Migration to the most recent release of
iScala (3.0) for Merck KGaA, a leading
Science & Technology company.
May 2017 saw the completion of the upgrade of the iScala ERP solution
to its most recent release 3.0 for the German based leading Science &
Technology company Merck KGaA, Darmstadt, Germany (Merck). It
covered 19 subsidiaries of the group in Europe, Asia, Australia and the
Middle East. Mindbox’s offer was selected as the most advantageous in
terms of the proposed timing, cost and mode of performance, as well as
the years-long successful business relationship and cooperation between
Merck and Mindbox. Another important factor was Mindbox’s extensive
experience in complex information technology projects of global reach.
Mindbox specializes in supporting businesses using Epicor software,
including the iScala system among other products.
Case Study Merck
The iScala system has been used by Merck for more than a decade. It is a
solution for smaller subsidiaries within organization (Tier II). Business
process handling and system use have been standardized. Support for
450 simultaneous remote users is provided by the Global Scala Team
based in Darmstadt, Germany and in Singapore.
iScala at Merck
Given that the implementation was required for a pharmaceutical
company, some specific industry requirements had to be taken into
consideration, such as legal restrictions, data security and other
potential threats. The migration was from release 2.3, no longer
supported by the vendor for some time, to the most recent release 3.0.
The system is customized for Merck’s requirement by some 120
modifications, hundreds of reports, OLAP cubes, and documents.
Project objectives and
characteristics
Work efficiency is ensured by intensive communication and data
exchange between iScala and other systems, both internal and those of
business partners, via more than 100 interfaces. All these elements had
to be transferred to the new release and then tested with maximum
precision. The primary objective of the project was to change the
technological platform with minimum disturbance to the business
operations.
Project objectives and
characteristics
From the business and technological points of view, the migration was a
very important step. Its benefits included:
• Ensuring the continuity and stability of business operations for the
next five years;
• Reducing legal risk and related expenses;
• New supported technology;
• Increased system flexibility through extended range of functionalities
in the new release.
Key benefits of the migration
„As regards our ERP strategy, we believe that Global Scala ensures our
business stability for the next five years. This will enable us to focus on
building new generation ERP systems at Merck. We have seen once again
how much we can achieve together and what power can be generated by
our cooperation.”
Anthony Peckham,
ERP Program Manager, Merck
Key benefits of the migration
The paramount objective was to complete the project with minimum
disturbance to the business operations. Given the complexity and
geographical reach of the system, the task required detailed analysis and
precise planning. Areas critical for successful project completion
included:
• High degree of system modification;
• Geographical dispersion and cultural differences, with respect to both
users and project team members;
• Procedures specific to the pharmaceutical industry.
Risks involved in the project
The migration project, which took over a year, was completed by
Mindbox with the support of a dedicated team appointed by Merck. As a
whole, the project was scheduled for 16 months. At the very outset, the
timeframes for all successive stages were specified. One of the greatest
challenges posed by the project was the geographical dispersion of the
project team (over 20 people in 10 countries) and end users (18
countries). A definite majority of the work was done on a remote basis.
The success of the project was possible only due to precise planning and
rigorous project management.
Implementation process
The implementation process was completed in four major stages. During
the first one, the Mindbox team completed the migration of all the
technical components of the system. The phase was concluded by a test
migration and a one-month period of internal tests. The pilot migration
was carried out in Sweden. It was then rolled out in groups ranging from
four to eight countries, in three successive phases. Each included a test
migration, user acceptance tests, the final migration, and post-
implementation support.
All the project phases started and ended as scheduled.
Implementation process
„The migration has been a complete success. The system is stable and
the whole complex upgrade process has been performed correctly.”
Wai-Leng Cheng,
Merck Service Delivery Manager, Global Scala
Implementation process
Implementation process
After completing all the scheduled activities, the system is running
without any perceptible changes to the user while its operation is faster,
more effective and safer, and more importantly, it offers an array of new
possibilities to improve the operating efficiency of the business.
Project results
„The project was completed achieving all of its objectives without any
unforeseen downtime in business operations. This is the outcome of
excellent cooperation between our team and Mindbox, who have shown
great professionalism in the face of complicated technological
challenges.”
Anthony Peckham,
ERP Program Manager, Merck
Project results
Contact
Mindbox SA
Powiśle Business Centre
Ul. Wiślana 8, 00-317 Warszawa , tel +48 22 486 31 56
info@mindboxgroup.com

