KUNAL SAHA
C/O Kalyan Kumar Saha,
160-A, Manik Danga Road,
P.O Ghola Bazaar,
KolKata-700111, West Bengal.
Contact: +91 9804386630/ +880 1704404223; Email: kunals4u2007@gmail.com
CARRIER OBJECTIVE
Seeking a challenging and rewarding opportunity with an organization of repute which recognizes and utilizes my
true potential while nurturing my analytical and technical skills across the industry.
CARRIER PROFILE AND STRENGTHS
 B.Tech in Electrical Engineering from Techno India College of Technology under West Bengal University of
Technology, accented with the latest trends and techniques of the field, having an inborn quantitative aptitude &
determined to carve a successful and satisfying career in the industry.
 Good knowledge of Three Phase Transmission Line, Transmission and Distribution, Transformers and Induction
Machines and Basic Electronics Areas, Cable Selection Procedure, PLC, SCADA , Electrical Panel Design &
component selection for Process Industries, Manufacturing Hardware Selection as per process Mapping.
 Project Management / Project Engineering/ Project Planning/ Capex Budget Preparation/ Vendor Development.
 Electrical Panel assembly drawings along with development of detail design experience along with Breaker
selection/ACB/VCB/ Transformer/Capacitor Bank selection. LT side power distribution to balance optimum
energy solution.
 Personal Care product manufacturing facility establishments and Automatic packing lines.
 Outstanding communication skills, verbal as well as written coupled with exceptional presentation skills with the
ability to perform above expectations.
 Possess an inquisitive mind, creative thinking, excellent organizational skills, flexible and detail oriented attitude
combined with strong analytical & information analysis skills and a proven ability to interact with a diverse range
of people in a professional manner.
 Strong team leader builder, fostering an atmosphere that motivates highly talented professionals to balance
high-level skills with maximum productivity.
PROFESSIONAL EXPERIENCE
1. EMAMI LIMITED
From FEB’2012- Till Now
Sr. Executive Engineer (Operation)
a. Responsible to deliver projects on development of facility creation.
b. Responsible to drive a team.
c. Responsible to vendor development.
d. Responsible in project operation activity.
e. Strategically planning, analyzing & conceptualizing the basic requirements while setting up the
technical infrastructure of the project.
f. Coordinating with colleagues and subordinates for getting the work done effectively, training
and guiding trainees to meet organizational objectives.
g. Responsible to deliver general maintenance activities in daily plant schedule.
h. Responsible for vendor visit and inspection related activity.
i. Responsible for techno commercial activity for project material (capital expenditure).
 Project Experience:
 Project 1: 6.6 KV Substation installation
o Project Execution Plan Preparation
o 1000 KVA Transformer Installation,
o VCB installation.
o LT Breaker Installation.
o Knowledge in underground laying through cable trench.
 Installation of 130 TR HVAC system with Water Cooled Chiller (Voltas).
o Execution Plan Preparation.
o Design checking as per approved layout.
o Vendor co-ordination.
 120 KVAR & 100 KVAR Capacitor Bank Panel Installation.
o Design finalization for capacitor bank requirement.
o Panel Erection & commissioning.
o Vendor co-ordination.
 Installation of Fire Detection, Sprinkler & Hydrant system.
o Pipeline Layout checking.
o Execution plan preparation.
o Smoke detection layout checking.
o Vendor co-ordination.
 Project 2: R&D Facility expansion.
o Project Budget Preparation [Capital Expenditure].
o Techno commercial comparative preparation with vendor negotiation.
o 36 TR HVAC Facility creation including cooling tower.
o Interior Facility creation.
o Fire Detection system Installation.
o Electrical Power Distribution.
 Project 3: Universal Cosmetic Manufacturing facility (UMS system) creation & related facility creation.
o Project Budget Finalization.
o Project Plan preparation.
o Equipment Sections and ordering process.
o Master Layout Planning in AutoCAD.
o .5 ton capacity UMS Mixer & .3 ton capacity Side pots Installation.
o Lobe Pump & homogenizer installation.
o Utility Details finalization (BOQ as per P&ID).
o Electrical Panel Design Finalization including BOQ preparation.
 Project 4: Ayurvedic Product Manufacturing Facility & related facility creation (COPP under WHOGMP Certified
Product Range).
o Project Budget Finalization.
o Equipments Selection and ordering process.
o Project Plan preparation.
o GMP Guidelines & norms.
o Master Layout Planning in Auto CAD.
o Electrical Panel [PLC & HMI] Design Finalization including BOQ preparation.
o Vendor Visit for inspection of electrical panel& manufacturing vessels.
o 1 ton, .5 ton capacity UMS Mixer & .3 ton side pots Installation & commissioning.
o 1.2 ton Load cell model finalization & Installation.
o Lobe Pump & Homogenizer Installation including SS316 L product pipeline.
o Utility Details finalization (BOQ as per P&ID).
o 12TR Air Cooled Process Chiller Installation.
