PAWAN KUMAR MUNDRA
(BE (Mechanical) from Govt. Engg. College, Ajmer & Certified Energy Manager by BEE, India)
Address: E–64/4, Adityapurm,Shambhupura, Distt– Chittorgarh, Rajasthan, India
Mobile: +918440045450, 07073838030 Email: pawan.eca@gmail.com, pawan_mundhra_eca@yahoo.co.in
----------------------------------------------------------------------------------------------------------------------------------------------------------------
A competent, result driven engineering professional with over 8.5 years experience in areas of project execution and
maintenance in cement. Seeking a challenging assignment in Projects Management, Scheduling, Planning, Erection
& Commissioning, Operations & Maintenance in sector Cement Sector/Building Materials/ Power Sector/ Design.
Summery
• B.E. (Mechanical Engineering) from reputed Govt. Engg. College, Ajmer & certified Energy Manager from
BEE, India.
• 6.5 yrs of experience in Execution of Projects, Planning, Scheduling and Execution such in cement plant.
• 2.0 yrs of experience in cement grinding unit maintenance (Preventive, Predictive & Shut-down) of cement ball mill,
roller press, conveyor, separator, bag-filter, fan, elevator, silo equipment, packer, truck loader & screen etc.
Professional Experience
1. Aditya Birla Cement, Chittourgarh (Rajasthan) as Sr.Engineer Project Management (Sep 2014 to Till Date)
• Preparing L2 schedule for the complete project at the initial stage in Microsoft project or Primavera P6 covering
various areas such as engineering, Supply chain & site execution in line with the contract.
• Updating the schedule on fortnightly basis to monitor the project trend. Analyzing the reasons for the variance
between the plan and actual
• Tracking the site plans on monthly basis and refreshing the original plan based on the pro-rated site situations
• Co-ordination with Engineering (Design) dept. for GA & Load data, Layout approval by consultant.
• Project building, costing, controlling and preparation of WBS elements through SAP
• Procurement of energy efficient equipment by comparison sheet of vendors with negotiation for minimum cost(Win-
Win Condition)
• Preparation/ Updating of project schedule applying logical sequencing of activities.
• Preparation/ Updating of Progress S curves for Engineering, Procurement and construction activities.
• Preparation/ Updating of Project Cost control estimates and Cash flows.
• Controlling the cost of the project and estimating the forecast at completion of the project.
• Preparation of Project Progress Reports covering Problem areas/Hold-ups/ Areas of Concern and Action Plan.
• Resource Planning and Man Hour Control by Primavera P6 project tool.
• Preparation of Look-ahead schedule & micro-planning for better control of Projects in coordination with site.
• Analyze the critical areas of concerns, set priorities and suggest corrective actions.
• Monitoring the project and raise alarm in case of any deviation from the target date.
• Expediting Scheduling information from Leads and subcontractors
2. Binani Cement Ltd, Pindwara, Rajasthan as Asst. Manager Project Management (Feb 2011 to Aug 2014)
(A leading firm engaged in production of high strength cement with capacity exceeding 6.25MTPA)
Job Profile:
• Successfully installed Packer-6 (Make-Enexco, 240TPH), VRM Coal Mill, Truck-loader, Dense-phase system in
Binani Gram.
• Preparation of site scheduling charts with avail all activity for Installation of Packer as per time frame with man-
power by help of MS-Project & Primavera-P6.7.
• Finalized & assurance of contractor work scope, project budget estimation, safety, man-power requirement, works
status etc.
• Assurance of quality work is performed by contractor by safe working procedure & zero incidents on site..
• Monitoring performance in view of project schedule by using Primavera P6 Project tool.
• Settling all technical disputes / clarifications during execution of project.
• Implementing necessary modification suitable to site conditions.
• Project planning, Project monitoring, cost controlling, schedule update & progress monitoring of generating progress
report for site management review and analyzing current status of projects in all discipline by using project tool
Primavera-6.7.
