2. Safety :
Contribution from All
Level ( Top to Shop )
SAFETY STATISTICS
Apr 2013 May 2013
Accumulated Man-hour 617,084 672,864
Days worked from Commencement 538 569
Accumulated Man-day Lost 1229 1353
Cumulative Accident Frequency Rate 0.81 0.74
C270 Monthly Safety Report – May 2013
3. SAFETY INSPECTION / MEETING
Physical site safety walks
C270 Monthly Safety Report – May 2013
4. SAFETY INSPECTION / MEETING
Weekly Safety Meetings with Safety Representatives of Subcontractors
C270 Monthly Safety Report – May 2013
5. AREA NEED IMPROVEMENT
FALL PREVENTION
– Damaged temporary railing and
conspicuous netting at floor edge
PROMPT RECTIFICATION
Improvement
– Damaged temporary railing repaired
– Damaged conspicuous netting repaired
C270 Monthly Safety Report – May 2013
6. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
C270 Monthly Safety Report – May 2013
Improvement
– New lock allotted to the Temporary
Electricity Distribution Box
ELECTRICITY SAFETY
– Temporary Electricity Distribution
Box not properly locked
7. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
C270 Monthly Safety Report – May 2013
Improvement
– Toe-board on bamboo scaffold
reinstated in position
FALL PREVENTION
– Toe-board on bamboo scaffold
damaged
8. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
C270 Monthly Safety Report – May 2013
Improvement
– Lifting gears combination rectified
LIFTING SAFETY
– Wrong combination of lifting gears
9. AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
C270 Monthly Safety Report – May 2013
Improvement
– Pail not in use turned upside down
HYGIENE
– Stagnant water in pail not in use
10. POSITIVE SAFETY ATTITUDE
PRE-WORK MEETING
Installation of Pipe Bridge – Site Specific Safety Meeting prior to
lifting operation
C270 Monthly Safety Report – May 2013
12. POSITIVE SAFETY ATTITUDE
Regular Inspection by Building Department
QUALITY, SAFETY and ENVIRONMENT Inspection by
Government Department
C270 Monthly Safety Report – May 2013
13. POSITIVE SAFETY ATTITUDE
Inspection Visit by ASB Board of Directors
QUALITY, SAFETY and ENVIRONMENT Inspection by Client
C270 Monthly Safety Report – May 2013
14. POSITIVE SAFETY ATTITUDE
Technical Visit by HKIE members
QUALITY, SAFETY and ENVIRONMENT Inspection by
Government Department
C270 Monthly Safety Report – May 2013
15. SAFETY TRAINING
Site Specific Safety
Induction
Current Month
Accumulate
(Oct 2011 – May 2013)
No. of class 28 385
No. of Attendee 97 1689
INDUCTION
TRAINING
C270 Monthly Safety Report – May 2013
16. TOOL BOX TALK
TRAININGSAFETY TRAINING
Topic No. of attendee
Safety
Safety
Safety
Safety
Current Month Total 309 nos.
Accumulated Total :5,841 nos.
C270 Monthly Safety Report – May 2013
17. SAFETY Promotion
1 no. Very Hot Weather Warning
8 nos. Thunderstorm Warning
4 nos. Safety News Sharing
8 nos. Safety & Health Warning
4 nos. Safety & Health Interface – BDI
3 nos. Updated Safety & Health Advice
4 nos. Communication with CHEC Safety
Safety Circulation
C270 Monthly Safety Report – May 2013