SlideShare a Scribd company logo
Mohamed Ezzat Abd El-Rahman Negm
Personal Summary
As a Project Manager Engineer with more than 4 years' experience in MEP Construction field and 2 years as a
senior Production and Manufacturing Engineer, I have the ability to analyze complex engineering problems and
recommend solutions. I’m driven hardworking and complete all projects to an excellent standard on time and to
budget. I'm looking for the next step which is working in large organization which will add more to my knowledge
and experience in addition to a much better opportunities to progress in my career.
Contact Info.
Mobile: + (002) 0100 245 6639.
Phone: + (002) 25412710.
Email: M_Negm87@Live.Com.
Personal Data
Date of Birth: 1th
of Oct 1987
Nationality: Egypt.
Marital Status: Married
Military Status: Exempted.
Driving License: Available.
Address: Villa 42 - 5th
District - New Cairo - Cairo - EGYPT.
Education
2004 - 2009 Bachelor of Engineering, Modern Academy Collage.
Graduation year: August 2009.
Major: Production and Manufacturing.
Graduation Grade: Good.
B.Sc. Graduation Project grade: Excellent (98%).
B.Sc. Graduation Project:
CAD/CAM Software (Computer Aided Design / Computer Aided Manufacturing) for
Automatic Feature Recognition and Part Programming Software for CNC Machine
using Programming Language.
Work Experience
Current Job (January 2012 – till now)
Project Manager in EMAS El- SEWEDY for Engineering and installation one of EL-SEWEDY Company groups.
Reference List of Projects:
 Mega Mall / 6th
of October / Electrical works and LC activity / closed and hand over.
 CHIMI Art factory / 6th
of October industrial area / LT, PS and LC activity / SUBBOR Consultant /
Closed and hand over.
 Porto October park / 6th
of October / LT, Electrical and LC activity / closed and hand over.
 Al-AMAL for pipes / 10th
of Ramadan / HVAC works and Electrical Panels / SUBBOR Consultant /
Closed and hand over.
Alex. Containers / Alexandria / High-Mast Lighting Towers / closed and hand over.
 KAFR ZAYAT / El- Ain El SOKHNA / Small Power Plant / (Running Project).
 Vaccine / 6th
of October / EMP Project All Electrical & Mechanical activities / SUBBOR Consultant / (Running
Project).
 El - Bohous Building / Nasr City / Electrical works activities / Wady El-Nile Consultant / (Running Project).
Duties & Responsibilities:
1) Understands project specific accepted terms and conditions and their application to project contracts,
including awareness of risks of negative impact on margin, performance and risk factors.
2) Review contract drawings, detail drawings and specifications.
3) Prepares Primavera P6/ MS Project schedules, using P6 tool/ MS Project to extract progress information.
4) Coordination of the time schedule with the project team and the various sub-contractors involved in a
project, to ensuring that the interfaces between various organizations are identified and scheduled.
5) Follow up / Monitor site work to make sure the site progress as per the project schedule.
6) Tracking and coordinate the progress of the project on a day-to-day basis to ensure that the project is on-
track.
7) Ensuring that the project is completed safely, in time, within budget and according to specifications.
8) Create and approved the cash flow from the owner according to Project planning.
9) Responsible for Reviewing and approved shop drawings, materials submittals, catalogues and samples
from Owner / Consultant.
10) Contact Tech. Office to Preparing shop drawing for all MEP systems.
11) Monitor and manage the project schedule.
12) Monitor and manage the project budget.
13) Monitor and manage the project risk.
14) Perform quality assurance on sub-contractor performance.
15) Forecast manpower to complete according to project commitments and productivity.
16) Analysis the Bill of Quantity to create Work breakdown Structure (WBS).
17) Attend project coordination meetings with client/consultant.
18) Estimate and negotiate project Change Requests.