• Preparation and Updating of Master Project Schedule, Progress Measurement Sheet, Manpower, resource Planning
& Budgeting.
• Prepared Engineering modified drawing during project, estimated project budget, BOM, project scheduling, finalizing
of equipment designing & technology etc.
Résumé of Pawan Kumar Page 1
• Prepared technical specifications, scope and deliverables, as well as estimates based on requirements generated
during detailed engineering of project.
• Followed up with vendors and finalized order for all equipments by preparation of proper comparison sheets &
selected the vendor at optimum costs.
• Arranged daily and weekly safety coordination meeting and discussed problems related to the construction project.
• Attended any trouble-shooting related during commissioning, erection & execution etc.
3. National Cement Factory, Abudhabi (UAE) as Plant Maintenance Engineer (Sep 2009 to Feb-2011)
(Grinding Unit with annual capacity of 2 MTPA (2 grinding mills) located in Abudhabi (UAE). Holcim has 44% stake &
management responsibilities)
Job Profile:
As Engineer–responsible for plant preventive, predictive, shut-down & break-down Maintenance etc
• Functioning as an OH&S Pyramid Block-Hazard Identification and Lifting & Supporting Champion, Hot Work FPE
Champion, MAC (Maintenance Cement which is integrated with SAP-PM module) Coordinator, SAP PM and MM
Module Master Data Coordinator, Plant Master Plan (PMP) Coordinator .
• Responsible for directing a team of Supervisors, Technicians, Skilled & Unskilled Workers for smooth functioning of
mechanical maintenance.
• Functioning as Mechanical Planner and preparing maintenance master / weekly / daily plans in coordination with
Maintenance / Production Department Head
• Identification of improvement areas for better productivity and machine availability & MTTR, MTBF, Why-Why
analysis, Root cause analysis.
• Maintaining of ISO document like master preventive schedule, history cards, breakdown analysis report, equipment
checklist, shift log book.
• Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement of
specification and offer evaluation. Planning and executing capital procurement.
• Planning of shut down program, arrangement of spare parts & manpower.
• Daily organized the safety tool talk meeting aware to all people about safety then allotted to job.
Highlights:
• Recognized for handling the maintenance of Cement Ball Mills (130 TPH), Separator, Bag-filter, Rotary Dryer,
Centrifugal Pumps, High Speed Fans, Screw Conveyor System, Belt Conveyor, Belt Bucket Elevator, Blower, PG
Conveyor and all Rotary Equipments, Screw & Reciprocating Compressor.
• Played a pivotal role in:
o Reducing the lubricant consumption
o Increasing the equipment’s Net Availability Index (NAI) and Mean Time between Failure (MTBF) of the
equipment.
• Played a key role in Fatality Prevention Element (FPE)– Lifting & Supporting Work Champion to implement at plant
• Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in
O&M Expenditures and work within the budget
4. Shree Cement Ltd (Cement Grinding Unit ), Khushkera, Rajasthan (Jan 2007 – Sep 2009)
(An ISO 9001:2000, ISO14001, OHSAS 18001, and SA-8000 certified Company with turnover exceeding Rs 1300 Cr,
and the Khushkera Grinding Unit turnover is 10000 TPD & located near of 40 Kms from Bhiwari (Raj.))
Job Profile:
Job profile in Green Field Project
• Erection & Commissioning of packing plant equipment such as vibrating screen, packer, belt conveyor, truck
loader, supplied by Enexo.
• Erection & Commissioning of SKS separator (Model SZ3750/375), roller Press, and cement mill, Cyclone,
Elevator, Conveyor, bag-filter, crusher etc.
• Erection & Commissioning of cement silo within 25 days.
Job profile in Maintenance
• After completion of plant equipment erection successfully commissioning of whole plant, understand the
troubleshooting related to operation through the temperature, vibration, motor load, sound level etc.
• Preparation of the master annual, monthly, weekly preventive maintenance schedule & lubrication schedule by
using the manuals of all equipment.