More Related Content

What's hot

Maximize Your Enterprise DevOps Efforts and Outcomes with Value Streams
Maximize Your Enterprise DevOps Efforts and Outcomes with Value StreamsMaximize Your Enterprise DevOps Efforts and Outcomes with Value Streams
Maximize Your Enterprise DevOps Efforts and Outcomes with Value Streams
DevOps.com
 
Continuous Delivery Pipelines: Metrics, Myths, and Milestones
Continuous Delivery Pipelines:  Metrics, Myths, and MilestonesContinuous Delivery Pipelines:  Metrics, Myths, and Milestones
Continuous Delivery Pipelines: Metrics, Myths, and Milestones
DevOps.com
 
Software estimation challenge diederik wortman - metri
Software estimation challenge   diederik wortman - metriSoftware estimation challenge   diederik wortman - metri
Software estimation challenge diederik wortman - metri
Nesma
 
IBM i Application Lifecycle Management with Remain Software
IBM i Application Lifecycle Management with Remain SoftwareIBM i Application Lifecycle Management with Remain Software
IBM i Application Lifecycle Management with Remain Software
Remain Software
 
Advanced sap cybersecurity webinar
Advanced sap cybersecurity webinarAdvanced sap cybersecurity webinar
Advanced sap cybersecurity webinar
David Milano
 
R12 Up Grade
R12 Up GradeR12 Up Grade
R12 Up Grade
Jody5802
 
Shell chemicalsseraya
Shell chemicalsserayaShell chemicalsseraya
Shell chemicalsseraya
Cameron
 
Presentation Alvalade XXI_[1]
Presentation Alvalade XXI_[1]Presentation Alvalade XXI_[1]
Presentation Alvalade XXI_[1]
internationalgroup
 
British Gas - Success story with Basis Technologies
British Gas - Success story with Basis TechnologiesBritish Gas - Success story with Basis Technologies
British Gas - Success story with Basis Technologies
Richard Page
 
Abhi bhalla a 02
Abhi bhalla a 02Abhi bhalla a 02
Abhi bhalla a 02
Abhi Bhalla
 
EVMS for Commercial projects
EVMS for Commercial projectsEVMS for Commercial projects
EVMS for Commercial projects
Glen Alleman
 
IRJET- Cloud Migration Research: Concept
IRJET-  	  Cloud Migration Research: ConceptIRJET-  	  Cloud Migration Research: Concept
IRJET- Cloud Migration Research: Concept
IRJET Journal
 
Resume-JohnZiegler
Resume-JohnZieglerResume-JohnZiegler
Resume-JohnZiegler
John Ziegler
 
Breaking New Ground in Efficiency
Breaking New Ground in EfficiencyBreaking New Ground in Efficiency
Breaking New Ground in Efficiency
McKenney's Inc
 
Ares I Instrument Unit Status and Progress
Ares I Instrument Unit Status and ProgressAres I Instrument Unit Status and Progress
Ares I Instrument Unit Status and Progress
American Astronautical Society
 
Project Methodology - On The Fly
Project Methodology - On The FlyProject Methodology - On The Fly
Project Methodology - On The Fly
ibenari
 
Lightning talk Accenture
Lightning talk AccentureLightning talk Accenture
Lightning talk Accenture
French Scrum User Group
 
Enterprise Resource Planning and CSFs
Enterprise Resource Planning and CSFsEnterprise Resource Planning and CSFs
Enterprise Resource Planning and CSFs
Mayuree Srikulwong
 
