RESUME QC CIVIL INSPECTOR
SAJJAD ALI SOOMRO
QC CIVIL INSPECTOR
PROFISSIONAL CERTIFICATION
COMPLETION: 2002- 2006
B.E (Bachelor in Civil Engineering
N.E.D University Of Engineering and Technology
Karachi, Pakistan.
PROFESSIONAL EXPERIENCE: 10 YEARS OVER ALL IN GULF
CURRENT EMPLOYEE:
Company DESCON ENGINEERING PVT L.L.C
Head Office O DESCON ENGINEERING L.L.C EN
Designation QC INSPECTOR
Duration NOV.2013 TO Till NOW.
LOCATION: QATAR GAS
ROLE AND RESPONSIBILITY:
ď‚§ Reporting to the QA/QC Engineer at site.
ď‚§ Inspection of Buildings like Sub-Station, IES (Instrument Equipment Shelter), OMS (Operator Maintenance Shelter),
Foundation of Building, Raft, Column, RCC Walls, Block Work, Tiles and also Finishing work.
Contact Info: Cell: +92 332 8372720
Email Address sajj41@yahoo.com
Licenses: Valid (U.A.E, QATAR & PAK.)
10 years of work experience in the Engineering and Construction, Commercial industries
with Oil & Gas Sector & in Piling, Roads, Bridges, Electrical Cable Trenches Drainage Pipe
Lines, Sub Station, HiriseBuildings, Structure Foundations & infrastructure, Steel Structure,
QA/QC Engineer, Quantity Estimation of Building, Villa's apprentice at field sites working on different
phases of construction work and engineering documentation, Including All Municipality routine works.
DESCON ENGINEERING PVT L.L.C QATAR -NOV.2012-TO Onward.
RESUME QC CIVIL INSPECTOR
ď‚§ Provision of inspection assistance services to enable the sites to execute works as per client
requirement. Ensure better quality standards of the works by consistent monitoring of the
process and proper production sequence.
ď‚§ Ensure the subcontractors are in compliance with their own Quality Systems and FAST Quality
Assurance & Control plan.
ď‚§ Liaise with the Quality representative of the client and CJV.
ď‚§ Carry out phased inspections of preparatory inspections, initial inspections and follow-up
inspections as specified.
ď‚§ Ensure all Method Statements and Inspection Test Plans are properly implemented.
ď‚§ Prepare Non Conformance Reports, report to responsible person and follow-up for close out.
ď‚§ Help to maintain and issue Quality Control and inspection records.
ď‚§ Assist in the verification that contract close out documentation is prepared as necessary.
ď‚§ Check the works in their area of responsibility for compliance with the specifications.
ď‚§ Prepare Inspection Requests and respond to them in a timely manner, in order to be approved
and closed. Ensure there are no ambiguities in the agreed standards to be achieved, i.e.,
workmanship, benchmarks, material samples, etc.
ď‚§ Responsible for quality assurance & quality control at the project site and report to the QA/QC
Manager in the issues related to non-conformance (NCR) & deficiencies in the quality management
process at the site.
• Assist the QA/QC EngineerManager in preparation of all related quality documents such as ITPs &
Method Statements.
• Coordination & direct supervision on all activities related to laboratories & field tests. Conduct quality
awareness meetings & inductions for project engineers, site engineers & other construction staffs.
• To prepare all documents related to inspection & attend all inspection for different individual activities
of the site & ensure that it is as per latest approved drawings.
• Full supervision of concreting activity, internal inspection for all activities on the site. Carryout all
inspection with main contractor & client and get the approval.
• Follow up with the Handing Over procedure & requirements with the client to get the Acceptance
certificate. Demolition of Structure during Shutdown of Plant
• Excavation, Backfilling And concreting Works.
• Constriction of Electrical cable trenches and Concreting of Foundations etc Regarding Civil job.
Company DESCON ENGINEERING PVT L.L.C
Head Office O DESCON ENGINEERING L.L.C EN
Designation QC INSPECTOR
Duration MAY 2013 TO FEB 2014
RESUME QC CIVIL INSPECTOR
LOCATION: Q-CHEM 1-11
ROLE AND RESPONSIBILITY:
• Preparation of all checklists required for inspection of construction activities as per ITP.
