PROJECT ENGINEER - MECHANICAL ENGINEER - PLANNER/SCHEDULER - TEST ENGINEER
❶Personal Biodata:
• Name: Mohammad Husni Bin Abdullah Zawawi
• Address: Lot 2511, Kg Gaung Kota, Batu 5, Jalan Salor, 15100 Kelantan, Malaysia.
• Phone no: +6013-5960906
• Email: mhusni202@gmail.com
• Nric No: 890220-14-6341
• Status: Single
❷Education:
• University Technology MARA (UITM) - Bachelor (Hons) in Mechanical Engineering - 2010-2013 - CGPA: 3.07
• University Technology MARA (UITM) - Diploma in Mechanical Engineering - 2007-2010 - CGPA: 3.25
❸Certification:
• Institute of Engineer Malaysia - IEM
• Board of Engineer Malaysia - BEM
• Project Planning & Control (PRIMAVERA P6)
• OGSP - Level 1
• Authorised Entrant And Standby Person For Confined Space (AESP)
❹Career Objectives:
• A self-motivated Planner/Scheduler & Test Engineer with good experience in the Oil & Gas Plant Operation and
Automotive/Manufacturing Industry.
• Seeking for a challenging job as Project Engineer, Mechanical Engineer, Planner/Scheduler, Test Engineer or any job is suitable
with my working experience and my academic qualification where I can apply and enhance my knowledge, skill to serve the firm
to the best of my efforts.
❺Employment History:
1. NEWWIN ENGINEERING SDN BHD (August 2015 - Present)
Current position: PLANNER/SCHEDULER
Job Responsibilities:
• To prepare & establish preliminary level 5 schedule until finalize freeze schedule for shutdown/start-up and execution phase schedule.
• Gather & translate from all sections Job Method Sheet (JMS) into work sequence to establish detailed TA Master Execution schedule.
• Critical path and near critical path jobs identification & monitoring.
• Integrate Shutdown, Mechanical Day & Start-up Schedules. Liaise with Operations TA Coordinator and Client Scheduler for schedule review
during schedule construction. Liaise with other departments, contractors & sub-contractors if there is any interfacing activities.
• To attend daily unit coordination meeting with Operations, Maintenance, Contractors and other parties involve during
Turnaround execution to discuss updates, 24-Hours Look-ahead, current issues and way forward to solve the issues if founded.
• Responsible to advice Execution Team if there is any deviation from schedule.
• Preparing daily progress report to all Project Management Team including Progress update, S-curves updates, manpower
loading, current issues and bulletin as to ensure work carried out are within plans and approved schedule.
• Progress tracking of TA Planning & Preparation Schedule by establish data tracking and progress control sheet.
• To prepare weekly report to management.
• Responsible to produce TA close-out report.
Project/Activity Involved:
• BASF-PETRONAS CHEMICAL (BPC) TA ACRYLIC & OXO-COMPLEX SHUTDOWN 2016
• PPMSB PSR2-MG3 PESD TA (PETA) TURNAROUND 2015
❺Employment History (continue)
2. RB SOLUTIONS (RBS) SDN. BHD. (Sept 2014 – August 2015)
Current position: SCHEDULER
Job Responsibilities:
• To develop and monitor hi-level milestone schedule for planning and preparation phase.
• To prepare & establish preliminary level 5 schedule for shutdown/start-up and execution phase.
• To prepare and establish schedule basis memorandum for turnaround schedule.
• Gather & translate from all sections Job Method Sheet (JMS) into work sequence to establish detailed TA Master Execution schedule.
• Critical path and near critical path jobs identification.
• Integrate Shutdown, Mechanical Day & Start-up Schedules. Liaison with Operations TA Coordinator.
• Compilation of TA execution schedules from jobs under TACS and non-TACS. Liaison with other departments & contractor.
