SlideShare a Scribd company logo
Paul C. Brayman
Cell – (918) 510-9310 Industrial/Manufacturing/Project Engineer
Email: chevypu46@yahoo.com https://www.linkedin.com/in/paulbrayman Sand Springs, OK 74063
BACKGROUND SUMMARY
Over 20 years of success in the manufacturing, operations and sales of electrical and electromechanical equipment.
Demonstrated ability to reduce operating cost through improved efficiencies, equipment uptime, quality, product cost reductions,
implementing new manufacturing technology and lean manufacturing processes within cross functional teams.
KEY SKILLS SUMMARY
Project Management
Value Stream Mapping
Capital Budgets, IRR & ROI
Point-Of-Use Storage
Setup Reduction
Maintenance Manager
Lean Manufacturing
Cellular Flow Manufacturing
DFMA, FMEA, PPAP, DOE
Time & Motion Studies
5S Workshop
Plant Layout
Tooling/Fixture Design
CNC Machining
ISO 9001 Manager
PROFESSIONAL HISTORY
Employment History
Project Engineer
TMK-IPSCO Catoosa, OK 8/11– 9/15
• Project Engineer on $6.5MM upgrade fully automated quench & temper to improve throughput by 72% on heat treat process.
• Eliminated a walking beam and designed new kickers, conveyors & pop-up stops to convey pipe through UT station.
• Reduced pipe prove-up cycle times by 15% by designing monorail carts to carry tools, torch and supplies.
• Reduced heat treat outages by 50% by improving water filtration to drop out mill scale in quench water.
• Developed a bid package for vendors to develop a means to laser inspect pipe to measure ovality, end hook & OD size.
• Savings of $1.5MM on a Green Belt Project for Black Crested Threads to reduce thread rejects by 10%.
• Developed two ergonomic end effectors to pick up heavy threaded couplings from pallets and start coupling on casing pipe.
• Integrated a pneumatic torque tool with a reaction arm, monorail and air balancer to install thread protectors.
• Coordinated $235K state funding for Unloading Dock Rail Spur with retaining wall, fall protection and trackmobile.
• Used pareto charts to analyze equipment downtimes and product reject codes to determine root cause & corrective action.
Manufacturing Process Engineer (Contract Consultant)
Cooper Power Systems Nacogdoches, TX 11/10 – 6/11
• Worked with a team to close a pad mount transformer plant and integrate it into a plant manufacturing pole mount
transformers. Planned the logistics of moving capital equipment from closing plant to minimize production outages at
receiving plant.
• Responsible for the plant layout and integrating of 1-piece flow of pad-mount transformers. Integrated a $650K fully
automated wash and phosphate system. Value streams, manufacturing, kitting and test processes were validated by
engineering and quality.
• Developed manpower forecasting/leveling, time standards using MOST Work Measurement, proper work sequencing, work
balancing, plant layout and cost reductions.
• Developed value streams for coil winding, core construction, coil & core assembly, tank fabrication and test processes that
were validated by engineering and quality.
• Equipment included coil winders, flatteners, de-reelers, automated prime & paint line, powder coat paint line, transformer
vacuum filling, automated conveyors, multiple assembly stations and crane systems.
New Product Development Process Engineer (Contract Consultant)
Thermo Fisher Scientific Asheville, NC 1/10 – 10/10
• Member of a New Product Development Team on a HVAC freezer. Continuous improvement efforts to implement root cause
analysis, corrective action, problem solving, PFMEA, control plans, continuous flow processes, induction brazing, CNC tube
bending & SPC data collection.
• Responsible for visual management by using color coding, shadow boards, painting shop floors and implementing white
boards displaying drawings, bill of materials, work instructions, inventory levels, schedules and quality metrics.
• Responsible for the verification of the manufacturability of a new product design. Assisted in the selection of urethane foam
fixturing system, induction brazing, CNC tube bending, end effectors, shears, brakes, punch presses and powder coat paint.
• Member on a PFMEA team to define CTQ data and implement preventive measures to reduce or eliminate risk exposure.
Manufacturing Engineering Manager, Lean Coordinator, Maintenance Manager
Tarby, Inc Claremore, OK 7/08 – 6/09
• Managed maintenance personnel and CNC programmer.
• Implemented a $140K new product development and purchase of capital equipment such as a CNC whirling lathe,
autoclaves, quench tank and heater control box totaling.
• Implemented a PM software program to track scheduled maintenance, downtime, costs, parts inventory and oil analysis.
• Worked on project to reduce scrap by using an induction coil to melt rubber out of failed stators so they could be reworked.
• Performed a Value Stream Mapping Kaisan to reduce WIP and balance work cell loads.