• Coordination with consultants for Joint Inspection, making RFI’s for the construction activities.
• Inspection of Buildings like Sub-Station, IES (Instrument Equipment Shelter), OMS (Operator Maintenance Shelter),
Foundation of Building, Raft, Column, RCC Walls, Block Work, Tiles and also Finishing work.
• Day end reports to the QC Engineer.
• Fire Proofing work on Steel Structure and also inside or Out Side Vessels according with DGS and ITPs.
• Inspection of PSK, Sealant also final Inspection of Fire Proofing on Steel Structure and inside or Out Side Vessels
according with DGS and ITPs.
• Demolition of Structure during Shutdown of Plant
• Excavation, Backfilling And concreting Works.
• Concreting of Foundations etc Regarding Civil job.
• Installation of safety shower.
• Installation of Assembly Muster Point.
Company DESCON ENGINEERING PVT L.L.C
Client QATAR PETROLEM (SHUTDOWN-2013)
Designation QC INSPECTOR
Duration March 2013 TO MAY
ROLE AND RESPONSIBILITY:
• Inspection of Buildings like Sub-Station, IES (Instrument Equipment Shelter), OMS (Operator Maintenance Shelter),
Foundation of Building, Raft, Column, RCC Walls, Block Work, Tiles and also Finishing work.
• Day end reports to the QC Engineer.
• Fire Proofing work on Steel Structure and also inside or Out Side Vessels according with DGS and ITPs.
RESUME QC CIVIL INSPECTOR
• Inspection of PSK, Sealant also final Inspection of Fire Proofing on Steel Structure and inside or Out Side Vessels
according with DGS and ITPs.
ď‚§ Demolition of Structure during Shutdown of Plant
ď‚§ Excavation, Backfilling And concreting Works.
ď‚§ Concreting of Foundations etc Regarding Civil job.
ď‚§ Installation of Precast foundation.
 Installation of Assembly Muster Point’s foundations.
PERVIOUS EMPLOYEE
Project Name CP – 1 Project at Lusail Development DOHA
Clint Qatari diar
Consultant Parsons / Halcrow (Design)
Sub Contractors Sino hydro and Mercury.
Designation QC INSPECTOR - AREA Engineer (Nov.2012 To Mar.2013)
MAJOR ROLES ON SITE
Follow up of planning schedule, Work progress, Subcon activities, progress, updating progress, meeting, arrangement
of material, updating and working on P6 & follow-up of 25km tunnel work activity etc.
Project Name IGD Habshan-5 Oil & Gas Process Plant Abu Dhabi
Clint Gasco
Consultant JGC (Japan Gas Corporation)
Designation QC INSPECTOR - AREA Engineer
RESUME QC CIVIL INSPECTOR
Duration 2010 TO 2012
Roles and Responsibility
• In Oil & Gas Field Responsible For Building Work (i-e) Sub Station, OMS, and IES Building.
• All Areas Preparation of Basement of Building and Structure Foundation, Trenches, Table Top, Equipment’s
Foundation ,Sub Grade , Subase , Road Work, Main Whole, Junction Box,Sumpit,katch Basin, Wall Pit, Fire
Work, Backfilling Excavation in all etc.
• Take measures for security of tool, plant and equipment and other assets being used by the teams.
• Planning, scheduling and monitoring of construction activities. Detail study of drawings and raise the technical
queries.
• Achieve weekly/daily work progress targets provided by the discipline Incharge. Conduct weekly internal
meetings and resolve the issues of construction.
• Raising technical queries pertaining to civil drawing. Water proofing for basements .Making of weekly site
action list & weekly schedules.
• Implement all the specifications of Quality and QHSE. Daily progress report to the discipline in charge
• Raise request for inspection (RFI) on daily basis. Inspection of steel to consultant. Supervision of all civil
construction activities. Making of bar bending schedules
• Maintenance of all mechanical machinery. Making of daily and weekly progress reports, Responsible to
prepare daily inspection reports of executed work.
• Estimation of materials and coordinate with commercial department. Conduct weekly internal meetings and
resolve the issues of construction.
• Supervision for the finishes of Building Work and Cladding for Building. Calculate all the quantities of Form
Work, Rebar and Concrete.
