CURRICULUM VITAE
A.SAHADEVAN
1/9 Mettugundu- (PO),
Palavanatham -(VIA),
Virudhunagar - (DT),
Tamilnadu,India.
Pin:626004
Mobile +919894676717
Land Line +914562283681
E-mail:ssaha_dev@yahoo.com
:ssaha1427cwi@gmail.com
SEEKING A SUITABLE POSITION IN QUALITY CONTROL DOM AIN
DIPLOMA IN MECHANICAL ENGINEERING
(Trained & certified in AWS-CWI and Level II in RT, PT, UT&MPT)
Recognised for 100% QUALITY Work/ Perfect Safety Record
PROFILE AT A GLANCE
 A dynamic & competent professional more than 13 years of experience and strong
background in the field of construction which involves supervision, quality control
of welding, piping, pipeline, Tank inspection & test package review, witness of
pressure test and non-destructive examination of various construction such as
LNG, oil & gas separation plant, power stations petrochemical plant and Refinery
works.
 Conversant with code and standard and project specification such as ASME/ANSI
B31.1, B31.3,API 1104 ASME sec I, II, V, VIII, IX & AWS D1.1
 Proficient in Oil, Gas, Petro chemical Sector and Power Stations
 Outstanding work ethic with attention to quality, costs and project scheduling
(deadline).
 Highly organised & dedicated with a positive attitude. Self motivated; able to set
effective priorities and handle multiple assignments under high pressure within
tight deadlines; adapt easily to new concepts and responsibilities.
 Ability to trigger growth through implementing leadership initiatives in dynamic
business environments.
AREAS OF EXPERTISE
 Strong Technical & Mechanical Aptitude
 Regulations & Code compliance
 Customer service management
 Team Management
 Excellent trainer in high-skill work
 Custom Fabrication & Welding
 Flexible and adaptable
 Project coordination-expense control
 Quality Control – Attention to detail
 Safety & Security Coordination
CAREER PROFILE
Career Progression
Orgainsation Designation Duration
Saipem Bosconco, Republic Of Congo Welding Inspector Jun 2014 to jun
2015.
Kharafi National.Co.(L.L.C). Kuwait Welding/piping inspector March 2013 to
May 2014
Kharafi National.Co.(L.L.C). Abu Dhabi Welding/piping inspector April 2012 to
March 2013
Nasser S.Al-Hajri Corp., Jubail KSA. Welding/piping inspector Sep 2009 to sep
2011
Baby Engineering (P) Ltd Welding inspector July2008 to Feb
2009
Nat Steel Asia (P) Ltd, Singapore QC Inspector July 2004 to Mar
2008
Jayaram Engineering Works, Trichy QC Inspector July 2000 to Jun
2004
KEY SKILL
• Excellent Knowledge of applicable industry standards and QC activities in Welding,
Mechanical and NDT.
• Overall monitoring implementation and outputs of quality control on the project.
• Experience in Co-ordination of site inspection activities.
• Experience in establish welding requirements against specifications for entire projects.
• Experience in material receiving inspection and review of material test certificates and
related documents.
• Review of QA/QC procedures, method statements and ITP.
• Experience in develop and co ordinate recommended corrective and preventive actions.
• Experience in UT, MPI, PT, PMI, and Hardness testing.
• Experience in Monitoring heat treatment activities.
• Experience in establishing welding procedure qualification and welder qualification.
• Familiar with welding surveillance inspection and monitoring welder performance.
• Conduct routine auditing on contractors project records.
• Review of pressure test packs and witnessing leak testing.
• Test pack wise Punch listing before Leak test and system wise punch listing after leak
test
• Inspection of re instatement after leak test.
• Conversant with carbon steel, low alloy steel, austenic stainless steel, duplex stainless
steel and Nickel based Alloy welding.
• Experienced in establishment of punch list system, reviews mechanical completion
submissions to ensure that all QC Inspection requirements have been met.
• Having interpersonal skills to co ordinate with contractors, suppliers, owner
representatives, and competent bodies on matters of quality and final product
acceptance.
• Having the aptitude and Experience in communicating with personal and management
of multy disciplined Nationalities.
PROJECT MANAGEMENT & RESPONSIBILITY
• Reporting to QC Manager, Lead a team of inspectors and QC staff. Plan and
Coordinates inspection activities for discipline inspectors at site and reports to the
QC Manager on Quality Surveillance issues.
• Monitor the site work and lead the Quality team of Multi disciplines Qc Inspectors
and ensure the entire site Inspections are performed on timely basis as per the
approved Inspection & test plans. And to verify the completion of the Quality
records of each of the Respective disciplines in compliance with the requirements
of the Project and the Quality management system.
• Review/Validate quality documents such as Welding procedure specification, PQR,
Work Method statement, Standard Operating Procedures, Standard Inspection
Procedures, Inspection Test Plans, Material Test Certificate, Equipment Health
Certificates, Instrument Calibration Certificates, etc.