Warehouse Manager
Arrow Engine Company Tulsa, OK 3/06 – 7/08
• Managed 26 employees in the Shipping, Receiving and Warehouse Departments. Responsible for $17MM worth of
inventory, maintaining low shipping errors, a 24-hour ship rate of 87% and inventory accuracy of 98%.
• Increased throughput sales by $1.9MM by reducing labor on engines by 40% resulting in annualized savings of $180K.
• Integrated the move and start up of ten different manufacturing groups including engine & NG compressor assembly and
ASME code weld shop. Responsible for plant layouts, inventory accuracy and turns, material flow, equipment expenditures
and acquisitions, budget proposals, design proposals and ROIs.
• Purchased $130K worth of pallet racking and shelving from a sister company for only $18K. This was put up in four
different manufacturing facilities to utilize approximately 75,000 sq. ft. of warehouse storage.
Lean Manufacturing (Contract Consultant)
Industrial Solutions Tulsa, OK 3/05 – 9/05
• Worked with clients in implementing Lean Methods kaisen events, setup reduction (SMED), value stream mapping, point-of-
use-storage, kan ban, cellular manufacturing, 5S workplace organization, 1-piece flow, hyjunka, line balancing, inspection at
the source, poka yoke (error proofing) devices.
Manufacturing Engineer, Safety Director, Assembly Supervisor, Maintenance Manager
Tulsa Winch Jenks, OK 6/00 –1/05
• Managed 28 employees to include assemblers, order pullers, tooling and maintenance technicians.
• Implemented a focused factory with a HMC, live tooling lathe, gear hob, broach and 1-piece flow assembly cell with Kan
Ban, Point-Of-Use Storage, conveyors, automated/metered oil and vendor managed inventory. Resulted in reducing
inventory 50%, lead-time 50%, cycle time 70% and increased on time delivery from 85% to 98%.
• Led a kaisen event and performed ROI to change to a gear wafer cutter. Resulted in reduced tooling costs by $60K/year,
increased throughput 20%, reduced setup time and increased gear quality.
• Assisted on a Cost Reduction Team to launch a new winch product with a low cost manufacturing design.
• Led a kaisen event to change a hone operation to a hard turn operation by using ceramic inserts. Resulted in reduced cycle
times by as much as 70%, tooling costs and increased part quality.
• Savings of $300K/year by reorganizing warehouse by product category. Resulted in increasing inventory accuracy by 15%,
reduced work order pull time by 60% and reduced inventory in-stocking time by 30%.
• Increased throughput by 75% by purchasing tooling to part off drum flanges rather than turn them down on a manual lathe.
• Developed two ergonomic end effectors to pick heavy castings from crates to place into lathes, mills and gear shapers.
• Increased throughput and quality up to 75% by designing tooling and fixtures for work holding and assembly.
• Designed a 1-piece flow cell for planetary winches which resulted in increased throughput by 50% and improved quality by
20%. Comprised of three scissor lift tables with turntables, roll conveyors between each table and 75 hp hydraulic test stand.
• Designed returnable pallets for a customer to keep units from getting paint damage in transit. Reduced floor space, increased
throughput of product and customer satisfaction.
• Integrated a drum machining cell with 630 mm HMC, twin pallet, 50 taper, 60-tool tool changer totaling $239K
• For a winch machining and assembly cell, purchased a Haas VMC, Haas live tooling lathe, 40-ton vertical broach, bridge,
crane, tables, presses, shelving, pallet racks and carts to support customer orders totaling $320K.
• Purchased a live tooling lathe with a bar feeder and subspindle to manufacture a worm gear complete that had previously
been run on 4-6 machines previously totaling $190K.
• Purchased CNC gear hob to run multiple stacked gears that had been run one at a time a manual gear hob totaling $270K.
• Reduced cycle times by 60% by designing tooling to press planetary carrier pins 3 at a time using a H-frame hydraulic press.
Reduced warranty claims from 50/year to approximately 2/year.
• Designed a test stand implementing a VFD electric motor, flexible shaft and an electric motor belt tensioner on a planetary
swingdrive assembly cell to conduct final test on gearbox brakes.
EDUCATION
MS, Engineering, Technology & Management, Oklahoma State University, Tulsa, Oklahoma
BS, Industrial Engineering, Manufacturing – Minor: Business Management, University of North Texas, Denton, Texas
AS, Electromechanical Technology, Southern Arkansas University, Camden, Arkansas
CPM, Certified Project Management, Xavier University, Cincinnati, OH
SKILLS
SolidWorks, AutoCAD Inventor, MS:WordExcelAccessPower PointProject, PMXpert, Minitab, Allen Bradley Historian, MRP,
ERP, SAP, BOMs, Routers, Work Instructions, PLC, DFT, DMAIC, CTQ, KPI, PFMEA, SQDC, 8D, Fault Tree & Fishbone