Ensuring Project Success with SpiraTeam and Rapise from Inflectra pta - short
Ensuring Project Success with SpiraTeam and Rapise from Inflectra   pta - shortEnsuring Project Success with SpiraTeam and Rapise from Inflectra   pta - short
Ensuring Project Success with SpiraTeam and Rapise from Inflectra pta - short
Adam Sandman
 
Life after upgrading to r12
Life after upgrading to r12Life after upgrading to r12
Life after upgrading to r12
InSync Conference
 

What's hot (20)

Maximize Your Enterprise DevOps Efforts and Outcomes with Value Streams
Maximize Your Enterprise DevOps Efforts and Outcomes with Value StreamsMaximize Your Enterprise DevOps Efforts and Outcomes with Value Streams
Maximize Your Enterprise DevOps Efforts and Outcomes with Value Streams
 
Continuous Delivery Pipelines: Metrics, Myths, and Milestones
Continuous Delivery Pipelines:  Metrics, Myths, and MilestonesContinuous Delivery Pipelines:  Metrics, Myths, and Milestones
Continuous Delivery Pipelines: Metrics, Myths, and Milestones
 
Software estimation challenge diederik wortman - metri
Software estimation challenge   diederik wortman - metriSoftware estimation challenge   diederik wortman - metri
Software estimation challenge diederik wortman - metri
 
IBM i Application Lifecycle Management with Remain Software
IBM i Application Lifecycle Management with Remain SoftwareIBM i Application Lifecycle Management with Remain Software
IBM i Application Lifecycle Management with Remain Software
 
Advanced sap cybersecurity webinar
Advanced sap cybersecurity webinarAdvanced sap cybersecurity webinar
Advanced sap cybersecurity webinar
 
R12 Up Grade
R12 Up GradeR12 Up Grade
R12 Up Grade
 
Shell chemicalsseraya
Shell chemicalsserayaShell chemicalsseraya
Shell chemicalsseraya
 
Presentation Alvalade XXI_[1]
Presentation Alvalade XXI_[1]Presentation Alvalade XXI_[1]
Presentation Alvalade XXI_[1]
 
British Gas - Success story with Basis Technologies
British Gas - Success story with Basis TechnologiesBritish Gas - Success story with Basis Technologies
British Gas - Success story with Basis Technologies
 
Abhi bhalla a 02
Abhi bhalla a 02Abhi bhalla a 02
Abhi bhalla a 02
 
EVMS for Commercial projects
EVMS for Commercial projectsEVMS for Commercial projects
EVMS for Commercial projects
 
IRJET- Cloud Migration Research: Concept
IRJET-  	  Cloud Migration Research: ConceptIRJET-  	  Cloud Migration Research: Concept
IRJET- Cloud Migration Research: Concept
 
Resume-JohnZiegler
Resume-JohnZieglerResume-JohnZiegler
Resume-JohnZiegler
 
Breaking New Ground in Efficiency
Breaking New Ground in EfficiencyBreaking New Ground in Efficiency
Breaking New Ground in Efficiency
 
Ares I Instrument Unit Status and Progress
Ares I Instrument Unit Status and ProgressAres I Instrument Unit Status and Progress
Ares I Instrument Unit Status and Progress
 
Project Methodology - On The Fly
Project Methodology - On The FlyProject Methodology - On The Fly
Project Methodology - On The Fly
 
Lightning talk Accenture
Lightning talk AccentureLightning talk Accenture
Lightning talk Accenture
 
Enterprise Resource Planning and CSFs
Enterprise Resource Planning and CSFsEnterprise Resource Planning and CSFs
Enterprise Resource Planning and CSFs
 
Ensuring Project Success with SpiraTeam and Rapise from Inflectra pta - short
Ensuring Project Success with SpiraTeam and Rapise from Inflectra   pta - shortEnsuring Project Success with SpiraTeam and Rapise from Inflectra   pta - short
Ensuring Project Success with SpiraTeam and Rapise from Inflectra pta - short
 
Life after upgrading to r12
Life after upgrading to r12Life after upgrading to r12
Life after upgrading to r12
 