• Recognized & procured the spare parts of packing plant equipment.
• Prepared the maintenance procedure, safe operating procedure (SOP) of all packing plant equipment like truck
loader, vibration screen, packer, belt conveyor, elevator, and replacement & jointing of belt etc.
Training
• Attended SKF training about fan balancing by using the different mass.
Résumé of Pawan Kumar Page 2
• Attended safety-training program of FPE lifting & supporting, confine space, hot work, height, digging & excavation,
machine guarding etc.
Software Competencies
• ERP, SAP, MS-Project, Primavera P6, Project Study Report.
• Window-vista, Ms-word, Ms-excel, Ms-PowerPoint.
• Auto-cad Designing, Inventor etc.
• Certified Primevera P6.7 by Cad-Centre, Jaipur.
Education
• Energy Manager Certificate from BEE (India) in 2013.
• B.E. - Mechanical from Govt. Engg. College Ajmer in 2002-2006 with 65%.
• RPET preparation in Kota, got 857 rank in 2001-2002.
• 12th
-Govt. Sen. Sec. School, Suratgadh in 2000-2001.
Achievements
Achievement in Binani cement ltd
• Energy Manager Certificate from BEE, India in 2013.
Achievement in National cement factory,Abudhabi
• Effective Preventive Maintenance, assurance of minimum break-down in plant.
Achievement in Shree cement plant, Khushkera
• Power saving 450 unit/day & amount 6.25 lacks/ annum in cement ,fly ash silo with mission-11
• Won the Chess championship in the company.
• Won the Badminton championship in the plant.
Achievement in College
• 656 RANK & 97.1% in GATE-2006
• Participated in NATIONAL LEVEL ANNUAL NSS CAMP
• First award in the Badminton, Chess championship trophy in college tournament.
Personal Details
Father name: Sh. B.L. Mundra
Date of Birth: JULY 15, 1983
Marital status: Married
Language Known: Hindi, English, Punjabi, Marwari
Passport No.: H5075701
Date of expiry: 15/7/2019
Résumé of Pawan Kumar Page 3
Résumé of Pawan Kumar Page 4

Pawan Resume-2014(rev)

  • 1.
    PAWAN KUMAR MUNDRA (BE(Mechanical) from Govt. Engg. College, Ajmer & Certified Energy Manager by BEE, India) Address: E–64/4, Adityapurm,Shambhupura, Distt– Chittorgarh, Rajasthan, India Mobile: +918440045450, 07073838030 Email: pawan.eca@gmail.com, pawan_mundhra_eca@yahoo.co.in ---------------------------------------------------------------------------------------------------------------------------------------------------------------- A competent, result driven engineering professional with over 8.5 years experience in areas of project execution and maintenance in cement. Seeking a challenging assignment in Projects Management, Scheduling, Planning, Erection & Commissioning, Operations & Maintenance in sector Cement Sector/Building Materials/ Power Sector/ Design. Summery • B.E. (Mechanical Engineering) from reputed Govt. Engg. College, Ajmer & certified Energy Manager from BEE, India. • 6.5 yrs of experience in Execution of Projects, Planning, Scheduling and Execution such in cement plant. • 2.0 yrs of experience in cement grinding unit maintenance (Preventive, Predictive & Shut-down) of cement ball mill, roller press, conveyor, separator, bag-filter, fan, elevator, silo equipment, packer, truck loader & screen etc. Professional Experience 1. Aditya Birla Cement, Chittourgarh (Rajasthan) as Sr.Engineer Project Management (Sep 2014 to Till Date) • Preparing L2 schedule for the complete project at the initial stage in Microsoft project or Primavera P6 covering various areas such as engineering, Supply chain & site execution in line with the contract. • Updating the schedule on fortnightly basis to monitor the project trend. Analyzing the reasons for the variance between the plan and actual • Tracking the site plans on monthly basis and refreshing the original plan based on the pro-rated site situations • Co-ordination with Engineering (Design) dept. for GA & Load data, Layout approval by consultant. • Project building, costing, controlling and preparation of WBS elements through SAP • Procurement of energy efficient equipment by comparison sheet of vendors with negotiation for