More Related Content

What's hot

Audie Maxey Resume
Audie Maxey ResumeAudie Maxey Resume
Audie Maxey ResumeAudie Maxey
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
Steve Wonnacott
 
Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)Murali Raja
 
Subhash_21_years___DVS__
Subhash_21_years___DVS__Subhash_21_years___DVS__
Subhash_21_years___DVS__subhash patil
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedJermaine Brown
 
Rehan Ahmed - Mechanical (Nov-2016)
Rehan Ahmed  - Mechanical (Nov-2016)Rehan Ahmed  - Mechanical (Nov-2016)
Rehan Ahmed - Mechanical (Nov-2016)Rehan Ahmed
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
Jose F. Gonzalez, P. Eng.
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael BowerMichael Bower
 

What's hot (18)

Alzagon engineering solutions 1
Alzagon engineering solutions 1Alzagon engineering solutions 1
Alzagon engineering solutions 1
 
Audie Maxey Resume
Audie Maxey ResumeAudie Maxey Resume
Audie Maxey Resume
 
PaulGodard2015
PaulGodard2015PaulGodard2015
PaulGodard2015
 
Sharath-Resume
Sharath-ResumeSharath-Resume
Sharath-Resume
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
updated_resume
updated_resumeupdated_resume
updated_resume
 
LARRY CV
LARRY CVLARRY CV
LARRY CV
 
Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)
 
Subhash_21_years___DVS__
Subhash_21_years___DVS__Subhash_21_years___DVS__
Subhash_21_years___DVS__
 
jermaine_brown resume 2016 updated
jermaine_brown resume 2016 updatedjermaine_brown resume 2016 updated
jermaine_brown resume 2016 updated
 
Rehan Ahmed - Mechanical (Nov-2016)
Rehan Ahmed  - Mechanical (Nov-2016)Rehan Ahmed  - Mechanical (Nov-2016)
Rehan Ahmed - Mechanical (Nov-2016)
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)
 
Resume%27-2
Resume%27-2Resume%27-2
Resume%27-2
 
TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
 

Viewers also liked

Aandreeiithhhaaa lla booniithha
Aandreeiithhhaaa lla booniithhaAandreeiithhhaaa lla booniithha
Aandreeiithhhaaa lla booniithhaaandreeiithaa
 
Tp3 el obelisco sin punta 3
Tp3  el obelisco sin punta 3Tp3  el obelisco sin punta 3
Tp3 el obelisco sin punta 3
yikyanil
 
Chekkit msds SenseTek.nl
Chekkit msds SenseTek.nlChekkit msds SenseTek.nl
Chekkit msds SenseTek.nl
Hans Bronkhorst
 