• Witness the Mechanical test of PQR, like Bend test, Hardness test, Tensile test,
Charpy impact test etc.
• Witness of Welder Performance Quantification.
• Submission of Quality Documents i.e. Monthly / weekly management reports,
Quality procedures, WPS, Qualification of personnel’s etc as per the Client
requirements and obtaining the approval prior to the start up of the work activity.
• Analyze the root causes for the non conformances and initiate the corrective and
preventative actions so as to avoid the same repetition of the Non conformances
and to close out of the relevant NCR’S (Non conformance reports) by coordinating
with the concerned discipline Engineers / superintendents so to avoid the delay in
meeting of the project milestones & completion of the project work.
• Co ordinate with the client in all technically related issues and resolve The Quality /
Technical issues by coordinating with the Concerned Disciplines
• Conduct the Weekly Quality tool box meeting with the Quality staff and The
construction crews to resolve the technical / Quality issues.
• Provide technical direction regarding determination and selection of QC Hold
points.
• Ensure quality norms are maintained as per set standards through inspections,
daily checks, supervision etc.
• Ensure optimum utilisation of resources through proper planning, allocation and
approval of outsourced quality personnel like Quality Control Inspectors, NDE &
Heat Treatment Operators
• Prepare and generate daily/weekly/monthly progress reports.
• Supervise & witness final Hydro testing.
• Full charge responsibility of Quality Control planning and review through
performance of Direct Point Inspections.
• Conduct inspection of Pre Weld Joint Set-Ups and Post Weld Joint Visuals. Select
Welds for NDE and Surface Preparation by Blasting.
• Witness & monitor the Preheat, Post weld heat treatment are carried out according
to the requirement of the WPS, project specification and the relevant standard,
review the PWHT Chart.
• Co-ordinate with the NDT third party Examination & testing agencies
For the relevant testing and examination as to comply with the Requirements of
client.
• To witness and review the hydrostatic test package for the completed
quality related documents and reports in accordance with the approved Inspection
& Test Plan,like pre hydro test check list, post hydro test check list, line flushing
reports, and summery of Welding including reports for NDE, P&IDS, pipe
arrangement plan, isometric drawings and certificate for the calibration of the relief
valves, pressure gauges etc prior to hydro test of the line etc.
• Coordinate all activities in material handling, storage, preservation etc
as to ensure adequate protection & proper storage, handling & Preservation of the
materials at site.
• Accountable for maintaining compliance with Quality Management
System and the Local Procedures. In case of any shortfalls, take immediate
corrective actions.
EMPLOYMENT RECORD
Feb 2015 To Till date : Saipem Boscongo, Republic Of Congo.
Project : Moho Nord (SPS Project)
Client : Total
June 2014 To Jan 2015 : Saipem Boscongo, Republic Of Congo.
Project : Litchendjili Jetty WPB4
Client : Eni Congo
Mar 2013 to May 2014 : Kharafi National.Co (L.L.C), Kuwait,
Project ; Installation of LSFO,FG&GO Pipeline from MAA to Sabiya and Doha Power
Stations
Client : Hyundai
April 2012 to Mar 2013 : Kharafi National.Co (L.L.C). U.A.E
Project : Gasco Igd Habshan 5 Process Plant.
Client : Technimont
April 2011 to sep 2011 : Nasser .S. Al-Hajri Corporation Kingdom of Saudi Arabia
Project : Saudi Aramco Total Refining and Petrochemical Company (SATORP),
Client : Daelim Saudi Arabia ltd.
Mar 2010 to April 2011 : Nasser .S. Al-Hajri Corporation Kingdom of Saudi Arabia
Project : National Chevron Philips (Ethylene Cracker Plant)
Client : Japan Gas Company Arabia Ltd
Sep 2009 to Mar 2010 : Nasser .S. Al-Hajri Corporation Kingdom of Saudi Arabia
Project : Saudi kayan Olefins Plant (Ethylene cracker Plant)
Client : Kellogg Brown & Root
July 2008 to Feb 2009 : Baby Engineering.,India
Project : JSW Block -II
Client : Jindal Steel Works
July 2004 to Mar2008 : Nat Steel Asia Pte Ltd, Singapore.
Position : Working as QA / QC Inspector.
July 2000 to June 2004 : Jayaram Engineering Works, Trichy
Position : Worked as QA / QC Inspector.
EDUCATION
• Diploma In Mechanical Engineering (1998 – 2000)
• AWS – Certified (Cert No: 09012111)
• ASNT - Level-II in RT, UT, DPT, & MPT.
PERSONAL DETAILS
• Date of birth : 14-05-1981.
• Marital status : Married.
• Religion : Hindu.
• Sex : Male.