• Coordinate to batch plant in charge to arrange the concrete. Preparing of Sub Base Material for Concrete
Paving. Maintaining technical records.
Expertise
• All Type of Foundation Work Of Plant.
• Fitting and Finishing of Pipes (i-e) Gas pipes, Steel pipes, Casing etc
• Foundation of Rotatory and Stationary Equipment.
• Industries maintenous work.
Company BAUER SPEZIALTIEFBAU GmbH
LOCTION Abu Dhabi, Dubai, (U.A.E.)
PROJECT NAME Five Star Hotel.
Duration 2006 T0 2008
Designation QC INSPECTOR
RESUME QC CIVIL INSPECTOR
• H-Beam wall, Anchoring, Grouting and High Pressure Injection, Vibro Compaction.
Environment: Specialized foundations group offering services like execution of specialized
techniques/foundations like Secant pile walls, Contiguous pile walls, Diaphragm walls.Vibro-compaction,
Bored cast-in-situ piles, Soil Stabilization, Soil Nailing, Micro Piles, and Anchoring etc.
Job Purpose:
• Controlling & managing project operations, quality monitoring and quality control procedures, application of health
& safety programs, liaison with contractor, consultant & client to ensure work quality.
• To manage and maintain the work site operations for MPCL, deliver continuous updates on work site conditions;
work with other personnel to achieve timeline. Ensure quality control during execution and follow-up after. Cost
estimation, invoicing and billing
Responsibilities:
ď‚§ Worked as a Site In charge of all civil work of Bridge and Excavation of Canal
ď‚§ Working as Piling In charge
ď‚§ Working as Super Stretcher of Bridge
ď‚§ Preparing the monthly and weekly site progress report.
ď‚§ Preparing the bar bending schedule.
ď‚§ Preparing the cast in suit concrete requirement
ď‚§ Preparing of Billing report of Sub Contractor
ď‚§ Demolition of Structure during Shutdown of Plant
ď‚§ Excavation, Backfilling And concreting Works.
ď‚§ Concreting of Foundations etc Regarding Civil job.
ď‚§ Daily, weekly and monthly report generation for own office, consultant and client.
ď‚§ Schedule, coordinate and monitor the various activities of work force and sub-ordinates.
ď‚§ Manage and assist team members to establish and achieve timelines.
ď‚§ Liaise with technical and logistics departments to ensure maximum optimization of work force and timely completion of
work.
ď‚§ Material estimation & cost control of project.
RESUME QC CIVIL INSPECTOR
ď‚§ Ensure the well being and safety of workforce by implementing a proper safety plan incorporating all site activities and
environment.
ď‚§ Manage project operations to the satisfaction of consultant and client
ď‚§ Revision and modification of shop drawings as per site requirements.
ď‚§ Carrying out geotechnical investigations.
ď‚§ Establishment of programs and operational routes for piling rigs on site.
SNAPSHOT OF ALL EXPRIENCED
Project Name : Mixed use First Gulf Bank 2 High Rise Buildings, AbuDhabi
Main Contractor : SEIDCO Contracting
Project Detail : Secant piles wall 393Nos. having dia of 1.0m including installation
of Anchors & 210 Lm of diaphragm wall including installation of Anchor.
Project Name : 5 High Rise Buildings Palm Deira, Dubai
Client : Nakheel
Project Detail : Secant piles wall 642Nos. having dia of 1.0m including installation
of Anchors plus installation of H-beam for pre-shoring.
Project Name : City Of Arabia (Wadi Tower)
Client : ILYAS AND MUSTAFA GALADARI MANAGEMENT
Consultant : P&T Architects and Engineers
Main Contractor : BAUER SPEZIALTIEFBAU GmbH
Project Detail : 162 Cast-in-situ bored piles having dia of 1.0m, having depth upto
30m having dia of 800mm and 900mm including installation of
Anchors plus Testing Of PTP.
Project Name : Interchange No. 8 Sheikh Zayed Road Dubai
Client : RTA
Consultant : Consult Mounsel
Main Contractor : Shimizu Corporation
Project Detail : 830 cast-in-situ bored piles having dia of 1.0m, 1.2m and 1.4m.