O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...
O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...
O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...
Ana Lidia Alencar
 
Despesas sassepe
Despesas sassepeDespesas sassepe
Despesas sassepe
Portal NE10
 
Hallgrímur Pétursson
Hallgrímur PéturssonHallgrímur Pétursson
Hallgrímur Pétursson
Hrefnakristin
 
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
k4ritho
 
Motion and energy
Motion and energyMotion and energy
Motion and energy
gauravlath1997
 
Do not let your eyes fool you
Do not let your eyes fool youDo not let your eyes fool you
Do not let your eyes fool youitalienaren
 
Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...
Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...
Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...
Tanil Ozkan
 

Viewers also liked (14)

Web Marketing 2015
Web Marketing 2015Web Marketing 2015
Web Marketing 2015
 
Aandreeiithhhaaa lla booniithha
Aandreeiithhhaaa lla booniithhaAandreeiithhhaaa lla booniithha
Aandreeiithhhaaa lla booniithha
 
Tp3 el obelisco sin punta 3
Tp3  el obelisco sin punta 3Tp3  el obelisco sin punta 3
Tp3 el obelisco sin punta 3
 
Chekkit msds SenseTek.nl
Chekkit msds SenseTek.nlChekkit msds SenseTek.nl
Chekkit msds SenseTek.nl
 
O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...
O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...
O uso das redes sociais como ferramenta de comunicação no ambiente jurídico: ...
 
Despesas sassepe
Despesas sassepeDespesas sassepe
Despesas sassepe
 
Important
ImportantImportant
Important
 
Hallgrímur Pétursson
Hallgrímur PéturssonHallgrímur Pétursson
Hallgrímur Pétursson
 
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
7 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento
 
Trabajo practico 6
Trabajo practico 6Trabajo practico 6
Trabajo practico 6
 
PARA USTEDES
PARA USTEDESPARA USTEDES
PARA USTEDES
 
Motion and energy
Motion and energyMotion and energy
Motion and energy
 
Do not let your eyes fool you
Do not let your eyes fool youDo not let your eyes fool you
Do not let your eyes fool you
 
Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...
Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...
Meen 489 689 lecture 10 nanomaterials in emerging energy sectors and their ap...
 

Similar to Paul brayman chronological

SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_ResumeSumit Gaur
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
Saminathan Ramadoss
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
Saminathan Ramadoss
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
Gary Giblock
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resumemichael burns
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
Jose F. Gonzalez, P. Eng.
 
Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016Neil Lindsay
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
Kent White
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projectsweshumba
 

Similar to Paul brayman chronological (20)

SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Resume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnamResume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnam
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
CV.
CV.CV.
CV.
 
richard resume word
richard resume wordrichard resume word
richard resume word
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
dapski042116
dapski042116dapski042116
dapski042116
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
 
Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016Stanley Lindsay Resume 2016
Stanley Lindsay Resume 2016
 
Prashant__jcb
Prashant__jcbPrashant__jcb
Prashant__jcb
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