• Passport No : K8440641.
• Passport Expiry : 24/10/2022
• Place of issue : Abu Dhabi.
CURRICULUM VITAE
CURRICULUM VITAE

CURRICULUM VITAE

  • 1.
    CURRICULUM VITAE A.SAHADEVAN 1/9 Mettugundu-(PO), Palavanatham -(VIA), Virudhunagar - (DT), Tamilnadu,India. Pin:626004 Mobile +919894676717 Land Line +914562283681 E-mail:ssaha_dev@yahoo.com :ssaha1427cwi@gmail.com SEEKING A SUITABLE POSITION IN QUALITY CONTROL DOM AIN DIPLOMA IN MECHANICAL ENGINEERING (Trained & certified in AWS-CWI and Level II in RT, PT, UT&MPT) Recognised for 100% QUALITY Work/ Perfect Safety Record PROFILE AT A GLANCE  A dynamic & competent professional more than 13 years of experience and strong background in the field of construction which involves supervision, quality control of welding, piping, pipeline, Tank inspection & test package review, witness of pressure test and non-destructive examination of various construction such as LNG, oil & gas separation plant, power stations petrochemical plant and Refinery works.  Conversant with code and standard and project specification such as ASME/ANSI B31.1, B31.3,API 1104 ASME sec I, II, V, VIII, IX & AWS D1.1  Proficient in Oil, Gas, Petro chemical Sector and Power Stations  Outstanding work ethic with attention to quality, costs and project scheduling (deadline).  Highly organised & dedicated with a positive attitude. Self motivated; able to set effective priorities and handle multiple assignments under high pressure within tight deadlines; adapt easily to new concepts and responsibilities.  Ability to trigger growth through implementing leadership initiatives in dynamic business environments. AREAS OF EXPERTISE  Strong Technical & Mechanical Aptitude  Regulations & Code compliance  Customer service management  Team Management  Excellent trainer in high-skill work  Custom Fabrication & Welding  Flexible and adaptable  Project coordination-expense control  Quality Control – Attention to detail  Safety & Security Coordination CAREER PROFILE
  • 2.
    Career Progression Orgainsation DesignationDuration Saipem Bosconco, Republic Of Congo Welding Inspector Jun 2014 to jun 2015. Kharafi National.Co.(L.L.C). Kuwait Welding/piping inspector March 2013 to May 2014 Kharafi National.Co.(L.L.C). Abu Dhabi Welding/piping inspector April 2012 to March 2013 Nasser S.Al-Hajri Corp., Jubail KSA. Welding/piping inspector Sep 2009 to sep 2011 Baby Engineering (P) Ltd Welding inspector July2008 to Feb 2009 Nat Steel Asia (P) Ltd, Singapore QC Inspector July 2004 to Mar 2008 Jayaram Engineering Works, Trichy QC Inspector July 2000 to Jun 2004 KEY SKILL • Excellent Knowledge of applicable industry standards and QC activities in Welding, Mechanical and NDT. • Overall monitoring implementation and outputs of quality control on the project. • Experience in Co-ordination of site inspection activities. • Experience in establish welding requirements against specifications for entire projects. • Experience in material receiving inspection and review of material test certificates and related documents. • Review of QA/QC procedures, method statements and ITP. • Experience in develop and co ordinate recommended corrective and preventive actions. • Experience in UT, MPI, PT, PMI, and Hardness testing. • Experience in Monitoring heat treatment activities. • Experience in establishing welding procedure qualification and welder qualification. • Familiar with welding surveillance inspection and monitoring welder performance. • Conduct routine auditing on contractors project records. • Review of pressure test packs and witnessing leak testing.
  • 3.
    • Test packwise Punch listing before Leak test and system wise punch listing after leak test • Inspection of re instatement after leak test. • Conversant with carbon steel, low alloy steel, austenic stainless steel, duplex stainless steel and Nickel based Alloy welding. • Experienced in establishment of punch list system, reviews mechanical completion submissions to ensure that all QC Inspection requirements have been met. • Having interpersonal skills to co ordinate with contractors, suppliers, owner representatives, and competent bodies on matters of quality and final product acceptance. • Having the aptitude and Experience in communicating with personal and management of multy disciplined Nationalities. PROJECT MANAGEMENT & RESPONSIBILITY • Reporting to QC Manager, Lead a team of inspectors and QC staff. Plan and Coordinates inspection activities for discipline inspectors at site and reports to the QC Manager on Quality Surveillance issues. • Monitor the site work and lead the Quality team of Multi disciplines Qc Inspectors and ensure the entire site Inspections are performed on timely basis as per the approved Inspection & test plans. And to verify the completion of the Quality records of each of the Respective disciplines in compliance with the requirements of the Project and the Quality management system. • Review/Validate quality documents such as Welding procedure specification, PQR, Work Method statement, Standard Operating Procedures, Standard Inspection Procedures, Inspection Test Plans, Material Test Certificate, Equipment Health Certificates, Instrument Calibration Certificates, etc. • Witness the Mechanical test of PQR, like Bend test, Hardness test, Tensile test, Charpy impact test etc. • Witness of Welder Performance Quantification. • Submission of Quality Documents i.e. Monthly / weekly management reports, Quality procedures, WPS, Qualification of personnel’s etc as per the Client requirements and obtaining the approval prior to the start up of the work activity. • Analyze the root causes for the non conformances and initiate the corrective and preventative actions so as to avoid the same repetition of the Non conformances and to close out of the relevant NCR’S (Non conformance reports) by coordinating with the concerned discipline Engineers / superintendents so to avoid the delay in meeting of the project milestones & completion of the project work. • Co ordinate with the client in all technically related issues and resolve The Quality / Technical issues by coordinating with the Concerned Disciplines
  • 4.