19) Coordinate submittals and procure all close-out documents including operation warranties, and
maintenance manuals.
Pervious Job Experience (September 2009 – December 2011)
Production and Manufacturing Engineer in EMAS El-SEWEDY for Electrical Panel Boards
“SIEMENS Partnership” One of EL-SEWEDY Company groups.
Duties & Responsibilities:
1) Prepare Production Plan for all projects components according to priorities and production process.
2) Prepare Product tracing Card for all components according to priorities.
3) Prepare nesting sheets by using different programs for CNC Punching Machines as follow :
(a) Punch 5 / Lenia 5 for AMADA EMZ 3610 NT Sheet Metal Machine.
(b) Jetcam for Finn-Power E5 and Finn-Power C5 Sheet Metal Machine.
(c) Fanuc 21 for EHRT Cupper Machine.
4) Review the programming of nesting sheets to be sure that it investigating the maximum productivity and
minimum scraps.
5) Prepare sheet metal dimension list for Cut to Length Machine after programming CNC Machines.
6) Make sure that shearing and bending machines working according to technical drawings.
7) Make sure that all materials and tools are organized during manufacturing to shorten changeover time.
8) Create and improve working instructions of new product and current mass production process.
9) Work smoothly with Assembly Department, Quality to ensure projects are handled efficiently.
10) Identifying ways to reduce production costs, time and increase production rates
11) Reviewing production schedule and estimating future requirements.
12) Calculate the break-even point BEP for all material used.
13) Keep Equipment’s operational by coordinating, performing maintenance, repair services, following
manufacturer's instructions, established procedures, and requesting special service.
14) Provide guidance and training to the staff.
15) Follow all safety and work procedures.
16) Writing professional progress reports for Production and Assembly Managers.
17) Running meetings and Coordination with other team members.
Courses
1) PLC Advanced Course from Technology Competency Center TCC.
2) Business & Communication Skills (American Theories) at International Education Association.
3) Microsoft Office (all versions).
4) Mechanical drawing Software (AutoCAD 2D) from Information System Institute, Ministry of Defense 2008.
5) Solidworks from CADCAMCIM.
6) English Conversation (Level 9/11) – Native Teacher at SYE.
7) Project Management Professional (PMP) Certified by PMI.
8) Mini-Master Business Administrator (Mini-MBA) from NGC Academy.
9) Designing & Implementations of Electrical Systems Diploma from Expert Academy.
10) Primavera P6 Course (Version R8.1) from Expert Academy “Still Studying “.
Training
1) Arab Steel Fabrication Co. (ASF El-Sewedy) From (15/7/2008) To (7/8/2008).
 Galvanization of Metals (Application – Others).
 Steel Factory (Application – Others).
 Lighting Columns Factory (Application – Others).
2) Canyon El-Sewedy Co. From (8/8/2008) To (15/9/2008).
 Plant Electrical Panels.
 Automatic Casting.
 Production of Neon Lamp.
3) Solid Edge - (Inside working founder).
4) JETCAM Controller Software for Finn-Power Machine - (Inside working founder).
5) Punch 5 (LENIA 5) Controller Software for AMADA Machine - (Inside working founder).
Technical Software Skills
1. Solidworks (3D drawings, Animation).
2. Microsoft office (Word, Excel, PowerPoint, Access).
3. Mechanical drawing Software (AutoCAD 2D).
4. Solid Edge (3D drawings, Animation).
5. Microsoft Project.
6. Primavera.
7. Electronic circuits Simulator software (Electronic work bench).
Soft Skills
1. Self-motivated.
2. Time Management.
3. Communication skills.
4. Presentation skills.
5. Planning.
6. Hard worker.
7. Problem Solver.
8. Team leadership.
Language
• Arabic: Fluent.
• English: Advanced.
Hobbies
* Reading. * Swimming
* Playing Chess. * Traveling.
* Meeting Friends. * Computer Searching.
N.B: All Documents are available upon request