 Project 5: New Manufacturing Plant Establishment at Bangladesh , Dhaka [ Project In Change ]
o Project Budget Finalization.
o Consultant Finalization.
o Handling & manage CAPEX activity.
o Master Plan Preparation.
o Liaison with Consultant & local authorities.
o Finalization of vendors of equipment’s based on BOQ.
o Time to time project management to adhere timeline.
o Electrical Distribution Design finalization including 1.1KV substation.
o Electrical Light fixture design confirmation & installation as per zone wise LUX level.
o Fire management System finalization & execution including smoke detection & sprinkler system
o Tube filling automatic machines & cartooning machine finalization for BPAC & FAH product range.
o Lotion Filling & capping line along with automatic labeling machine finalization.
o Planetary mixer, paddle Mixer, UMS setup finalization& installation.
o Automatic filling & packing lines selection, Installation & commissioning.
o Finalization of DQ and FAT for all kinds of manufacturing & filling & capping machines.
o 130 TR capacity HVAC design finalization & execution.
o Techno Commercial Details Preparation along with Vendor Finalization.
o Execution of total project expansion with reference of Master Track sheet.
 Core team member for ‘Asset Care’ & ‘IFC’ Pillar in IMEA-2012 assessment.
 Experience as Team Leader ‘SHEA’ [Safety, Health & Environment] Pillar in IMEA-2013(Indian Manufacturing
Excellence Assessment); conducted by Frost & Sullivan and achieved 63 % score.
 Documentation process in EMS (ISO 14001:2007) and OSHAS (ISO18001:2007) certification audit.
 Adhere periodic health checkup of plant equipment as per PM schedule & developing SOP for O&M.
 Taken Perfect measure on Equipment Failure analysis by RCA & CAPA.
 Development of assent history card by priority schedule considering PQCDSM / TBM & RCM/ OEE.
 Plan & implementation in Cost Management Program /Energy Audit.
 Team Development & Training Organization by TNI analysis.
 Best class knowledge & Improvements of OEE trend by RCA & CAPA of Process improvement.
 Knowledge & shop floor Application of 5S, TPM; Kaizen, JH activities; Quality tools.
 Knowledge in 7 QC tools.
 Participation at CCQC, Kolkata (2012 & 2013) Chapter as a team member of TPM circle, won Gold Award.
 Participation of Safety Week Celebration as core team member in 2013, 2014, 2015.
2. RMG POLYVINAYLE INDIA LIMITED, UTTAR PRADESH
From NOV’2010 to JAN, 2012
Assistant Electrical Engineer
 Veteran at electrical maintenance, condition monitoring of transformers, earthling systems and cables at site.
 Drive efforts in reliability checking of D.C Drives SCR controlled panel and starters of induction motors, detection
of fault points and maintenance of relays in site.
 Performing the task to maintaining and check breakdown like flashover, oil leakage and mechanism problems
and taking all remedial measure.
 Project experience on Rockwell MES Platform: Rockwell Asset Centre.
EDUCATIONAL CREDENTIALS:
Bachelor of Technology, Electrical, 2010
Techno India College of Technology – West Bengal University of Technology; 7.94 CGPA
Maximum Marks Marks Obtained Maximum Marks Marks Obtained
1st Semester 10 7.50 2nd Semester 10 8.48
3rd Semester 10 8.27 4th Semester 10 7.32
5th Semester 10 6.56 6th Semester 10 8.20
7th Semester 10 8.21 8th Semester 10 8.73
Higher Secondary Examination, 2006
West Bengal Council of Higher Secondary Examination; 72.10%
Madhyamik Examination, 2004
West Bengal Board of Secondary Education; 73.33%
General Proficiency:
Microsoft Office; Microsoft Project.
Trainings Undertaken:
 Thermal power plant overview from NTPC, Farakka, 2008.
 Basic Networking from (Hewlett-Packard) HP, 2009 for 1 month.
Professional Trainings:
 Training on Industrial Automation (PLC & SCADA) From WEBEL ACA.
1. Rockwell PLC system
Personal Details:
Date of Birth: 9th
August 1988.
Nationality: Indian
Languages Known: English, Hindi, and Bengali.
