Multimodal transport refers to the transportation of goods using multiple modes of transportation, with a single operator arranging the transport under a single contract. In India, multimodal transport is growing due to increasing container traffic at ports and planned investments in port infrastructure. However, India faces challenges like infrastructure constraints at ports and for other modes of transport, as well as regulatory and institutional issues. Developing multimodal transport further in India requires improvements in areas like ports, coastal and inland shipping, customs procedures, and the use of technology.