Similar to Mindbox Merck Case Study

TC-CV-2015
TC-CV-2015TC-CV-2015
TC-CV-2015
Tom Colford
 
CV Alan Leakey v9_3
CV Alan Leakey v9_3CV Alan Leakey v9_3
CV Alan Leakey v9_3
Alan Leakey
 
Oracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrysOracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrys
Satya Harish
 
ITMAM Profile-English v1.19
ITMAM Profile-English v1.19ITMAM Profile-English v1.19
ITMAM Profile-English v1.19
Bassam Bin Gheshian
 
Thomas R Graham bio
Thomas R Graham bioThomas R Graham bio
Thomas R Graham bio
Tom Graham
 
TechExpert: Service and Project for Business
TechExpert: Service and Project for BusinessTechExpert: Service and Project for Business
TechExpert: Service and Project for Business
TechExpert
 
Logistics and Supply Chain Manage_New_Vijay Sapale
Logistics and Supply Chain Manage_New_Vijay SapaleLogistics and Supply Chain Manage_New_Vijay Sapale
Logistics and Supply Chain Manage_New_Vijay Sapale
VIJAY SAPALE
 
MindQuad Solutions Pvt. Ltd. - Corporate Profile
MindQuad Solutions Pvt. Ltd. - Corporate ProfileMindQuad Solutions Pvt. Ltd. - Corporate Profile
MindQuad Solutions Pvt. Ltd. - Corporate Profile
nikhil patel
 
Automation, Audits, and Apps Tour
Automation, Audits, and Apps TourAutomation, Audits, and Apps Tour
Automation, Audits, and Apps Tour
Chef
 
PWalsh_2016
PWalsh_2016PWalsh_2016
PWalsh_2016
Peter Walsh
 
JDower Resume and Profile September 2015v3
JDower Resume and Profile September 2015v3JDower Resume and Profile September 2015v3
JDower Resume and Profile September 2015v3
Jacqueline Dower
 
nitesh_rajpurkar_2016
nitesh_rajpurkar_2016nitesh_rajpurkar_2016
nitesh_rajpurkar_2016
Nitesh Rajpurkar
 
F-Secure Cloud Software icgse2013
F-Secure Cloud Software icgse2013F-Secure Cloud Software icgse2013
F-Secure Cloud Software icgse2013
Janne Järvinen
 
Optimus enhances the productivity in the projects by improving Requirements M...
Optimus enhances the productivity in the projects by improving Requirements M...Optimus enhances the productivity in the projects by improving Requirements M...
Optimus enhances the productivity in the projects by improving Requirements M...
Visure Solutions
 
Perintis Mobiliti Success Story: Enterprise Task Management System
Perintis Mobiliti Success Story: Enterprise Task Management SystemPerintis Mobiliti Success Story: Enterprise Task Management System
Perintis Mobiliti Success Story: Enterprise Task Management System
Ratha Jegatheson
 
A Case Study on Business Process Management
A Case Study on Business Process ManagementA Case Study on Business Process Management
A Case Study on Business Process Management
Goutama Bachtiar
 
QSM Mendix Benchmark Report
QSM Mendix Benchmark ReportQSM Mendix Benchmark Report
QSM Mendix Benchmark Report
Matt Haney
 
[Capella Day Toulouse] Driving intelligent transportation systems with Capella
[Capella Day Toulouse] Driving intelligent transportation systems with Capella[Capella Day Toulouse] Driving intelligent transportation systems with Capella
[Capella Day Toulouse] Driving intelligent transportation systems with Capella
Obeo
 
Case Study SpecsaversCase specsavers-en
Case Study SpecsaversCase specsavers-enCase Study SpecsaversCase specsavers-en
Case Study SpecsaversCase specsavers-en
BMI Healthcare
 
ey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdf
ey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdfey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdf
ey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdf
ravinatke
 

Similar to Mindbox Merck Case Study (20)

TC-CV-2015
TC-CV-2015TC-CV-2015
TC-CV-2015
 
CV Alan Leakey v9_3
CV Alan Leakey v9_3CV Alan Leakey v9_3
CV Alan Leakey v9_3
 
Oracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrysOracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrys
 