Hobbies: Travelling, Watching movies, Listening music, Sports.
Signature: KUNAL SAHA
Date: 23.08.16

Profile Details (CV)

  • 1.
    KUNAL SAHA C/O KalyanKumar Saha, 160-A, Manik Danga Road, P.O Ghola Bazaar, KolKata-700111, West Bengal. Contact: +91 9804386630/ +880 1704404223; Email: kunals4u2007@gmail.com CARRIER OBJECTIVE Seeking a challenging and rewarding opportunity with an organization of repute which recognizes and utilizes my true potential while nurturing my analytical and technical skills across the industry. CARRIER PROFILE AND STRENGTHS  B.Tech in Electrical Engineering from Techno India College of Technology under West Bengal University of Technology, accented with the latest trends and techniques of the field, having an inborn quantitative aptitude & determined to carve a successful and satisfying career in the industry.  Good knowledge of Three Phase Transmission Line, Transmission and Distribution, Transformers and Induction Machines and Basic Electronics Areas, Cable Selection Procedure, PLC, SCADA , Electrical Panel Design & component selection for Process Industries, Manufacturing Hardware Selection as per process Mapping.  Project Management / Project Engineering/ Project Planning/ Capex Budget Preparation/ Vendor Development.  Electrical Panel assembly drawings along with development of detail design experience along with Breaker selection/ACB/VCB/ Transformer/Capacitor Bank selection. LT side power distribution to balance optimum energy solution.  Personal Care product manufacturing facility establishments and Automatic packing lines.  Outstanding communication skills, verbal as well as written coupled with exceptional presentation skills with the ability to perform above expectations.  Possess an inquisitive mind, creative thinking, excellent organizational skills, flexible and detail oriented attitude combined with strong analytical & information analysis skills and a proven ability to interact with a diverse range of people in a professional manner.  Strong team leader builder, fostering an atmosphere that motivates highly talented professionals to balance high-level skills with maximum productivity.
  • 2.
    PROFESSIONAL EXPERIENCE 1. EMAMILIMITED From FEB’2012- Till Now Sr. Executive Engineer (Operation) a. Responsible to deliver projects on development of facility creation. b. Responsible to drive a team. c. Responsible to vendor development. d. Responsible in project operation activity. e. Strategically planning, analyzing & conceptualizing the basic requirements while setting up the technical infrastructure of the project. f. Coordinating with colleagues and subordinates for getting the work done effectively, training and guiding trainees to meet organizational objectives. g. Responsible to deliver general maintenance activities in daily plant schedule. h. Responsible for vendor visit and inspection related activity. i. Responsible for techno commercial activity for project material (capital expenditure).  Project Experience:  Project 1: 6.6 KV Substation installation o Project Execution Plan Preparation o 1000 KVA Transformer Installation, o VCB installation. o LT Breaker Installation. o Knowledge in underground laying through cable trench.  Installation of 130 TR HVAC system with Water Cooled Chiller (Voltas). o Execution Plan Preparation. o Design checking as per approved layout. o Vendor co-ordination.  120 KVAR & 100 KVAR Capacitor Bank Panel Installation. o Design finalization for capacitor bank requirement. o Panel Erection & commissioning. o Vendor co-ordination.  Installation of Fire Detection, Sprinkler & Hydrant system. o Pipeline Layout checking. o Execution plan preparation. o Smoke detection layout checking. o Vendor co-ordination.  Project 2: R&D Facility expansion. o Project Budget Preparation [Capital Expenditure]. o Techno commercial comparative preparation with vendor negotiation. o 36 TR HVAC Facility creation including cooling tower. o Interior Facility creation. o Fire Detection system Installation. o Electrical Power Distribution.
  • 3.
