C270 (HK BIODIESEL PLANT)   Safety Report
SAFETY STATISTICS

Month:                                 Apr 2012   May 2012
Total Accumulated man-hour:             167,151    201,951
Man-hour without lost time injury:      167,151    201,951
Days worked since project commenced:     173        204
Days since last Time lost accident :     N/A        N/A
Cumulative Accident Frequency Rate:        0%        0%



 You are an important stakeholder !
SAFETY INSPECTION / MEETING




  Physical site safety walks   Weekly Safety Meetings
AREA NEED IMPROVEMENT

                                      PROMPT RECTIFICATION



                                      Improvement – equipment stored at
                                      safe distant from floor edge



HOUSEKEEPING
Storage of equipment close to floor
edge
AREA NEED IMPROVEMENT

                                      PROMPT RECTIFICATION



                                      Improvement – sharp end of reinforce
                                      bar protected by reused plastic bottle



HOUSEKEEPING
Sharp end of reinforce bar prone to
bodily injury
AREA NEED IMPROVEMENT

                                         PROMPT RECTIFICATION


                                         Improvement – safety warning and
                                         name and contact no. of responsible
                                         electrician clearly displayed


ELECTRIC SHOCK HAZARD
No safety warning sign and
information of responsible electrician
POSITIVE POINTERS




All workers using safety harness attached to
safe anchorage points at work


                                               Team work / Signal man deployed for
                                               safe lifting work
POSITIVE POINTERS




Provision of safe access and safety sign   Provision of safe working platform for
                                           working at height
SAFETY TRAINING




                                                 INDUCTION
                                                    TRAINING




  Site Specific Safety                        Accumulate
                         Current Month
       Induction                         (Oct 2011 – May 2012)


     No. of class            19                 142

    No. of Attendee          84                 712
TOOL BOX TALK
SAFETY TRAINING
TRAINING




                                            Accumulated Total : 1,724 nos.

                       Topic                              No. of attendee
 Occupational Safety     Prevention of Slip & Trip            66 nos.
 Occupational Safety           Site Housekeeping              38 nos.
 Occupational Safety           Accident Reporting             63 nos.
 Occupational Safety      Emergency Procedures                71 nos.
 Occupational Safety           Safe Use of Ladder             64 nos.
                                Current Month Total           305 nos.
GUEST VISIT




 Introduction seminar held by Project   Visitors accompanied by Project
 Director and Project Manager           Management Team
GOVERNMENT / AUTHORITIES VISIT
             NO reported injury accident recorded in May 2012; all
             subcontractors reported neither site accident nor dangerous
             occurrence happened in their subcontracted responsible
             area at the Weekly Safety Meetings with CHEC / AECOM /
             Jacob.




BD inspection on 17/5/2012           BD conduct testing
SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE
               Safety & Health Audit – at interval of every 6 months by
                  Independent Registered Safety Auditor
               Environmental Monitoring – monthly by Independent
                  Environmental Checker
               Environmental Audit – at interval of every 6 months by CHEC
                  Environmental Officer




 Safety Audit conducted by               Environmental Audit conducted by
 Independent Safety Auditor on           Independent Environmental Checker
 15/5/2012                               on 22/5/2012
THE END

Thanks for watching!!

Monthly safety report may 2012

  • 1.
    C270 (HK BIODIESELPLANT) Safety Report
  • 2.
    SAFETY STATISTICS Month: Apr 2012 May 2012 Total Accumulated man-hour: 167,151 201,951 Man-hour without lost time injury: 167,151 201,951 Days worked since project commenced: 173 204 Days since last Time lost accident : N/A N/A Cumulative Accident Frequency Rate: 0% 0% You are an important stakeholder !
  • 3.
    SAFETY INSPECTION /MEETING Physical site safety walks Weekly Safety Meetings
  • 4.
    AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – equipment stored at safe distant from floor edge HOUSEKEEPING Storage of equipment close to floor edge
  • 5.
    AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – sharp end of reinforce bar protected by reused plastic bottle HOUSEKEEPING Sharp end of reinforce bar prone to bodily injury
  • 6.
    AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – safety warning and name and contact no. of responsible electrician clearly displayed ELECTRIC SHOCK HAZARD No safety warning sign and information of responsible electrician
  • 7.
    POSITIVE POINTERS All workersusing safety harness attached to safe anchorage points at work Team work / Signal man deployed for safe lifting work
  • 8.
    POSITIVE POINTERS Provision ofsafe access and safety sign Provision of safe working platform for working at height
  • 9.
    SAFETY TRAINING INDUCTION TRAINING Site Specific Safety Accumulate Current Month Induction (Oct 2011 – May 2012) No. of class 19 142 No. of Attendee 84 712
  • 10.
    TOOL BOX TALK SAFETYTRAINING TRAINING Accumulated Total : 1,724 nos. Topic No. of attendee Occupational Safety Prevention of Slip & Trip 66 nos. Occupational Safety Site Housekeeping 38 nos. Occupational Safety Accident Reporting 63 nos. Occupational Safety Emergency Procedures 71 nos. Occupational Safety Safe Use of Ladder 64 nos. Current Month Total 305 nos.
  • 11.
    GUEST VISIT Introductionseminar held by Project Visitors accompanied by Project Director and Project Manager Management Team
  • 12.
    GOVERNMENT / AUTHORITIESVISIT NO reported injury accident recorded in May 2012; all subcontractors reported neither site accident nor dangerous occurrence happened in their subcontracted responsible area at the Weekly Safety Meetings with CHEC / AECOM / Jacob. BD inspection on 17/5/2012 BD conduct testing
  • 13.
    SAFETY & HEALTH& ENVIRONMENTAL ASSURANCE Safety & Health Audit – at interval of every 6 months by Independent Registered Safety Auditor Environmental Monitoring – monthly by Independent Environmental Checker Environmental Audit – at interval of every 6 months by CHEC Environmental Officer Safety Audit conducted by Environmental Audit conducted by Independent Safety Auditor on Independent Environmental Checker 15/5/2012 on 22/5/2012