Static Load Testing of 19Nos. of piles having dia of 1.0m, 1.2m
Project Name : JT Metro Project, Dubai
Client : JT Metro
Project Detail : 16 cast-in-situ bored piles having dia of 2.25m, having depth 35m.
Project Name : Business Bay
Client : Sheth Estate
Consultant : Aedas
Main Contractor : BAUER SPEZIALTIEFBAU GmbH
Project Detail : Contiguous piles wall 210 Nos. having dia of 800mm.
RESUME QC CIVIL INSPECTOR
Project Name : JT Metro Project (Centre of Sheikh Zayed Road)
Client : JT Metro
Project Detail : 39 cast-in-situ bored piles having dia of 2.25m up to the depth of
28m.
Project Name : City Of Arabia (I & M AND METO TOWER)
Client : ILYAS AND MUSTAFA GALADARI MANAGEMENT
Consultant : P&T Architects and Engineers
Main Contractor : BAUER SPEZIALTIEFBAU GmbH
Project Detail : 392 Cast-in-situ bored piles having dia of 1.5m, 1.2m,
800mm having depth up to 18.5m, 30m, 32m, 35m long including
Installation of Anchors plus Testing Of static compression and
Dynamic test of pile.
Projects In Building Works.
Project Place : Shama Al Bhaya (Abu Dhabi U.A.E)
Client : Private.
Consultant : Jidar Engineering and Consulting
Main Contractor : ALQURM AL SHARQI GEN: CONT: L.L.C.
Project Detail G+1 Villa, Plot No 423 .
Project Place : Bani yas Khalifa (B) (Abu Dhabi U.A.E)
Client : First Gulf Bank.
Consultant : SiMA Engineers - Consultants
Main Contractor : ALQURM AL SHARQI GEN: CONT: L.L.C.
Project Detail Five Villa's.G+1 Villa, Plot No 29 .
Project Place : Khalifa (A) (Abu Dhabi U.A.E)
Client : ADIB Bank.
Consultant : Al Nahda Engineers - Consultants
Main Contractor : ALQURM AL SHARQI GEN: CONT: L.L.C.
Project Detail G+1 Villa, Plot No 81 .
RESUME QC CIVIL INSPECTOR
Company SAMSUNG ENGINEERING CO. LTD
Location U.A.E
Designation QC INSPECTOR CIVIL
Duration 2008 T0 2010
Project Ras Al Khaimah,(U.A.E), Al Ghail Industrial Park Of RAKIA, SeAH UAE STEEL
PIPE MILL
ROLE AND RESPONSIBILITY
Job Purpose:
• Controlling & managing project operations, quality monitoring and quality control procedures, application of health
& safety programs, liaison with consultant & client (owner) to ensure work quality, and Duration of work time line.
• To manage and maintain the work site operations for MPCL, deliver continuous updates on work site conditions;
work with other personnel to achieve timeline. Ensure quality control during execution and follow-up after. Cost
estimation, invoicing and billing.
Responsibilities:
ď‚§ Making (%) wise schedule of the handling project.
ď‚§ Material estimation & cost control of project.
ď‚§ Daily, report generation for own office, consultant and client (owner).
ď‚§ Maintain work schedule for both skilled/ unskilled labor
ď‚§ Schedule, monitor the various activities of work force.
ď‚§ Manage and assist team members to establish and achieve timelines.
ď‚§ Liaise with technical and logistics departments to ensure maximum optimization of work force and timely completion
of work.
ď‚§ Manage project operations to the satisfaction of consultant and client (owner)
ď‚§ Carrying out geotechnical (soil) investigations.
ď‚§ Liaise with designers, structural engineers and geotechnical engineer to ensure construction guidelines are met.
Following the rules and regulation of company,
Following the Construction of Industrial Work.
Supervision of work.
Inspecting with the subcon.
Preparing Non Conformation Report.
Maintain & server Updating the All department wise documents.
Making weekly and monthly report.
Formal Presentation report (Presentation about project).
Schedule preparing according to construction progress
Subcontractor Contract coordination.
Checking of Progress payment from Subcontractor % wise.
Receiving and Sending of Transmittal and Letters to Subcon.
Preparing the Work order and Change order.
Preparing purchase order as requirement of department. and so on.
