C270 (HK BIODIESEL PLANT)   Safety Report
SAFETY STATISTICS

Month:                                          Oct 2012   Nov 2012
Accumulated man-hour:                            379,781   413,541
Days worked since project commenced:               357       357
Accumulated man-day lost:                           445       481
Cumulative Accident Frequency Rate:                1.05     0.97




Safety :
From Top Level to Shop Floor




   C270 Monthly Safety Report – November 2012
SAFETY INSPECTION / MEETING
                                               Physical site safety walks




  C270 Monthly Safety Report – November 2012
SAFETY INSPECTION / MEETING


                                               Weekly Safety Meetings




  C270 Monthly Safety Report – November 2012
AREA NEED IMPROVEMENT

                                            PROMPT RECTIFICATION

                                            Improvement – Rubbish removed and
                                            workplace kept tidy and clean




HOUSEKEEPING
Workplace should be kept tidy
and clean




    C270 Monthly Safety Report – November 2012
AREA NEED IMPROVEMENT

                                             PROMPT RECTIFICATION

                                             Improvement – Guard shield of
                                             moving parts maintained in place




GUSRDING OF MOVING PART
Guard shield of moving parts should not
be removed




     C270 Monthly Safety Report – November 2012
AREA NEED IMPROVEMENT

                                             PROMPT RECTIFICATION

                                             Improvement – Sufficient length
                                             ladder + Safety Harness + Co-worker




SAFE USE OF LADDER
Malpractice of working with ladder




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Launching of “N” and “P” label system for New Workers to site




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Inspection by Labour Inspector of Labour Department




    C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Inspection by Occupational Safety Officer of Labour Department




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Inspection by Occupational Safety Officer of Labour Department




                                            Follow Up Meeting with Safety
                                            Representatives



     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Routine Safety Regularity Action




Elimination of Substandard Lifting Gear   Elimination of Substandard Electrical
                                          Equipment



     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Technical Visit – HKIE on 24/11/2012




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Technical Visit – China Light & Power Co Ltd




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Specific Safety Meeting – Review Safety Deficiency of subcontractor




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Specific Safety Meeting – Review Safety Deficiency of subcontractor




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Specific Safety Meeting – Review Safety Deficiency of subcontractor




     C270 Monthly Safety Report – November 2012
POSITIVE SAFETY ATTITUDE


Specific Safety Meeting – Review Safety Deficiency of subcontractor




     C270 Monthly Safety Report – November 2012
SAFETY TRAINING


                                      INDUCTION
                                      TRAINING




  Site Specific Safety                                 Accumulate
                              Current Month
       Induction                                  (Oct 2011 – Nov 2012)


     No. of class                  21                    276

    No. of Attendee                82                   1296


  C270 Monthly Safety Report – November 2012
TOOL BOX TALK
SAFETY TRAINING
TRAINING




                                           Accumulated Total : 4,214 nos.

                       Topic                             No. of attendee
   Environmental            Waste Management                 89 nos.
   Environmental           Dust Control Measure              89 nos.
 Occupational Safety          Fire Prevention                91 nos.
 Occupational Safety     Inclement Weather Safety            89 nos.
 Occupational Safety        Safe Use of Scaffold                 6
 Occupational Safety     Working in Confined Space              23
 Occupational Safety           Lifting Safety                   13
 Occupational Safety         Electricity Safety                  8
                               Current Month Total          408 nos.
  C270 Monthly Safety Report – November 2012
SAFETY Promotion

 Safety Circulation

   4 nos.    Safety News Sharing

   5 nos.    Safety Reminder to Subcontractors


   5 nos.    General Safety Advice on Construction Safety


   1 no.     Internal – BDI – Damage Bamboo Scaffold

   1 no.     Risk Assessment – Installation of IC Reactor

   1 no.     Thunderstorm Warning




  C270 Monthly Safety Report – November 2012
C270 Monthly Safety Report – November 2012

