SECTION Y1 - Y1
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 009
9
40
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 TO LOT 138
6 HALL 3
7 HALL 4
8 INACCESSIBLE STAIRCASE
9 UTILITIES ROOM
10 INACCESSBLE ROOM
11 ROOM 1
12 ROOM 2
13 CORRIDOR 1
14 ROOM 3
15 TO LOT 138
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
16 CORRIDOR 2
17 ROOM 4
18 ROOM 5
19 ROOM 6
20 CORRIDOR 4
21 KITCHEN
22 W.C
PENANG GROUP
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING

9 final-section-y1-ready-plot-y1 - y1

  • 1.
    SECTION Y1 -Y1 02-03-2015 1 : 100 STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY DRAWING NO. SHEET NO.PROJECT TITLE 19-01-2015 KOH JING HAO & SANJEH KUMAR RAMAN PENANG GROUP DRAWING TITLE LHCO. 009 9 40 LEGENDS : 1 FIVE FOOT WALKWAY 2 HALL 1 3 AIR WELL 1 4 HALL 2 5 TO LOT 138 6 HALL 3 7 HALL 4 8 INACCESSIBLE STAIRCASE 9 UTILITIES ROOM 10 INACCESSBLE ROOM 11 ROOM 1 12 ROOM 2 13 CORRIDOR 1 14 ROOM 3 15 TO LOT 138 ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG LIAN HUAT COMPANY 16 CORRIDOR 2 17 ROOM 4 18 ROOM 5 19 ROOM 6 20 CORRIDOR 4 21 KITCHEN 22 W.C PENANG GROUP A1 1 1 FFL : 0.000 SPACE NO. FINISH FLOOR LEVEL TIMBER DRAWING SHEET NO. DRAWING NAME TILES FINISHING