This document summarizes a cranberry cooperative's issues with inconsistent wet and dry harvest yields causing bottlenecks in berry processing. In the short term, implementing a truck schedule, adding holding bins for wet cranberries, and installing a new grading system were proposed. Long term, adding two new dryers and temporary storage was suggested to reduce wait times for trucks. The conclusion was that removing bottlenecks and increasing early processing would have an impressive return on investment.