ITMAM Profile-English v1.19
ITMAM Profile-English v1.19ITMAM Profile-English v1.19
ITMAM Profile-English v1.19
 
Thomas R Graham bio
Thomas R Graham bioThomas R Graham bio
Thomas R Graham bio
 
TechExpert: Service and Project for Business
TechExpert: Service and Project for BusinessTechExpert: Service and Project for Business
TechExpert: Service and Project for Business
 
Logistics and Supply Chain Manage_New_Vijay Sapale
Logistics and Supply Chain Manage_New_Vijay SapaleLogistics and Supply Chain Manage_New_Vijay Sapale
Logistics and Supply Chain Manage_New_Vijay Sapale
 
MindQuad Solutions Pvt. Ltd. - Corporate Profile
MindQuad Solutions Pvt. Ltd. - Corporate ProfileMindQuad Solutions Pvt. Ltd. - Corporate Profile
MindQuad Solutions Pvt. Ltd. - Corporate Profile
 
Automation, Audits, and Apps Tour
Automation, Audits, and Apps TourAutomation, Audits, and Apps Tour
Automation, Audits, and Apps Tour
 
PWalsh_2016
PWalsh_2016PWalsh_2016
PWalsh_2016
 
JDower Resume and Profile September 2015v3
JDower Resume and Profile September 2015v3JDower Resume and Profile September 2015v3
JDower Resume and Profile September 2015v3
 
nitesh_rajpurkar_2016
nitesh_rajpurkar_2016nitesh_rajpurkar_2016
nitesh_rajpurkar_2016
 
F-Secure Cloud Software icgse2013
F-Secure Cloud Software icgse2013F-Secure Cloud Software icgse2013
F-Secure Cloud Software icgse2013
 
Optimus enhances the productivity in the projects by improving Requirements M...
Optimus enhances the productivity in the projects by improving Requirements M...Optimus enhances the productivity in the projects by improving Requirements M...
Optimus enhances the productivity in the projects by improving Requirements M...
 
Perintis Mobiliti Success Story: Enterprise Task Management System
Perintis Mobiliti Success Story: Enterprise Task Management SystemPerintis Mobiliti Success Story: Enterprise Task Management System
Perintis Mobiliti Success Story: Enterprise Task Management System
 
A Case Study on Business Process Management
A Case Study on Business Process ManagementA Case Study on Business Process Management
A Case Study on Business Process Management
 
QSM Mendix Benchmark Report
QSM Mendix Benchmark ReportQSM Mendix Benchmark Report
QSM Mendix Benchmark Report
 
[Capella Day Toulouse] Driving intelligent transportation systems with Capella
[Capella Day Toulouse] Driving intelligent transportation systems with Capella[Capella Day Toulouse] Driving intelligent transportation systems with Capella
[Capella Day Toulouse] Driving intelligent transportation systems with Capella
 
Case Study SpecsaversCase specsavers-en
Case Study SpecsaversCase specsavers-enCase Study SpecsaversCase specsavers-en
Case Study SpecsaversCase specsavers-en
 
ey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdf
ey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdfey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdf
ey-hfs-top-10-application-modernization-services-2022-ey-excerpt.pdf
 

Recently uploaded

“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
Pixlogix Infotech
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Mariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceXMariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceX
Mariano Tinti
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
Zilliz
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
Zilliz
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 

Recently uploaded (20)

“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Mariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceXMariano G Tinti - Decoding SpaceX
Mariano G Tinti - Decoding SpaceX
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 