    • Conduct theWeekly Quality tool box meeting with the Quality staff and The construction crews to resolve the technical / Quality issues. • Provide technical direction regarding determination and selection of QC Hold points. • Ensure quality norms are maintained as per set standards through inspections, daily checks, supervision etc. • Ensure optimum utilisation of resources through proper planning, allocation and approval of outsourced quality personnel like Quality Control Inspectors, NDE & Heat Treatment Operators • Prepare and generate daily/weekly/monthly progress reports. • Supervise & witness final Hydro testing. • Full charge responsibility of Quality Control planning and review through performance of Direct Point Inspections. • Conduct inspection of Pre Weld Joint Set-Ups and Post Weld Joint Visuals. Select Welds for NDE and Surface Preparation by Blasting. • Witness & monitor the Preheat, Post weld heat treatment are carried out according to the requirement of the WPS, project specification and the relevant standard, review the PWHT Chart. • Co-ordinate with the NDT third party Examination & testing agencies For the relevant testing and examination as to comply with the Requirements of client. • To witness and review the hydrostatic test package for the completed quality related documents and reports in accordance with the approved Inspection & Test Plan,like pre hydro test check list, post hydro test check list, line flushing reports, and summery of Welding including reports for NDE, P&IDS, pipe arrangement plan, isometric drawings and certificate for the calibration of the relief valves, pressure gauges etc prior to hydro test of the line etc. • Coordinate all activities in material handling, storage, preservation etc as to ensure adequate protection & proper storage, handling & Preservation of the materials at site. • Accountable for maintaining compliance with Quality Management System and the Local Procedures. In case of any shortfalls, take immediate corrective actions. EMPLOYMENT RECORD Feb 2015 To Till date : Saipem Boscongo, Republic Of Congo. Project : Moho Nord (SPS Project) Client : Total June 2014 To Jan 2015 : Saipem Boscongo, Republic Of Congo. Project : Litchendjili Jetty WPB4 Client : Eni Congo
  • 5.
    Mar 2013 toMay 2014 : Kharafi National.Co (L.L.C), Kuwait, Project ; Installation of LSFO,FG&GO Pipeline from MAA to Sabiya and Doha Power Stations Client : Hyundai April 2012 to Mar 2013 : Kharafi National.Co (L.L.C). U.A.E Project : Gasco Igd Habshan 5 Process Plant. Client : Technimont April 2011 to sep 2011 : Nasser .S. Al-Hajri Corporation Kingdom of Saudi Arabia Project : Saudi Aramco Total Refining and Petrochemical Company (SATORP), Client : Daelim Saudi Arabia ltd. Mar 2010 to April 2011 : Nasser .S. Al-Hajri Corporation Kingdom of Saudi Arabia Project : National Chevron Philips (Ethylene Cracker Plant) Client : Japan Gas Company Arabia Ltd Sep 2009 to Mar 2010 : Nasser .S. Al-Hajri Corporation Kingdom of Saudi Arabia Project : Saudi kayan Olefins Plant (Ethylene cracker Plant) Client : Kellogg Brown & Root July 2008 to Feb 2009 : Baby Engineering.,India Project : JSW Block -II Client : Jindal Steel Works July 2004 to Mar2008 : Nat Steel Asia Pte Ltd, Singapore. Position : Working as QA / QC Inspector. July 2000 to June 2004 : Jayaram Engineering Works, Trichy Position : Worked as QA / QC Inspector. EDUCATION • Diploma In Mechanical Engineering (1998 – 2000) • AWS – Certified (Cert No: 09012111) • ASNT - Level-II in RT, UT, DPT, & MPT. PERSONAL DETAILS • Date of birth : 14-05-1981. • Marital status : Married. • Religion : Hindu. • Sex : Male. • Passport No : K8440641. • Passport Expiry : 24/10/2022 • Place of issue : Abu Dhabi.