RESUME QC CIVIL INSPECTOR
ď‚§ Establish and implement standards as per specifications for the work concerning to municipality.
Trainings and Certification
• First Aider and Basic Life Support from Descon.
• H2S/BA Training from Descon, JGC.
• Permit to work (PTW) training from JGC.
• Incident and Injury free (IIF) from Descon.
• Supervisor skill workshop from JGC
Computer Literacy: P6 Primavera, M S-Project, Auto Cad, MS-Office, Web Working.

QA-QC_CIVIL ENGINEER

  • 1.
    RESUME QC CIVILINSPECTOR SAJJAD ALI SOOMRO QC CIVIL INSPECTOR PROFISSIONAL CERTIFICATION COMPLETION: 2002- 2006 B.E (Bachelor in Civil Engineering N.E.D University Of Engineering and Technology Karachi, Pakistan. PROFESSIONAL EXPERIENCE: 10 YEARS OVER ALL IN GULF CURRENT EMPLOYEE: Company DESCON ENGINEERING PVT L.L.C Head Office O DESCON ENGINEERING L.L.C EN Designation QC INSPECTOR Duration NOV.2013 TO Till NOW. LOCATION: QATAR GAS ROLE AND RESPONSIBILITY: ď‚§ Reporting to the QA/QC Engineer at site. ď‚§ Inspection of Buildings like Sub-Station, IES (Instrument Equipment Shelter), OMS (Operator Maintenance Shelter), Foundation of Building, Raft, Column, RCC Walls, Block Work, Tiles and also Finishing work. Contact Info: Cell: +92 332 8372720 Email Address sajj41@yahoo.com Licenses: Valid (U.A.E, QATAR & PAK.) 10 years of work experience in the Engineering and Construction, Commercial industries with Oil & Gas Sector & in Piling, Roads, Bridges, Electrical Cable Trenches Drainage Pipe Lines, Sub Station, HiriseBuildings, Structure Foundations & infrastructure, Steel Structure, QA/QC Engineer, Quantity Estimation of Building, Villa's apprentice at field sites working on different phases of construction work and engineering documentation, Including All Municipality routine works. DESCON ENGINEERING PVT L.L.C QATAR -NOV.2012-TO Onward.
  • 2.
    RESUME QC CIVILINSPECTOR  Provision of inspection assistance services to enable the sites to execute works as per client requirement. Ensure better quality standards of the works by consistent monitoring of the process and proper production sequence.  Ensure the subcontractors are in compliance with their own Quality Systems and FAST Quality Assurance & Control plan.  Liaise with the Quality representative of the client and CJV.  Carry out phased inspections of preparatory inspections, initial inspections and follow-up inspections as specified.  Ensure all Method Statements and Inspection Test Plans are properly implemented.  Prepare Non Conformance Reports, report to responsible person and follow-up for close out.  Help to maintain and issue Quality Control and inspection records.  Assist in the verification that contract close out documentation is prepared as necessary.  Check the works in their area of responsibility for compliance with the specifications.  Prepare Inspection Requests and respond to them in a timely manner, in order to be approved and closed. Ensure there are no ambiguities in the agreed standards to be achieved, i.e., workmanship, benchmarks, material samples, etc.  Responsible for quality assurance & quality control at the project site and report to the QA/QC Manager in the issues related to non-conformance (NCR) & deficiencies in the quality management process at the site. • Assist the QA/QC EngineerManager in preparation of all related quality documents such as ITPs & Method Statements. • Coordination & direct supervision on all activities related to laboratories & field tests. Conduct quality awareness meetings & inductions for project engineers, site engineers & other construction staffs. • To prepare all documents related to inspection & attend all inspection for different individual activities of the site & ensure that it is as per latest approved drawings. • Full supervision of concreting activity, internal inspection for all activities on the site. Carryout all inspection with main contractor & client and get the approval. • Follow up with the Handing Over procedure & requirements with the client to get the Acceptance certificate. Demolition of Structure during Shutdown of Plant • Excavation, Backfilling And concreting Works. • Constriction of Electrical cable trenches and Concreting of Foundations etc Regarding Civil job. Company DESCON ENGINEERING PVT L.L.C Head Office O DESCON ENGINEERING L.L.C EN Designation QC INSPECTOR Duration MAY 2013 TO FEB 2014
  • 3.