• Creation & extraction of customized TA Execution schedules. This includes but not limited to:
> Overall Schedule (P2P) > Schedule by Units (For systemization purpose)
> Schedule by Mechanical Day (Sections) > Critical Path Schedule
> Manpower Loading > EIS Schedule
> Equipment Loading > RT Schedule
> DOSH Inspection Schedule > Confined Space Entry Schedule
> PTW Schedule > Handover Schedule
• To attend daily unit coordination meeting with Operations, Maintenance, Contractors and other parties involve during
Turnaround execution to discuss updates, 24-Hours Lookahead, current issues and way forward to solve the issues if founded.
• Responsible to advice Execution Team if there is any deviation from schedule.
• Preparing daily progress report to all Project Management Team including Progress update, S-curves updates, manpower
loading, current issues and bulletin as to ensure work carried out are within plans and approved schedule.
• Progress tracking of TA Planning & Preparation Schedule by establish data tracking and progress control sheet.
• Responsible to produce TA close-out report.
Project/Activity Involved:
• PCFKSB PLANT TURNAROUND 2015
3. PERUSAHAAN OTOMOBIL NASIONAL SDN. BHD. (PROTON) (Mac 2014 - Aug 2014)
Last position: TEST ENGINEER (VEHICLE / RESEARCH & DEVELOPMENT DEPARTMENT)
Job Responsibilities:
• Perusahaan Otomobil Nasional Sdn. Bhd. (PROTON) is a Malaysian Automobile Manufacturer.
• Responsible to propose vehicle performance and driveability testing and development schedule including managing resources
in meeting project milestones.
• Responsible to conduct, verify and recommend improvement on overall vehicle performance for new product introduction in
meeting design specifications, regulations and market requirements.
• Responsible on benchmarking by collect, measure and analyse the vehicle performance objective data & driveability subjective data.
• Responsible to investigate, analyze all problem related to vehicle performance and its control system / component and determine
the solution which reflect to the product implementation.
• To collect, measure and analyse the vehicle performance objective data using Dynojet WinPEP 7 software.
• To ensure accurate document, record and archive measurement data pertaining to product parameters & process control performance.
• Responsible to design, review and established vehicle performance test standard along with progress report in timely manner.
• Provide ideas, suggestions and solutions regarding design and technical issues to other departments whenever needed.
❼Related Subject Undergone:
• Dynamics and Vibration • Mechanics of Material
• Thermodynamics • Fluid Mechanics
• Operation Management • Control Engineering
• Material For Engineering Application • Computer Aided Design
• Computational Fluid Dynamic • Mechanical Engineering Design & Industrial Management.
❽Skills & Proficiencies:
Language Skills:
• Good command of English and Bahasa Malaysia.
• Fair in German.
Computer Skills:
• PRIMAVERA P6 • AutoCAD
• Microsoft Project • SolidWorks
• Microsoft Office (Word, Excel & Power Point) • CATIA
• ANSYS 14 • MATLAB / Simulink
Others Skills & Strength:
• Good knowledge in Machining Process such as Cutting, Milling, Lathe, etc.
• Able to work independently and able to manage priorities and tasks.
• Ability to provide technical assistance and resolution.
• Skilled in the analysis and interpretation of complex data.
• Able to implement strategies and make informed decisions based on data.
• Advance computer proficiency & simulation software
• Able to work well under pressure with high confident level.
• Optimistic, self-motivated, committed, hard-working and willingly to learn new knowledge.
❾References:
• Ismail Bin Mohd Noor - Lead Planner/Scheduler – Newwin Engineering Sdn Bhd - (+6019-9857992)
• Ahmad Bin Mustaffa - TACS Scheduler - Turnaround Centralized Services/Petronas Chemical Group Berhad - (+6013-9807465)
• Noor Isham Bin Yasin – TACS Planner - Turnaround Centralized Services/Petronas Chemical Group Berhad - (+6019-7057899)
• Arif Bin Hamdan – Project Management Office – PROTON – (+60199330011)
❿Job Preferences:
• Willing to travel/relocate - Yes
• Date of availability - After one month notice
Mohamad Husni_Resume

Mohamad Husni_Resume

  • 1.