More Related Content

What's hot

Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016Romany Fayez
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00
Muhammad Al-hanbali
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NationalLaboratory
 
Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning Engineer
AbanoubGhobrial1
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016Ayman Alhaggar
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineer
AbanoubGhobrial1
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016Ahmed Hikal
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMohamed ASalem
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
hassanyoussef26
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
CV
CVCV
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 

What's hot (20)

CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
cm cv
cm cvcm cv
cm cv
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
 
mohammad fathi cv2017
mohammad fathi cv2017mohammad fathi cv2017
mohammad fathi cv2017
 
Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning Engineer
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineer
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Ahmad-Adnan cv
Ahmad-Adnan cvAhmad-Adnan cv
Ahmad-Adnan cv
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
CV
CVCV
CV
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 

Viewers also liked

Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
rahmi221297
 
Persia, Greece, and Rome By Chi Chi and Sole'
Persia, Greece, and Rome By Chi Chi and Sole'Persia, Greece, and Rome By Chi Chi and Sole'
Persia, Greece, and Rome By Chi Chi and Sole'
_itschichii
 
Irfan rahmi sa
Irfan rahmi saIrfan rahmi sa
Irfan rahmi sa
rahmi221297
 
Irfan rahmi sa
Irfan rahmi saIrfan rahmi sa
Irfan rahmi sa
rahmi221297
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
rahmi221297
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
rahmi221297
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
rahmi221297
 
Talk with the Team
Talk with the TeamTalk with the Team
Talk with the TeamRabbidGecko
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
rahmi221297
 
Contingency Plan WAK BANKS ATM
Contingency Plan WAK BANKS ATMContingency Plan WAK BANKS ATM
Contingency Plan WAK BANKS ATMWajahat Ali Khan
 
Complications of Contact Lenses
Complications of Contact LensesComplications of Contact Lenses
Complications of Contact Lenses
Kaylie Ling
 
Word tarea en clases
Word tarea en clasesWord tarea en clases
Word tarea en clasesxcolorada15
 
Contact Lenses Management in Pediatrics
Contact Lenses Management in PediatricsContact Lenses Management in Pediatrics
Contact Lenses Management in Pediatrics
Kaylie Ling
 
Macro y micro entorno de una empresa
Macro y micro entorno de una empresaMacro y micro entorno de una empresa
Macro y micro entorno de una empresa
Yesenia Natalí Mejía
 

Viewers also liked (16)

Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
 
Persia, Greece, and Rome By Chi Chi and Sole'
Persia, Greece, and Rome By Chi Chi and Sole'Persia, Greece, and Rome By Chi Chi and Sole'
Persia, Greece, and Rome By Chi Chi and Sole'
 
Irfan rahmi sa
Irfan rahmi saIrfan rahmi sa
Irfan rahmi sa
 
Irfan rahmi sa
Irfan rahmi saIrfan rahmi sa
Irfan rahmi sa
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
 
Talk with the Team
Talk with the TeamTalk with the Team
Talk with the Team
 
Praktik pp2
Praktik pp2Praktik pp2
Praktik pp2
 
DRP presentation
DRP presentationDRP presentation
DRP presentation
 
Contingency Plan WAK BANKS ATM
Contingency Plan WAK BANKS ATMContingency Plan WAK BANKS ATM
Contingency Plan WAK BANKS ATM
 
Complications of Contact Lenses
Complications of Contact LensesComplications of Contact Lenses
Complications of Contact Lenses
 
Word tarea en clases
Word tarea en clasesWord tarea en clases
Word tarea en clases
 
Contact Lenses Management in Pediatrics
Contact Lenses Management in PediatricsContact Lenses Management in Pediatrics
Contact Lenses Management in Pediatrics
 
Macro y micro entorno de una empresa
Macro y micro entorno de una empresaMacro y micro entorno de una empresa
Macro y micro entorno de una empresa
 
Micro y macro entorno
Micro y macro entornoMicro y macro entorno
Micro y macro entorno
 

Similar to Mohamed Ezzat - curriculum vitae

(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Professional resume
Professional resumeProfessional resume
Professional resumeayman adawy
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWaell Azmy
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Mohamed Sayed
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
Ehab A. Azeem
 

Similar to Mohamed Ezzat - curriculum vitae (20)

CV - 2017
CV - 2017CV - 2017
CV - 2017
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
CV
CVCV
CV
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
CV
CVCV
CV
 