minimum cost(Win- Win Condition) • Preparation/ Updating of project schedule applying logical sequencing of activities. • Preparation/ Updating of Progress S curves for Engineering, Procurement and construction activities. • Preparation/ Updating of Project Cost control estimates and Cash flows. • Controlling the cost of the project and estimating the forecast at completion of the project. • Preparation of Project Progress Reports covering Problem areas/Hold-ups/ Areas of Concern and Action Plan. • Resource Planning and Man Hour Control by Primavera P6 project tool. • Preparation of Look-ahead schedule & micro-planning for better control of Projects in coordination with site. • Analyze the critical areas of concerns, set priorities and suggest corrective actions. • Monitoring the project and raise alarm in case of any deviation from the target date. • Expediting Scheduling information from Leads and subcontractors 2. Binani Cement Ltd, Pindwara, Rajasthan as Asst. Manager Project Management (Feb 2011 to Aug 2014) (A leading firm engaged in production of high strength cement with capacity exceeding 6.25MTPA) Job Profile: • Successfully installed Packer-6 (Make-Enexco, 240TPH), VRM Coal Mill, Truck-loader, Dense-phase system in Binani Gram. • Preparation of site scheduling charts with avail all activity for Installation of Packer as per time frame with man- power by help of MS-Project & Primavera-P6.7. • Finalized & assurance of contractor work scope, project budget estimation, safety, man-power requirement, works status etc. • Assurance of quality work is performed by contractor by safe working procedure & zero incidents on site.. • Monitoring performance in view of project schedule by using Primavera P6 Project tool. • Settling all technical disputes / clarifications during execution of project. • Implementing necessary modification suitable to site conditions. • Project planning, Project monitoring, cost controlling, schedule update & progress monitoring of generating progress report for site management review and analyzing current status of projects in all discipline by using project tool Primavera-6.7. • Preparation and Updating of Master Project Schedule, Progress Measurement Sheet, Manpower, resource Planning & Budgeting. • Prepared Engineering modified drawing during project, estimated project budget, BOM, project scheduling, finalizing of equipment designing & technology etc. Résumé of Pawan Kumar Page 1
  • 2.
    • Prepared technicalspecifications, scope and deliverables, as well as estimates based on requirements generated during detailed engineering of project. • Followed up with vendors and finalized order for all equipments by preparation of proper comparison sheets & selected the vendor at optimum costs. • Arranged daily and weekly safety coordination meeting and discussed problems related to the construction project. • Attended any trouble-shooting related during commissioning, erection & execution etc. 3. National Cement Factory, Abudhabi (UAE) as Plant Maintenance Engineer (Sep 2009 to Feb-2011) (Grinding Unit with annual capacity of 2 MTPA (2 grinding mills) located in Abudhabi (UAE). Holcim has 44% stake & management responsibilities) Job Profile: As Engineer–responsible for plant preventive, predictive, shut-down & break-down Maintenance etc • Functioning as an OH&S Pyramid Block-Hazard Identification and Lifting & Supporting Champion, Hot Work FPE Champion, MAC (Maintenance Cement which is integrated with SAP-PM module) Coordinator, SAP PM and MM Module Master Data Coordinator, Plant Master Plan (PMP) Coordinator . • Responsible for directing a team of Supervisors, Technicians, Skilled & Unskilled Workers for smooth functioning of mechanical maintenance. • Functioning as Mechanical Planner and preparing maintenance master / weekly / daily plans in coordination with Maintenance / Production Department Head • Identification of improvement areas for better productivity and machine availability & MTTR, MTBF, Why-Why analysis, Root cause analysis. • Maintaining of