    PROJECT ENGINEER -MECHANICAL ENGINEER - PLANNER/SCHEDULER - TEST ENGINEER ❶Personal Biodata: • Name: Mohammad Husni Bin Abdullah Zawawi • Address: Lot 2511, Kg Gaung Kota, Batu 5, Jalan Salor, 15100 Kelantan, Malaysia. • Phone no: +6013-5960906 • Email: mhusni202@gmail.com • Nric No: 890220-14-6341 • Status: Single ❷Education: • University Technology MARA (UITM) - Bachelor (Hons) in Mechanical Engineering - 2010-2013 - CGPA: 3.07 • University Technology MARA (UITM) - Diploma in Mechanical Engineering - 2007-2010 - CGPA: 3.25 ❸Certification: • Institute of Engineer Malaysia - IEM • Board of Engineer Malaysia - BEM • Project Planning & Control (PRIMAVERA P6) • OGSP - Level 1 • Authorised Entrant And Standby Person For Confined Space (AESP) ❹Career Objectives: • A self-motivated Planner/Scheduler & Test Engineer with good experience in the Oil & Gas Plant Operation and Automotive/Manufacturing Industry. • Seeking for a challenging job as Project Engineer, Mechanical Engineer, Planner/Scheduler, Test Engineer or any job is suitable with my working experience and my academic qualification where I can apply and enhance my knowledge, skill to serve the firm to the best of my efforts. ❺Employment History: 1. NEWWIN ENGINEERING SDN BHD (August 2015 - Present) Current position: PLANNER/SCHEDULER Job Responsibilities: • To prepare & establish preliminary level 5 schedule until finalize freeze schedule for shutdown/start-up and execution phase schedule. • Gather & translate from all sections Job Method Sheet (JMS) into work sequence to establish detailed TA Master Execution schedule. • Critical path and near critical path jobs identification & monitoring. • Integrate Shutdown, Mechanical Day & Start-up Schedules. Liaise with Operations TA Coordinator and Client Scheduler for schedule review during schedule construction. Liaise with other departments, contractors & sub-contractors if there is any interfacing activities. • To attend daily unit coordination meeting with Operations, Maintenance, Contractors and other parties involve during Turnaround execution to discuss updates, 24-Hours Look-ahead, current issues and way forward to solve the issues if founded. • Responsible to advice Execution Team if there is any deviation from schedule. • Preparing daily progress report to all Project Management Team including Progress update, S-curves updates, manpower loading, current issues and bulletin as to ensure work carried out are within plans and approved schedule. • Progress tracking of TA Planning & Preparation Schedule by establish data tracking and progress control sheet. • To prepare weekly report to management. • Responsible to produce TA close-out report. Project/Activity Involved: • BASF-PETRONAS CHEMICAL (BPC) TA ACRYLIC & OXO-COMPLEX SHUTDOWN 2016 • PPMSB PSR2-MG3 PESD TA (PETA) TURNAROUND 2015
  • 2.