     Project 3:Universal Cosmetic Manufacturing facility (UMS system) creation & related facility creation. o Project Budget Finalization. o Project Plan preparation. o Equipment Sections and ordering process. o Master Layout Planning in AutoCAD. o .5 ton capacity UMS Mixer & .3 ton capacity Side pots Installation. o Lobe Pump & homogenizer installation. o Utility Details finalization (BOQ as per P&ID). o Electrical Panel Design Finalization including BOQ preparation.  Project 4: Ayurvedic Product Manufacturing Facility & related facility creation (COPP under WHOGMP Certified Product Range). o Project Budget Finalization. o Equipments Selection and ordering process. o Project Plan preparation. o GMP Guidelines & norms. o Master Layout Planning in Auto CAD. o Electrical Panel [PLC & HMI] Design Finalization including BOQ preparation. o Vendor Visit for inspection of electrical panel& manufacturing vessels. o 1 ton, .5 ton capacity UMS Mixer & .3 ton side pots Installation & commissioning. o 1.2 ton Load cell model finalization & Installation. o Lobe Pump & Homogenizer Installation including SS316 L product pipeline. o Utility Details finalization (BOQ as per P&ID). o 12TR Air Cooled Process Chiller Installation.  Project 5: New Manufacturing Plant Establishment at Bangladesh , Dhaka [ Project In Change ] o Project Budget Finalization. o Consultant Finalization. o Handling & manage CAPEX activity. o Master Plan Preparation. o Liaison with Consultant & local authorities. o Finalization of vendors of equipment’s based on BOQ. o Time to time project management to adhere timeline. o Electrical Distribution Design finalization including 1.1KV substation. o Electrical Light fixture design confirmation & installation as per zone wise LUX level. o Fire management System finalization & execution including smoke detection & sprinkler system o Tube filling automatic machines & cartooning machine finalization for BPAC & FAH product range. o Lotion Filling & capping line along with automatic labeling machine finalization. o Planetary mixer, paddle Mixer, UMS setup finalization& installation. o Automatic filling & packing lines selection, Installation & commissioning. o Finalization of DQ and FAT for all kinds of manufacturing & filling & capping machines. o 130 TR capacity HVAC design finalization & execution. o Techno Commercial Details Preparation along with Vendor Finalization. o Execution of total project expansion with reference of Master Track sheet.  Core team member for ‘Asset Care’ & ‘IFC’ Pillar in IMEA-2012 assessment.  Experience as Team Leader ‘SHEA’ [Safety, Health & Environment] Pillar in IMEA-2013(Indian Manufacturing Excellence Assessment); conducted by Frost & Sullivan and achieved 63 % score.  Documentation process in EMS (ISO 14001:2007) and OSHAS (ISO18001:2007) certification audit.  Adhere periodic health checkup of plant equipment as per PM schedule & developing SOP for O&M.  Taken Perfect measure on Equipment Failure analysis by RCA & CAPA.  Development of assent history card by priority schedule considering PQCDSM / TBM & RCM/ OEE.  Plan & implementation in Cost Management Program /Energy Audit.  Team Development & Training Organization by TNI analysis.
  • 4.
     Best classknowledge & Improvements of OEE trend by RCA & CAPA of Process improvement.  Knowledge & shop floor Application of 5S, TPM; Kaizen, JH activities; Quality tools.  Knowledge in 7 QC tools.  Participation at CCQC, Kolkata (2012 & 2013) Chapter as a team member of TPM circle, won Gold Award.  Participation of Safety Week Celebration as core team member in 2013, 2014, 2015. 2. RMG POLYVINAYLE INDIA LIMITED, UTTAR PRADESH From NOV’2010 to JAN, 2012 Assistant Electrical Engineer  Veteran at electrical maintenance, condition monitoring of transformers, earthling systems and cables at site.  Drive efforts in reliability checking of D.C Drives SCR controlled panel and starters of induction motors, detection of fault points and maintenance of relays in site.  Performing the task to maintaining and check breakdown like flashover, oil leakage and mechanism problems and taking all remedial measure.  Project experience on Rockwell MES Platform: Rockwell Asset Centre. EDUCATIONAL CREDENTIALS: Bachelor of Technology, Electrical, 2010 Techno India College of Technology – West Bengal University of Technology; 7.94 CGPA Maximum Marks Marks Obtained Maximum Marks Marks Obtained 1st Semester 10 7.50 2nd Semester 10 8.48 3rd Semester 10 8.27 4th Semester 10 7.32 5th Semester 10 6.56 6th Semester 10 8.20 7th Semester 10 8.21 8th Semester 10 8.73 Higher Secondary Examination, 2006 West Bengal Council of Higher Secondary Examination; 72.10% Madhyamik Examination, 2004 West Bengal Board of Secondary Education; 73.33% General Proficiency: Microsoft Office; Microsoft Project. Trainings Undertaken:  Thermal power plant overview from NTPC, Farakka, 2008.  Basic Networking from (Hewlett-Packard) HP, 2009 for 1 month. Professional Trainings:  Training on Industrial Automation (PLC & SCADA) From WEBEL ACA. 1. Rockwell PLC system Personal Details: Date of Birth: 9th August 1988. Nationality: Indian Languages Known: English, Hindi, and Bengali. Hobbies: Travelling, Watching movies, Listening music, Sports. Signature: KUNAL SAHA Date: 23.08.16