Mindbox Merck Case Study

  • 2. Case Study Merck Migration to the most recent release of iScala (3.0) for Merck KGaA, a leading Science & Technology company.
  • 3. May 2017 saw the completion of the upgrade of the iScala ERP solution to its most recent release 3.0 for the German based leading Science & Technology company Merck KGaA, Darmstadt, Germany (Merck). It covered 19 subsidiaries of the group in Europe, Asia, Australia and the Middle East. Mindbox’s offer was selected as the most advantageous in terms of the proposed timing, cost and mode of performance, as well as the years-long successful business relationship and cooperation between Merck and Mindbox. Another important factor was Mindbox’s extensive experience in complex information technology projects of global reach. Mindbox specializes in supporting businesses using Epicor software, including the iScala system among other products. Case Study Merck
  • 4. The iScala system has been used by Merck for more than a decade. It is a solution for smaller subsidiaries within organization (Tier II). Business process handling and system use have been standardized. Support for 450 simultaneous remote users is provided by the Global Scala Team based in Darmstadt, Germany and in Singapore. iScala at Merck
  • 5. Given that the implementation was required for a pharmaceutical company, some specific industry requirements had to be taken into consideration, such as legal restrictions, data security and other potential threats. The migration was from release 2.3, no longer supported by the vendor for some time, to the most recent release 3.0. The system is customized for Merck’s requirement by some 120 modifications, hundreds of reports, OLAP cubes, and documents. Project objectives and characteristics
  • 6. Work efficiency is ensured by intensive communication and data exchange between iScala and other systems, both internal and those of business partners, via more than 100 interfaces. All these elements had to be transferred to the new release and then tested with maximum precision. The primary objective of the project was to change the technological platform with minimum disturbance to the business operations. Project objectives and characteristics
  • 7. From the business and technological points of view, the migration was a very important step. Its benefits included: • Ensuring the continuity and stability of business operations for the next five years; • Reducing legal risk and related expenses; • New supported technology; • Increased system flexibility through extended range of functionalities in the new release. Key benefits of the migration
  • 8. „As regards our ERP strategy, we believe that Global Scala ensures our business stability for the next five years. This will enable us to focus on building new generation ERP systems at Merck. We have seen once again how much we can achieve together and what power can be generated by our cooperation.” Anthony Peckham, ERP Program Manager, Merck Key benefits of the migration
  • 9. The paramount objective was to complete the project with minimum disturbance to the business operations. Given the complexity and geographical reach of the system, the task required detailed analysis and precise planning. Areas critical for successful project completion included: • High degree of system modification; • Geographical dispersion and cultural differences, with respect to both users and project team members; • Procedures specific to the pharmaceutical industry. Risks involved in the project
  • 10. The migration project, which took over a year, was completed by Mindbox with the support of a dedicated team appointed by Merck. As a whole, the project was scheduled for 16 months. At the very outset, the timeframes for all successive stages were specified. One of the greatest challenges posed by the project was the geographical dispersion of the project team (over 20 people in 10 countries) and end users (18 countries). A definite majority of the work was done on a remote basis. The success of the project was possible only due to precise planning and rigorous project management. Implementation process
  • 11. The implementation process was completed in four major stages. During the first one, the Mindbox team completed the migration of all the technical components of the system. The phase was concluded by a test migration and a one-month period of internal tests. The pilot migration was carried out in Sweden. It was then rolled out in groups ranging from four to eight countries, in three successive phases. Each included a test migration, user acceptance tests, the final migration, and post- implementation support. All the project phases started and ended as scheduled. Implementation process
  • 12. „The migration has been a complete success. The system is stable and the whole complex upgrade process has been performed correctly.” Wai-Leng Cheng, Merck Service Delivery Manager, Global Scala Implementation process
  • 14. After completing all the scheduled activities, the system is running without any perceptible changes to the user while its operation is faster, more effective and safer, and more importantly, it offers an array of new possibilities to improve the operating efficiency of the business. Project results
  • 15. „The project was completed achieving all of its objectives without any unforeseen downtime in business operations. This is the outcome of excellent cooperation between our team and Mindbox, who have shown great professionalism in the face of complicated technological challenges.” Anthony Peckham, ERP Program Manager, Merck Project results
  • 16. Contact Mindbox SA Powiśle Business Centre Ul. Wiślana 8, 00-317 Warszawa , tel +48 22 486 31 56 info@mindboxgroup.com