SlideShare a Scribd company logo
PRATIK PARMAR
Contact: +91-9727576720.
E-Mail: pratik.power@hotmail.com, pratiksparmar@yahoo.com , PAN no: BXQPP0474D
Seeking assignments in Operations & Maintenance, Commissioning, Project Management of
Boilers and turbine up to 500 TPH and 120 MW, Servicing with technology driven organizations
in Oil & Gas Refinery, Power Generation, Chemical & Cement manufacturing sector in India.
____________________________________________PROFILE
SUMMARY_______________________________________
Offering 6 years of experience in:
Operations & Maintenance of Boilers/Turbines Troubleshooting/Coordination Project Management
Boilers & Heaters Commissioning Start-up/Shut down Operations of Boilers Test & Inspection
• Sound knowledge of O&M and commissioning of CFBC,IR-CFBC, AFBC, HRSG, Radiant, HCFM,BFG Fired, WHRB (Cock
Oven & Sponge Iron) Boilers, HP Dowtherm Heater, Turbine & their Auxiliaries by DCS Panel and Power Plant Process
Systems
• Gained expertise to complete all mile stone commissioning activities i.e. Refractory Dry Out, Acid cleaning, Alkali Boil
Out, Steam Blowing and Safety Valve Floating and for turbine, i.e. Lube oil Flushing, Control oil flushing, TG set on
Turning gear, CEPs Commissioning, HP-LP heaters Commissioning, HP oil system commissioning, Jacking oil system
commissioning, Lube Oil purifier system commissioning, Lube oil system commissioning, Vacuum pulling through
ejectors, Gland sealing system commissioning, TG set on Rolling, STG synchronization.
• Hands on experience in overseeing project commissioning activities from conceptualization to execution within
budgeted time and for customer satisfaction including technical specifications, stage inspections, progress monitoring
and manpower planning.
• Skilled in carrying out pre-commissioning and commissioning activities for various boilers and following the protocols
with expertise in planning commissioning schedules to meet challenging organizational goals
• Deft at looking after operations & maintenance till handing over of project to customers
• Exposure in developing & streamlining systems with proven ability to enhance operational effectiveness and meet
operational goals within the cost, time & quality parameters
• Skilled in managing operations involving resource planning, materials planning, team building and co-ordination with
the internal departments.
• Possess communication, presentation, relationship management and problem solving skills.
______________________________________CORE
COMPETENCIES____________________________________________
• Managing activities involving working out various requirements & monitoring overall project operations for ensuring
timely completion
• Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available
resources to achieve organizational objectives
• Overseeing commissioning of all auxiliaries I.e. BFP, FD Fan, ID Fan, Fuel Oil Pump, DM Transfer Pump, Scanner Cooling
Fans, Soot Blowers, BMS, centrifuge oil pump, GSC, Ejector, Condenser, HP-HP heaters, turbine lube oil system, HP
steam bypass system, LP steam system, ESP system.
• Conducting problem investigation analysis to identify the problem & take corrective actions with Commissioning Action
Report (CAR) & Learning from incidence(LFI) to improve the quality of process.
• Implementing commissioning schedules and maintaining requisite documents for reporting & troubleshooting boilers
• Monitoring and optimising activities, troubleshooting problems in coordination with other departments and improving
efficiency
• Identifying areas of obstruction / breakdowns and taking steps to rectify the problem through application of
troubleshooting methods.
_________________________________ORGANISATIONAL
EXPERIENCE_______________________________________
Since 2nd
Jan’2016 with Reliance Industries Ltd, Dahej as an Executive Engineer.
Role:
• Managing boiler/turbine start-up & troubleshooting operations and shutdown inspection. Unit of 270.9 MW coal
base captive power includes 4 x 500 TPH IR-CFBC Thermax make boiler and 3 x 90.3 MW BHEL make turbines with
distributing steam trough PRDS to process.
• Specification of boiler:
4X 500 TPH steam flow, 121.3 kg/cm2 pressure and 530° C temperature, Thermax make IR CFBC Boiler
• Specification of boiler:
BHEL make surface condensing turbine 3 x 90.3 MW turbines having 6 uncontrolled extraction.
• Managing boiler/turbine start-up & troubleshooting operations and shutdown inspection
• Taking decisions about load sharing of both electrical load and process steam as per demand.
• Overseeing commissioning and overhauling of IR-CFBC boilers
• Looking after activities related to:
