 1 S.K. MISHRA FG0000025 9891303200 2 V.K. MALIK FG0001199 9911871515 3 SUNIL CHAWLA PGT000250 9999178641 4 RAVI SHARMA PGT000070 8010870109 5 RITA ARORA FG1000476 9711411628 6 JYOTI KUKREJA FG0001226 9958890450 7 ASHISH GHILDIYAL R-3207 9990333276 8 ARITRO MUKERJEE R-3379 9899076706 9 YUVRAJ SINGH C-135649 9911581326 10 SHILPI SG -330 7827831449
  • 5.
    BUILDING EVACUATION DETAILS 5– Title of the document or activity name – Month XX, 2016 – Insert tab > Header/Footer Evacuation started at 1530 Hrs after siren got activated. ERT Members was instructing the employees to follow the emergency routes. All employees gathered at the Emergency Assembly Area at 1537 Hrs.  Total numbers of employees was 288 ( NOKIA(247), Sodexo(29), Terrier(12).  Total headcount at Assembly area was 241  47 Employee had not participated in Drill.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
    ERT MEMBERS TRAININGIN PROGRESS 11 – Title of the document or activity name – Month XX, 2012 – Insert tab > Header/Footer
  • 12.