Paul brayman chronological

  • 1. Paul C. Brayman Cell – (918) 510-9310 Industrial/Manufacturing/Project Engineer Email: chevypu46@yahoo.com https://www.linkedin.com/in/paulbrayman Sand Springs, OK 74063 BACKGROUND SUMMARY Over 20 years of success in the manufacturing, operations and sales of electrical and electromechanical equipment. Demonstrated ability to reduce operating cost through improved efficiencies, equipment uptime, quality, product cost reductions, implementing new manufacturing technology and lean manufacturing processes within cross functional teams. KEY SKILLS SUMMARY Project Management Value Stream Mapping Capital Budgets, IRR & ROI Point-Of-Use Storage Setup Reduction Maintenance Manager Lean Manufacturing Cellular Flow Manufacturing DFMA, FMEA, PPAP, DOE Time & Motion Studies 5S Workshop Plant Layout Tooling/Fixture Design CNC Machining ISO 9001 Manager PROFESSIONAL HISTORY Employment History Project Engineer TMK-IPSCO Catoosa, OK 8/11– 9/15 • Project Engineer on $6.5MM upgrade fully automated quench & temper to improve throughput by 72% on heat treat process. • Eliminated a walking beam and designed new kickers, conveyors & pop-up stops to convey pipe through UT station. • Reduced pipe prove-up cycle times by 15% by designing monorail carts to carry tools, torch and supplies. • Reduced heat treat outages by 50% by improving water filtration to drop out mill scale in quench water. • Developed a bid package for vendors to develop a means to laser inspect pipe to measure ovality, end hook & OD size. • Savings of $1.5MM on a Green Belt Project for Black Crested Threads to reduce thread rejects by 10%. • Developed two ergonomic end effectors to pick up heavy threaded couplings from pallets and start coupling on casing pipe. • Integrated a pneumatic torque tool with a reaction arm, monorail and air balancer to install thread protectors. • Coordinated $235K state funding for Unloading Dock Rail Spur with retaining wall, fall protection and trackmobile. • Used pareto charts to analyze equipment downtimes and product reject codes to determine root cause & corrective action. Manufacturing Process Engineer (Contract Consultant) Cooper Power Systems Nacogdoches, TX 11/10 – 6/11 • Worked with a team to close a pad mount transformer plant and integrate it into a plant manufacturing pole mount transformers. Planned the logistics of moving capital equipment from closing plant to minimize production outages at receiving plant. • Responsible for the plant layout and integrating of 1-piece flow of pad-mount transformers. Integrated a $650K fully automated wash and phosphate system. Value streams, manufacturing, kitting and test processes were validated by engineering and quality. • Developed manpower forecasting/leveling, time standards using MOST Work Measurement, proper work sequencing, work balancing, plant layout and cost reductions. • Developed value streams for coil winding, core construction, coil & core assembly, tank fabrication and test processes that were validated by engineering and quality. • Equipment included coil winders, flatteners, de-reelers, automated prime & paint line, powder coat paint line, transformer vacuum filling, automated conveyors, multiple assembly stations and crane systems. New Product Development Process Engineer (Contract Consultant) Thermo Fisher Scientific Asheville, NC 1/10 – 10/10 • Member of a New Product Development Team on a HVAC freezer. Continuous improvement efforts to implement root cause analysis, corrective action, problem solving, PFMEA, control plans, continuous flow processes, induction brazing, CNC tube bending & SPC data collection. • Responsible for visual management by using color coding, shadow boards, painting shop floors and implementing white boards displaying drawings, bill of materials, work instructions, inventory levels, schedules and quality metrics. • Responsible for the verification of the manufacturability of a new product design. Assisted in the selection of urethane foam fixturing system, induction brazing, CNC tube bending, end effectors, shears, brakes, punch presses and powder coat paint. • Member on a PFMEA team to define CTQ data and implement preventive measures to reduce or eliminate risk exposure. Manufacturing Engineering Manager, Lean Coordinator, Maintenance Manager Tarby, Inc Claremore, OK 7/08 – 6/09