o Refectory dry out, alkali boil out and steam blowing of boilers
• Administering all departments under the power line for resource optimization
• Performing:
o Condition-assessment of boiler’s accessories & mountings such as pumps, air pre-heater, economizer & fly-ash
system.
Routine check-up of field machinery like pumps, fans, ash conveying system, valves, dampers, etc
’06-April’12 with Thermax Ltd. Pune, Maharashtra as an Executive
Commissioning Engineer –
Oil & Gas Department.
Role:
• Spearheaded commissioning of HRSG, Radiant, HCFM, BFG fired, WHRB (Cock Oven & Sponge Iron) Boilers, HP
Dowtherm Heater and their auxiliaries, Steam driven Turbo Generator and its system, i.e. Condensate system, Lube oil
system, Control oil system, Evacuation system, LP and HP heaters-drain system, Gland sealing system.
• Supervising for Operations & Maintenance till handing over of project to customers.
• Performed out all mile stone commissioning activities of boilers i.e. Burner Firing with different fuels, Refractory Dry Out,
Acid cleaning, Alkali Boil Out, Steam Blowing and Safety Valve Floating and for turbine, i.e. Lube oil Flushing, Control oil
flushing, TG set on Turning gear, CEPs Commissioning, HP-LP heaters Commissioning, HP oil system commissioning,
Jacking oil system commissioning, Lube Oil purifier system commissioning, Lube oil system commissioning, Vacuum
pulling through ejectors, Gland sealing system commissioning, TG set on Rolling, STG synchronization.
• Served as a SPOC for all customer correspondence & queries till project completion
• Looked after:
o Internal coordination with Commissioning Head, Commissioning Coordinator & Other departments as Process
Engineering, Design, Mechanical Engineering, Purchase, Manufacturing, Quality Control, Erection & Commissioning,
Shipping & Logistics
o External coordination with Customer, Vendors and Inspection Agencies
Projects Handled:
• Fully Commissioning of BTG package including 223 TPH * 2 Nos. BFG fired Boilers (BFG, COG, LDO/HFO fired 8 no’s
burners),1 * 120 MW (SIEMENS MAKE CONDENSING STG),Compressors, Diesel unloading station, Chillers, AIS & GIS at
Vizag Steel Plant, RINL, Vishakhapatnam.
• 150 TPH * 2 Nos. Radiant boiler (NG & Naphtha Fired Burners), Reliance industries Ltd., Bharuch, Gujarat
• 125 TPH *2 Nos. HRSG boiler (NG & Naphtha Fired Burners), Reliance industries Ltd., Bharuch, Gujarat
• 115 TPH *2 Nos. HCFM Boiler(NG & LDO Fired),Cairn India Ltd., Barmer, Rajasthan
• 65 TPH *1 Nos. FM boiler(LDO fired),GMR Energy Ltd., Raipur, Chhattisgarh
• 15 MMKcal *4 DOWTHERM heaters at Reliance Industries Limited, Bharuch, Silvassa, Gujarat
• 25 TPH*4 no’s, 66 kg/cm2, Cock-oven WHRB at ISP-Asansol, West Bengal
• 58 TPH*1 no’s, 110kg/cm2, BFG fired boiler at SAIL, Rourkella, Orissa
• 38 TPH*2 no’s, 67 kg/cm2, WHRB at ABHIJEET LTD, Jamshedhpur, Jharkhand
• 35 TPH*1 no’s, 67 kg/cm2, BFG fired, FM Boiler at SLR Metallic. Hospet, Karnataka
• 38 TPH*2 no’s, 67 kg/cm2, WHRB at TRIMUA INDUSTRIS LTD. Singrauli, MP
• 10 TPH*2 nos,66 KG/CM2 ,WHRB & 41 TPH, 66 KG/CM2, AFBC boiler at HRG Alloys & Steel Pvt. Ltd., Koppal,
Karnataka.
Since Feb’10 with Saurastra Chemical Ltd., Porbandar as Boiler Operation Engineer
Role:
• To operate 120TPH x 2 Nos. CFBC Boiler (105 Bars, 505degC), 12.5MW x 2 Nos. of Extraction Back Pressure Turbine by
DCS Panel
• Managing boiler/turbine start-up & troubleshooting operations and shutdown inspection
• Taking decisions about load sharing of both electrical load and process steam as per demand.
• Overseeing commissioning and overhauling of CFBC boilers
• Looking after activities related to:
o Refectory dry out, alkali boil out and steam blowing of boilers
• Administering all departments under the power line for resource optimization
• Performing:
o Condition-assessment of boiler’s accessories & mountings such as pumps, air pre-heater, economizer & fly-ash
system.
o Routine checkup of field machinery like pumps, fans, ash conveying system, valves, dampers, etc.
__________________________________________EDUCATION___________________________________
_____________
• Pursuing B.Tech. (Mechanical) from IGNOU, L.D Engineering College, Ahmedabad: 2015
• Advance Computer integrated manufacturing program from IGNOU, Ahmedabad: 2012
• Diploma in Mechanical Engineering from Sir B.P.T.I College, Bhavnagar with 64.79%: 2009
• AutoCAD 2009 from Cosmos Institute, Bhavnagar with ‘A’ Grade: 2008
________________________________________PERSONAL
DETAILS____________________________________________
Date of Birth 6
th
May 1991
Address A-44, Alankar Apartments, Near Salpara Water Tank, Vejalpur, Ahmedabad – 380058
Languages Known English, Hindi and Gujarati