Professional resume
Professional resumeProfessional resume
Professional resume
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Hossam Hendawy 2016
Hossam Hendawy 2016Hossam Hendawy 2016
Hossam Hendawy 2016
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
haitham cv
haitham cvhaitham cv
haitham cv
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Mohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CVMohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CV
 
Resume
ResumeResume
Resume
 
Mostafa Abdelrazek3
Mostafa Abdelrazek3Mostafa Abdelrazek3
Mostafa Abdelrazek3
 
Nadi CV 2016
Nadi CV 2016  Nadi CV 2016
Nadi CV 2016
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 

Mohamed Ezzat - curriculum vitae

  • 1. Mohamed Ezzat Abd El-Rahman Negm Personal Summary As a Project Manager Engineer with more than 4 years' experience in MEP Construction field and 2 years as a senior Production and Manufacturing Engineer, I have the ability to analyze complex engineering problems and recommend solutions. I’m driven hardworking and complete all projects to an excellent standard on time and to budget. I'm looking for the next step which is working in large organization which will add more to my knowledge and experience in addition to a much better opportunities to progress in my career. Contact Info. Mobile: + (002) 0100 245 6639. Phone: + (002) 25412710. Email: M_Negm87@Live.Com. Personal Data Date of Birth: 1th of Oct 1987 Nationality: Egypt. Marital Status: Married Military Status: Exempted. Driving License: Available. Address: Villa 42 - 5th District - New Cairo - Cairo - EGYPT. Education 2004 - 2009 Bachelor of Engineering, Modern Academy Collage. Graduation year: August 2009. Major: Production and Manufacturing. Graduation Grade: Good. B.Sc. Graduation Project grade: Excellent (98%). B.Sc. Graduation Project: CAD/CAM Software (Computer Aided Design / Computer Aided Manufacturing) for Automatic Feature Recognition and Part Programming Software for CNC Machine using Programming Language. Work Experience Current Job (January 2012 – till now) Project Manager in EMAS El- SEWEDY for Engineering and installation one of EL-SEWEDY Company groups. Reference List of Projects:  Mega Mall / 6th of October / Electrical works and LC activity / closed and hand over.  CHIMI Art factory / 6th of October industrial area / LT, PS and LC activity / SUBBOR Consultant / Closed and hand over.  Porto October park / 6th of October / LT, Electrical and LC activity / closed and hand over.  Al-AMAL for pipes / 10th of Ramadan / HVAC works and Electrical Panels / SUBBOR Consultant / Closed and hand over. Alex. Containers / Alexandria / High-Mast Lighting Towers / closed and hand over.  KAFR ZAYAT / El- Ain El SOKHNA / Small Power Plant / (Running Project).  Vaccine / 6th of October / EMP Project All Electrical & Mechanical activities / SUBBOR Consultant / (Running Project).  El - Bohous Building / Nasr City / Electrical works activities / Wady El-Nile Consultant / (Running Project).
  • 2. Duties & Responsibilities: 1) Understands project specific accepted terms and conditions and their application to project contracts, including awareness of risks of negative impact on margin, performance and risk factors. 2) Review contract drawings, detail drawings and specifications. 3) Prepares Primavera P6/ MS Project schedules, using P6 tool/ MS Project to extract progress information. 4) Coordination of the time schedule with the project team and the various sub-contractors involved in a project, to ensuring that the interfaces between various organizations are identified and scheduled. 5) Follow up / Monitor site work to make sure the site progress as per the project schedule. 6) Tracking and coordinate the progress of the project on a day-to-day basis to ensure that the project is on- track. 7) Ensuring that the project is completed safely, in time, within budget and according to specifications. 8) Create and approved the cash flow from the owner according to Project planning. 9) Responsible for Reviewing and approved shop drawings, materials submittals, catalogues and samples from Owner / Consultant. 10) Contact Tech. Office to Preparing shop drawing for all MEP systems. 11) Monitor and manage the project schedule. 12) Monitor and manage the project budget. 