    RESUME QC CIVILINSPECTOR LOCATION: Q-CHEM 1-11 ROLE AND RESPONSIBILITY: • Preparation of all checklists required for inspection of construction activities as per ITP. • Coordination with consultants for Joint Inspection, making RFI’s for the construction activities. • Inspection of Buildings like Sub-Station, IES (Instrument Equipment Shelter), OMS (Operator Maintenance Shelter), Foundation of Building, Raft, Column, RCC Walls, Block Work, Tiles and also Finishing work. • Day end reports to the QC Engineer. • Fire Proofing work on Steel Structure and also inside or Out Side Vessels according with DGS and ITPs. • Inspection of PSK, Sealant also final Inspection of Fire Proofing on Steel Structure and inside or Out Side Vessels according with DGS and ITPs. • Demolition of Structure during Shutdown of Plant • Excavation, Backfilling And concreting Works. • Concreting of Foundations etc Regarding Civil job. • Installation of safety shower. • Installation of Assembly Muster Point. Company DESCON ENGINEERING PVT L.L.C Client QATAR PETROLEM (SHUTDOWN-2013) Designation QC INSPECTOR Duration March 2013 TO MAY ROLE AND RESPONSIBILITY: • Inspection of Buildings like Sub-Station, IES (Instrument Equipment Shelter), OMS (Operator Maintenance Shelter), Foundation of Building, Raft, Column, RCC Walls, Block Work, Tiles and also Finishing work. • Day end reports to the QC Engineer. • Fire Proofing work on Steel Structure and also inside or Out Side Vessels according with DGS and ITPs.
  • 4.
    RESUME QC CIVILINSPECTOR • Inspection of PSK, Sealant also final Inspection of Fire Proofing on Steel Structure and inside or Out Side Vessels according with DGS and ITPs.  Demolition of Structure during Shutdown of Plant  Excavation, Backfilling And concreting Works.  Concreting of Foundations etc Regarding Civil job.  Installation of Precast foundation.  Installation of Assembly Muster Point’s foundations. PERVIOUS EMPLOYEE Project Name CP – 1 Project at Lusail Development DOHA Clint Qatari diar Consultant Parsons / Halcrow (Design) Sub Contractors Sino hydro and Mercury. Designation QC INSPECTOR - AREA Engineer (Nov.2012 To Mar.2013) MAJOR ROLES ON SITE Follow up of planning schedule, Work progress, Subcon activities, progress, updating progress, meeting, arrangement of material, updating and working on P6 & follow-up of 25km tunnel work activity etc. Project Name IGD Habshan-5 Oil & Gas Process Plant Abu Dhabi Clint Gasco Consultant JGC (Japan Gas Corporation) Designation QC INSPECTOR - AREA Engineer
  • 5.
    RESUME QC CIVILINSPECTOR Duration 2010 TO 2012 Roles and Responsibility • In Oil & Gas Field Responsible For Building Work (i-e) Sub Station, OMS, and IES Building. • All Areas Preparation of Basement of Building and Structure Foundation, Trenches, Table Top, Equipment’s Foundation ,Sub Grade , Subase , Road Work, Main Whole, Junction Box,Sumpit,katch Basin, Wall Pit, Fire Work, Backfilling Excavation in all etc. • Take measures for security of tool, plant and equipment and other assets being used by the teams. • Planning, scheduling and monitoring of construction activities. Detail study of drawings and raise the technical queries. • Achieve weekly/daily work progress targets provided by the discipline Incharge. Conduct weekly internal meetings and resolve the issues of construction. • Raising technical queries pertaining to civil drawing. Water proofing for basements .Making of weekly site action list & weekly schedules. • Implement all the specifications of Quality and QHSE. Daily progress report to the discipline in charge • Raise request for inspection (RFI) on daily basis. Inspection of steel to consultant. Supervision of all civil construction activities. Making of bar bending schedules • Maintenance of all mechanical machinery. Making of daily and weekly progress reports, Responsible to prepare daily inspection reports of executed work. • Estimation of materials and coordinate with commercial department. Conduct weekly internal meetings and resolve the issues of construction. • Supervision for the finishes of Building Work and Cladding for Building. Calculate all the quantities of Form Work, Rebar and Concrete. • Coordinate to batch plant in charge to arrange the concrete. Preparing of Sub Base Material for Concrete Paving. Maintaining technical records. Expertise • All Type of Foundation Work Of Plant. • Fitting and Finishing of Pipes (i-e) Gas pipes, Steel pipes, Casing etc • Foundation of Rotatory and Stationary Equipment. • Industries maintenous work. Company BAUER SPEZIALTIEFBAU GmbH LOCTION Abu Dhabi, Dubai, (U.A.E.) PROJECT NAME Five Star Hotel. Duration 2006 T0 2008 Designation QC INSPECTOR
  • 6.