  • 2. • Managed maintenance personnel and CNC programmer. • Implemented a $140K new product development and purchase of capital equipment such as a CNC whirling lathe, autoclaves, quench tank and heater control box totaling. • Implemented a PM software program to track scheduled maintenance, downtime, costs, parts inventory and oil analysis. • Worked on project to reduce scrap by using an induction coil to melt rubber out of failed stators so they could be reworked. • Performed a Value Stream Mapping Kaisan to reduce WIP and balance work cell loads. Warehouse Manager Arrow Engine Company Tulsa, OK 3/06 – 7/08 • Managed 26 employees in the Shipping, Receiving and Warehouse Departments. Responsible for $17MM worth of inventory, maintaining low shipping errors, a 24-hour ship rate of 87% and inventory accuracy of 98%. • Increased throughput sales by $1.9MM by reducing labor on engines by 40% resulting in annualized savings of $180K. • Integrated the move and start up of ten different manufacturing groups including engine & NG compressor assembly and ASME code weld shop. Responsible for plant layouts, inventory accuracy and turns, material flow, equipment expenditures and acquisitions, budget proposals, design proposals and ROIs. • Purchased $130K worth of pallet racking and shelving from a sister company for only $18K. This was put up in four different manufacturing facilities to utilize approximately 75,000 sq. ft. of warehouse storage. Lean Manufacturing (Contract Consultant) Industrial Solutions Tulsa, OK 3/05 – 9/05 • Worked with clients in implementing Lean Methods kaisen events, setup reduction (SMED), value stream mapping, point-of- use-storage, kan ban, cellular manufacturing, 5S workplace organization, 1-piece flow, hyjunka, line balancing, inspection at the source, poka yoke (error proofing) devices. Manufacturing Engineer, Safety Director, Assembly Supervisor, Maintenance Manager Tulsa Winch Jenks, OK 6/00 –1/05 • Managed 28 employees to include assemblers, order pullers, tooling and maintenance technicians. • Implemented a focused factory with a HMC, live tooling lathe, gear hob, broach and 1-piece flow assembly cell with Kan Ban, Point-Of-Use Storage, conveyors, automated/metered oil and vendor managed inventory. Resulted in reducing inventory 50%, lead-time 50%, cycle time 70% and increased on time delivery from 85% to 98%. • Led a kaisen event and performed ROI to change to a gear wafer cutter. Resulted in reduced tooling costs by $60K/year, increased throughput 20%, reduced setup time and increased gear quality. • Assisted on a Cost Reduction Team to launch a new winch product with a low cost manufacturing design. • Led a kaisen event to change a hone operation to a hard turn operation by using ceramic inserts. Resulted in reduced cycle times by as much as 70%, tooling costs and increased part quality. • Savings of $300K/year by reorganizing warehouse by product category. Resulted in increasing inventory accuracy by 15%, reduced work order pull time by 60% and reduced inventory in-stocking time by 30%. • Increased throughput by 75% by purchasing tooling to part off drum flanges rather than turn them down on a manual lathe. • Developed two ergonomic end effectors to pick heavy castings from crates to place into lathes, mills and gear shapers. • Increased throughput and quality up to 75% by designing tooling and fixtures for work holding and assembly. • Designed a 1-piece flow cell for planetary winches which resulted in increased throughput by 50% and improved quality by 20%. Comprised of three scissor lift tables with turntables, roll conveyors between each table and 75 hp hydraulic test stand. • Designed returnable pallets for a customer to keep units from getting paint damage in transit. Reduced floor space, increased throughput of product and customer satisfaction. • Integrated a drum machining cell with 630 mm HMC, twin pallet, 50 taper, 60-tool tool changer totaling $239K • For a winch machining and assembly cell, purchased a Haas VMC, Haas live tooling lathe, 40-ton vertical broach, bridge, crane, tables, presses, shelving, pallet racks and carts to support customer orders totaling $320K. • Purchased a live tooling lathe with a bar feeder and subspindle to manufacture a worm gear complete that had previously been run on 4-6 machines previously totaling $190K. • Purchased CNC gear hob to run multiple stacked gears that had been run one at a time a manual gear hob totaling $270K. • Reduced cycle times by 60% by designing tooling to press planetary carrier pins 3 at a time using a H-frame hydraulic press. Reduced warranty claims from 50/year to approximately 2/year. • Designed a test stand implementing a VFD electric motor, flexible shaft and an electric motor belt tensioner on a planetary swingdrive assembly cell to conduct final test on gearbox brakes. EDUCATION MS, Engineering, Technology & Management, Oklahoma State University, Tulsa, Oklahoma BS, Industrial Engineering, Manufacturing – Minor: Business Management, University of North Texas, Denton, Texas AS, Electromechanical Technology, Southern Arkansas University, Camden, Arkansas
  • 3. CPM, Certified Project Management, Xavier University, Cincinnati, OH SKILLS SolidWorks, AutoCAD Inventor, MS:WordExcelAccessPower PointProject, PMXpert, Minitab, Allen Bradley Historian, MRP, ERP, SAP, BOMs, Routers, Work Instructions, PLC, DFT, DMAIC, CTQ, KPI, PFMEA, SQDC, 8D, Fault Tree & Fishbone