More Related Content

What's hot

HareshPattani
HareshPattaniHareshPattani
HareshPattani
H J Pattani
 
ncb
ncbncb
JANARDAN
JANARDANJANARDAN
JANARDAN
Janardan Dave
 
Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)
Lalit Patnaik
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
THARANG A KUTTY
 
Asif Mahmood Resume
Asif Mahmood ResumeAsif Mahmood Resume
Asif Mahmood Resume
Asif Mahmood
 
surya's resume
surya's resumesurya's resume
surya's resume
Suryanarayana Guruzu
 
Dinesh Chauhan
Dinesh ChauhanDinesh Chauhan
Dinesh Chauhan
Dinesh Chauhan
 
richard resume word
richard resume wordrichard resume word
richard resume word
Richard Erickson
 
chinna terminal operator.
chinna terminal operator.chinna terminal operator.
chinna terminal operator.
chinna praveen kumar
 
updated_resume
updated_resumeupdated_resume
updated_resume
sreedhar govindapillai
 
RESUME-Latest
RESUME-LatestRESUME-Latest
RESUME-Latest
Jayanta Paul
 
sengu cv
sengu cvsengu cv
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
prashant rai
 
Resume - C.P. Johny
Resume - C.P. JohnyResume - C.P. Johny
Resume - C.P. Johny
CP JOHNY
 
rajpanday
rajpandayrajpanday
rajpanday
raj panday
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
kamalesh Krishnan
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
Kamatham Ravikumar
 
Bhavdeep Resume
Bhavdeep ResumeBhavdeep Resume
Bhavdeep Resume
BHAVDEEP SHARMA
 
Hydrogenation Reactor Design Considerations
Hydrogenation Reactor Design ConsiderationsHydrogenation Reactor Design Considerations
Hydrogenation Reactor Design Considerations
Gerard B. Hawkins
 

What's hot (20)

HareshPattani
HareshPattaniHareshPattani
HareshPattani
 
ncb
ncbncb
ncb
 
JANARDAN
JANARDANJANARDAN
JANARDAN
 
Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)Resume(Lalit Patnaik-Int)
Resume(Lalit Patnaik-Int)
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Asif Mahmood Resume
Asif Mahmood ResumeAsif Mahmood Resume
Asif Mahmood Resume
 
surya's resume
surya's resumesurya's resume
surya's resume
 
Dinesh Chauhan
Dinesh ChauhanDinesh Chauhan
Dinesh Chauhan
 
richard resume word
richard resume wordrichard resume word
richard resume word
 
chinna terminal operator.
chinna terminal operator.chinna terminal operator.
chinna terminal operator.
 