    RESUME QC CIVILINSPECTOR • H-Beam wall, Anchoring, Grouting and High Pressure Injection, Vibro Compaction. Environment: Specialized foundations group offering services like execution of specialized techniques/foundations like Secant pile walls, Contiguous pile walls, Diaphragm walls.Vibro-compaction, Bored cast-in-situ piles, Soil Stabilization, Soil Nailing, Micro Piles, and Anchoring etc. Job Purpose: • Controlling & managing project operations, quality monitoring and quality control procedures, application of health & safety programs, liaison with contractor, consultant & client to ensure work quality. • To manage and maintain the work site operations for MPCL, deliver continuous updates on work site conditions; work with other personnel to achieve timeline. Ensure quality control during execution and follow-up after. Cost estimation, invoicing and billing Responsibilities:  Worked as a Site In charge of all civil work of Bridge and Excavation of Canal  Working as Piling In charge  Working as Super Stretcher of Bridge  Preparing the monthly and weekly site progress report.  Preparing the bar bending schedule.  Preparing the cast in suit concrete requirement  Preparing of Billing report of Sub Contractor  Demolition of Structure during Shutdown of Plant  Excavation, Backfilling And concreting Works.  Concreting of Foundations etc Regarding Civil job.  Daily, weekly and monthly report generation for own office, consultant and client.  Schedule, coordinate and monitor the various activities of work force and sub-ordinates.  Manage and assist team members to establish and achieve timelines.  Liaise with technical and logistics departments to ensure maximum optimization of work force and timely completion of work.  Material estimation & cost control of project.
  • 7.
    RESUME QC CIVILINSPECTOR ď‚§ Ensure the well being and safety of workforce by implementing a proper safety plan incorporating all site activities and environment. ď‚§ Manage project operations to the satisfaction of consultant and client ď‚§ Revision and modification of shop drawings as per site requirements. ď‚§ Carrying out geotechnical investigations. ď‚§ Establishment of programs and operational routes for piling rigs on site. SNAPSHOT OF ALL EXPRIENCED Project Name : Mixed use First Gulf Bank 2 High Rise Buildings, AbuDhabi Main Contractor : SEIDCO Contracting Project Detail : Secant piles wall 393Nos. having dia of 1.0m including installation of Anchors & 210 Lm of diaphragm wall including installation of Anchor. Project Name : 5 High Rise Buildings Palm Deira, Dubai Client : Nakheel Project Detail : Secant piles wall 642Nos. having dia of 1.0m including installation of Anchors plus installation of H-beam for pre-shoring. Project Name : City Of Arabia (Wadi Tower) Client : ILYAS AND MUSTAFA GALADARI MANAGEMENT Consultant : P&T Architects and Engineers Main Contractor : BAUER SPEZIALTIEFBAU GmbH Project Detail : 162 Cast-in-situ bored piles having dia of 1.0m, having depth upto 30m having dia of 800mm and 900mm including installation of Anchors plus Testing Of PTP. Project Name : Interchange No. 8 Sheikh Zayed Road Dubai Client : RTA Consultant : Consult Mounsel Main Contractor : Shimizu Corporation Project Detail : 830 cast-in-situ bored piles having dia of 1.0m, 1.2m and 1.4m. Static Load Testing of 19Nos. of piles having dia of 1.0m, 1.2m Project Name : JT Metro Project, Dubai Client : JT Metro Project Detail : 16 cast-in-situ bored piles having dia of 2.25m, having depth 35m. Project Name : Business Bay Client : Sheth Estate Consultant : Aedas Main Contractor : BAUER SPEZIALTIEFBAU GmbH Project Detail : Contiguous piles wall 210 Nos. having dia of 800mm.