Monthly safety report 2012 11

  • 1.
    C270 (HK BIODIESELPLANT) Safety Report
  • 2.
    SAFETY STATISTICS Month: Oct 2012 Nov 2012 Accumulated man-hour: 379,781 413,541 Days worked since project commenced: 357 357 Accumulated man-day lost: 445 481 Cumulative Accident Frequency Rate: 1.05 0.97 Safety : From Top Level to Shop Floor C270 Monthly Safety Report – November 2012
  • 3.
    SAFETY INSPECTION /MEETING Physical site safety walks C270 Monthly Safety Report – November 2012
  • 4.
    SAFETY INSPECTION /MEETING Weekly Safety Meetings C270 Monthly Safety Report – November 2012
  • 5.
    AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Rubbish removed and workplace kept tidy and clean HOUSEKEEPING Workplace should be kept tidy and clean C270 Monthly Safety Report – November 2012
  • 6.
    AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Guard shield of moving parts maintained in place GUSRDING OF MOVING PART Guard shield of moving parts should not be removed C270 Monthly Safety Report – November 2012
  • 7.
    AREA NEED IMPROVEMENT PROMPT RECTIFICATION Improvement – Sufficient length ladder + Safety Harness + Co-worker SAFE USE OF LADDER Malpractice of working with ladder C270 Monthly Safety Report – November 2012
  • 8.
    POSITIVE SAFETY ATTITUDE Launchingof “N” and “P” label system for New Workers to site C270 Monthly Safety Report – November 2012
  • 9.
    POSITIVE SAFETY ATTITUDE Inspectionby Labour Inspector of Labour Department C270 Monthly Safety Report – November 2012
  • 10.
    POSITIVE SAFETY ATTITUDE Inspectionby Occupational Safety Officer of Labour Department C270 Monthly Safety Report – November 2012
  • 11.
    POSITIVE SAFETY ATTITUDE Inspectionby Occupational Safety Officer of Labour Department Follow Up Meeting with Safety Representatives C270 Monthly Safety Report – November 2012
  • 12.
    POSITIVE SAFETY ATTITUDE RoutineSafety Regularity Action Elimination of Substandard Lifting Gear Elimination of Substandard Electrical Equipment C270 Monthly Safety Report – November 2012
  • 13.
    POSITIVE SAFETY ATTITUDE TechnicalVisit – HKIE on 24/11/2012 C270 Monthly Safety Report – November 2012
  • 14.
    POSITIVE SAFETY ATTITUDE TechnicalVisit – China Light & Power Co Ltd C270 Monthly Safety Report – November 2012
  • 15.
    POSITIVE SAFETY ATTITUDE SpecificSafety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  • 16.
    POSITIVE SAFETY ATTITUDE SpecificSafety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  • 17.
    POSITIVE SAFETY ATTITUDE SpecificSafety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  • 18.
    POSITIVE SAFETY ATTITUDE SpecificSafety Meeting – Review Safety Deficiency of subcontractor C270 Monthly Safety Report – November 2012
  • 19.
    SAFETY TRAINING INDUCTION TRAINING Site Specific Safety Accumulate Current Month Induction (Oct 2011 – Nov 2012) No. of class 21 276 No. of Attendee 82 1296 C270 Monthly Safety Report – November 2012
  • 20.
    TOOL BOX TALK SAFETYTRAINING TRAINING Accumulated Total : 4,214 nos. Topic No. of attendee Environmental Waste Management 89 nos. Environmental Dust Control Measure 89 nos. Occupational Safety Fire Prevention 91 nos. Occupational Safety Inclement Weather Safety 89 nos. Occupational Safety Safe Use of Scaffold 6 Occupational Safety Working in Confined Space 23 Occupational Safety Lifting Safety 13 Occupational Safety Electricity Safety 8 Current Month Total 408 nos. C270 Monthly Safety Report – November 2012
  • 21.
    SAFETY Promotion SafetyCirculation 4 nos. Safety News Sharing 5 nos. Safety Reminder to Subcontractors 5 nos. General Safety Advice on Construction Safety 1 no. Internal – BDI – Damage Bamboo Scaffold 1 no. Risk Assessment – Installation of IC Reactor 1 no. Thunderstorm Warning C270 Monthly Safety Report – November 2012
  • 22.
    C270 Monthly SafetyReport – November 2012