    ❺Employment History (continue) 2.RB SOLUTIONS (RBS) SDN. BHD. (Sept 2014 – August 2015) Current position: SCHEDULER Job Responsibilities: • To develop and monitor hi-level milestone schedule for planning and preparation phase. • To prepare & establish preliminary level 5 schedule for shutdown/start-up and execution phase. • To prepare and establish schedule basis memorandum for turnaround schedule. • Gather & translate from all sections Job Method Sheet (JMS) into work sequence to establish detailed TA Master Execution schedule. • Critical path and near critical path jobs identification. • Integrate Shutdown, Mechanical Day & Start-up Schedules. Liaison with Operations TA Coordinator. • Compilation of TA execution schedules from jobs under TACS and non-TACS. Liaison with other departments & contractor. • Creation & extraction of customized TA Execution schedules. This includes but not limited to: > Overall Schedule (P2P) > Schedule by Units (For systemization purpose) > Schedule by Mechanical Day (Sections) > Critical Path Schedule > Manpower Loading > EIS Schedule > Equipment Loading > RT Schedule > DOSH Inspection Schedule > Confined Space Entry Schedule > PTW Schedule > Handover Schedule • To attend daily unit coordination meeting with Operations, Maintenance, Contractors and other parties involve during Turnaround execution to discuss updates, 24-Hours Lookahead, current issues and way forward to solve the issues if founded. • Responsible to advice Execution Team if there is any deviation from schedule. • Preparing daily progress report to all Project Management Team including Progress update, S-curves updates, manpower loading, current issues and bulletin as to ensure work carried out are within plans and approved schedule. • Progress tracking of TA Planning & Preparation Schedule by establish data tracking and progress control sheet. • Responsible to produce TA close-out report. Project/Activity Involved: • PCFKSB PLANT TURNAROUND 2015 3. PERUSAHAAN OTOMOBIL NASIONAL SDN. BHD. (PROTON) (Mac 2014 - Aug 2014) Last position: TEST ENGINEER (VEHICLE / RESEARCH & DEVELOPMENT DEPARTMENT) Job Responsibilities: • Perusahaan Otomobil Nasional Sdn. Bhd. (PROTON) is a Malaysian Automobile Manufacturer. • Responsible to propose vehicle performance and driveability testing and development schedule including managing resources in meeting project milestones. • Responsible to conduct, verify and recommend improvement on overall vehicle performance for new product introduction in meeting design specifications, regulations and market requirements. • Responsible on benchmarking by collect, measure and analyse the vehicle performance objective data & driveability subjective data. • Responsible to investigate, analyze all problem related to vehicle performance and its control system / component and determine the solution which reflect to the product implementation. • To collect, measure and analyse the vehicle performance objective data using Dynojet WinPEP 7 software. • To ensure accurate document, record and archive measurement data pertaining to product parameters & process control performance. • Responsible to design, review and established vehicle performance test standard along with progress report in timely manner. • Provide ideas, suggestions and solutions regarding design and technical issues to other departments whenever needed.
  • 3.
    ❼Related Subject Undergone: •Dynamics and Vibration • Mechanics of Material • Thermodynamics • Fluid Mechanics • Operation Management • Control Engineering • Material For Engineering Application • Computer Aided Design • Computational Fluid Dynamic • Mechanical Engineering Design & Industrial Management. ❽Skills & Proficiencies: Language Skills: • Good command of English and Bahasa Malaysia. • Fair in German. Computer Skills: • PRIMAVERA P6 • AutoCAD • Microsoft Project • SolidWorks • Microsoft Office (Word, Excel & Power Point) • CATIA • ANSYS 14 • MATLAB / Simulink Others Skills & Strength: • Good knowledge in Machining Process such as Cutting, Milling, Lathe, etc. • Able to work independently and able to manage priorities and tasks. • Ability to provide technical assistance and resolution. • Skilled in the analysis and interpretation of complex data. • Able to implement strategies and make informed decisions based on data. • Advance computer proficiency & simulation software • Able to work well under pressure with high confident level. • Optimistic, self-motivated, committed, hard-working and willingly to learn new knowledge. ❾References: • Ismail Bin Mohd Noor - Lead Planner/Scheduler – Newwin Engineering Sdn Bhd - (+6019-9857992) • Ahmad Bin Mustaffa - TACS Scheduler - Turnaround Centralized Services/Petronas Chemical Group Berhad - (+6013-9807465) • Noor Isham Bin Yasin – TACS Planner - Turnaround Centralized Services/Petronas Chemical Group Berhad - (+6019-7057899) • Arif Bin Hamdan – Project Management Office – PROTON – (+60199330011) ❿Job Preferences: • Willing to travel/relocate - Yes • Date of availability - After one month notice