  • 8.
    RESUME QC CIVILINSPECTOR Project Name : JT Metro Project (Centre of Sheikh Zayed Road) Client : JT Metro Project Detail : 39 cast-in-situ bored piles having dia of 2.25m up to the depth of 28m. Project Name : City Of Arabia (I & M AND METO TOWER) Client : ILYAS AND MUSTAFA GALADARI MANAGEMENT Consultant : P&T Architects and Engineers Main Contractor : BAUER SPEZIALTIEFBAU GmbH Project Detail : 392 Cast-in-situ bored piles having dia of 1.5m, 1.2m, 800mm having depth up to 18.5m, 30m, 32m, 35m long including Installation of Anchors plus Testing Of static compression and Dynamic test of pile. Projects In Building Works. Project Place : Shama Al Bhaya (Abu Dhabi U.A.E) Client : Private. Consultant : Jidar Engineering and Consulting Main Contractor : ALQURM AL SHARQI GEN: CONT: L.L.C. Project Detail G+1 Villa, Plot No 423 . Project Place : Bani yas Khalifa (B) (Abu Dhabi U.A.E) Client : First Gulf Bank. Consultant : SiMA Engineers - Consultants Main Contractor : ALQURM AL SHARQI GEN: CONT: L.L.C. Project Detail Five Villa's.G+1 Villa, Plot No 29 . Project Place : Khalifa (A) (Abu Dhabi U.A.E) Client : ADIB Bank. Consultant : Al Nahda Engineers - Consultants Main Contractor : ALQURM AL SHARQI GEN: CONT: L.L.C. Project Detail G+1 Villa, Plot No 81 .
  • 9.
    RESUME QC CIVILINSPECTOR Company SAMSUNG ENGINEERING CO. LTD Location U.A.E Designation QC INSPECTOR CIVIL Duration 2008 T0 2010 Project Ras Al Khaimah,(U.A.E), Al Ghail Industrial Park Of RAKIA, SeAH UAE STEEL PIPE MILL ROLE AND RESPONSIBILITY Job Purpose: • Controlling & managing project operations, quality monitoring and quality control procedures, application of health & safety programs, liaison with consultant & client (owner) to ensure work quality, and Duration of work time line. • To manage and maintain the work site operations for MPCL, deliver continuous updates on work site conditions; work with other personnel to achieve timeline. Ensure quality control during execution and follow-up after. Cost estimation, invoicing and billing. Responsibilities:  Making (%) wise schedule of the handling project.  Material estimation & cost control of project.  Daily, report generation for own office, consultant and client (owner).  Maintain work schedule for both skilled/ unskilled labor  Schedule, monitor the various activities of work force.  Manage and assist team members to establish and achieve timelines.  Liaise with technical and logistics departments to ensure maximum optimization of work force and timely completion of work.  Manage project operations to the satisfaction of consultant and client (owner)  Carrying out geotechnical (soil) investigations.  Liaise with designers, structural engineers and geotechnical engineer to ensure construction guidelines are met. Following the rules and regulation of company, Following the Construction of Industrial Work. Supervision of work. Inspecting with the subcon. Preparing Non Conformation Report. Maintain & server Updating the All department wise documents. Making weekly and monthly report. Formal Presentation report (Presentation about project). Schedule preparing according to construction progress Subcontractor Contract coordination. Checking of Progress payment from Subcontractor % wise. Receiving and Sending of Transmittal and Letters to Subcon. Preparing the Work order and Change order. Preparing purchase order as requirement of department. and so on.
  • 10.
    RESUME QC CIVILINSPECTOR  Establish and implement standards as per specifications for the work concerning to municipality. Trainings and Certification • First Aider and Basic Life Support from Descon. • H2S/BA Training from Descon, JGC. • Permit to work (PTW) training from JGC. • Incident and Injury free (IIF) from Descon. • Supervisor skill workshop from JGC Computer Literacy: P6 Primavera, M S-Project, Auto Cad, MS-Office, Web Working.