ISO document like master preventive schedule, history cards, breakdown analysis report, equipment checklist, shift log book. • Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement of specification and offer evaluation. Planning and executing capital procurement. • Planning of shut down program, arrangement of spare parts & manpower. • Daily organized the safety tool talk meeting aware to all people about safety then allotted to job. Highlights: • Recognized for handling the maintenance of Cement Ball Mills (130 TPH), Separator, Bag-filter, Rotary Dryer, Centrifugal Pumps, High Speed Fans, Screw Conveyor System, Belt Conveyor, Belt Bucket Elevator, Blower, PG Conveyor and all Rotary Equipments, Screw & Reciprocating Compressor. • Played a pivotal role in: o Reducing the lubricant consumption o Increasing the equipment’s Net Availability Index (NAI) and Mean Time between Failure (MTBF) of the equipment. • Played a key role in Fatality Prevention Element (FPE)– Lifting & Supporting Work Champion to implement at plant • Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the budget 4. Shree Cement Ltd (Cement Grinding Unit ), Khushkera, Rajasthan (Jan 2007 – Sep 2009) (An ISO 9001:2000, ISO14001, OHSAS 18001, and SA-8000 certified Company with turnover exceeding Rs 1300 Cr, and the Khushkera Grinding Unit turnover is 10000 TPD & located near of 40 Kms from Bhiwari (Raj.)) Job Profile: Job profile in Green Field Project • Erection & Commissioning of packing plant equipment such as vibrating screen, packer, belt conveyor, truck loader, supplied by Enexo. • Erection & Commissioning of SKS separator (Model SZ3750/375), roller Press, and cement mill, Cyclone, Elevator, Conveyor, bag-filter, crusher etc. • Erection & Commissioning of cement silo within 25 days. Job profile in Maintenance • After completion of plant equipment erection successfully commissioning of whole plant, understand the troubleshooting related to operation through the temperature, vibration, motor load, sound level etc. • Preparation of the master annual, monthly, weekly preventive maintenance schedule & lubrication schedule by using the manuals of all equipment. • Recognized & procured the spare parts of packing plant equipment. • Prepared the maintenance procedure, safe operating procedure (SOP) of all packing plant equipment like truck loader, vibration screen, packer, belt conveyor, elevator, and replacement & jointing of belt etc. Training • Attended SKF training about fan balancing by using the different mass. Résumé of Pawan Kumar Page 2
  • 3.
    • Attended safety-trainingprogram of FPE lifting & supporting, confine space, hot work, height, digging & excavation, machine guarding etc. Software Competencies • ERP, SAP, MS-Project, Primavera P6, Project Study Report. • Window-vista, Ms-word, Ms-excel, Ms-PowerPoint. • Auto-cad Designing, Inventor etc. • Certified Primevera P6.7 by Cad-Centre, Jaipur. Education • Energy Manager Certificate from BEE (India) in 2013. • B.E. - Mechanical from Govt. Engg. College Ajmer in 2002-2006 with 65%. • RPET preparation in Kota, got 857 rank in 2001-2002. • 12th -Govt. Sen. Sec. School, Suratgadh in 2000-2001. Achievements Achievement in Binani cement ltd • Energy Manager Certificate from BEE, India in 2013. Achievement in National cement factory,Abudhabi • Effective Preventive Maintenance, assurance of minimum break-down in plant. Achievement in Shree cement plant, Khushkera • Power saving 450 unit/day & amount 6.25 lacks/ annum in cement ,fly ash silo with mission-11 • Won the Chess championship in the company. • Won the Badminton championship in the plant. Achievement in College • 656 RANK & 97.1% in GATE-2006 • Participated in NATIONAL LEVEL ANNUAL NSS CAMP • First award in the Badminton, Chess championship trophy in college tournament. Personal Details Father name: Sh. B.L. Mundra Date of Birth: JULY 15, 1983 Marital status: Married Language Known: Hindi, English, Punjabi, Marwari Passport No.: H5075701 Date of expiry: 15/7/2019 Résumé of Pawan Kumar Page 3
  • 4.