updated_resume
updated_resumeupdated_resume
updated_resume
 
RESUME-Latest
RESUME-LatestRESUME-Latest
RESUME-Latest
 
sengu cv
sengu cvsengu cv
sengu cv
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
Resume - C.P. Johny
Resume - C.P. JohnyResume - C.P. Johny
Resume - C.P. Johny
 
rajpanday
rajpandayrajpanday
rajpanday
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
Bhavdeep Resume
Bhavdeep ResumeBhavdeep Resume
Bhavdeep Resume
 
Hydrogenation Reactor Design Considerations
Hydrogenation Reactor Design ConsiderationsHydrogenation Reactor Design Considerations
Hydrogenation Reactor Design Considerations
 

Similar to My latest cv 1

CustomerCopy (2)
CustomerCopy (2)CustomerCopy (2)
CustomerCopy (2)
PRABU PERUMAL
 
Resume
ResumeResume
KONI RESUME
KONI RESUMEKONI RESUME
nazeemres
nazeemresnazeemres
Santhosh Resume updated
Santhosh Resume updatedSanthosh Resume updated
Santhosh Resume updated
santhosh sreedharan
 
VIJAY CV
VIJAY CVVIJAY CV
R Rao CV update
R Rao CV updateR Rao CV update
R Rao CV update
RAJESWARA RAO ALLADA
 
Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
jaseem
 
Lanmark Engineering 2013
Lanmark Engineering 2013Lanmark Engineering 2013
Lanmark Engineering 2013
Lauren Pryor
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
Bitu.word
Bitu.wordBitu.word
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronological
Paul Brayman
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
ZAHEERUDDIN AHMED
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
Abhinav Rawat
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
Allwyn Stanley
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
Allwyn Stanley
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
Sushil Podia
 
BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)
Binod Yadav
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
Jose F. Gonzalez, P. Eng.
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
Thomas Mathew
 

Similar to My latest cv 1 (20)

CustomerCopy (2)
CustomerCopy (2)CustomerCopy (2)
CustomerCopy (2)
 
Resume
ResumeResume
Resume
 
KONI RESUME
KONI RESUMEKONI RESUME
KONI RESUME
 
nazeemres
nazeemresnazeemres
nazeemres
 
Santhosh Resume updated
Santhosh Resume updatedSanthosh Resume updated
Santhosh Resume updated
 
VIJAY CV
VIJAY CVVIJAY CV
VIJAY CV
 
R Rao CV update
R Rao CV updateR Rao CV update
R Rao CV update
 
Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
 
Lanmark Engineering 2013
Lanmark Engineering 2013Lanmark Engineering 2013
Lanmark Engineering 2013
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Bitu.word
Bitu.wordBitu.word
Bitu.word
 
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronological
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 

Recently uploaded

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 

Recently uploaded (20)