13) Monitor and manage the project risk. 14) Perform quality assurance on sub-contractor performance. 15) Forecast manpower to complete according to project commitments and productivity. 16) Analysis the Bill of Quantity to create Work breakdown Structure (WBS). 17) Attend project coordination meetings with client/consultant. 18) Estimate and negotiate project Change Requests. 19) Coordinate submittals and procure all close-out documents including operation warranties, and maintenance manuals. Pervious Job Experience (September 2009 – December 2011) Production and Manufacturing Engineer in EMAS El-SEWEDY for Electrical Panel Boards “SIEMENS Partnership” One of EL-SEWEDY Company groups. Duties & Responsibilities: 1) Prepare Production Plan for all projects components according to priorities and production process. 2) Prepare Product tracing Card for all components according to priorities. 3) Prepare nesting sheets by using different programs for CNC Punching Machines as follow : (a) Punch 5 / Lenia 5 for AMADA EMZ 3610 NT Sheet Metal Machine. (b) Jetcam for Finn-Power E5 and Finn-Power C5 Sheet Metal Machine. (c) Fanuc 21 for EHRT Cupper Machine. 4) Review the programming of nesting sheets to be sure that it investigating the maximum productivity and minimum scraps. 5) Prepare sheet metal dimension list for Cut to Length Machine after programming CNC Machines. 6) Make sure that shearing and bending machines working according to technical drawings. 7) Make sure that all materials and tools are organized during manufacturing to shorten changeover time. 8) Create and improve working instructions of new product and current mass production process. 9) Work smoothly with Assembly Department, Quality to ensure projects are handled efficiently. 10) Identifying ways to reduce production costs, time and increase production rates 11) Reviewing production schedule and estimating future requirements. 12) Calculate the break-even point BEP for all material used. 13) Keep Equipment’s operational by coordinating, performing maintenance, repair services, following manufacturer's instructions, established procedures, and requesting special service. 14) Provide guidance and training to the staff. 15) Follow all safety and work procedures. 16) Writing professional progress reports for Production and Assembly Managers. 17) Running meetings and Coordination with other team members.
  • 3. Courses 1) PLC Advanced Course from Technology Competency Center TCC. 2) Business & Communication Skills (American Theories) at International Education Association. 3) Microsoft Office (all versions). 4) Mechanical drawing Software (AutoCAD 2D) from Information System Institute, Ministry of Defense 2008. 5) Solidworks from CADCAMCIM. 6) English Conversation (Level 9/11) – Native Teacher at SYE. 7) Project Management Professional (PMP) Certified by PMI. 8) Mini-Master Business Administrator (Mini-MBA) from NGC Academy. 9) Designing & Implementations of Electrical Systems Diploma from Expert Academy. 10) Primavera P6 Course (Version R8.1) from Expert Academy “Still Studying “. Training 1) Arab Steel Fabrication Co. (ASF El-Sewedy) From (15/7/2008) To (7/8/2008).  Galvanization of Metals (Application – Others).  Steel Factory (Application – Others).  Lighting Columns Factory (Application – Others). 2) Canyon El-Sewedy Co. From (8/8/2008) To (15/9/2008).  Plant Electrical Panels.  Automatic Casting.  Production of Neon Lamp. 3) Solid Edge - (Inside working founder). 4) JETCAM Controller Software for Finn-Power Machine - (Inside working founder). 5) Punch 5 (LENIA 5) Controller Software for AMADA Machine - (Inside working founder). Technical Software Skills 1. Solidworks (3D drawings, Animation). 2. Microsoft office (Word, Excel, PowerPoint, Access). 3. Mechanical drawing Software (AutoCAD 2D). 4. Solid Edge (3D drawings, Animation). 5. Microsoft Project. 6. Primavera. 7. Electronic circuits Simulator software (Electronic work bench). Soft Skills 1. Self-motivated. 2. Time Management. 3. Communication skills. 4. Presentation skills. 5. Planning. 6. Hard worker. 7. Problem Solver. 8. Team leadership. Language • Arabic: Fluent. • English: Advanced. Hobbies * Reading. * Swimming * Playing Chess. * Traveling. * Meeting Friends. * Computer Searching. N.B: All Documents are available upon request