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 

My latest cv 1

  • 1. PRATIK PARMAR Contact: +91-9727576720. E-Mail: pratik.power@hotmail.com, pratiksparmar@yahoo.com , PAN no: BXQPP0474D Seeking assignments in Operations & Maintenance, Commissioning, Project Management of Boilers and turbine up to 500 TPH and 120 MW, Servicing with technology driven organizations in Oil & Gas Refinery, Power Generation, Chemical & Cement manufacturing sector in India. ____________________________________________PROFILE SUMMARY_______________________________________ Offering 6 years of experience in: Operations & Maintenance of Boilers/Turbines Troubleshooting/Coordination Project Management Boilers & Heaters Commissioning Start-up/Shut down Operations of Boilers Test & Inspection • Sound knowledge of O&M and commissioning of CFBC,IR-CFBC, AFBC, HRSG, Radiant, HCFM,BFG Fired, WHRB (Cock Oven & Sponge Iron) Boilers, HP Dowtherm Heater, Turbine & their Auxiliaries by DCS Panel and Power Plant Process Systems • Gained expertise to complete all mile stone commissioning activities i.e. Refractory Dry Out, Acid cleaning, Alkali Boil Out, Steam Blowing and Safety Valve Floating and for turbine, i.e. Lube oil Flushing, Control oil flushing, TG set on Turning gear, CEPs Commissioning, HP-LP heaters Commissioning, HP oil system commissioning, Jacking oil system commissioning, Lube Oil purifier system commissioning, Lube oil system commissioning, Vacuum pulling through ejectors, Gland sealing system commissioning, TG set on Rolling, STG synchronization. • Hands on experience in overseeing project commissioning activities from conceptualization to execution within budgeted time and for customer satisfaction including technical specifications, stage inspections, progress monitoring and manpower planning. • Skilled in carrying out pre-commissioning and commissioning activities for various boilers and following the protocols with expertise in planning commissioning schedules to meet challenging organizational goals • Deft at looking after operations & maintenance till handing over of project to customers • Exposure in developing & streamlining systems with proven ability to enhance operational effectiveness and meet operational goals within the cost, time & quality parameters • Skilled in managing operations involving resource planning, materials planning, team building and co-ordination with the internal departments. • Possess communication, presentation, relationship management and problem solving skills. ______________________________________CORE COMPETENCIES____________________________________________ • Managing activities involving working out various requirements & monitoring overall project operations for ensuring timely completion • Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives • Overseeing commissioning of all auxiliaries I.e. BFP, FD Fan, ID Fan, Fuel Oil Pump, DM Transfer Pump, Scanner Cooling Fans, Soot Blowers, BMS, centrifuge oil pump, GSC, Ejector, Condenser, HP-HP heaters, turbine lube oil system, HP steam bypass system, LP steam system, ESP system. • Conducting problem investigation analysis to identify the problem & take corrective actions with Commissioning Action Report (CAR) & Learning from incidence(LFI) to improve the quality of process. • Implementing commissioning schedules and maintaining requisite documents for reporting & troubleshooting boilers • Monitoring and optimising activities, troubleshooting problems in coordination with other departments and improving efficiency • Identifying areas of obstruction / breakdowns and taking steps to rectify the problem through application of troubleshooting methods.
  • 2. _________________________________ORGANISATIONAL EXPERIENCE_______________________________________ Since 2nd Jan’2016 with Reliance Industries Ltd, Dahej as an Executive Engineer. Role: • Managing boiler/turbine start-up & troubleshooting operations and shutdown inspection. Unit of 270.9 MW coal base captive power includes 4 x 500 TPH IR-CFBC Thermax make boiler and 3 x 90.3 MW BHEL make turbines with distributing steam trough PRDS to process. • Specification of boiler: 4X 500 TPH steam flow, 121.3 kg/cm2 pressure and 530° C temperature, Thermax make IR CFBC Boiler • Specification of boiler: BHEL make surface condensing turbine 3 x 90.3 MW turbines having 6 uncontrolled extraction. • Managing boiler/turbine start-up & troubleshooting operations and shutdown inspection • Taking decisions about load sharing of both electrical load and process steam as per demand. • Overseeing commissioning and overhauling of IR-CFBC boilers • Looking after activities related to: o Refectory dry out, alkali boil out and steam blowing of boilers • Administering all departments under the power line for resource optimization • Performing: o Condition-assessment of boiler’s accessories & mountings such as pumps, air pre-heater, economizer & fly-ash system. Routine check-up of field machinery like pumps, fans, ash conveying system, valves, dampers, etc ’06-April’12 with Thermax Ltd. Pune, Maharashtra as an Executive Commissioning Engineer – Oil & Gas Department. Role: • Spearheaded commissioning of HRSG, Radiant, HCFM, BFG fired, WHRB (Cock Oven & Sponge Iron) Boilers, HP Dowtherm Heater and their auxiliaries, Steam driven Turbo Generator and its system, i.e. Condensate system, Lube oil system, Control oil system, Evacuation system, LP and HP heaters-drain system, Gland sealing system. • Supervising for Operations & Maintenance till handing over of project to customers. • Performed out all mile stone commissioning activities of boilers i.e. Burner Firing with different fuels, Refractory Dry Out, Acid cleaning, Alkali Boil Out, Steam Blowing and Safety Valve Floating and for turbine, i.e. Lube oil Flushing, Control oil flushing, TG set on Turning gear, CEPs Commissioning, HP-LP heaters Commissioning, HP oil system commissioning, Jacking oil system commissioning, Lube Oil purifier system commissioning, Lube oil system commissioning, Vacuum pulling through ejectors, Gland sealing system commissioning, TG set on Rolling, STG synchronization. • Served as a SPOC for all customer correspondence & queries till project completion • Looked after: o Internal coordination with Commissioning Head, Commissioning Coordinator & Other departments as Process Engineering, Design, Mechanical Engineering, Purchase, Manufacturing, Quality Control, Erection & Commissioning, Shipping & Logistics o External coordination with Customer, Vendors and Inspection Agencies Projects Handled: • Fully Commissioning of BTG package including 223 TPH * 2 Nos. BFG fired Boilers (BFG, COG, LDO/HFO fired 8 no’s burners),1 * 120 MW (SIEMENS MAKE CONDENSING STG),Compressors, Diesel unloading station, Chillers, AIS & GIS at Vizag Steel Plant, RINL, Vishakhapatnam. • 150 TPH * 2 Nos. Radiant boiler (NG & Naphtha Fired Burners), Reliance industries Ltd., Bharuch, Gujarat • 125 TPH *2 Nos. HRSG boiler (NG & Naphtha Fired Burners), Reliance industries Ltd., Bharuch, Gujarat • 115 TPH *2 Nos. HCFM Boiler(NG & LDO Fired),Cairn India Ltd., Barmer, Rajasthan
  • 3. • 65 TPH *1 Nos. FM boiler(LDO fired),GMR Energy Ltd., Raipur, Chhattisgarh • 15 MMKcal *4 DOWTHERM heaters at Reliance Industries Limited, Bharuch, Silvassa, Gujarat • 25 TPH*4 no’s, 66 kg/cm2, Cock-oven WHRB at ISP-Asansol, West Bengal • 58 TPH*1 no’s, 110kg/cm2, BFG fired boiler at SAIL, Rourkella, Orissa • 38 TPH*2 no’s, 67 kg/cm2, WHRB at ABHIJEET LTD, Jamshedhpur, Jharkhand • 35 TPH*1 no’s, 67 kg/cm2, BFG fired, FM Boiler at SLR Metallic. Hospet, Karnataka • 38 TPH*2 no’s, 67 kg/cm2, WHRB at TRIMUA INDUSTRIS LTD. Singrauli, MP • 10 TPH*2 nos,66 KG/CM2 ,WHRB & 41 TPH, 66 KG/CM2, AFBC boiler at HRG Alloys & Steel Pvt. Ltd., Koppal, Karnataka. Since Feb’10 with Saurastra Chemical Ltd., Porbandar as Boiler Operation Engineer Role: • To operate 120TPH x 2 Nos. CFBC Boiler (105 Bars, 505degC), 12.5MW x 2 Nos. of Extraction Back Pressure Turbine by DCS Panel • Managing boiler/turbine start-up & troubleshooting operations and shutdown inspection • Taking decisions about load sharing of both electrical load and process steam as per demand. • Overseeing commissioning and overhauling of CFBC boilers • Looking after activities related to: o Refectory dry out, alkali boil out and steam blowing of boilers • Administering all departments under the power line for resource optimization • Performing: o Condition-assessment of boiler’s accessories & mountings such as pumps, air pre-heater, economizer & fly-ash system. o Routine checkup of field machinery like pumps, fans, ash conveying system, valves, dampers, etc. __________________________________________EDUCATION___________________________________ _____________ • Pursuing B.Tech. (Mechanical) from IGNOU, L.D Engineering College, Ahmedabad: 2015 • Advance Computer integrated manufacturing program from IGNOU, Ahmedabad: 2012 • Diploma in Mechanical Engineering from Sir B.P.T.I College, Bhavnagar with 64.79%: 2009 • AutoCAD 2009 from Cosmos Institute, Bhavnagar with ‘A’ Grade: 2008 ________________________________________PERSONAL DETAILS____________________________________________ Date of Birth 6 th May 1991 Address A-44, Alankar Apartments, Near Salpara Water Tank, Vejalpur, Ahmedabad – 380058 Languages Known English, Hindi and Gujarati